Loading...
HomeMy WebLinkAboutAttachment 6 - ADEC intended use plan ALASKA CLEAN WATER FUND STATE WASTEWATER LOAN PROGRAM INTENDED USE PLAN - AMENDED FINAL FFY15 Grant Allotment State Fiscal Year 2016 Submitted to the U.S. Environmental Protection Agency By Alaska Department of Environmental Conservation Division of Water July 2015 CW Priority Planning List Appendix Ia IUP - FINAL Rank Score APDES Permit Number Category Community Project Title Project Description Requested Assistance Amount Finance Charge Rate Term (Yrs) Green Project Amount1 Green Project Type1 Estimated Binding Commitment Estimated Construction Start Sustainability Policy2 21 315 2003db00 37 III(b)Kotzebue Lift Station No.12 Replacement Install new energy efficient above ground pumps, SCADA Control Systems,new building enclosure, and wetwell replacement. It will also replace/upgrade gravity & Force Main piping & manholes. $1,500,000 1.50%20 $300,000 ENG-BC 7/4/2015 6/6/2016 Fix it First 22 315 AK- 0021431 I Anchorage - AWWU AWWTF Improvements  Remove the obsolete sludge incinerator No. 1, improvements to stabilize the slopes and foundation of the effluent outfall structure and upgrade the HVAC in the Old Raw Sludge Pump Station. $1,100,000 1.50%20 10/2/2015 11/19/2015 Fix it First 23 310 AK- 0023213 I Juneau Biosolids Treatment Project  Selection of energy efficient sludge dryer system; design and build headworks and other treatment improvements; and, design and begin construction of dryer and associated infrastructure installation. $10,000,000 1.50%20 $2,000,000 ENG-BC 6/1/5/15 7/1/2015 Improve TFM 24 305 Pending I Mat-Su Borough Mat-Su Septage & Leachate Treatment Facility Design and construct a new energy efficient septage and leachate facility to minimize septage and leachate disposal costs and environmental impacts in the Matanuska-Susitna Valley $22,000,000 1.50%20 $4,400,000 ENG-BC 6/15/2015 2/27/2017 Improve TFM 25 300 2003db00 37 III(b)Kotzebue Lift Station No.1 Replacement/Upgrade Replace submersible pumps with highly energy efficient above ground pumps, new electrical components/SCADA, and construct a building enclosure over an existing wetwell. $600,000 1.50%20 $120,000 ENG-BC 6/4/2015 6/6/2016 Fix it First 26 300 2003db00 37 III(b)Kotzebue Lift Station No.7 Replacement/Upgrade Replace submersible pumps with highly energy efficient above ground pumps, new electrical components/SCADA, and construct a building enclosure over an existing wetwell. $600,000 1.50%20 $120,000 ENG-BC 6/4/2015 6/6/2016 Fix it First 27 280 AK- 0021385 IV(a)Haines Moose Lane Sewer Main Extension Extend approximately 1,050 feet of 6" PVC pipe on Moose Lane and North Sawmill Road in order to bring service to approximately eight properties currently not served by the utility. $158,000 1.50%20 9/1/2015 6/1/2016 Improve TFM 28 280 AK- 0021547 I Corodva Wastewater Treatment Plant Blower Upgrades Replace one pump and upgrade to High Speed Turbine (HST) blowers and/or install variable frequency drives for better energy efficiency. $200,000 1.50%20 $90,000 ENG-BC 6/18/2015 9/21/2015 Fix it First 29 220 AK- 0023213 I Juneau Juneau Waste Water Plant Upgrades  The initial phase of this infrastructure upgrade project replaces severly corroded existing cat walk structures in the Aeration Basin and Digester buildings. $2,000,000 1.50%20 5/31/2015 2/1/2016 Fix it First 30 220 AK- 0023213 I Sitka WWTP HVAC improvements Replace oil-fired boilers with an energy efficient heat pump utilizing treated effluent as a heat source. Additinoally, replace existing unit heaters, supply fans, exhaust fans and scrubbers. $2,832,500 1.50%20 $1,416,250 ENG-BC 7/1/2015 3/1/2017 Fix it First 31 220 AK- 0023213 I Sitka WWTP building envelope improvements Replace doors, windows, insulation, sheathing, and wooden cladding to improve the facility's insulation and moisture resistance, and reduce energy needed to maintain temperatures in the facility. $1,825,000 1.50%20 $1,825,000 ENG-BC 7/1/2015 5/1/2018 Fix it First 32 215 AK- 0021431 I Anchorage - AWWU Asplund WWTF Sludge Dewatering Replacement  Replace two of the three belt filter presses at the AWWTF with new sludge dewatering equipment, and upgrade the thickened sludge piping in the vicinity of the belt filter presses. $4,250,000 1.50%20 1/15/2016 2/27/2017 Fix it First  Disadvantaged Community (criteria may be referenced on page 10)Total Requested Amount:47,065,500$ Equivalency Project (criteria may be referenced on page 9)Total Green Amount:10,271,250$ Extra 50 points for "ready to go projects," approved construction by February 13, 2015 Total Priority & Planning Amount:102,730,083$ Total Priority & Planning Green Amount:12,507,500$ 2 Sustainability Policy - "Fix it First" - fix existing critical infrastructure; "Improve TFM" - improve technical, financial and managerial capacity of the system; and, "Planning" - planning and development of alternative projects that reflect the full life cycle cost of infrastructure. ALASKA CLEAN WATER FUND Point Source Funding Priority Planning List - Amended (Continued) Fiscal Year 2016 1 Green Project Reserve Category Type: GIF- Green Infrastructure, WTR - Water Efficiency, ENG - Energy Efficiency & EIN - Environmentally Innovative. Green Project Justification Type: BC - Business Case / CAT - Categorical. Funding for Green projects is based on meeting a minimal required amount of $833,300 under the State's capitalization grant for the program. Note, an extra 25 scoring points are awarded to Green projects.