HomeMy WebLinkAboutAPP_Port Heiden_Rd13Renewable Energy Fund Round 13
Grant Application -Standard Form
SECTION 1 -APPLICANT INFORMATION
ALASKA
ENERGY
AUTHORITY
Please specify the legal grantee that will own, operate, and maintain the project upon completion.
Name (Name of utility, IPP, local government, or other government entity)
City of Port Heiden
Tax 10 # 92-6009671
Date of last financial statement audit: NIA
Mailin_g_ Address: Ph ysical Address:
P. 0. BOX 49050 2020 James Street
Port Heiden, AK 99549 Port Heiden, AK 99549
Tele phone: Fax: Email:
(907) 837-2209 (907) 837-2248 scott2050@ llahoo.com
(cell)
I 1.1 Applicant Point of Contact I Grants Manager
Name: Title:
Scott Anderson Mayor
City of Port Heiden
Mailing Address:
PO Box 49050-Port Heiden, AK 99549
I Telep hone: I Fax: I Email:
same Same
1.1.1 Applicant Signatory Authority Contact Information
Name: Same As Above
I Mailing Address:
: Same As Above
Tele p hone:
Title:
I Fax:
I
1.1.2 Applicant Alternate Points of Contact
Name Telephone: Fax:
NIA
AEA 21010 Page 3 of31
1 Email:
l
Email:
7/20/2020
I
l
Renewable Energy Fund Round 13
Grant Application -Standard Form
ALASKA
ENERGY
AUTHORITY
1.2 Applicant Minimum Requirements
Please check as appropriate. If applicants do not meet the minimum requirements, the application
will be rej ected.
I 1.2.1 Applicant T y pe
~ An electric utility holding a certificate of public convenience and necessity under AS 42.05
CPCN # 412 , or
D An independent power producer in accordance with 3 AAC 107.695 (a} (1)
CPCN # , or
I D A local government, or
0 A governmental entity (which includes tribal councils and housing authorities)
Add'f t 1 1ona m1mmum re QUiremen s
~ 1.2.2 Attached to this application is formal approval and endorsement for the project by the
applicant's board of directors, executive management, or other governing authority. If the
applicant is a collaborative grouping, a formal approval from each participant's governing
authority is necessary. (Indicate yes by checking the box)
~ 1.2.3 As an applicant, we have administrative and financial management systems and follow
procurement standards that comply with the standards set forth in the grant agreement
(Section 3 of the RFA). (Indicate yes by checking the box)
~ 1.2.4 If awarded the grant, we can comply with all terms and conditions of the award as
identified in the Standard Grant Agreement template at www.akenerqyauthori ty .org/what-we-
do/qrants-loans/renewable-energ:i-fund-ref-qrants/2020-ref-a !;!Diication (Any exceptions
should be clearly noted and submitted with the application.} (Indicate yes by checking the
box)
~ 1.2.5 We intend to own and operate any project that may be constructed with grant funds for
the benefit of the general public. If no please describe the nature of the project and who will
be the primary beneficiaries. (Indicate yes by checking the box)
AEA 21010 Page4 of31 7/20/2020
Renewable Energy Fund Round 13
Grant Application -Standard Form
I SECTION 2-PROJECT SUMMARY
2.1 Project Title
ALASKA
ENERGY
AUTHORITY
Provide a 4 to 7 word title for your project. Type in the space below. I Port Heiden Reconnaissance study
I 2.2 Project Location
2.2.1 Location of Project -Latitude and longitude (preferred), street address, or
community name.
Latitude and longitude coordinates may be obtained from Google Map s by finding you project's
location on the map and then right clicking with the mouse and selecting "What is here? The
coordinates will be displayed in the Google search window above the map in a format as follows:
61.195676.-149.898663. If you would like assistance obtaining this infonnation, please contact
AEA 's Grants Manager Karin St. Clair by email at g rants@akenerqyauthoritv.org or by phone at
(907) 771-3081.
Latitude l I Lon g itude I
[Other description of location]
Port Heiden, Alaska
2.2.2 Community benefiting -Name(s) of the community or communities that will be the
beneficiaries of the project.
I Port Heiden, Alaska
2.3 Project Type
Please check as appropriate.
J 2.3.1 Renewable Resource Type
181 Wind D Biomass or Biofuels (excluding heat-only)
D Hydro, Including Run of River D Hydrokinetic
D Geothermal, Excluding Heat Pumps D Transmission of Renewable Energy
181 Solar Photovoltaic 181 Storage of Renewable
I D Other (Describe) D Small Natural Gas
I 2.3.2 Proposed Grant Funded Phase(s) for this Request (Check all that apply}
Pre-Construction Construction
181 Reconnaissance D Final Design and Permitting
D Feasibility and Conceptual Design D Construction
AEA21010 Page 5 of31 7/20/2020
Renewable Energy Fund Round 13
Grant Application -Standard Form
2.4 Project Description
Provide a brief, one-paragraph description of the proposed project.
ALASKA
ENERGY
AUTHORITY
Reconnaissance Study will focus on collecting and analyzing Port Heiden's current diesel
system and its wind and solar resources along with Its electric and thermal load data. This
baseline data will then be used to create a conceptual design for an energy system that
Incorporates wind/solar/battery with the current diesel system. A proposed costs and
financing will also be included In the final Reconnaissance Study Report.
2.5 Scope of Work
Provide a short narrative for the scope of work detailing the tasks to be performed under this
funding request. This should include work paid for by grant funds and matching funds or performed
as in-kind match.
Tasks will collect and analyze wind, solar, and electric and thermal load data, assess
current energy system, create a conceptual energy system Integrating renewables with the
current system, provide a proposed cost and financing report/economic analysis study,
identify environmental items, including land ownership and permitting needs, and lastly
analyze the data and make recommendations to the community.
This work Includes -installation and instrumentation of a meteorological tower, collection
and analysis of resource and load data, examination of potential development sites, system
configuration options, analyzing potential operational and financial impacts, developing
initial site plans, identifying permitting requirements, and developing project cost
estimates.
The primary dellverables will be: Resource Assessments, Final Conceptual Design and
proposed costs and financing.
2.6 Previous REF Applications for the Project
See Section 1.15 of the RFA for the maximum ger groject cumulative grant award amount
Round Title of application Application Did you Amount of REF
Submitted #,if known receive a grant awarded
grant? YIN ($)
N/A
AEA21010 Page 6 of31 7/20/2020
Renewable Energy Fund Round 13
Grant Application -Standard Form
l SECTION 3 -Project Management, Development, and Operation
I 3.1 Schedule and Milestones
ALASKA
ENERGY
AUTHORITY
Please fill out the schedule below (or attach a similar sheet) for the work covered by this funding
request. Be sure to identify key tasks and decision points, induding go/no go decisions, in your
project along with estimated start and end dates for each of the milestones and tasks. Please
clearly identify the beginning and ending of all phases (I. Reconnaissance, II. Feasibility and
Conceptual Design, Ill. Final Design and Permitting, and IV. Construction) of your proposed
project. See the RFA, Sections 2.3-2.6 for the recommended milestones for each phase. Add
additional rows as needed.
Task Start End
# Milestones Tasks Date Date Deliverables
Preliminary Collect studies and mechanical Base systems, as-builts and
1 report and work electrical drawings related to energy studies
plan existing base; Within Within
Identify site condition, 1 3
community information; month months Base System Design
Research and writing to from from Documentation Binder
develop a project plan and site start start
description. Draft Conceptual Design
2 On-site data Travel to site with team to Condition report
collection verify site conditions
Confirm as-built drawings,
and survey electrical Within Within
distribution, select site 1 3 Data collection plus travel to month months Port Heiden from Anchorage from from System condition report
with a project team consisting
of an electrical engineer, start start
diesel mechanic, and project
manager and research
assistant
3 Install Field support, to include Installation report on
monitoring installation of a 34 meter met monitoring equipment
equipment tower, data logger and sensor.
