Loading...
HomeMy WebLinkAbout200803-KnutsonHydro_DOA_NWP_AppnU.S. ARMY CORPS OF ENGINEERS APPLICATION FOR DEPARTMENT OF THE ARMY PERMIT OMB APPROVAL NO. 0710-0003 33 CFR 325. The proponent agency is CECW-CO-R. EXPIRES: 28 FEBRUARY 2013 Public reporting for this collection of information is estimated to average 11 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of the collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters, Executive Services and Communications Directorate, Information Management Division and to the Office of Management and Budget, Paperwork Reduction Project (0710-0003). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number Please DO NOT RETURN your form to either of those addresses. Completed applications must be submitted to the District Engineer having jurisdiction over the location of the proposed activity. PRIVACY ACT STATEMENT Authorities: Rivers and Harbors Act, Section 10, 33 USC 403; Clean Water Act, Section 404, 33 USC 1344; Marine Protection, Research, and Sanctuaries Act, Section 103, 33 USC 1413; Regulatory Programs of the Corps of Engineers; Final Rule 33 CFR 320-332. Principal Purpose: Information provided on this form will be used in evaluating the application for a permit. Routine Uses: This information may be shared with the Department of Justice and other federal, state, and local government agencies, and the public and may be made available as part of a public notice as required by Federal law. Submission of requested information is voluntary, however, if information is not provided the permit application cannot be evaluated nor can a permit be issued. One set of original drawings or good reproducible copies which show the location and character of the proposed activity must be attached to this application (see sample drawings and/or instructions) and be submitted to the District Engineer having jurisdiction over the location of the proposed activity. An application that is not completed in full will be returned. (ITEMS I THRU 4 TO BE FILLED BY THE CORPS) I APPLICATION NO. 2, FIELD OFFICE CODE 3, DATE RECEIVED 4, DATE APPLICATION COMPLETE (ITEMS BELOW TO BE FILLED BY APPLICANT} 5. APPLICANT'S NAME 8. AUTHORIZED AGENT'S NAME AND TITLE (agent is not required) First - JOHN Middle - Last - BAALKE First - JOEL Middle - Last - GROVES Company - Tribal Administrator, Pedro Bay Village Council Company - Project Engineer, Polarconsult Alaska, Inc, E-mail Address - J.BAALKE@PEDROBAY.COM E-mail Address - JOEL@POLARCONSULT.NET 6. APPLICANT'S ADDRESS: 9, AGENT'S ADDRESS: Address- PO BOX 47020 Address- 1503 W 33RD AVENUE 9310 City - PEDRO BAY State - AK Zip - 99647 Country - USA City - ANCHORAGE State - AK Zip - 99503 Country - USA 7 APPLICANT'S PHONE NOs. WAREA CODE 10. AGENTS PHONE NOs. WAREA CODE a. Residence b. Business c, Fax a. Residence b. Business c, Fax 907-850-2225 907-258-2420 STATEMENT OF AUTHORIZATION 11. 1 hereby authorize, 402r pplication and to furnish, upon request, supplemental information in support of this SIGNATURE O PPLICANT DATE ME �OCATION, AND DESCRIPTION OF PROJECT OR ACTIVITY 12. PROJECT NAME OR TITLE (see instructions) KNUTSON CREEK HYDROELECTRIC PROJECT 13. NAME OF WATERBODY, IF KNOWN (if applicable) 14. PROJECT STREET ADDRESS (if applicable) KNUTSON CREEK Address N/A 15. LOCATION OF PROJECT Latitude: -N 59.81d Longitude: -W 154.13d City - PEDRO BAY State- AK Zip- 99647 16. OTHER LOCATION DESCRIPTIONS, IF KNOWN (see instructions) State Tax Parcel ID N/A Municipality N/A Section - 16,20,21.,28,29,33 Township - 004S Range - 028W (SEWARD MERIDIAN) tNU t-UKM 4345, OUT 2012 PREVIOUS EDITIONS ARE OBSOLETE. Page 1 of 3 17. DIRECTIONS TO THE SITE HIKE NORTH APPROXIMATELY ONE MILE ALONG EXISTING ATV TRAIL FROM QUARRY SITE NORTH OF / ADJACENT TO AIRPORT. ONCE AT KNUTSON CREEK, CONTINUE NORTHEAST UP CREEK APPROXIMATELY ONE MILE TO INTAKE SITE. COORDINATE WITH APPLICANT PRIOR TO VISIT FOR LOGISTIC SUPPORT, ACCESS AUTHORIZATION AND SAFETY BRIEFING. SEE ATTACHED NARRATIVE FOR PROJECT MAP. 18. Nature of Activity (Description of project, include all features) 200 KW RUN -OF -RIVER HYDROELECTRIC PROJECT ON KNUTSON CREEK TO SERVE VILLAGE OF PEDRO BAY. INCLUDES UNPAVED 18-FOOT WIDE ACCESS ROADS/TRAILS FROM VILLAGE OF PEDRO BAY, CONCRETE AND ROCK FILL DIVERSION/INTAKE STRUCTURE TO WITHDRAW 20 CUBIC FEET PER SECOND FROM KNUTSON CREEK, 24-INCH DIAMETER PENSTOCK, POWERHOUSE, TAILRACE RETURNING ALL WATER TO CREEK, UNDERGROUND ELECTRIC POWER EXTENSION FROM VILLAGE DISTRIBUTION SYSTEM TO HYDRO POWERHOUSE, UNDERGROUND CONTROL CABLE CONNECTION TO EXISTING DIESEL POWERHOUSE, AND APPURTENANT FACILITIES AND IMPROVEMENTS. SEE ATTACHED NARRATIVE FOR DETAILS. 