Loading...
HomeMy WebLinkAboutPoint MacKenzie Solar 2021.11.09 REF Round 14 Standard Application Form (Final) SignedRenewable Energy Fund Round 14 Grant Application – Standard Form AEA 23001 Page 1 of 33 11/16/2021 Application Forms and Instructions This instruction page and the following grant application constitutes the Grant Application Form for Round 14 of the Renewable Energy Fund (REF). A separate application form is available for projects with a primary purpose of producing heat (see Request for Applications (RFA) Section 1.5). This is the standard form for all other projects, including projects that will produce heat and electricity. An electronic version of the RFA and both application forms is available online at: https://www.akenergyauthority.org/What-We-Do/Grants-Loans/Renewable-Energy-Fund/2021- REF-Application. What follows are some basic information and instructions for this application: • The Alaska Energy Authority (AEA) expects this application to be used as part of a two-year solicitation cycle with an opt-out provision in the second year of the cycle. • If you are applying for grants for more than one project, provide separate application forms for each project. • Multiple phases (e.g. final design, construction) for the same project may be submitted as one application. • If you are applying for grant funding for more than one phase of a project, provide milestones and grant budget for each phase of the project (see Sections 3.1 and 3.2.2). • In order to ensure that grants provide sufficient benefit to the public, AEA may limit recommendations for grants to preliminary development phases in accordance with 3 Alaska Administrative Code (ACC) 107.605(1). • If some work has already been completed on your project and you are requesting funding for an advanced phase, submit information sufficient to demonstrate that the preceding phases are completed and funding for an advanced phase is warranted. Supporting documentation may include, but is not limited to, reports, conceptual or final designs, models, photos, maps, proof of site control, utility agreements, business and operation plans, power sale agreements, relevant data sets, and other materials. Please provide a list of supporting documents in Section 11 of this application and attach the documents to your application. • If you have additional information or reports you would like the Authority to consider in reviewing your application, either provide an electronic version of the document with your submission or reference a web link where it can be downloaded or reviewed. Please provide a list of additional information; including any web links, in Section 12 of this application and attach the documents to your application. For guidance on application best practices please refer to the resource-specific Best Practices Checklists; links to the checklists can be found in the appendices list at the end of the accompanying REF Round 14 RFA. • In the Sections below, please enter responses in the spaces provided. You may add additional rows or space to the form to provide sufficient space for the information, or attach additional sheets if needed. • If you need assistance with your application, please contact AEA’s Grants Coordinator by email at grants@akenergyauthority.org or by phone at (907) 771-3081. Renewable Energy Fund Round 14 Grant Application – Standard Form AEA 23001 Page 2 of 33 11/16/2021 REMINDER: • AEA is subject to the Public Records Act AS 40.25, and materials submitted to AEA may be subject to disclosure requirements under the act if no statutory exemptions apply. • All applications received will be posted on the Authority web site after final recommendations are made to the legislature. Please submit resumes as separate PDFs if the applicant would like those excluded from the web posting of this application. • In accordance with 3 AAC 107.630 (b) Applicants may request trade secrets or proprietary company data be kept confidential subject to review and approval by AEA. If you want information to be kept confidential the applicant must: o Request the information be kept confidential. o Clearly identify the information that is the trade secret or proprietary in their application. o Receive concurrence from the Authority that the information will be kept confidential. If the Authority determines it is not confidential, it will be treated as a public record in accordance with AS 40.25 or returned to the applicant upon request. Renewable Energy Fund Round 14 Grant Application – Standard Form AEA 23001 Page 3 of 33 11/16/2021 SECTION 1 – APPLICANT INFORMATION Please specify the legal grantee that will own, operate, and maintain the project upon completion. Name (Name of utility, IPP, local government, or other government entity) Point MacKenzie Solar Tax ID # Date of last financial statement audit: Mailing Address: Physical Address: 9033 Washburn St Lot 1 David Bruce Ring Subdivision Anchorage AK 99502 Telephone: Fax: Email: 907-317-5882 fthoerner@gmail.com 1.1 Applicant Point of Contact / Grants Coordinator Name: Fred Thoerner Title: President Mailing Address: 9033 Washburn St Anchorage AK 99502 Telephone: Fax: Email: 907-317-5882 fthoerner@gmail.com 1.1.1 Applicant Signatory Authority Contact Information Name: Fred Thoerner Title: President Point MacKenzie Solar LLC Mailing Address: 9033 Washburn St Anchorage AK 99502 Telephone: Fax: Email: 1.1.2 Applicant Alternate Points of Contact Name Telephone: Fax: Email: Renewable Energy Fund Round 14 Grant Application – Standard Form AEA 23001 Page 4 of 33 11/16/2021 1.2 Applicant Minimum Requirements Please check as appropriate. If applicants do not meet the minimum requirements, the application will be rejected. 