This includes purchasing and
installing the met tower, data
logger and sensors, for wind
Within Within speed, direction, solar
insolation and temperature, 1 6
with 12 months data collection month months
and resource report. This task is from from
estimated to require 10 days of start start
equipment procurement,
mobilization, installation and
demobilization
Data gateway for load Load profile
information at power plant
Map of electrical distribution Distribution map
AEA21010 Page 7 of31 7/20/2020
Renewable Energy Fund Round 13
Grant Application -Standard Form
4 Options Analysis Field support, including
and Cost documentation, remote
Estimates troubleshooting and
diagnostics, training activities,
assistance with maintenance,
assistance with data collection
and evaluation, and availability
to attend workshops and
tutorials
Technology survey, of
proposed wind, solar and
battery systems
Options Analysis
5 Feasibility and Compile and Write resource
Conceptual assessments
Design Report
Compile and Write final
Conceptual Design
Compile and Write Projected
Costs/Financing .
13.2 Budget
3.2.1 Funding Sources
Within Within
3 12-18
months months
from from
start start
Within Within
6 18
months months
from from
start start
ALASKA
ENERGY
AUTHORITY
Draft and final Operating
Manuals
Identity potential system
components, and collection
of design, installation,
support and documentation
HOMER and PV Watts
analysis
Resource Assessments
Final Conceptual Design
Projected Costs/Financing
Indicate the funding sources for the phase(s) of the project applied for in this funding request.
Grant funds re q uested in this a__QJ:)_Iication $91,000.00
Cash match to be p rovlded8 $
In-kind match to be p rovided8 $
Ene i"QY. efficiency match p rovidedb $
Total costs for project phase(s) covered in application (sum of $ 91,000.00
above)
Describe your financial commitment to the project and the source(s) of match. Indicate whether
these matching funds are secured or pending future approvals. Describe the impact, if any, that
the timing of additional funds would have on the ability to proceed with the grant.
N/A
8 Attach documentation for proof (see Section 1.18 of the Request for Applications)
bSee Section 8.2 of this application and Section 1.18 of the RFA for requirements for Energy Efficiency
Match.
3.2.2 Cost Overruns
Describe the plan to cover potential cost increases or shortfalls in funding.
Most of the cost is in labor to collect data and write reports. If these items take longer than
anticipated, the contractor will cover.
AEA21010 Page 8 of31 7/20/2020
I
Renewable Energy Fund Round 13
Grant Application -Standard Form
Phase 2 -Feasibility and Conceptual Desig n
Source of
Matching
Anticipated Grantee Funds:
RE-Fund Cash/In-Milestone or Task Completion Grant Funds Matching kind/Federal Date Funds Grants/Other
State
Grants/Other
(List milestones based on
phase and type of project. $ $ See Sections 2. 3 thru 2. 6 of
the RFA )
$ $
$ $
$ $
$ $
$ $
$ $
$ $
$ $
$ $
$ $
$ $
TOTALS $ $
Budg et Categories:
Direct Labor & Benefits $ $
Travel & Per Diem $ $
Equipment $ $
Materials & Supplies $ $
Contractual Services $ $
Construction Services $ $
Other $ $
TOTALS $ $
AEA2l010 Page 11 of31
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
ALASKA
ENERGY
AUTHORITY
TOTALS
7/20/2020
Renewable Energy Fund Round 13
Grant Application -Standard Form
3.2.3 Budget Forms
ALASKA
ENERGY
AUTHORITY
Applications MUST include a separate worksheet for each project phase that was identified in
Section 2.3.2 of this application -I. Reconnaissance, II. Feasibility and Conceptual Design, Ill.
Final Design and Permitting, and IV. Construction. Please use the tables provided below to detail
your proposed project's total budget. Be sure to use one table for each phase of your project . and
delete an y unnecessa ry tables . The milestones and tasks should match those listed in 3.1 above.
If you have any question regarding how to prepare these tables or if you need assistance preparing
the application please feel free to contact AEA 's Grants Manager Karin St. Clair by email at
grants@akenerg vauthoritv.org or by phone at (907) 771-3081.
Phase 1 -Reconnaissance
Source of
Matching
Anticipated Grantee Funds:
RE-Fund Cash/In-Milestone or Task Completion Grant Funds Matching kind/Federal TOTALS
Date Funds Grants/Other
State
Grants/Other
(List milestones based on
phase and type of project. See $ $ $ Sections 2.3 thru 2.6 of the
RFA )
1 See above $ 6,000 $ $ 6,000
2 See above $ 8 000 $ $ 8,000
3 See above $45 000 $ $45,000
4 See above $ 7,000 $ $ 7,000
Within 18
5 months from $26,000 $ $26,000 starUSee
above
$ $ $
$ $ $
$ $ $
$ $ $
$ $ $
$ $ $
TOTALS $91,000 $ $91 000
Budget Categ ories:
Direct Labor & Benefits $ $ $
Travel & Per Diem $ $ $
EquiQ_ment $ $ $
Materials & Su pp lies $ $ $
Contractual Services $91,000 $ $91,000
Construction Services $ $ $
Other $ $ $
TOTALS $91,000 $ $91,000
AEA21010 Page 10 of31 7/20/2020
Renewable Energy Fund Round 13
Grant Application -Standard Form
3.2.3 Total Project Costs
ALASKA
ENERGY
AUTHORITY
Indicate the anticipated total cost by phase of the project (including all funding sources). Use actual
costs for completed phases. Indicate if the costs were actual or estimated.
Reconnaissance [ActuaVEstimated] $91,000.00
(based on q uote)
Feasibility and Conceptual Desig n [ActuaVEstimated] $
Final Desig n and Permittina f Actual/Estimated] $
Construction [ActuaUEstimated] $
Total Project Costs (sum of above) Estimated $
MeteringfTracking Equipment [not included in Estimated $
p roject cost]
3.2.4 Funding Subsequent Phases
If subsequent phases are required beyond the phases being applied for in this application,
describe the anticipated sources of funding and the likelihood of receipt of those funds.
• State and/or federal grants
• Loans, bonds, or other financing options
• Additional incentives (i.e. tax credits)
• Additional revenue streams (i.e. green tag sales or other renewable energy subsidies or
programs that might be available)
This information is part of the Reconnaissance Study final report.
AEA 21010 Page 9 of31 7/20/2020
Renewable Energy Fund Round 13
Grant Application -Standard Form
Phase 3 -Final Design and Permittin~
Anticipated Grantee RE-Fund Milestone or Task Completion Grant Funds Matching
Date Funds
(List milestones based on
phase and type of project. $ $ See Sections 2.3 thru 2.6 of
the RFA )
$ $
$ $
$ $
$ $
$ $
$ $
$ $
$ $
$ $
$ $
$ $
TOTALS $ $
Budg et Categories:
Direct Labor & Benefits $ $
Travel & Per Diem $ $
Equipment $ $
Materials & Su pp lies $ $
Contractual Services $ $
Construction Services $ $
Other $ $
TOTALS $ $
AEA21010 Page 12 of31
Source of
Matching
Funds:
Cash/In-
kind/Federal
Grants/Other
State
Grants/Other
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
ALASKA
ENERGY
AUTHORITY
TOTALS
7/20/2020
Renewable Energy Fund Round 13
Grant Application -Standard Form
Phase 4-Construction
Anticipated Grantee RE-Fund Milestone or Task Completion Grant Funds Matching
Date Funds
(List milestones based on
phase and type of project. $ $ See Sections 2. 3 thru 2. 6 of
the RFA )
$ $
$ $
$ $
$ $
$ $
$ $
$ $
$ $
$ $
$ $
$ $
TOTALS $ $
Budget Ca teQ ories:
Direct Labor & Benefits $ $
Travel & Per Diem $ $
Equipment $ $
Materials & Su pp lies $ $
Contractual Services $ $
Construction Services $ $
Other $ $
TOTALS $ $
AEA21010 Page 13 of31
Source of
Matching
Funds:
Cash/In-
kind/Federal
Grants/Other
State
Grants/Other
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
ALASKA
ENERGY
AUTHORITY
TOTALS
7/20/2020
Renewable Energy Fund Round 13
Grant Application -Standard Form
3.2.4 Cost Justification
ALASKA
ENERGY
AUTHORITY
Indicate the source(s) of the cost estimates used for the project budget, including costs for future
phases not included in this application.
