Loading...
HomeMy WebLinkAboutKotzebue Electric Support Docs for REF14 Wind to PVKEA Installed Wind Infrastructure Cost Summary Installed Wind Infrastructure Qty Est In‐Situ Value Power 15kV 3ph undergound primary cabling in HDPE 2000' 35000 Power Transformers (225kVA, 300kVA) 2 85,000.00$            600V #2/4C Armored CLX cable 2000' 24,000.00$            150A 3ph Service Entrance (meterbase w/ main) 8 24,000.00$            Communications Fiber cable in 1‐1/4" HDPE Conduit 5000' 22,000.00$            MOXA Fiber/Copper Ethernet Network Interface 8 18,000.00$            SCADA system (real time and historian) 1 48,000.00$            Shelter Control Shelters/Cabinets 2 18,000.00$            Site Development Access Roads 185,000.00$          Site Office (Safety/PPE, tools, parts, SCADA HMI) 28,000.00$            452,000.00$       KOTZEBUE SOLAR ELECTRIC SYSTEM OF 4SHEET NO.:SHEET TITLE:PROJECT:REVISION:DATE PROJECT NO.:2003 DATE SIGNED: DESIGNED BY:EDR CHECKED BY EDR FULL SCALE:1 INCH COORDINATES: 66°50'19.47"N, 162°33'16.63"W ALASKA NATIVE RENEWABLE INDUSTRIES 2790 MONTEVERDE RD., FAIRBANKS AK 99709 | TEL 907.458.8484 | WWW.ROBERTS-KANEKO.COMKRROBERTS-K ANEKO ENGINEERING, INC.DRAFT 100%EVAN D. ROBERTSEE 8834REGISTEREDPROFESSI ONAL E N GINEERE1SYMBOLS & SPECIFICATIONS 1 KOTZEBUE SOLAR ELECTRIC SYSTEM OF 4SHEET NO.:SHEET TITLE:PROJECT:REVISION:DATE PROJECT NO.:2003 DATE SIGNED: DESIGNED BY:EDR CHECKED BY EDR FULL SCALE:1 INCH COORDINATES: 66°50'19.47"N, 162°33'16.63"W ALASKA NATIVE RENEWABLE INDUSTRIES 2790 MONTEVERDE RD., FAIRBANKS AK 99709 | TEL 907.458.8484 | WWW.ROBERTS-KANEKO.COMKRROBERTS-K ANEKO ENGINEERING, INC.DRAFT 100%EVAN D. ROBERTSEE 8834REGISTEREDPROFESSI ONAL E N GINEERE2SITE PLAN 2 KOTZEBUE SOLAR ELECTRIC SYSTEM OF 4SHEET NO.:SHEET TITLE:PROJECT:REVISION:DATE PROJECT NO.:2003 DATE SIGNED: DESIGNED BY:EDR CHECKED BY EDR FULL SCALE:1 INCH COORDINATES: 66°50'19.47"N, 162°33'16.63"W ALASKA NATIVE RENEWABLE INDUSTRIES 2790 MONTEVERDE RD., FAIRBANKS AK 99709 | TEL 907.458.8484 | WWW.ROBERTS-KANEKO.COMKRROBERTS-K ANEKO ENGINEERING, INC.DRAFT 100%EVAN D. ROBERTSEE 8834REGISTEREDPROFESSI ONAL E N GINEERE3DETAILS30D. ATTLA6/7/20AS-BUILT0D. ATTLA6/7/20AS-BUILT KOTZEBUE SOLAR ELECTRIC SYSTEM OF 4SHEET NO.:SHEET TITLE:PROJECT:REVISION:DATE PROJECT NO.:2003 DATE SIGNED: DESIGNED BY:EDR CHECKED BY EDR FULL SCALE: 1 INCH COORDINATES: 66°50'19.47"N, 162°33'16.63"W ALASKA NATIVE RENEWABLE INDUSTRIES 2790 MONTEVERDE RD., FAIRBANKS AK 99709 | TEL 907.458.8484 | WWW.ROBERTS-KANEKO.COMKRROBERTS-K ANEKO ENGINEERING, INC.DRAFT 100%EVAN D. ROBERTSEE 8834REGISTEREDPROFESSI ONAL E N GINEERE4DIAGRAMS4 Figure 1 & 2. KEA Initial PV project. Completed July 2020.