Loading...
HomeMy WebLinkAboutG9d-150311-FERC_ECUC_TLP Approval_3032(30316038)FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D. C. 20426 March 11, 2015 OFFICE OF ENERGY PROJECTS Project No. 14514-001Alaska Crooked Creek and Jim’s Lake Hydroelectric Project Community of Elfin Cove, dba Elfin Cove Utility Commission Jane Button Elfin Cove Utility Commission P.O. Box 2 Elfin Cove, AK 99825 Reference: Authorization to Use the Traditional Licensing Process Dear Ms. Button: In a letter filed on February 2, 2015, you requested to use the Traditional Licensing Process (TLP) in preparing a license application for the 140-kilowatt Crooked Creek and Jim’s Lake Hydroelectric Project, located on Crooked Creek and Jim’s Lake near the Community of Elfin Cove in the Sitka Recording District, Alaska. On the same date, you also filed a notice of intent and pre-application document (PAD) for the proposed project. On February 24, 2015, you filed documentation with the Commission showing that you published a notice of the request to use the TLP in the February 3, 2015 edition of the Juneau Empire. Your notice contained the information required in section 5.3(d)(2) of the Commission’s regulations, including a statement requesting that comments on the request to use the TLP be filed with the Commission by March 5, 2015. No comments have been received in response to the notice or your PAD. Therefore, based on the information that you’ve provided that indicates that the complexity of the resource issues is believed to be small and the level of anticipated controversy is expected to be minimal, I am granting your request. Section 4.38 of the Commission’s regulations describes the pre-filing steps that need to be completed when preparing an application for a hydropower license under the TLP, including consultation and conducting necessary studies [18 C.F.R. §4.38(a)-(e)]. Specific steps that will need to be carried out during pre-filing consultation include an initial joint agency/public meeting and site visit [§4.38(b)(3)]; an opportunity for 20150311-3032 FERC PDF (Unofficial) 03/11/2015 2 participants to request studies [§4.38(b)(5)]; preparation and participant review of a draft application [§4.38(c)(4)]; and a meeting to resolve any disputes on the draft application [§4.38(c)(6)]. Please note that the initial joint agency/public meeting, is required to be held no sooner than 30 days, nor later than 60 days, from the date of this letter [§4.38(b)(3)(ii)]. If you have any questions, please contact Sean O’Neill at (202) 502-6462 or via email at sean.oneill@ferc.gov. Sincerely, Vince Yearick Director Division of Hydropower Licensing cc:Mailing List Public Files Joel Groves, PE Polarconsult Alaska, Inc. 1503 West 33rd Avenue, Suite 310 Anchorage, Alaska 99503 20150311-3032 FERC PDF (Unofficial) 03/11/2015 Document Content(s) P-14514-001Letter2.DOC................................................1-2 20150311-3032 FERC PDF (Unofficial) 03/11/2015