The quote Is from experienced consultant/contractor is included In this application.
I 3.3 Project Communications
3.3.1 Project Progress Reporting
Describe how you plan to monitor the progress of the project and keep AEA informed of the status.
Who will be responsible for tracking the progress? What tools and methods will be used to track
progress?
Project will be monitored and reported as required by AEA. Port Heiden will require reports
from contractor and will provide those + Port Heiden oversight report to AEA.
All grant funds will be expended on costs directly related to the petformance of the scope of
work and administration and reporting of grant activities.
I 3.3.2 Financial Reporting
Describe the controls that will be utilized to ensure that only costs that are reasonable, ordinary
and necessary will be allocated to this project. Also discuss the controls in place that will ensure
that no expenses for overhead, or any other unallowable costs will be requested for reimbursement
from the REF Grant Program.
Quote is attached. Port Heiden is confident of quote for these services as the amount is
reasonable, e.g. less than $100k. It is from a highly experienced Alaska firm. Only
contractual cost reimbursements will be requested from the REF Grant Program.
AEA21010 Page 14 of31 7/20/2020
Renewable Energy Fund Round 13
Grant Application -Standard Form
I SECTION 4-QUALIFICATIONS AND EXPERIENCE
4.1 Project Team
ALASKA
ENERGY
AUTHORITY
Include resumes for known key personnel and contractors, including all functions below, as an
attachment to your application. In the electronic submittal, please submit resumes as separate
PDFs if the applicant would like those excluded from the web posting of this application.
4.1.1 Project Manager
Indicate who will be managing the project for the Grantee and include contact information. If the
applicant does not have a project manager indicate how you intend to solicit project management
support. If the applicant expects project management assistance from AEA or another government
entity, state that in this section.
Dennis Meiners (lead Project Manager}, Principal and Founder of Intelligent Energy Systems,
LLC (IES). This project will benefit from Dennis's many years of experience, and his support team
and network of energy and technology specialists. IES will coordinate reconnaissance and
engineering activities, drawing on experience with similar projects and the abilities of a number of
experts in the field of wind-diesel-battery systems. IES intends to establish the same level of on-
going commitment to Port Heiden as it has to other remote, rural communities in Alaska.
4.1.2 Project Accountant
Indicate who will be performing the accounting of this project for the grantee. If the applicant does
not have a project accountant indicate how you intend to solicit financial accounting support.
Pati Crofut (Grants Manager}, Highly experienced rural utility accounting consultant and trainer.
She has been solely responsible for the grant accounting and financial management on numerous
USDA High Energy Cost grants awarded to villages in Western Alaska and administered through
IES.
I 4.1.3 Expertise and Resources
Describe the project team including the applicant, partners, and contractors.
For each member of the project team, indicate:
• the milestones/tasks in 3.1 they will be responsible for;
• the knowledge, skills, and experience that will be used to successfully deliver the tasks;
If contractors have not been selected to complete the work, provide reviewers with sufficient detail
to understand the applicant's capacity to successfully select contractors and manage complex
contracts.
Dennis Meiners (lead Project Manager)-(Lead/Responsible for all Milestones)
Jean-Paul Pinard, PhD, P.Eng. {Consulting Engineer), Expert in modeling wind energy in Arctic
conditions and is a published peer-reviewed researcher on this subject. For over 27 years Dr.
Pinard has been evaluating wind resources across Yukon, Northwest Territories and Nunavit
communities. He has extensive experience in the energy sector as an engineer, scientist, lecturer,
and advocate on renewable energy. He also specializes in piloting smart wind to energy storage in
homes and businesses. Evaluates wind and renewable energy in remote communities of Alaska
and Canada by conducting energy modelling and data analysis. Extensive work with Indigenous
communities to empower their renewable energy economies.
(Milestones 1 Task 3-Senior Consultant; Milestones 2-5 and Associated Tasks: Consultant and
Editor for Written Documentations)
Dale Letourneau {Electrical Engineer), Specializing in remote, independent energy generation and
grid systems, with more than 40 years of experience in design and construction of these systems.
AEA21010 Page 15 of31 7/20/2020
Renewable Energy Fund Round 13
Grant Application -Standard Form
ALASKA
ENERGY
AUTHORITY
Extensive experience managing and conducting energy projects in Alaska's harsh, remote
conditions and communities.
(Co-Lead for Milestones 1, 2, 3, 4 and 5 and Associated Tasks)
Greg Egan (Solar PV Specialist), President of Remote Power, Inc. in Fairbanks. As the first
NABCEP certified PV installer in Alaska and a journeyman electrician he has been responsible for
the design and installation of hundreds of photovoltaic power systems for residential, commercial
and industrial applications across the state. Mr. Egan has extensive experience working in rural
Alaska. This includes the design of the
solar power systems and custom array racking that were installed at the Water Treatment Facilities
located in Deering, Kobuk, Noatak, and Noorvik and Shungnak in 2013.
(Milestones 1 Task 3-Senior Consultant; Milestones 2-5 and Associated Tasks: Consultant and
Editor for Written Documentations)
lan Knapp (Research Technical Specialist), Graduate in statistics with a focus on technical
analysis with a strong desire to contribute to the future of Alaska while becoming a more being a
more skilled and knowledgeable statistician.
(Assist with Milestones 1, 2, 3, 4 and 5 and Associated Tasks)
John Columbus (EIT), A graduate of the Mechanical Engineering program at the University of
Notre Dame. Experienced in energy modeling, CAD modeling, procuring materials, transportation
logistics, and construction field work in rural Alaska. Passed the Fundamentals of Engineering
exam.
(Assist with Milestones 1, 2, 3, 4 and 5 and Associated Tasks)
4.2 Local Workforce
Describe how the project will use local labor or train a local labor workforce.
The project will interact with local utility manager I operators to understand how Port
Heiden's power plant functions and to collect accurate information/data. However, there are
no plans to hire local individuals for this Reconnaissance Study.
AEA21010 Page 16of31 7/20/2020
Renewable Energy Fund Round 13
Grant Application -Standard Form
I SECTION 5-TECHNICAL FEASIBILITY
I 5.1 Resource Availability
5.1.1 Assessment of Proposed Energy Resource
ALASKA
ENERGY
AUTHORITY
Describe the potential extent/amount of the energy resource that is available, including average
resource availability on an annual basis. For pre-construction applications, describe the resource to
the extent known . For design and permitting or construction projects, please provide feasibility
documents, design documents, and permitting documents (if applicable) as attachments to this
application (See Section 11 ). Likelihood of the resource being available over the life of the project.
See the "Resource Assessment" section of the appropriate Best Practice Checklist for additional
guidance.
Part of the purpose of the Reconnaissance Study is to conduct a resource assessment.
5.1.2 Alternatives to Proposed Energy Resource
Describe the pros and cons of your proposed energy resource vs. other alternatives that may be
available for the market to be served by your project.
5.1.3 Permits
Provide the following information as it may relate to permitting and how you intend to address
outstanding permit issues. See the "Environmental and Permitting Risks" section of the appropriate
Best Practice Checklist for additional guidance.
• List of applicable permits
• Anticipated permitting timeline
• Identify and describe potential barriers including potential permit timing issues, public
opposition that may result in difficulty obtaining permits, and other permitting barriers
Part of the purpose of the Reconnaissance Study is to identify permitting
requirements/needs.
5.2 Project Site
Describe the availability of the site and its suitability for the proposed energy system . Identify
potential land ownership issues, including whether site owners have agreed to the project or how
you intend to approach land ownership and access issues. See the "Site control" section of the
appropriate Best Practice Checklist for additional guidance.
Part of the purpose of the Reconnaissance Study is to identify project site.
I 5.3 Project Technical & Environmental Risk
5.3.1 Technical Risk
Describe potential technical risks and how you would address them.
• Which tasks are expected to be most challenging?
• How will the project team reduce the risk of these tasks?
• What internal controls will be put in place to limit and deal with technical risks?