19. Project Purpose (Describe the reason or purpose of the project; see instructions) THIS PROJECT WILL PROVIDE A RENEWABLE SOURCE OF ELECTRICITY TO THE VILLAGE OF PEDRO BAY TO REDUCE CONSUMPTION OF DIESEL FUEL BURNED FOR ELECTRICITY GENERATION. THIS PROJECT WILL REDUCE AND STABILIZE ELECTRICITY COSTS IN THE COMMUNITY. CONSTRUCTION IS ESTIMATED TO COMMENCE IN MAY 2021 AND BE COMPLETED IN OCTOBER 2022. USE BLOCKS 20-23 IF DREDGED ANDIOR FILL MATERIAL IS TO BE DISCHARGED 20. Reason(s) for Discharge NO DREDGING IS PROPOSED FOR THIS PROJECT. FILL MATERIAL IS REQUIRED TO (1) CONSTRUCT ACCESS ROADS, TRAILS, AND OTHER CIVIL SITE WORK TO BUILD AND OPERATE THE PROJECT, AND (2) CONSTRUCT THE DIVERSION AND INTAKE STRUCTURE TO (a) DIRECT PROJECT WATER INTO PENSTOCK, (b) SAFELY PASS KNUTSON CREEK FLOOD FLOWS BACK INTO THE CREEK CHANNEL DOWNSTREAM OF THE DIVERSION STRUCTURE, AND (c) PROVIDE FOR FISH PASSAGE AROUND THE DIVERSION STRUCTURE. SEE ATTACHED NARRATIVE FOR DETAILS. 21. Type(s) of Material Being Discharged and the Amount of Each Type in Cubic Yards: Type Type Type Amount in Cubic Yards Amount in Cubic Yards Amount in Cubic Yards APPROX 160 CYDS CONCRETE APPROX 3,260 CYDS MINERAL FILL 22. Surface Area in Acres of Wetlands or Other Waters Filled (see instructions) Acres 0.34 ACRES or Linear Feet 23. Description of Avoidance, Minimization, and Compensation (see instructions) PROJECT LAYOUT HAS BEEN ADJUSTED IN CONSULTATION WITH STATE RESOURCE AGENCIES TO AVOID AND MINIMIZE IMPACTS TO WETLANDS AND WATERS OF U.S. AREA IMPOUNDED BY THE DIVERSION STRUCTURE (SEE FIGURE 7) AND TAILRACE FOOTPRINT (SEE FIGURE 8) PROVIDE MITIGATION/COMPENSATION FOR PROJECT IMPACTS. SEE ATTACHED NARRATIVE FOR DETAILS. ENG FORM 4345, OCT 2012 Page 2 of 3 24. Is Any Portion of the Work Already Complete?F-]Yes FX-JNo IF YES, DESCRIBE THE COMPLETED WORK 25. Addresses of Adjoining Property Owners, Lessees, Etc., Whose Property Adjoins the Waterbody of more than can be entered here, please attach a supplemental list). a. Address- PEDRO BAY CORPORATION -- 721 DEPOT DRIVE City - ANCHORAGE State - AK Zip - 99501 b. Address - city - State - Zip - c. Address - city - State - Zip - d. Address - City - State - Zip - a. Address - City - State - Zip - 26. List of Other Certificates or Approvals/Denials received from other Federal, State, or Local Agencies for Work Described in This Application. AGENCY TYPE APPROVAL* IDENTIFICATION DATE APPLIED DATE APPROVED DATE DENIED NUMBER FERC NON JURIS. DI- 14-06 2014-07-21 2015-09-09 ADFG FISH HABITAT - 2016-03-02 PENDING ADNR WATER RIGHTS L AS 33 115— 2019-12-09 PENDING ADNR DAM SAFETY 1j tA ,2q 2(�20 - G -- 2 8 Would include but is not restricted to zoning, building, and flood plain permits 27 Application is hereby made for permit or permits to authorize the work described in this application. I certify that this information in this application is comp) -0- and accurate. I possess the authority to undertake the work described herein or am acting as the duly authorized agent of the applica' . i = 2019-12-09 Zo-zo - 8 - —3 SIGNATURE APPLICANT DATE SIGNATURE OF AGENT DATE The Application must be signed by the person who desires to undertake the proposed activity (applicant) or it may be signed by a duly auth '-drized agent if the statement in block 11 has been filled out and signed, 18 U.S.C. Section 1001 provides that: Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly and willfully falsifies, conceals, or covers up any trick, scheme, or disguises a material fact or makes any false, fictitious or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false, fictitious or fraudulent statements or entry, shall be fined not more than $10,000 or imprisoned not more than five years or both. ENG FORM 4345, OCT 2012 Page 3 of 3