1.2.1 Applicant Type ☐ An electric utility holding a certificate of public convenience and necessity under AS 42.05 CPCN #______, or ☒ An independent power producer in accordance with 3 AAC 107.695 (a) (1) CPCN #______, or Point MacKenzie Solar LLC - 10118545 ☐ A local government, or ☐ A governmental entity (which includes tribal councils and housing authorities) Additional minimum requirements ☒ 1.2.2 Attached to this application is formal approval and endorsement for the project by the applicant’s board of directors, executive management, or other governing authority. If the applicant is a collaborative grouping, a formal approval from each participant’s governing authority is necessary. (Indicate yes by checking the box) ☒ 1.2.3 As an applicant, we have administrative and financial management systems and follow procurement standards that comply with the standards set forth in the grant agreement (Section 3 of the RFA). (Indicate yes by checking the box) ☒ 1.2.4 If awarded the grant, we can comply with all terms and conditions of the award as identified in the Standard Grant Agreement template at https://www.akenergyauthority.org/What-We-Do/Grants-Loans/Renewable-Energy- Fund/2021-REF-Application (Any exceptions should be clearly noted and submitted with the application.) (Indicate yes by checking the box) ☒ 1.2.5 We intend to own and operate any project that may be constructed with grant funds for the benefit of the general public. If no please describe the nature of the project and who will be the primary beneficiaries. (Indicate yes by checking the box) Renewable Energy Fund Round 14 Grant Application – Standard Form AEA 23001 Page 5 of 33 11/16/2021 SECTION 2 – PROJECT SUMMARY 2.1 Project Title Provide a 4 to 7 word title for your project. Type in the space below. Point MacKenzie Solar 2.2 Project Location 2.2.1 Location of Project – Latitude and longitude (preferred), street address, or community name. Latitude and longitude coordinates may be obtained from Google Maps by finding you project’s location on the map and then right clicking with the mouse and selecting “What is here? The coordinates will be displayed in the Google search window above the map in a format as follows: 61.195676.-149.898663. If you would like assistance obtaining this information, please contact AEA’s Grants Coordinator by email at grants@akenergyauthority.org or by phone at (907) 771- 3081. Latitude Longitude [Other description of location] Lot 1 David Bruce Ring Subdivision - Point MacKenzie - Alaska 2.2.2 Community benefiting – Name(s) of the community or communities that will be the beneficiaries of the project. Point MacKenzie - Anchorage 2.3 Project Type Please check as appropriate. 2.3.1 Renewable Resource Type ☐ Wind ☐ Biomass or Biofuels (excluding heat-only) ☐ Hydro, Including Run of River ☐ Hydrokinetic ☐ Geothermal, Excluding Heat Pumps ☐ Transmission of Renewable Energy ☒ Solar Photovoltaic ☐ Storage of Renewable ☐ Other (Describe) ☐ Small Natural Gas 2.3.2 Proposed Grant Funded Phase(s) for this Request (Check all that apply) Pre-Construction Construction ☒ Reconnaissance ☒ Final Design and Permitting ☒ Feasibility and Conceptual Design ☒ Construction Renewable Energy Fund Round 14 Grant Application – Standard Form AEA 23001 Page 6 of 33 11/16/2021 2.4 Project Description Provide a brief, one-paragraph description of the proposed project. This will be a Solar PV Facility, with installed capacity of 5.9 MW, highly reliable and most available in the summer months, with 500 MWh average to be delivered each month. A 6 MegaWatt DC/5 Megawatt AC utility-scale solar farm is planned for the proposed system. The system will be interconnected to the CEA power grid via a medium-voltage line extension to the site feeding the two Y-Y 2.5 MVA transformers. Each of the two transformers will feed one of the two 4,000 Amp service MDP’s with backfeed rated circuit breakers for collecting solar inverters. The 5 Megawatt of AC rated inverters will be interconnected to the MDP’s by 480V 3 phase. The solar inverters will collect the 6 MegaWatt of 480 Watt solar modules for conversion to AC power. The solar modules will be mounted in a fixed position on a ground-mounted racking system positioned in rows to maximize the use of the land available for the greatest overall efficiency. The DC wiring will be operating at approximately 1,200 Volts DC per string providing 6 million KWh annually. 2.5 Scope of Work Provide a short narrative for the scope of work detailing the tasks to be performed under this funding request. This should include work paid for by grant funds and matching funds or performed as in-kind match. • Phase 1 Initial Design and Interconnection Study, 1 year Grant Funds • Phase 2 Engineering, Procurement and Construction 1 year • Phase 3 Interconnection – 6 months • Full Commercial Operation Date March 1, 2025 Cost Description Cost/watt Actual Cost Module $0.50 $2,937,600.00 Inverters $0.07 $411,264.00 Pile, Pile driving and Clearing $0.13 $747,520.00 Structural Balance of System $0.13 $763,776.00 Electrical Balance of System $0.19 $1,116,288.00 Installation labor and equipment $0.15 $881,280.00 EPC Overhead $0.09 $528,768.00 Permitting Cost $0.01 $58,752.00 Interconnection Fee $0.14 $800,000.00 Transmission Line $0.02 $117,504.00 Developer Overhead/financing $0.11 $646,272.00 Contingency $0.03 $176,256.00 EPC/Developer Profit $0.04 $235,008.00 TOTAL $1.60 $9,420,288.00 2.6 Previous REF Applications for the Project See Section 1.15 of the RFA for the maximum per project cumulative grant award amount Round Submitted Title of application Application #, if known Did you receive a grant? Y/N Amount of REF grant awarded ($) N/A Renewable Energy Fund Round 14 Grant Application – Standard Form AEA 23001 Page 7 of 33 11/16/2021 SECTION 3 – Project Management, Development, and Operation 3.1 Schedule and Milestones Please fill out the schedule below (or attach a similar sheet) for the work covered by this funding request. Be sure to identify key tasks and decision points, including go/no go decisions, in your project along with estimated start and end dates for each of the milestones and tasks. Please clearly identify the beginning and ending of all phases (I. Reconnaissance, II. Feasibility and Conceptual Design, III. Final Design and Permitting, and IV. Construction) of your proposed project. See the RFA, Sections 2.3-2.6 for the recommended milestones for each phase. Add additional rows as needed. Task # Milestones Tasks Start Date End Date Deliverables 1 Initial Design and Interconnection Study 08/22 12/22 2 Engineering, Procurement and Construction Module $0.50 $2,937,600.00 Inverters $0.07 $411,264.00 Pile, Pile driving and Clearing $0.13 $747,520.00 Structural Balance of System $0.13 $763,776.00 Electrical Balance of System $0.19 $1,116,288.00 Installation labor and equipment $0.15 $881,280.00 1/23 11/23 3 3 Interconnection Connect to Grid 1/24 