AEA21010 Page 17 of31 7/20/2020
Renewable Energy Fund Round 13
Grant Application -Standard Form
ALASKA
ENERGY
AUTHORITY
See the "Common Planning Risks" section of the appropriate Best Practice Checklist for additional
guidance.
Technical risks are low. Perhaps installing the 34-meter met tower, data logger and sensor.
This will likely be weather/wind dependent and we may need to have an extra dose of
patience if there is a storm when these tasks are due to be conducted.
5.3.2 Environmental Risk
Explain whether the following environmental and land use issues apply, and if so which project
team members will be involved and how the issues will be addressed. See the "Environmental and
Permitting Risks" section of the appropriate Best Practice Checklist for additional guidance.
• Threatened or endangered species
• Habitat issues
• Wetlands and other protected areas
• Archaeological and historical resources
• Land development constraints
• Telecommunications interference
• Aviation considerations
• Visual, aesthetics impacts
• Identify and describe other potential barriers
Not applicable for the Reconnaissance Study.
5.4 Technical Feasibility of Proposed Energy System
In this section you will describe and give details of the existing and proposed systems. The
information for existing system will be used as the baseline the proposal is compared to and also
used to make sure that proposed system can be integrated.
Only complete sections applicable to your proposal. If your proposal only generates electricity, you
can remove the sections for thermal (heat) generation.
5.4.1 Basic Operation of Existing Energy System
Describe the basic operation of the existing energy system including: description of control system;
spinning reserve needs and variability in generation (any high loads brought on quicldy); and
current voltage, frequency, and outage issues across system. See the "Understanding the Existing
System" section of the appropriate Best Practice Checklist for additional guidance.
Part of the Reconnaissance Study is to detail the existing energy system.
5.4.2 Existing Energy Generation Infrastructure and Production
In the following tables, only fill in areas below applicable to your project. You can remove extra
tables. If you have the data below in other formats, you can attach them to the application (see
Section 11 ). N/A
AEA21010 Page 18 of31 7/20/2020
Renewable Energy Fund Round 13
Grant Application -Standard Form
5.4.2.1 Existing Power Generation Units
ALASKA
ENERGY
AUTHORITY
Include for each unit include: resource/fuel, make/model, design capacity (kW), minimum
operational load (kW), RPM, electronic/mechanical fuel injection, make/model of genset
controllers, hours on g,enset
Unit 1: Not Apf!.licable
Unit2:
Unit 3:
Unit 4:
Unit 5:
Unit 6:
Is there operational heat recovery? (YIN) If yes estimated
annual displaced heating fuel (gallons)
5.4.2.2 Existing Distribution System
Describe the basic elements of the distribution system. Include the capacity of the step-up
transformer at the powerhouse, the distribution voltage(s) across the community, any transmission
voltages, and other elements that will be affected by the proposed project.
Part of the purpose of the Reconnaissance Study is to detail the existing energy system.
5.4.2.3 Exis.ting Thermal Generation IJnitl!.Jif aJ>Piicable to ~our fJrCij ect)
Generation Resource/ Design J Make I Model Average Year j Hours
unit Fuel type capacity annual Installed
(MMBtu/hr efficienCYJ _
I
. --
5.4.2.4 O&M and replacement costs for Power Generation Thermal Generation
existing units
i. Annual O&M cost for labor
ii. Annual O&M cost for non-labor
iii. Replacement schedule and cost for
existing units
5.4.2.5 Annual Electricity Production and Fuel Consumption {Existing System)
Use most recent year. Replace the section (Type 1 ), (Type 2), and (Type 3} with generation
sources
Month
Janua[Y
February
March
-~_ri_l_
AEA21010
Generati
on (Type
1)
(kWh)
Generatio Generatio
n (Type 2) n (Type 3)
(kWh) (kWh)
Fuel
Consumptio
n
(Diesel-
----'-----____§allons)
Page 19 of31
Fuel
Consumptio
n
[Other]
Pea
k
Loa
d
Minimu
m Load
7/20/2020
Renewable Energy Fund Round 13
Grant Application -Standard Form
May
June
~~1y_
_August
Septembe
r
October
November
December
Total
5.4.2.6 Annual Heating Fuel Consumption (Existing System)
ALASKA
ENERGY
AUTHORITY
Use most recent year. Include only if your project affects the recovered heat off the diesel
genset or will include electric heat loads. Only include heat loads affected by the project.
Month Diesel1 Electricity Propane Coal Wood l Other
January
Februa_IY
March
~ril
May
June
July
Aug ust
_!eptember
October
November
December
Total
(Gallons) (Gallons) (Tons) (Cords,
green tons,
_ _!!!:Y. ton~}_
5.4.3 Future Trends
Describe the anticipated energy demand in the community, or whatever will be affected by the
project, over the life of the project. Explain how the forecast was developed and provide year by
year forecasts. As appropriate, include expected changes to energy demand, peak load, seasonal
variations, etc. that will affect the project.
Part of the purpose of the Reconnaissance Study is to identify potential future trends and
impacts on a future energy system.
5.4.4 Proposed System Design
Provide the following information for the proposed renewable energy system:
• A description of renewable energy technology specific to project location
• The total proposed capacity and a description of how the capacity was determined
• Integration plan, including upgrades needed to existing system(s) to integrate renewable
energy system: Include a description of the controls, storage, secondary loads, distribution
upgrades that will be included in the project
AEA21010 Page 20 of31 7/20/2020
Renewable Energy Fund Round 13
Grant Application -Standard Form
ALASKA
ENERGY
AUTHORITY
• Civil infrastructure that will be completed as part of the project-buildings, roads, etc.
• Include what backup and/or supplemental system will be in place
See the "Proposed System Design" section of the appropriate Best Practice Checklist for additional
guidance.
5.4.4.1 Prop osed Power Generation Units
Unit# Resource/ Design Make Model Expected Expected
Fuel type capacity capacity life
(kW}_ .. factor _(yearsL
.
-I -.
I -
---
--
5.4.4.2 Proposed Thermal Gt!!leration Units (if af!p liC!!fblel ..
Generation r Resource/ Design Make Mo1dl
unit Fuel type capacity
(MMBtu/hr)
5.4.5 Basic Operation of Proposed Energy System
Expected
Average
annual
efficiency
Expected
Availability
--
Expected
life
• To the best extent possible, describe how the proposed energy system will operate: When will
the system operate, how will the system integrate with the existing system, how will the
control systems be used, etc.
• When and how will the backup system(s) be expected to be used
See the "Proposed System Design" section of the appropriate Best Practice Checklist for additional
guidance.
Part of the purpose of the Reconnaissance Study is to identify basic operation of the
proposed energy system.
AEA21010 Page 21 of31 7/20/2020
Renewable Energy Fund Round 13
Grant Application -Standard Form
ALASKA
ENERGY
AUTHORITY
5.4.5.2 Annual Electricity~oduction and Fuel Consumption (Proposed Sy-stem)
Month J Generation Generation Generation Fuel Fuel Secondary
(Proposed (Type 2) (Type 3) Consumption Consumption load
System) (kWh) (kWh) (Diesel-[Other] (kWh)
(kWh}_ Gallons )_
January I
Februa_!Y ~
March
A p rtl
May
June
_July
.Au_gust
~~tember
October
November
oe·cember
Total
5.4.5.3 Annual Heatin g Fu~l Cons_!Jm pti~_!!_(PrQpose5f _System)
Monthl Diesel Electricity Propane Coal
.January
February
March
A pril
May
June
July
Aug ust
September
October
November
December
Total
(Gallons) (Gallons) (Tons)
---
Wood
(Cords,
green tons,
d ry tons) -----
5.4.6 Proposed System Operating and Maintenance (O&M} Costs
Other
O&M costs can be estimated in two ways for the standard application. Most proposed renewable
energy projects will fall under Option 1 because the new resource will not allow for diesel
generation to be turned off. Some projects may allow for diesel generation to be turned off for
periods of time; these projects should choose Option 2 for estimating O&M .
