Loading...
HomeMy WebLinkAboutProject DrawingsRevision No.DescriptionDateDesignedDrawnCheckedDateDrawing NumberCONCEPTUAL PIPING SCHEMATICCOMBINED WOOD BOILERAND SOLAR THERMAL SYSTEMFOR SHOP BUILDINGG1.0ACBLJBACB12/02/10SHEET OF12CHICKALOON VILLAGE TRADITIONAL COUNCILGATE VALVEHOSE BIBCHECK VALVEAIR VENTPUMPTEMPERATURE INDICATOR (GAUGE)PRESSURE INDICATOR (GAUGE)PRESSURE RELIEF VALVESOLAR THERMAL COLLECTORSCOLLECTOR LOOP IS 50% PROPYLENE GLYCOLLEGENDDIFFERENTIALCONTROLLERGOBI410GOBI410GOBI410GOBI410GOBI410GOBI410GOBI410GOBI410EXPANSIONTANKTTTIFTPITTTITIFTPIFLAT PLATEHEAT EXCHANGERHX-148 MBHGARNWHS 2000EXISITINGWEIL MCLAINOIL BOILEREXISTINGRADIANT FLOORSYSTEMEXISTINGBASEBOARDSYSTEMEXISTING DHWHX & LOADMMMTEMPERATURE TRANSMITTERFLOW TRANSMITTERTTFLAT PLATEHEAT EXCHANGERHX-2180 MBHBALANCING VALVENOTE:THIS SCHEMATIC IS FOR CONCEPTUAL PURPOSES ONLY.SPECIFIC MECHANICAL EQUIPMENT SIZING AND PIPING DETAILSWILL BE PRODUCED DURING DESIGN PHASE OF PROJECT.CIRCULATION PUMPTO HX-1 (4 GPM MAX)3 SPEED PUMP FORWINTER, SHOULDER &SUMMER SEASONS(15 GPM MAX)1" TYP L COPPER PIPE1" TYP L COPPER PIPE1-1/4" TYP L COPPER PIPE1-1/4" TYP L COPPER PIPEWATER WATERWATEREXISTING OIL BOILER WILL CARRYHEAT LOAD WHEN WOOD OR SOLARHEAT IS NOT PRESENTETASAIR SEPARATOREXPANSION TANK1,825 GALWATERSTORAGEETAS