6/24 Renewable Energy Fund Round 14 Grant Application – Standard Form AEA 23001 Page 8 of 33 11/16/2021 3.2 Budget 3.2.1 Funding Sources Indicate the funding sources for the phase(s) of the project applied for in this funding request. Grant funds requested in this application $ 1,000,000 Cash match to be provideda $ In-kind match to be provideda $ 250,000 Energy efficiency match providedb $ Total costs for project phase(s) covered in application (sum of above) $ 9,420,288.00 Describe your financial commitment to the project and the source(s) of match. Indicate whether these matching funds are secured or pending future approvals. Describe the impact, if any, that the timing of additional funds would have on the ability to proceed with the grant. Property for project is acquired estimated value $220,000.00 a Attach documentation for proof (see Section 1.18 of the Request for Applications) b See Section 8.2 of this application and Section 1.18 of the RFA for requirements for Energy Efficiency Match. 3.2.2 Cost Overruns Describe the plan to cover potential cost increases or shortfalls in funding. Contingency funds of $176,256 are calculated in project cost estimate. 3.2.3 Total Project Costs Indicate the anticipated total cost by phase of the project (including all funding sources). Use actual costs for completed phases. Indicate if the costs were actual or estimated. Reconnaissance [Estimated] $ See above Feasibility and Conceptual Design [Estimated] $ See above Final Design and Permitting [Estimated] $ See above Construction [Estimated] $ See above Total Project Costs (sum of above) Estimated $ 9,420,288 Metering/Tracking Equipment [not included in project cost] Estimated $ 3.2.4 Funding Subsequent Phases If subsequent phases are required beyond the phases being applied for in this application, describe the anticipated sources of funding and the likelihood of receipt of those funds. • State and/or federal grants • Loans, bonds, or other financing options • Additional incentives (i.e. tax credits) • Additional revenue streams (i.e. green tag sales or other renewable energy subsidies or programs that might be available) Tax incentives of 26%, 100% Bonus Depreciation, in addition to the Alaska Energy Authority (AEA), Power Project Fund (PPF) loan program and the Renewable Energy Fund (REF). Gross System Cost: $9,420,288 Federal Tax Credit (26%): $2,449,274100% Bonus Depreciation: $2,164,838 Renewable Energy Fund Round 14 Grant Application – Standard Form AEA 23001 Page 9 of 33 11/16/2021 Net System Cost: $4,806,176 Renewable Energy Fund Round 14 Grant Application – Standard Form AEA 23001 Page 10 of 33 11/16/2021 3.2.3 Budget Forms Applications MUST include a separate worksheet for each project phase that was identified in Section 2.3.2 of this application — I. Reconnaissance, II. Feasibility and Conceptual Design, III. Final Design and Permitting, and IV. Construction. Please use the tables provided below to detail your proposed project’s total budget. Be sure to use one table for each phase of your project, and delete any unnecessary tables. The milestones and tasks should match those listed in 3.1 above. If you have any question regarding how to prepare these tables or if you need assistance preparing the application please feel free to contact AEA’s Grants Coordinator by email at grants@akenergyauthority.org or by phone at (907) 771-3081. Phase 1 — Reconnaissance Milestone or Task Anticipated Completion Date RE- Fund Grant Funds Grantee Matching Funds Source of Matching Funds: Cash/In- kind/Federal Grants/Other State Grants/Other TOTALS (List milestones based on phase and type of project. See Sections 2.3 thru 2.6 of the RFA ) $ $ $ Interconnection Study 11/22 $ 25,000 $ $ Integration Study 11/22 $ 25,000 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ TOTALS $ $ $ Budget Categories: Direct Labor & Benefits $ $ $ Travel & Per Diem $ $ $ Equipment $ $ $ Materials & Supplies $ $ $ Contractual Services $ $ $ Construction Services $ $ $ Other $ $ $ TOTALS $ $ $ Renewable Energy Fund Round 14 Grant Application – Standard Form AEA 23001 Page 11 of 33 11/16/2021 Phase 2 — Feasibility and Conceptual Design Milestone or Task Anticipated Completion Date RE- Fund Grant Funds Grantee Matching Funds Source of Matching Funds: Cash/In- kind/Federal Grants/Other State Grants/Other TOTALS (List milestones based on phase and type of project. See Sections 2.3 thru 2.6 of the RFA ) $ $ $ $ $ $ Feasibility Study $ 25,000 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ TOTALS $ $ $ Budget Categories: Direct Labor & Benefits $ $ $ Travel & Per Diem $ $ $ Equipment $ $ $ Materials & Supplies $ $ $ Contractual Services $ $ $ Construction Services $ $ $ Other $ $ $ TOTALS $ $ $ Renewable Energy Fund Round 14 Grant Application – Standard Form AEA 23001 Page 12 of 33 11/16/2021 Phase 3 — Final Design and Permitting Milestone or Task Anticipated Completion Date RE- Fund Grant Funds Grantee Matching Funds Source of Matching Funds: Cash/In- kind/Federal Grants/Other State Grants/Other TOTALS (List milestones based on phase and type of project. See Sections 2.3 thru 2.6 of the RFA ) $ $ $ Permitting Cost $58,752 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ TOTALS $ $ $ Budget Categories: Direct Labor & Benefits $ $ $ Travel & Per Diem $ $ $ Equipment $ $ $ Materials & Supplies $ $ $ Contractual Services $ $ $ Construction Services $ $ $ Other $ $ $ TOTALS $ $ $ Renewable Energy Fund Round 14 Grant Application – Standard Form AEA 23001 Page 13 of 33 11/16/2021 Phase 4 — Construction Milestone or Task Anticipated Completion Date RE- Fund Grant Funds Grantee Matching Funds Source of Matching Funds: Cash/In- kind/Federal Grants/Other State Grants/Other TOTALS (List milestones based on phase and type of project. See Sections 2.3 thru 2.6 of the RFA ) $ $ $ Pile, Pile driving and Clearing $ $ $747,520.00 Structural Balance of System $ $ $763,776.00 Electrical Balance of System $ $ $1,116,288.00 Installation labor and equipment $ $ $881,280.00 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ TOTALS $ $ $ Budget Categories: Direct Labor & Benefits $ $ $ Travel & Per Diem $ $ $ Equipment $ $ $ Materials & Supplies $ $ $ 3,500,000.00 Contractual Services $ $ $ Construction Services $ $ $ Other $ $ $ TOTALS $ $ $ Renewable Energy Fund Round 14 Grant Application – Standard Form AEA 23001 Page 14 of 33 11/16/2021 3.2.4 Cost Justification Indicate the source(s) of the cost estimates used for the project budget, including costs for future phases not included in this application. Alaska Solar 3.3 Project Communications 3.3.1 Project Progress Reporting Describe how you plan to monitor the progress of the project and keep AEA informed of the status. Who will be responsible for tracking the progress? What tools and methods will be used to track progress? Fred Thoerner will responsible tracking progress and reporting to AEA. Checklists, photo documentation, Excel Spreadsheets. 