AEA21010 Page 22 of31 7/20/2020
Storage
(kWh)
Renewable Energy Fund Round 13
Grant Application -Standard Form
Option 1: Diesel generation ON
For projects that do not result in shutting_ down $
diesel generation there is assumed to be no
impact on the base case O&M. Please indicate
the estimated annual O&M cost associated with
the proposed renewable project.
Option 2: Diesel generation OFF
For projects that will result in shutting_ down
diesel generation please estimate:
1. Annual non-fuel savings of shutting off 1.$
diesel generation
2. Estimated hours that diesel generation 2. Hours diesel OFF/year:
will be off per year.
3. Annual O&M costs associated with the 3. $
proposed renewable project.
5.4. 7 Fuel Costs
ALASKA
ENERGY
AUTHORITY
Estimate annual cost for all applicable fuel(s) needed to run the proposed system (Year 1 of
o peration)
Diesel I Electricity I Propane I Coal I
(Gallons ) (Gallons ) (Tons)
I Unit cost
_l$)
Annual
Units
Total
Annual
. cost(~)
5.5 Performance and O&M Reporting
For construction proj ects only
5.5.1 Metering Equipment
Wood Other
Please provide a short narrative, and cost estimate, identifying the metering equipment that will be
used to comply with the operations reporting requirement identified in Section 3.15 of the Request
for Applications .
Reconnaissance Study will provide recommendations for metering equipment.
5.5.2 O&M reporting
Please provide a short narrative about the methods that will be used to gather and store reliable
operations and maintenance data, including costs, to comply with the operations reporting
requirement identified in Section 3.15 of the Request for Applications
Reconnaissance Study will provide recommendations for metering equipment.
AEA21010 Page 23 of31 7/20/2020
Renewable Energy Fund Round 13
Grant Application -Standard Form
I SECTION 6 -ECONOMIC FEASIBILITY AND BENEFITS
I 6.1 Economic Feasibility
6.1.1 Economic Benefit -
Reconnaissance Study will provide information on Economic Benefits.
Annual
Anticipated Diesel Fuel Displaced for Power
Generation (g allons)
Anticipated Fuel Displaced for Heat
(g allons)
Total Fuel dis placed (g allons )
Anticipated Diesel Fuel Displaced for Power
Generation ($)
Anticipated Fuel Displaced for Heat ($)
Anticipated Power Generation O&M Cost
Savings
Anticipated Thermal Generation O&M Cost
Savin gs
Total Other costs savings (taxes, insurance,
etc.)
Total Fuel, O&M, and Other Cost Savings
6.1.2 Economic Benefit
ALASKA
ENERGY
AUTHORITY
Lifetime
Explain the economic benefits of your project. Include direct cost savings and other economic
benefits, and how the people of Alaska will benefit from the project. Note that additional revenue
sources (such as tax credits or green tags) to pay for operations and/or financing, will not be
included as economic benefits of the project.
Where appropriate, describe the anticipated energy cost in the community, or whatever will be
affected by the project, over the life of the project. Explain how the forecast was developed and
provide year-by-year forecasts
The economic model used by AEA is available at www.akeneravauthoritv.org/What-We-Do/Grants-
Loans/Renewable-Energy-Fund-REF-Grants/2020-REF-App lication . This economic model may be
used by applicants but is not required. The final benefit/cost ratio used will be derived from the
AEA model to ensure a level playing field for all applicants. If used, please submit the model with
the application.
AEA21010 Page 24 of31 7/20/2020
Renewable Energy Fund Round 13
Grant Application -Standard Form
6.1.3 Economic Risks
ALASKA
ENERGY
AUTHORITY
Discuss potential issues that could make the project uneconomic to operate and how the project
team will address the issues. Factors may include:
• Low prices for diesel and/or heating oil
• Other projects developed in community
• Reductions in expected energy demand: Is there a risk of an insufficient market for energy
produced over the life of the project.
• Deferred and/or inadequate facility maintenance
• Other factors
Reconnaissance Study will provide insights about Economic Risks.
6.1.4 Public Benefit for Projects with Direct Private Sector Sales
For projects that include direct sales of power to private sector businesses (sawmills, cruise ships,
mines, etc.), please provide a brief description of the direct and indirect public benefits derived from
the project as well as the private sector benefits and complete the table below. See Section 1.6 in
the Request for Applications for more information.
Reconnaissance Study will address Public Benefit.
Renewable energy resource availability (kWh per month )
Estimated direct sales to p rivate sector businesses (kWh )
Revenue for displacin g diesel generation for use at p rivate sector businesses ($)
Estimated sales for use by the Alaskan public (kWh )
Revenue for displacin g diesel generation for use by the Alaskan public ($)
6.2 Other Public Benefit
Describe the non-economic public benefits to Alaskans over the lifetime of the project. For the
purpose of evaluating this criterion, public benefits are those benefits that would be considered
unique to a given project and not generic to any renewable resource. For example, decreased
greenhouse gas emission, stable pricing of fuel source, won't be considered under this category.
Some examples of other public benefits include:
• The project will result in developing infrastructure (roads, trails, pipes, power lines, etc,) that can
be used for other purposes
• The project will result in a direct long-tenn increase in jobs (operating, supplying fuel, etc.)
• The project will solve other problems for the community (waste disposal, food security, etc.)
• The project will generate useful information that could be used by the public in other parts of the
state
• The project will promote or sustain long-tenn commercial economic development for the
community
Reconnaissance Study will address Other Public Benefits
AEA21010 Page 25 of31 7/20/2020
Renewable Energy Fund Round 13
Grant Application -Standard Form
SECTION 7 -SUSTAINABILITY
ALASKA
ENERGY
AUTHORITY
Describe your plan for operating the completed project so that it will be sustainable throughout its
economic life.
At a minimum for oonstruction projects, a business and o perations plan should be attached and the
applicant should describe how it will be implemented. See Section 11.
7 .1.1 Operation and Maintenance
Demonstrate the capacity to provide for the long-term operation and maintenance of the proposed
project for its expected life
• Provide examples of success with similar or related long-term operations
• Describe the key personnel that will be available for operating and maintaining the
infrastructure.
• Describe the training plan for existing and future employees to become proficient at operating
and maintaining the proposed system.
• Describe the systems that will be used to track necessary supplies
• Describe the system will be used to ensure that scheduled maintenance is performed
Reconnaissance Study will address Sustainability and Finances.
7 .1.2 Financial Sustainability
• Describe the process used (or propose to use) to account for operational and capital costs.
• Describe how rates are determined (or will be determined). What process is required to set
rates?
• Describe how you ensure that revenue is collected.
• If you will not be selling energy, explain how you will ensure that the oompleted project will be
financiall y sustainable for its useful life.
7 .1.2.1 Revenue Sources
Briefly explain what if any effect your project will have on electrical rates in the proposed benefit
area over the life of the project. If there is expected to be multiple rates for electricity, such as a
separate rate for intermittent heat, explain what the rates will be and how they will be determined
Collect sufficient revenue to rover operational and capital costs
• What is the expected cost-based rate (as consistent with RFA requirements)
• If you expect to have multiple rate classes, such as excess electricity for heat, explain what
those rates are expected to be and how those rates account for the costs of delivering the
energy (see AEA's white paper on excess electricity for heat) ..
• Annual customer revenue sufficient to cover costs
• Additional incentives (i.e. tax credits)
• Additional revenue streams {i.e. green tag sales or other renewable energy subsidies or
programs that might be available)
7 .1.2.2 Power Purchase/Sale
The power purchase/sale information should include the following:
• Identification of potential power buyer(s)/customer(s)
AEA21010 Page 26of31 7/20/2020
Renewable Energy Fund Round 13
Grant Application -Standard Form
ALASKA
ENERGY
AUTHORITY
• Potential power purchase/sales price-at a minimum indicate a price range (consistent with the
Section 3.16 of the RFA)
Identify the potential power buyer(s)/customer(s) and anticipated power purchase/sales price
range. Indicate the proposed rate of return from the grant-funded project. Include letters of support
or power purchase agreement from identified customers.
Reconnaissance Study will address Power Purchase/Sale
I SECTION 8-PROJECT READINESS
8.1 Project Preparation
Describe what you have done to prepare for this award and how quickly you intend to proceed with
work once your grant is approved.
