Loading...
HomeMy WebLinkAbout130924_Letter of Support_MF September 24, 2013    Sara Fisher‐Goad, Executive Director  Alaska Energy Authority  813 West Northern Lights Boulevard  Anchorage, Alaska 99503    RE: Tsaina Lodge Cascade Creek Hydro – Feasibility Study    Dear Ms. Fisher‐Goad:    RIM First People supports and asks the state for funding the Tsaina Lodge (Blue Hole Properties, LLC) to  conduct a feasibility study for a proposed run‐of‐river hydroelectric project on Cascade Creek near the  Tsaina Lodge in Thompson Pass north of Valdez.  The project would sell power to Copper Valley Electric  Association, Inc. (CVEA), displacing fuel burned for power generation.      Cascade Creek drains approximately 6.7 square miles of the Chugach Range. The proposed run‐of‐river  hydro project would divert an estimated 5 to 20 cfs from Carlo Creek at an elevation of approximately 2,100  to 2,300 feet, divert it through an approximately 2,000 to 4,000 foot long penstock to a powerhouse on the  lodge property at MP 35 Richardson Highway.  Estimated installed capacity is 200 to 800 kW, and annual  energy generation is estimated at 1,000,000 to 3,000,000 kWh.  The feasibility study would define the most  economic project configuration.    Tsaina Lodge has already completed initial environmental screening and resource agency consultations, and  has not identified any regulatory or permitting barriers to this project.  These reconnaissance assessments  indicate the project would be beneficial to the CVEA system and ratepayers by reducing diesel fuel  consumption and increasing the renewable energy used on the CVEA system.      Thank you for your support of this project and do not hesitate to contact me if you have any further  questions.    Sincerely,      Michael Fredericks  President    cc: Jeff and Ingrid Fraser, Tsaina Lodge