3.3.2 Financial Reporting Describe the controls that will be utilized to ensure that only costs that are reasonable, ordinary and necessary will be allocated to this project. Also discuss the controls in place that will ensure that no expenses for overhead, or any other unallowable costs will be requested for reimbursement from the REF Grant Program. Only applicable costs will requested for reimbursement Renewable Energy Fund Round 14 Grant Application – Standard Form AEA 23001 Page 15 of 33 11/16/2021 SECTION 4 – QUALIFICATIONS AND EXPERIENCE 4.1 Project Team Include resumes for known key personnel and contractors, including all functions below, as an attachment to your application. In the electronic submittal, please submit resumes as separate PDFs if the applicant would like those excluded from the web posting of this application. 4.1.1 Project Manager Indicate who will be managing the project for the Grantee and include contact information. If the applicant does not have a project manager indicate how you intend to solicit project management support. If the applicant expects project management assistance from AEA or another government entity, state that in this section. Mike Kuchar of Kuchar Construction 4.1.2 Project Accountant Indicate who will be performing the accounting of this project for the grantee. If the applicant does not have a project accountant indicate how you intend to solicit financial accounting support. Lucas Parker of Kuchar Construction 4.1.3 Expertise and Resources Describe the project team including the applicant, partners, and contractors. For each member of the project team, indicate: • the milestones/tasks in 3.1 they will be responsible for; • the knowledge, skills, and experience that will be used to successfully deliver the tasks; • how time and other resource conflicts will be managed to successfully complete the task. If contractors have not been selected to complete the work, provide reviewers with sufficient detail to understand the applicant’s capacity to successfully select contractors and manage complex contracts. Fred Thoerner – Acquire Land Alaska Solar - Initial Design and Interconnection Study Kuchar Construction – Procurement and Construction Chugach Electric – Integration – Connect to Grid 4.2 Local Workforce Describe how the project will use local labor or train a local labor workforce. Local labor will be utilized – Kuchar Construction will hire additional crew. Renewable Energy Fund Round 14 Grant Application – Standard Form AEA 23001 Page 16 of 33 11/16/2021 SECTION 5 – TECHNICAL FEASIBILITY 5.1 Resource Availability 5.1.1 Assessment of Proposed Energy Resource Describe the potential extent/amount of the energy resource that is available, including average resource availability on an annual basis. For pre-construction applications, describe the resource to the extent known. For design and permitting or construction projects, please provide feasibility documents, design documents, and permitting documents (if applicable) as attachments to this application (See Section 11). Likelihood of the resource being available over the life of the project. See the “Resource Assessment” section of the appropriate Best Practice Checklist for additional guidance. The solar inverters will collect the 6 MegaWatt of 480 Watt solar modules for conversion to AC power. The solar modules will be mounted in a fixed position on a ground-mounted racking system positioned in rows to maximize the use of the land available for the greatest overall efficiency. The DC wiring will be operating at approximately 1,200 Volts DC per string providing 6 million KWh annually 5.1.2 Alternatives to Proposed Energy Resource Describe the pros and cons of your proposed energy resource vs. other alternatives that may be available for the market to be served by your project. Solar will be most abundant in summer months. A crew will regularly sweep snow from panels in winter to increase production. 5.1.3 Permits Provide the following information as it may relate to permitting and how you intend to address outstanding permit issues. See the “Environmental and Permitting Risks” section of the appropriate Best Practice Checklist for additional guidance. • List of applicable permits • Anticipated permitting timeline • Identify and describe potential barriers including potential permit timing issues, public opposition that may result in difficulty obtaining permits, and other permitting barriers Point MacKenzie Solar will abide by all federal, state, and local regulators 5.2 Project Site Describe the availability of the site and its suitability for the proposed energy system. Identify potential land ownership issues, including whether site owners have agreed to the project or how you intend to approach land ownership and access issues. See the “Site control” section of the appropriate Best Practice Checklist for additional guidance. Fred Thoerner, President of PMS LLC is the sole owner in fee of Lot 1 David Bruce Ring Subdivision. This land consists of 33 acres located adjacent to the CEA Substation at Point MacKenzie. An additional 14 acres to the north are also available for future expansion. Access in winter is done from the CEA High Voltage Power line easement to and from Point MacKenzie Road. No Lease Required. Access is also available from the beach of Cook Inlet as the land is Renewable Energy Fund Round 14 Grant Application – Standard Form AEA 23001 Page 17 of 33 11/16/2021 waterfront. There are no zoning requirements for the land, as well as no covenants or restrictions to hinder the project. 