Specifically address your progress towards or readiness to begin, at a minimum, the following:
• The phase(s) that must be completed prior to beginning the phase(s) proposed in this application
• The phase(s) proposed in this application
• Obtaining all necessary permits
• Securing land access and use for the project
• Procuring all necessary equipment and materials
Refer to the RFA and/or the pre-requisite checklists for the required activities and deliverables for
each project phase. Please describe below and attach any required documentation.
We have sought a quote for this work from a highly experienced team. The quote provides
good I sufficient details including tasks and milestones for this Reconnaissance Study, and
a pathway forward for this work to be conducted within a reasonable timeframe.
8.2 Demand-or Supply-5ide Efficiency Upgrades
If you have invested in energy efficiency projects that will have a positive impact on the proposed
project, and have chosen to not include them in the economic analysis, applicants should provide
as much documentation as possible including:
1. Explain how it will improve the success of the RE project
2. Energy efficiency pre and post audit reports, or other appropriate analysis,
3 . Invoices for work completed,
4. Photos of the work performed, and/or
5. Any other available verification such as scopes of work, technical drawings, and payroll for
work completed internally.
SECTION 9-LOCAL SUPPORT AND OPPOSITION
Describe local support and opposition, known or anticipated, for the project. lnclyde letters.
resolutions . or other documentation of local support from the community that would benefit from
this project. Provide letters of support, memorandum of understandings, cooperative agreements
between the applicant, the utility, local government and project partners. The documentation of
support must be dated within one year of the RFA date of July 20, 2020. Please note that letters of
support from legislators will not count toward this criterion.
AEA21010 Page 27 of31 7/20/2020
Renewable Energy Fund Round 13
Grant Application -Standard Form
ALASKA
ENERGY
AUTHORITY
Local support is verified as this application is being submitted by the only power plant
operator in Port Heiden.
SECTION 10-COMPLIANCE WITH OTHER AWARDS
Identify other grants that may have been previously awarded to the Applicant by AEA for this or
any other project. Describe the degree you have been able to meet the requirements of previous
grants including project deadlines, reporting, and information requests.
I Not applicable
SECTION 11 -LIST OF SUPPORTING DOCUMENTATION FOR PRIOR PHASES
In the space below, please provide a list of additional documents attached to support completion of
prior phases.
Not applicable
SECTION 12-LIST OF ADDITIONAL DOCUMENTATION SUBMmED FOR CONSIDERATION
In the space below, please provide a list of additional information submitted for consideration.
Quote from experienced contractor/consultant. In separate document.
AEA21010 Page 28 of31 7/20/2020
Renewable Energy Fund Round 13
Grant Application -Standard Form
I SECTION 13-AUTHORIZED SIGNERS FORM
Community/Grantee Name:
City of Port Heiden
Regular Election is held:
I Authorized Grant Signer(s):
Printed Name Title
Scott Anderson Mayor
I Date:
Term
November
2021
I authorize the above person(s) to sign Grant Documents:
Must be authorized b the hi hest rankin or anization/communi
Printed Name Title Term
Scott Anderson Mayor Nov. 2021
I Grantee Contact Information:
A
ALASKA
ENERGY
AUTHORITY
Signature
/(}--.
Mailing Address: PO Box 49050; Port Heiden, AK 99549
Phone Number:
907-837-2209
Fax Number:
9079-837-2248
Email Address:
Scott5025 @yahoo.com
Federal Tax ID #:
92-6009671
Please submit an updated form whenever there is a change to the above information.
AEA21010 Page 29 of31 7/20/2020
Renewable Energy Fund Round 13
Grant Application -Standard Form
SECTION 14-ADDITIONAL DOCUMENTATION AND CERTIFICATION
ALASKA
ENERGY
AUTHORITY
SUBMIT THE FOLLOWING DOCUMENTS WITH YOUR APPLICATION:
A. Contact information and resumes of Applicant's Project Manager, Project Accountant(s),
key staff, partners, consultants, and suppliers per application form Section 3.1, 3A and
3.6.
Applicants are asked to provide resumes submitted with applications in separate electronic
documents if the individuals do not want their resumes posted to the project web site.
In separate file
B. Letters or resolutions demonstrating local support per application form Section 9.
1 Letter after Signature Pages
C. For projects involving heat: Most recent invoice demonstrating the cost of heating fuel
for the building(s) impacted by the project.
D. Governing Body Resolution or other formal action taken by the applicant's governing
body or management per RFA Section 1.4 that:
• Commits the organization to provide the matching resources for project at the match
amounts indicated in the application.
• Authorizes the individual who signs the application has the authority to commit the
organization to the obligations under the grant.
• Provides as point of contact to represent the applicant for purposes of this
application.
• Certifies the applicant is in compliance with applicable federal, state, and local, laws
including existing credit and federal tax obligations.
1 Letter after Signature Pages
E. An electronic version of the entire application on CD or other electronic media, per RFA
Section 1.7.
AEA21010 Page 30 of31 7/20/2020
Renewable Energy Fund Round 13
Grant Application -Standard Form
F. CERTIFICATION
ALASKA
ENERGY
AUTHORITY
The undersigned certifies that this application for a renewable energy grant is truthful
and correct, and that the applicant is in compliance with, and will continue to comply
with, all federal and state laws including existing credit and federal tax obligations and
that they can indeed commit the entity to these obligations.
Print Name Scott Anderson
Signature ~/fl-
Title Mayor
Date September 28, 2020
AEA21010 Page 31 of31 7/20/2020
CITY OF PORT HEIDEN
PO BOX49050
Port Heiden, Alaska 99549
Scott Anderson, Mayor
P.O. Box 49050
Port Heiden, AK 99549
September 28, 2020
Alaska Energy Authority -Renewable Energy Fund 2020
RE: Letter of Commitment and Support and Governing Body Support for City of Port Heiden
Utility -Reconnaissance Study
I am writing to support and verify Port Heiden's application to the Renewable Energy Fund
for a Reconnaissance Study for our community.
As the Mayor:
• I am the formal point of contact for our REF grant application.
• I can commit the City of Port Heiden to the REF grant obligations.
• I am the authorized individual to sign the application and have the authority to
commit the City of Port Heiden to the REF grant obligations.
• I certify that the City of Port Heiden is in compliance with applicable federal state and
local laws including existing credit and federal tax obligations.
Due to COVID I am unable to meet with our Council on a regular basis and therefore we are
unable to provide a resolution from our community.
Currently, our community has a diesel only utility. This is very costly and a Reconnaissance
Study will help us greatly in finding a path forward to visualize and realize an economically
viable future where our reliance on diesel is substantially reduced and replaced with
renewables and a hybrid system including energy storage and wind-to-heat technologies.
By increasing fuel displacement and diesel engine-off operations we will become a much
more sustainable and resilient community.
Funding for this project is highly important to the entire community of Port Heiden.
Thank you for your consideration.
Respectfully,
Scott Anderson, Mayor
City of Port Heiden
-
.
5J5
City of Port Heiden Electric Utility
Cost Quotation for Reconnaissance Study, and Conceptual Design for
Wind+Solar+Battery+Diesel Power System
~·, -·-'es
Intelligent Energy Systems, LLC
110 W. 15th Avenue, Suite A • Anchorage, AK 99501
(907) 770-6367 • iesconnect.net • {907) 677-1886 Fax
Contents
1.0 Project Overview .............................................................................................................................. 3
2.0 Cost Quotation .................................................................................................................................. 9
3.0 Project Timeline and Schedule ....................................................................................................... 11
4.0 Project Team ................................................................................................................................... 13
Tables
Table 1: Milestone #1-Preliminary Report and Work Plan ................................................. 9
Table 2: Milestone #2 On-site Data Collection .............................................................. 10
Table 3: Milestone #3-Installation of Monitoring Equipment .......................................... 10
Table 4: Milestone #4-Options Analysis and Cost Estimates .......................................... ll
Table 5: Milestone #S-Feasibility and Conceptual Design Report .................................... ll
The infonnation in this document is proprietary and shall not be distnbuted, reproduced, used or copied without
the express written consent of IES, LLENERGY SYSTEMS Page I 2
1.0 Project Overview
The purpose of this cost quotation is to provide Port Heiden with a task list and
associated cost to provide a Reconnaissance Study, defined by AEA Renewable
Energy Fund as a preliminary, "desktop" study designed to ascertain whether additional
study is warranted.
