Loading...
HomeMy WebLinkAboutAttachment 1 - schedule and milestonesAttachment 1 (1 page) Milestones Tasks Start Date End Date Deliverables Project scoping and contractor solicitation Advertise for design consultant August 2016 August 2016 design contract Permit applications Submit applications October 2016 April 2017 CBS building permit application Final environmental assessment and mitigation plans NA NA NA work is in existing building Resolution of land use, right of way issues NA NA NA work is in existing building Permitting, rights-of-way, site control NA NA NA work is in existing building Final system design Prepare 100% plans and specifications September 2016 April 2017 final drawings and specifications Final cost estimate Prepare cost estimate from 100% plans April 2017 April 2017 final cost estimate Updated economic and financial analyses Detailed financial analysis based on chosen business structure and applicable costs, revenues and incentives May 2017 May 2017 addendum to financial and economic analysis Power or heat sale agreements in place NA NA NA no sales anticipated Final business and operational plan NA NA NA no sales anticipated Design and feasibility requirements Construction plan and schedule; commissioning plan and schedule; modifications to final design during construction May 2017 May 2017 bid-ready documents Bid documents Advertise for bids May 2017 May 2017 bids Vendor selection and award Review bids and select lowest responsive and responsible bidder June 2017 July 2017 construction contract Construction – unique to each project Actively track project costs against the project budget; propose budget modifications as needed; manage cost overruns August 2017 November 2017 functional heat pump system Integration and testing Continuous monitoring to verify and update projections of renewable resource availability November 2017 November 2017 commissioning and test reports Decommissioning of old system Only partial; some components of old system will remain to complement new system November 2017 November 2017 note: portions of old system will be integrated into new system Final acceptance, commissioning and start-up Final project report including as-built specifications and drawings, final budget, schedule and recommendations December 2017 December 2017 Operations reporting Periodic operation and maintenance reports as required by grant, including actual O&M, fuel, and equipment costs; O&M measures and schedule; energy output; project availability; conversion efficiency; renewable energy resource; and recommendations December 2017 December 2027 Phase III - Final Design & Permitting Phase IV - Construction