NOTES
1. THIS PROPERTY BOUNDARY IS TENTATIVE. ACCURATE SURVEY INFORMATION WAS NOT AVjILABLE FOR ALL ELEMENTS OF THE
PROJECT AT TIME OF EXHIBIT PREPARATION.
2. COMMUNICATION LINE WITHIN ELFIN COVE FROM USS 2950 LOT 40A TO THE EXISTING PTWERHOUSE ON USS 2946 LOT 13A
FOLLOWS AN EXISTING PUBLIC RIGHT OF WAY ACROSS MULTIPLE PRIVATE PROPERTIES (SITK RECORDING DISTRICT, BOOK 137, PAGE
756). THE RIGHT OF WAY DESCRIPTION IS "AN EXISTING PUBLIC TRAIL WITHIN 50 FEET OFI THE LINE OF MEAN HIGH WATER" A
METES AND BOUNDS DESCRIPTION OF THIS RIGHT OF WAY IS NOT KNOWN TO EXIST.
3. PUBLIC LAND OUTSIDE THE ELFIN COVE TOWNSITE IS UNSURVEYED.
4. ALL LAND OUTSIDE OF THE ELFIN COVE TOWNSITE, AND USS 2950 LOT 40A WITHIN THE. ELFIN COVE TOWNSITE, IS FEDERAL LAND
MANAGED BY THE U.S. FOREST SERVICE AS PART OF THE TONGASS NATIONAL FOREST.
5. DRAWING COORDINATES ARE NAD 83, UTM ZONE 8, U.S. SURVEY FOOT. VERTICAL DATUM IS MEAN LOW WATER.
I
I
UPPER INTAKE
AT CROOKED CREEK
COVE ACCESS TRAIL W/ UG .
ELECTRIC AND COMM. CABLES
_ _ _ RANGE 55 EAST
Q 36 31 RANGE
USS 2950
EXISTING ECUC ELECTRIC I DISTRIBUTION SYSTEM LOT 40A (USFS)
START PRIMARY ELECTRIC EXTENSION THIS PROJECT /
START COVE ACCES$ TRAIL THIS PROJECT
PROPOSED COMM, LINE WITHIN EXISTING PUBLIC RIG� HT OF WAY s , . "1" LOWER POWERHOUSE
H-6
EXISTING DIESEL POWER PLANT
1 PROJECT BOUNDARY MAP
L/TSCALE- 1 INCH = 400 FEET
NO. DATE
REVISIONS
Alt
. a
� r
.J a
9 `1!
o �
\
� s
C51-45A USS 2951
C1L1 USS 12199
C21-1 USS 12199
.I
J '
PERMIT DRAWING FOR FERC
LICENSE APPLICATION
65% DESIGN PROGRESS PLOT
NOT FOR CONSTRUCTION
H-1
CROOKED CREEK TRAIL W/ UG PENSTOCK
UPPER POWERHOUSE
H-14 /
JIM'S LAKE
RESERVOIR
/
BM-2
S L35 s\�.
31
JIM'S LAKE ACCESS TRAIL W/
PENSTOCK, ELECTRIC, COMMS.
polarconsult
alaska, inC•
DATE:
5/14/20
DESIGNED:
ENERGY SYSTEMS * ENVIRONMENTAL
SERVICES • ENGINEERING DESIGN
DRAWN:
JDG
CHECKED:
1503 WEST 33RD AVE, #310
PHONE (907) 258-2420
FILE:
ELV_DES3.DWG
ANCHORAGE, ALASKA 99503
FAX (907) 258-2419
PENSET:
color_pdf_hydro
1 g'45'E
i
o z
Z V
W
APPROXIMATE MEAN
DECLINATION IN
PROJECT AREA, 2015.
(NOAA CHART 17302),
a
��mmmE=
.: ,.
POINT
NORTHING
EASTING
C21-1 USS 12199
1 380 814.71
—21 183 388.90
C1 L1 USS 12199
1,380,925.6a
—21 182 995.02
C51-45A USS 2951
1,380,974.37
—21 182 933.47
H-1
1,352,295.30
—21,182,029.82
H-8
1 384 749.85
—21 159 098.88
H-14
1 385 345.43
—21 159 409.82
9M-2
1,384,535.48
—21,156,352.15
LOCATION MAP
PROJECT BOUNDARY MAP
CROOKED CREEK AND JIM'S LAKE HYDRO PROJECT
FERC P-14514 - ELFIN COVE, ALASKA
0 400 800 1200 1 600 FEET
1 " a 400'
EXHIBIT G I SHEET G1.1 OF 1