IES' proposed Reconnaissance Study focuses on collecting and analyzing Port
Heiden's current diesel system and its wind and solar resources along with its electric
and thermal load data. This baseline data will then be used to create a conceptual
design for an energy system that incorporates wind/solar/battery with the current diesel
system. A proposed cost and financing scheme will also be included in the final
Reconnaissance Study Report.
This quote consists of tasks to:
• Collect and analyze wind, solar, and electric and thermal load data
• Assess current energy system
• Create a conceptual energy system integrating renewables with the current
system
• Provide a proposed cost and financing report/economic analysis study
• Identify environmental items, including land ownership and permitting needs, and
lastly
• Analyze the data and make recommendations to the community
This work includes:
• Installation and instrumentation of a meterological tower
• Collection and analysis of resource and load data
• Examination of potential development sites
• System configuration options
• Analyzing potential operational and financial impacts
• Developing initial site plans
• Identifying permitting requirements, and developing project cost estimates
The primary deliverables will be:
• Resource Assessments
• Final Conceptual Design
• Proposed Costs and Financing
The infonnation in lhis dorument is proprietary and shall not be distributed, reproduced, used or copied without
lhe express written consent of IES, LLENERGY SYS1EMS Page I 3
Proposed Scope of Work -in 5 Phases
This scope of work will involve five phases, or project milestones.
These milestone-phases are:
1. Preliminary report and work plan
2. On-site data collection
3. Installation of monitoring equipment
4. Options analysis and cost estimates
5. Conceptual design report
1) Preliminary re port and work p lan
The first phase of the project will involve collecting existing community and resource data, as well
as a review of previous studies. This phase of work will include identifying potential development
sites for wind and solar, population community history, existing facilities, local economy, climate
and community infrastructure. The purpose of this work is to improve the efficiency of the study
and to incorporate previous information identified to improve the conceptual design.
2) On-site data collection
The second phase of the project will involve collection of on-site data. This will involve
community electrical and thermal load, and existing asset condition surveys. In every
community the load tends to vary in more or less a regular way, over the course of the
day, week, and season. As well as the gradual changes, there are also fluctuations of
much shorter duration caused by switching in and out of large electrical loads. There are
also likely to be substantial changes in the load with the day of the week, or season of
the year.
From an economic point of view it is necessary to understand the profiles of the load, and
to understand how variations in wind and solar potential corresponds to the load, or if
there is a substantial mismatch.
Initial information indicates that incorporating a wind-to-heat component, in a
wind+solar+battery+diesel system will enable the community to take full advantage of the
greatest amount of wind energy potential. This is important, especially for application of
larger capacity wind systems, which during the winter can generate surplus energy that
can then be used to displace heating fuel. These kinds of systems, which are designed
for lower wind resource applications, can match well with battery energy storage. In a
similar manner, during the summer months when wind speeds tend to be lower, the
wind+battery system would be supplemented by solar PV.
The information in this dowment is proprietary and shall not be disbibuted , reproduoed, used or copied wijhout
the express written consent of IES , LLENERGY SYS"TEMS Page I 4
On-site data will be collected to determine energy load profiles, assessing the condition
of electrical generation, and distribution readiness to incorporate renewables into the
existing power system.
The principle outcome will be to develop coincident load profile, and will involve power
plant monitoring . This phase will also include investigating existing geotechnical
information through the use of a "desk study'' to guide foundation design concepts for
wind and solar systems. In addition, initial consultations with permitting agencies and
equipment inventories.
3) Installation of Monitoring Equi pment
This phase will involve installing a 34 meter tall, NRG Systems, tubular-type
meteorological (met) tower in an open area selected by the City. The monitoring
equipment will be instrumented to measure wind speed, direction, temperature, solar
insolation and electrical load. At the same time, monitoring of electrical production in the
power plant will begin. The renewable resource data will be analyzed by Doug Vaught,
of V3 energy an experienced resource assessment engineer. The load profile will be
developed from monitoring data, and summarized in a report by IES.
Primary outcome of this phase will be a report that assesses and validates the wind
resource, along with the solar resource. This data will be used to estimate annual
energy production from various wind and solar configurations. The studies in Port
Heiden will focus on the application of large rotor wind turbines, designed for
productivity in lower wind speed regimes, to be supplemented by solar and battery
storage capabilities, which all serve to reduce the community's dependency on diesel
fuel.
4) O ptions Anal ysis and Cost Estimates
The wind, solar and electrical and thermal load data will be compared with wind turbine
power, and diesel generation fuel curves to develop time series estimates of wind, solar,
diesel and battery fuel displacement scenarios using the HOMER program. The
analysis will include a review of available and practical wind systems, potential solar
arrays, and battery energy storage systems. Both PV watts, and HOMER will be used to
estimate energy produced from various size fixed solar arrays.
HOMER analysis will be used to compare system configurations in relative rather than
absolute terms, with the understanding that renewable resources vary considerably
The information in lhis dorument is proprietary and shall not be distributed, reproduced, used or copied without
lhe express written consent of IES , LLENERGY SYSTEMS Page I 5
from year to year. HOMER output will enable design choices optimized around
parameters of interest such as, renewable contribution, potential for fuel displacement,
diesel off hours of operation, and surplus renewable energy available for heat. These
options will be compared to the diesel operational base line, and evaluated with respect
to the community's goals.
The turbines to be included in the evaluation include but are not limited to:
• EoCycle 25,
• Northwind 100, 21 and 24
• Xant 21 and 24
• Frontier, 24.4, and 30
• Vestas V-27
• EWT 61
Construction cost estimates will be developed for the most productive options. This will
include capital, installed , and operational cost estimates . The overall costs will include,
power line, additional infrastructure and integration costs.
5) Conce ptual S ystem Design Re port
The following information for the proposed renewable energy system will be developed:
• Wind and solar resource assessment
• Technology options analysis
• Proposed system configurations
• Estimated annual energy production from renewable generation
• Project cost estimates
• Economic feasibility based on diesel base case
• Methods of integration
• Site Plan
• Geo technical desk study
• System readiness
Summary of conceptual development and operations plan
The infonnation in this dOQJment is proprietary and shall not be distributed, reproduced , used or copied without
the express written consent of IES , LLENERGY SYSTEMS Page I 6
Permits
• List of applicable permits
• Anticipated permitting timeline
• Identify and discussion of potential barriers
Environmental
The following environmental and land use issues will be addressed:
• Threatened or Endangered species
• Habitat issues
• Wetlands and other protected areas
• Archaeological and historical resources
• Land development constraints
• Telecommunications interference
• Aviation considerations
• Visual, aesthetics impacts
• Identify and discuss other potential barriers
Proposed New System Costs and Benefits
Sufficient cost information will be developed to determine a cost of construction and the
financial benefits of the proposed system, along with projected debt financing.
Business Plan
Initial plans will be developed for operating the proposed project so that it will be
sustainable.
The infonnation in this doa.unent is proprietary and shall not be distributed , reproduced , used or copied without
the express written consent of IES, LLENERGY SYSTEMS Page 17
PROJECT BENEFIT
The economic and public benefits of the wind/solar/battery energy project will be
determined based on the following criteria:
• Potential annual fuel displacement (gal and $) over the lifetime of the renewable
energy project
• Potential impacts on fuel purchases, and investments in fuel and bulk fuel
infrastructure
• Comparison with diesel operational base case
• Potential for local jobs to displace fuel purchases
BUDGET
The following budget is based on project milestones
1
Preliminary report and work plan
$6,000
2 On-site data collection $8,000
3 Installation of monitoring equipment $45,000
4 Options analysis and cost estimates $7,000
5 Conceptual design report $26,000
Total $91,000
The infonnalion in 1his document is proprietary and shall not be distributed, reproduced, used or copied without
1he express written consent of IES, LLENERGY SYSTEMS Page I 8
Cost q uote
Tables 1 through 5 detail the milestones, deliverables, and costs associated with each within IES'
proposed scope of work.