5.3 Project Technical & Environmental Risk 5.3.1 Technical Risk Describe potential technical risks and how you would address them. • Which tasks are expected to be most challenging? • How will the project team reduce the risk of these tasks? • What internal controls will be put in place to limit and deal with technical risks? See the “Common Planning Risks” section of the appropriate Best Practice Checklist for additional guidance. Interconnection will be difficult to the High Voltage Power Lines, but not impossible. More detail will be provided with an Integration Study. The power provided by the sun will be based on daylight and intensity. More sun is available in the summer months than in winter. Solar is known for low maintenance, but we would have a plan in place with people ready to work in case of a loss of power. 5.3.2 Environmental Risk Explain whether the following environmental and land use issues apply, and if so which project team members will be involved and how the issues will be addressed. See the “Environmental and Permitting Risks” section of the appropriate Best Practice Checklist for additional guidance. • Threatened or endangered species • Habitat issues • Wetlands and other protected areas • Archaeological and historical resources • Land development constraints • Telecommunications interference • Aviation considerations • Visual, aesthetics impacts • Identify and describe other potential barriers No threatened or endangered species will be impacted, with no habitat issues and no wetlands, no archaeological resources, no aviation impacts, no visual impacts, and no land development constraints. No other environmental risks, as Solar is a clean renewable energy. 5.4 Technical Feasibility of Proposed Energy System In this section you will describe and give details of the existing and proposed systems. The information for existing system will be used as the baseline the proposal is compared to and also used to make sure that proposed system can be integrated. Only complete sections applicable to your proposal. If your proposal only generates electricity, you can remove the sections for thermal (heat) generation. 5.4.1 Basic Operation of Existing Energy System Describe the basic operation of the existing energy system including: description of control system; spinning reserve needs and variability in generation (any high loads brought on quickly); and Renewable Energy Fund Round 14 Grant Application – Standard Form AEA 23001 Page 18 of 33 11/16/2021 current voltage, frequency, and outage issues across system. See the “Understanding the Existing System” section of the appropriate Best Practice Checklist for additional guidance. Chugach Electric Association Transfer Substation in area. The high voltage lines will require a transformer to be able to connect to solar facility and provide power to low voltage lines connected to residents of Point MacKenzie. 5.4.2.1 Existing Power Generation Units Include for each unit include: resource/fuel, make/model, design capacity (kW), minimum operational load (kW), RPM, electronic/mechanical fuel injection, make/model of genset controllers, hours on genset Unit 1: Unit 2: Unit 3: Unit 4: Unit 5: Unit 6: 5.4.2.2 Existing Distribution System Describe the basic elements of the distribution system. Include the capacity of the step-up transformer at the powerhouse, the distribution voltage(s) across the community, any transmission voltages, and other elements that will be affected by the proposed project. Interconnection Study will determine. 5.4.2.3 Existing Thermal Generation Units (if applicable to your project) Generation unit Resource/ Fuel type Design capacity (MMBtu/hr) Make Model Average annual efficiency Year Installed Hours 5.4.2 Existing Energy Generation Infrastructure and Production In the following tables, only fill in areas below applicable to your project. You can remove extra tables. If you have the data below in other formats, you can attach them to the application (see Section 11). Is there operational heat recovery? (Y/N) If yes estimated annual displaced heating fuel (gallons) Renewable Energy Fund Round 14 Grant Application – Standard Form AEA 23001 Page 19 of 33 11/16/2021 5.4.2.5 Annual Electricity Production and Fuel Consumption (Existing System) Use most recent year. Replace the section (Type 1), (Type 2), and (Type 3) with generation sources Month Generati on (Type 1) (kWh) Generatio n (Type 2) (kWh) Generatio n (Type 3) (kWh) Fuel Consumptio n (Diesel- Gallons) Fuel Consumptio n [Other] Pea k Loa d Minimu m Load January February March April May June July August Septembe r October November December Total 5.4.2.6 Annual Heating Fuel Consumption (Existing System) Use most recent year. Include only if your project affects the recovered heat off the diesel genset or will include electric heat loads. Only include heat loads affected by the project. Month Diesel (Gallons) Electricity Propane (Gallons) Coal (Tons) Wood (Cords, green tons, dry tons) Other January February March April May June July August September October November 5.4.2.4 O&M and replacement costs for existing units Power Generation Thermal Generation i. Annual O&M cost for labor ii. Annual O&M cost for non-labor iii. Replacement schedule and cost for existing units Renewable Energy Fund Round 14 Grant Application – Standard Form AEA 23001 Page 20 of 33 11/16/2021 December Total 5.4.3 Future Trends Describe the anticipated energy demand in the community, or whatever will be affected by the project, over the life of the project. Explain how the forecast was developed and provide year by year forecasts. As appropriate, include expected changes to energy demand, peak load, seasonal variations, etc. that will affect the project. Energy demand for Anchorage and Point Mackenzie will only increase. Summer will be peak generation of power. See attached proposal. 5.4.4 Proposed System Design Provide the following information for the proposed renewable energy system: • A description of renewable energy technology specific to project location • The total proposed capacity and a description of how the capacity was determined • Integration plan, including upgrades needed to existing system(s) to integrate renewable energy system: Include a description of the controls, storage, secondary loads, distribution upgrades that will be included in the project • Civil infrastructure that will be completed as part of the project—buildings, roads, etc. • Include what backup and/or supplemental system will be in place See the “Proposed System Design” section of the appropriate Best Practice Checklist for additional guidance. See attached proposal. 