Loading...
HomeMy WebLinkAboutCover Letter - Stetson Grant Application - SignedCMUWd AMNAF POWERING ALASKA'$ FUTURE September 24, 2013 Shawn Calfa, Grant Administrator Alaska Energy Authority 813 West Northern Lights Blvd. Anchorage, AK 99503 Re: AEA 2014-006 — RE Fund Grant Application Round VI1 Dear Mr. Calfa: Enclosed you will find Chugach Electric Association's (Chugach's) renewable energy grant application for construction of a diversion project at Stetson Creek. This diversion project, currently being constructed, will increase the hydroelectric energy production from the Cooper Lake power plant by an estimated 6,020 NM per year. The grant application package includes: • The grant application including a grant/budget worksheet and a costlbenefit worksheet • Pictures of construction activities and material Cooper Lake dam and staging area Excavation in Stetson Canyon - Finishing slopes along the diversion alignment HDPE welding tent and machine Venting pipe • A map of the area where the project is located • A signed resolution from Chugach's Board of Directors • Letters of Support • A summary of the value of fuel savings due to incremental hydro production and ongoing operation of the existing Cooper Lake facility • An organizational chart of Chugach's Power Supply Division ■ An organizational chart of the project team and resumes for the project manager, key staff and contractors The point of contact for this grant application is Ron Vecera, Chugach's Director of Renewable Energy Business Development. He can be reached directly at 762-4759. Sincerely, Bradley W. Evans Chief Executive Officer Chugach Electric Association, Inc. 5601 E1edron Drive, P.O. Box 196300, Anchorage, Alasko 995196300 s (907) 5637494 Fox (9071562-0027 F (800) 4787494 www.chugachelectric,com • info@chugoc6electric.com