Table 1: Milestone #1-Preliminary Report and Work Plan
Collect studies and mechanical electrical drawings
related to existing base
Identify site condition, community information
Research and writing to develop a project plan and
site description
Total
Base systems, as, builts and
energy studies
Base System Design
Documentation Binder
Draft Conceptual Design
Workplan
This item is estimated to require 55 hours of professional services.
Table 2: Milestone #2 On-site data collection
Travel to site with team to verify site conditions
Confirm as-built drawings, and survey electrical
distribution, select site
Data collection plus travel to Port Heiden from
Anchorage with a project team consisting of an
electrical engineer, diesel mechanic, and project
manager and research assistant
Total
Condition report
System condition report
This item is estimated to require 70 hours of professional services.
Included
Included
Included
$6,000
Included
Included
Included
$ 8,000
r'--.-----1 I -~ -:---:-==---o--, --• ---- -
!~ks _ ~-il~fo~J~iy~ble . . _·_~; __ 1
~·, -·-'les The infonnation in this document is proprietary and shall not be distributed, reproduced, used or copied without
the express written consent of IES, LLENERGY SYSTEMS Page I 9
Field support, to include installation of a 34 meter
met tower, data logger and sensor.
This includes purchasing and installing the met
tower, data logger and sensors, for wind speed,
direction, solar insolation and temperature , with 12
months data collection and resource report. This
task is estimated to require 10 days of equipment
procurement, mobilization, installation and
demobilization
Data gateway for load information at power plant
Map of electrical distribution
Total
Installation report on monitoring
equipment
Load profile
Distribution map
This item is estimated to require 375 hours of professional services.
Table 3: Milestone #3 -Installation of Monitoring Equipment
Table 4: Milestone #4-Options Analysis and Cost Estimates
~· ... -·-
Included
$45,000
'tes The information in this document is proprietary and shall not be distributed , reproduced , used or copied without
the express written consent of IES, LLENERGY SYSTEMS
Page 110
Mllestone/Dellver.~ble PJ!~
Field support, including documentation, remote
troubleshooting and diagnostics, training activities,
assistance with maintenance, assistance with data
collection and evaluation, and availability to attend
workshops and tutorials
Technology survey, of proposed wind, solar and
battery systems
Options Analysis
Total
Draft and final Operating
Manuals
Identify potential system
components, and collection of
design, installation, support and
documentation
HOMER and PVWatts analysis
This item is estimated to require 60 hours of professional services.
Table 5: Milestone #5 -Feasibility and Conceptual Design Report
Resource Assessments
Final Conceptual Design
Projected Costs/Financing
$7,000
Total $26,000
This project is estimated to require 200 hours of professional services.
3.0 Project Timeline and Schedule
The table below summarizes the timeline, milestones and deliverables associated with this
quote.
~· .. .... 'les The information in this document is proprietary and shall not be distributed, reproduced, used or copied without
the express written consent of IES, LLENERGY SYSTEMS
Page 111
Associated
Milestone
1
2
3
4
5
Task Deliverable
assessment of existing base system Preliminary report components
Plan base system design and Onsite assessment report instrumentation
Installation of monitoring equipment Monitoring system report
Data collection and analysis Options analysis repoer
Conceptual design, cost estimate and Conceptual design report financial and operational feasibility
The infonnation in this document is proprietary and shall not be distributed, reproduced, used or copied without
the express written consent of IES, LLENERGY SYSTEMS
Projected
Completion
Date
3 months from
start
3 months from
start
6 months from
project start
12 to 18
months from
project start
18 months
from project
start
Page 112
4.0 Project Team
The following are the senior team members for this project.
Ke v Personnel
The following individuals and organizations will be the primary technical support for this
project. Their resumes along with others can be found in the Resume file, section 12 of this
application.
Intelligent Energy Systems, LLC
Dennis Meiners (Lead Project Manager), Principal and Founder of Intelligent Energy Systems,
LLC (IES). This project will benefit from Dennis's many years of experience, and his support
team and network of energy and technology specialists. IES will coordinate reconnaissance and
engineering activities, drawing on experience with similar projects and the abilities of a number
of experts in the field of wind-diesel-battery systems. IES intends to establish the same level of
on-going commitment to Port Heiden as it has to other remote, rural communities in Alaska.
Pati Crofut (Grants Manager), Highly experienced rural utility accounting consultant and
trainer. She has been solely responsible for the grant accounting and financial management on
numerous USDA High Energy Cost grants awarded to villages in Western Alaska and
administered through IES.
Dale Letourneau {Electrical Engineer), Specializing in remote, independent energy generation
and grid systems, with more than 40 years of experience in design and construction of these
systems. He has an extensive experience managing and conducting energy projects in Alaska's
harsh, remote conditions and communities.
Jean-Paul Pinard, PhD, P.Eng. {Consulting Engineer), 27 years of experience in the energy sector
as an engineer, scientist, lecturer, and advocate on renewable energy. Specializes in piloting
smart wind to energy storage in homes and businesses. Evaluates wind and renewable energy
in remote communities of Alaska and Canada by conducting energy modelling and data
analysis. Extensive work with Indigenous communities to empower their renewable energy
economies.
Carl Brothers, P.E., (Power Integration and Controls Specialist) President of Frontier Power
Systems, pioneered a number of successful wind diesel systems for Alaska and are involved
with the growth of high penetration wind diesel systems across the Arctic.
~·, -·-'leS The information in this dOOJment is proprietary and shall not be distributed , reproduced , used or copied without
the express written consent of IES, LLENERGY SYSlEMS
Page 113
Greg Egan (Solar PV Specialist), President of Remote Power, Inc. in Fairbanks has over 30 years
of experience in renewable energy design, data collection and telemetry integration, drawings,
maintenance plans and specifications, and in renewable energy system feasibility studies. As the
first NABCEP certified PV installer in Alaska and a journeyman electrician he has been responsible
for the design and installation of hundreds of photovoltaic power systems for residential,
commercial and industrial applications across the state. Mr. Egan has extensive experience
working in rural Alaska. This includes the design of the solar power systems and custom array
racking that were installed at the Water Treatment Facilities located in Deering, Kobuk, Noatak,
and Noorvik and Shungnak in 2013.
lan Knapp Research Technical Specialist, Graduate in statistics with a focus on technical analysis
with a strong desire to contribute to the future of Alaska while becoming a more being a more
skilled and knowledgeable statistician.
John Columbus (Mechanical Engineer-E.I.T.), Expertise in HOMER and other methods of
modeling energy systems and load profiles such as CAD modeling, logistics and procurement
experience for remote/rural Alaska procuring materials, transportation logistics, and
construction field work in rural Alaska.
~·, -·-'leS The information in this dowment is proprietary and shall not be distributed, reproduced, used or copied without
the express written consent of IES, LLENERGY SYSTEMS Page 114
Wednesday, September 30, 2020 at 12:35:14 Alaska Daylight Time
Subject: FW: REF Round 13 Grant Application
Date: Wednesday, September 30, 2020 at 12:35:06 PM Alaska Daylight Time
From: Margaret King
Attachments: Port Heiden REF Recon Study 2020 Final.pdf, Resumes 2020 Port Heiden REF Reconnaissance
Study .pdf, Port Heiden REF Recon Cost Justification. pdf
From: Margaret King <mjking@ mjkingandassociates.com>
Date: Monday, September 28, 2020 at 12:43 PM
To: <Grants@akenergyauthority.org>
Cc: Scott Anderson <scott502S@yahoo.com>
Subject: REF Round 13 Grant Application
This is being emailed to AEA on behalf of the City of Port Heiden, Mayor Scott Anderson is copied on this
email.
City of Port Heiden's REF Grant Application is attached:
• REF Application Form
• Resumes
• Cost Justification/Quote from consultant/contractor
Thank you for your consideration.