5.4.4.1 Proposed Power Generation Units Unit # Resource/ Fuel type Design capacity (kW) Make Model Expected capacity factor Expected life (years) Expected Availability Renewable Energy Fund Round 14 Grant Application – Standard Form AEA 23001 Page 21 of 33 11/16/2021 5.4.4.2 Proposed Thermal Generation Units (if applicable) Generation unit Resource/ Fuel type Design capacity (MMBtu/hr) Make Model Expected Average annual efficiency Expected life 5.4.5 Basic Operation of Proposed Energy System • To the best extent possible, describe how the proposed energy system will operate: When will the system operate, how will the system integrate with the existing system, how will the control systems be used, etc. • When and how will the backup system(s) be expected to be used See the “Proposed System Design” section of the appropriate Best Practice Checklist for additional guidance. Enough power to: Power about 800 homes Prevent approximately 8 million pounds per year of carbon dioxide emissions Equivalent to taking 2,000 large cars off the road This project interconnection location is at Point MacKenzie near the Chugach Electric Association Substation. PMS LLC will provide 12,500 Q-Cells Q.PEAK DUO XL 480W modules with a 25-year warranty. Our objective is to develop and maintain the largest Solar Farm in Alaska, 5MW minimum, on 33 acres of unrestricted bluff property adjacent to the Cook Inlet on Point MacKenzie. This location is perfect to serve Anchorage as once construction is complete, the system will be connected to the grid at the Chugach Electric Transfer Station only a few hundred yards away. This project has the potential to be a huge win for everyone involved as well as the environment. The point of interconnection is the CEA Substation located at Point MacKenzie and will cost approximately $800,000.00. Point MacKenzie Solar Concept Plan, maps, images, and spec sheets are attached. See attached proposal. 5.4.3.1 Expected Capacity Factor % 5.4.5.2 Annual Electricity Production and Fuel Consumption (Proposed System) Renewable Energy Fund Round 14 Grant Application – Standard Form AEA 23001 Page 22 of 33 11/16/2021 Month Generation (Proposed System) (kWh) Generation (Type 2) (kWh) Generation (Type 3) (kWh) Fuel Consumption (Diesel- Gallons) Fuel Consumption [Other] Secondary load (kWh) Storage (kWh) January February March April May June July August September October November December Total 5.4.5.3 Annual Heating Fuel Consumption (Proposed System) Month Diesel (Gallons) Electricity Propane (Gallons) Coal (Tons) Wood (Cords, green tons, dry tons) Other January February March April May June July August September October November December Total 5.4.6 Proposed System Operating and Maintenance (O&M) Costs O&M costs can be estimated in two ways for the standard application. Most proposed renewable energy projects will fall under Option 1 because the new resource will not allow for diesel generation to be turned off. Some projects may allow for diesel generation to be turned off for periods of time; these projects should choose Option 2 for estimating O&M. Option 1: Diesel generation ON For projects that do not result in shutting down diesel generation there is assumed to be no impact on the base case O&M. Please indicate the estimated annual O&M cost associated with the proposed renewable project. $ Renewable Energy Fund Round 14 Grant Application – Standard Form AEA 23001 Page 23 of 33 11/16/2021 Option 2: Diesel generation OFF For projects that will result in shutting down diesel generation please estimate: 1. Annual non-fuel savings of shutting off diesel generation 2. Estimated hours that diesel generation will be off per year. 3. Annual O&M costs associated with the proposed renewable project. 1. $ 2. Hours diesel OFF/year: 3. $ 5.4.7 Fuel Costs Estimate annual cost for all applicable fuel(s) needed to run the proposed system (Year 1 of operation) Diesel (Gallons) Electricity Propane (Gallons) Coal (Tons) Wood Other Unit cost ($) Annual Units Total Annual cost ($) 5.5 Performance and O&M Reporting For construction projects only 5.5.1 Metering Equipment Please provide a short narrative, and cost estimate, identifying the metering equipment that will be used to comply with the operations reporting requirement identified in Section 3.15 of the Request for Applications. Metering will be provided by Chugach Electric Association 5.5.2 O&M reporting Please provide a short narrative about the methods that will be used to gather and store reliable operations and maintenance data, including costs, to comply with the operations reporting requirement identified in Section 3.15 of the Request for Applications Point MacKenzie Solar LLC will have the latest technologies storing operations and maintenance data. All reporting will follow requirements identified in Section 3.15 Request for Appplications. SECTION 6 – ECONOMIC FEASIBILITY AND BENEFITS 6.1 Economic Feasibility Renewable Energy Fund Round 14 Grant Application – Standard Form AEA 23001 Page 24 of 33 11/16/2021 6.1.1 Economic Benefit Annual Lifetime Anticipated Diesel Fuel Displaced for Power Generation (gallons) Anticipated Fuel Displaced for Heat (gallons) Total Fuel displaced (gallons) Anticipated Diesel Fuel Displaced for Power Generation ($) Anticipated Fuel Displaced for Heat ($) Anticipated Power Generation O&M Cost Savings Anticipated Thermal Generation O&M Cost Savings Total Other costs savings (taxes, insurance, etc.) Total Fuel, O&M, and Other Cost Savings 6.1.2 Economic Benefit Explain the economic benefits of your project. Include direct cost savings and other economic benefits, and how the people of Alaska will benefit from the project. Note that additional revenue sources (such as tax credits or green tags) to pay for operations and/or financing, will not be included as economic benefits of the project. Where appropriate, describe the anticipated energy cost in the community, or whatever will be affected by the project, over the life of the project. Explain how the forecast was developed and provide year-by-year forecasts The economic model used by AEA is available at https://www.akenergyauthority.org/What-We- Do/Grants-Loans/Renewable-Energy-Fund/2021-REF-Application. This economic model may be used by applicants but is not required. The final benefit/cost ratio used will be derived from the AEA model to ensure a level playing field for all applicants. If used, please submit the model with the application. The people of Point MacKenzie will have access to clean renewable energy with the backing of the grid provided by Chugach electric at the same rate as residents of Anchorage. 6.1.3 Economic Risks Renewable Energy Fund Round 14 Grant Application – Standard Form AEA 23001 Page 25 of 33 11/16/2021 Discuss potential issues that could make the project uneconomic to operate and how the project team will address the issues. Factors may include: • Low prices for diesel and/or heating oil • Other projects developed in community • Reductions in expected energy demand: Is there a risk of an insufficient market for energy produced over the life of the project. • Deferred and/or inadequate facility maintenance • Other factors No risks are known at this time. Renewable Energy Fund Round 14 Grant Application – Standard Form AEA 23001 Page 26 of 33 11/16/2021 6.1.4 Public Benefit for Projects with Direct Private Sector Sales For projects that include direct sales of power to private sector businesses (sawmills, cruise ships, mines, etc.), please provide a brief description of the direct and indirect public benefits derived from the project as well as the private sector benefits and complete the table below. See Section 1.6 in the Request for Applications for more information. See attached proposal. Renewable energy resource availability (kWh per month) Estimated direct sales to private sector businesses (kWh) Revenue for displacing diesel generation for use at private sector businesses ($) Estimated sales for use by the Alaskan public (kWh) Revenue for displacing diesel generation for use by the Alaskan public ($) 6.2 Other Public Benefit Describe the non-economic public benefits to Alaskans over the lifetime of the project. For the purpose of evaluating this criterion, public benefits are those benefits that would be considered unique to a given project and not generic to any renewable resource. For example, decreased greenhouse gas emission, stable pricing of fuel source, won’t be considered under this category. Some examples of other public benefits include: • The project will result in developing infrastructure (roads, trails, pipes, power lines, etc.) that can be used for other purposes • The project will result in a direct long-term increase in jobs (operating, supplying fuel, etc.) • The project will solve other problems for the community (waste disposal, food security, etc.) • The project will generate useful information that could be used by the public in other parts of the state • The project will promote or sustain long-term commercial economic development for the community This project will result in developing infrastructure roads, trails, and power lines for the Point MacKenzie community. This project will promote and sustain long commercial economic development as it will provide the needed power for production at Point MacKenzie. The tip of Point Mackenzie currently is not connected to the grid. Renewable Energy Fund Round 14 Grant Application – Standard Form AEA 23001 Page 27 of 33 11/16/2021 SECTION 7 – SUSTAINABILITY Describe your plan for operating the completed project so that it will be sustainable throughout its economic life. At a minimum for construction projects, a business and operations plan should be attached and the applicant should describe how it will be implemented. See Section 11. 7.1.1 Operation and Maintenance Demonstrate the capacity to provide for the long-term operation and maintenance of the proposed project for its expected life • Provide examples of success with similar or related long-term operations • Describe the key personnel that will be available for operating and maintaining the infrastructure. • Describe the training plan for existing and future employees to become proficient at operating and maintaining the proposed system. • Describe the systems that will be used to track necessary supplies • Describe the system will be used to ensure that scheduled maintenance is performed 1.2 MW Willow Solar Farm. They are expanding. 7.1.2 Financial Sustainability • Describe the process used (or propose to use) to account for operational and capital costs. • Describe how rates are determined (or will be determined). What process is required to set rates? • Describe how you ensure that revenue is collected. • If you will not be selling energy, explain how you will ensure that the completed project will be financially sustainable for its useful life. We anticipate per MWh price will be $70.00 per MWh per year (price is negotiable). Alaska Solar proposal is based on 5.568 cents/KWh. PMS LLC will need to negotiate an annual increase in the utility buy back rate to offset inflation and to reflect the cost of energy to make electricity (i.e., to reflect the eventual increase in natural gas prices). Residential utility rates have increased 4.6% annually over the last 20 years. 6,000,000 KWh by .07 Estimated Yearly Revenue $420,000.00 A Power Purchase Agreement will be in place with CEA to insure payment. 7.1.2.1 Revenue Sources Briefly explain what if any effect your project will have on electrical rates in the proposed benefit area over the life of the project. If there is expected to be multiple rates for electricity, such as a separate rate for intermittent heat, explain what the rates will be and how they will be determined Collect sufficient revenue to cover operational and capital costs • What is the expected cost-based rate (as consistent with RFA requirements) Renewable Energy Fund Round 14 Grant Application – Standard Form AEA 23001 Page 28 of 33 11/16/2021 • If you expect to have multiple rate classes, such as excess electricity for heat, explain what those rates are expected to be and how those rates account for the costs of delivering the energy (see AEA’s white paper on excess electricity for heat).. • Annual customer revenue sufficient to cover costs • Additional incentives (i.e. tax credits) • Additional revenue streams (i.e. green tag sales or other renewable energy subsidies or programs that might be available) Electric rates for CEA customers will remain the same. 7.1.2.2 Power Purchase/Sale The power purchase/sale information should include the following: • Identification of potential power buyer(s)/customer(s) • Potential power purchase/sales price - at a minimum indicate a price range (consistent with the Section 3.16 of the RFA) Identify the potential power buyer(s)/customer(s) and anticipated power purchase/sales price range. Indicate the proposed rate of return from the grant-funded project. Include letters of support or power purchase agreement from identified customers. All energy will be sold to CEA at agreed rate. CEA will then be able to provide power to residents of Point MacKenzie is they so choose. SECTION 8 – PROJECT READINESS 8.1 Project Preparation Describe what you have done to prepare for this award and how quickly you intend to proceed with work once your grant is approved. Specifically address your progress towards or readiness to begin, at a minimum, the following: • The phase(s) that must be completed prior to beginning the phase(s) proposed in this application • The phase(s) proposed in this application • Obtaining all necessary permits • Securing land access and use for the project • Procuring all necessary equipment and materials Refer to the RFA and/or the pre-requisite checklists for the required activities and deliverables for each project phase. Please describe below and attach any required documentation. Renewable Energy Fund Round 14 Grant Application – Standard Form AEA 23001 Page 29 of 33 11/16/2021 Please see attached proposal. 8.2 Demand- or Supply-Side Efficiency Upgrades If you have invested in energy efficiency projects that will have a positive impact on the proposed project, and have chosen to not include them in the economic analysis, applicants should provide as much documentation as possible including: 1. Explain how it will improve the success of the RE project 2. Energy efficiency pre and post audit reports, or other appropriate analysis, 3. Invoices for work completed, 4. Photos of the work performed, and/or 5. Any other available verification such as scopes of work, technical drawings, and payroll for work completed internally. SECTION 9 – LOCAL SUPPORT AND OPPOSITION Describe local support and opposition, known or anticipated, for the project. Include letters, resolutions, or other documentation of local support from the community that would benefit from this project. Provide letters of support, memorandum of understandings, cooperative agreements between the applicant, the utility, local government and project partners. The documentation of support must be dated within one year of the RFA date of November 16, 2021. Please note that letters of support from legislators will not count toward this criterion. None SECTION 10 – COMPLIANCE WITH OTHER AWARDS Identify other grants that may have been previously awarded to the Applicant by AEA for this or any other project. Describe the degree you have been able to meet the requirements of previous grants including project deadlines, reporting, and information requests. None SECTION 11 – LIST OF SUPPORTING DOCUMENTATION FOR PRIOR PHASES Renewable Energy Fund Round 14 Grant Application – Standard Form AEA 23001 Page 30 of 33 11/16/2021 In the space below, please provide a list of additional documents attached to support completion of prior phases. Design Cost Estimate SECTION 12 – LIST OF ADDITIONAL DOCUMENTATION SUBMITTED FOR CONSIDERATION In the space below, please provide a list of additional information submitted for consideration. RFP provided to Chugach Electric Association 12.17.2021 Renewable Energy Fund Round 14 Grant Application – Standard Form AEA 23001 Page 31 of 33 11/16/2021 SECTION 13 – AUTHORIZED SIGNERS FORM Community/Grantee Name: Regular Election is held: Date: Authorized Grant Signer(s): Printed Name Title Term Signature I authorize the above person(s) to sign Grant Documents: (Must be authorized by the highest ranking organization/community/municipal official) Printed Name Title Term Signature Grantee Contact Information: Mailing Address: Phone Number: Fax Number: Email Address: Federal Tax ID #: Please submit an updated form whenever there is a change to the above information. Renewable Energy Fund Round 14 Grant Application – Standard Form AEA 23001 Page 32 of 33 11/16/2021 SECTION 14 – ADDITIONAL DOCUMENTATION AND CERTIFICATION SUBMIT THE FOLLOWING DOCUMENTS WITH YOUR APPLICATION: A. Contact information and resumes of Applicant’s Project Manager, Project Accountant(s), key staff, partners, consultants, and suppliers per application form Section 3.1, 3.4 and 3.6. Applicants are asked to provide resumes submitted with applications in separate electronic documents if the individuals do not want their resumes posted to the project web site. B. Letters or resolutions demonstrating local support per application form Section 9. C. For projects involving heat: Most recent invoice demonstrating the cost of heating fuel for the building(s) impacted by the project. D. Governing Body Resolution or other formal action taken by the applicant’s governing body or management per RFA Section 1.4 that: • Commits the organization to provide the matching resources for project at the match amounts indicated in the application. • Authorizes the individual who signs the application has the authority to commit the organization to the obligations under the grant. • Provides as point of contact to represent the applicant for purposes of this application. • Certifies the applicant is in compliance with applicable federal, state, and local, laws including existing credit and federal tax obligations. E. An electronic version of the entire application on CD or other electronic media, per RFA Section 1.7. F. CERTIFICATION The undersigned certifies that this application for a renewable energy grant is truthful and correct, and that the applicant is in compliance with, and will continue to comply with, all federal and state laws including existing credit and federal tax obligations and that they can indeed commit the entity to these obligations. Print Name Fred Thoerner Signature Title President Date 1/13/2022 Renewable Energy Fund Round 14 Grant Application – Standard Form AEA 23001 Page 33 of 33 11/16/2021