Loading...
HomeMy WebLinkAboutAppendixF1toF3CASCADE CREEK HYDROELECTRIC PROJECT FEASIBILITY STUDY GRANT APPLICATION   BLUE HOLE PROPERTIES, LLC  APPENDIX F  AEA RFA 2014‐006: ROUND 7, RENEWABLE ENERGY FUND  PAGE 1                      APPENDIX F: SUPPLEMENTAL PROJECT INFORMATION      F1: Project Maps      pages 2‐5  F2: Site Photographs      pages 6‐7  F3: Project Cost Estimate     page 8  F4: Existing Reconnaissance‐Level Assessments   ● Reconnaissance Assessment Memo (Polarconsult, 9/11/2013)  ● Hydrology Memo (Polarconsult, 2/15/2013)  ● Hydro Reconnaissance Memo (Summit, 11/5/2012)  ● Hydro Reconnaissance Memo (Summit, 6/14/2012)  ● Budgetary Quotes for Turbine/Generator Options (Canyon, 6/8/2012)  ● Hydro Reconnaissance Memo (Summit,  2/16/2012)  ● Renewable Strategies Report (YourCleanEnergy, 7/8/2009)    CASCADE CREEK HYDROELECTRIC PROJECT FEASIBILITY STUDY GRANT APPLICATION   BLUE HOLE PROPERTIES, LLC  APPENDIX F  AEA RFA 2014‐006: ROUND 7, RENEWABLE ENERGY FUND  PAGE 2  Appendix F.1:  Project Maps    Map 1:  Project Location  CASCADE CREEK HYDROELECTRIC PROJECT FEASIBILITY STUDY GRANT APPLICATION  BLUE HOLE PROPERTIES, LLC  APPENDIX F AEA RFA 2014‐006: ROUND 7,RENEWABLE ENERGY FUND PAGE 3 Map 2:  General Land Status in Project Area (Downloaded from BLM SDMS Website, September 11, 2013)                       Proposed Project Study AreaTsaina Lodge T8S  T9S R2W   R1WRichardson Highway  CASCADE CREEK HYDROELECTRIC PROJECT FEASIBILITY STUDY GRANT APPLICATION  BLUE HOLE PROPERTIES, LLC  APPENDIX F AEA RFA 2014‐006: ROUND 7,RENEWABLE ENERGY FUND PAGE 4 Map 3:  ADF&G Anadromous Fish Atlas for Project Area (Downloaded from ADFG Website, September 11, 2013)  Nearest Listed Anadromous Fish Habitat (downstream on Little Tonsina River)CascadeCreekRichardson Highway CASCADE CREEK HYDROELECTRIC PROJECT FEASIBILITY STUDY GRANT APPLICATION  BLUE HOLE PROPERTIES, LLC  APPENDIX F AEA RFA 2014‐006: ROUND 7,RENEWABLE ENERGY FUND PAGE 5 Map 4:  Topography in Project Area and Proposed Penstock Profile  CASCADE CREEK HYDROELECTRIC PROJECT FEASIBILITY STUDY GRANT APPLICATION   BLUE HOLE PROPERTIES, LLC  APPENDIX F  AEA RFA 2014‐006: ROUND 7,RENEWABLE ENERGY FUND PAGE 6  Appendix F.2: Site Photographs  Photograph 1:  Lodge Property Looking Southbound Towards Hydro Site                                Photograph 2:  View of Hydro Site from Richardson Highway MP 34, approximately one mile  south of Tsaina Lodge.  Hydro site is obscured by road‐side vegetation.  Approximate penstock /  access route  Image from Google Streetview, imagery ~fall 2011. Image from Google Streetview, imagery ~fall 2011. CASCADE CREEK HYDROELECTRIC PROJECT FEASIBILITY STUDY GRANT APPLICATION   BLUE HOLE PROPERTIES, LLC  APPENDIX F  AEA RFA 2014‐006: ROUND 7,RENEWABLE ENERGY FUND PAGE 7  Photograph 3:  View of Hydro Site from Richardson Highway MP ~34.9, approximately ½ mile  north of Tsaina Lodge.  Hydro site is visible to southbound travelers for approximately ½ mile  from this road cut to the lodge.                                Photograph 4:  Oblique Aerial View of Tsaina Lodge.  Cascade Creek is at picture‐right.                           Hydro Site Tsaina Lodge  Image from Google Streetview, imagery ~fall 2011. CASCADE CREEK HYDROELECTRIC PROJECT FEASIBILITY STUDY GRANT APPLICATION   BLUE HOLE PROPERTIES, LLC  APPENDIX F  AEA RFA 2014‐006: ROUND 7,RENEWABLE ENERGY FUND PAGE 8  Appendix F.3: Preliminary Project Cost Estimate for Cascade Creek  A preliminary cost estimate (Table 1) was developed for Cascade Creek based on the assumed  project configuration shown on the maps in section F.1, project technical data as described in  this application, preliminary estimates of material quantities, and estimated unit costs for these  materials.    Table 1: Preliminary Cascade Creek Hydroelectric Project Cost Estimate  Item Estimated Cost  Preconstruction Cost (reconnaissance, feasibility, design, permitting) $340,000 Construction    Power Line Connection (not including line extension) $40,000   Site Access Roads / Trails $100,000   Diversion / Intake Structure $270,000   Penstock $250,000   Powerhouse Building, Tailrace $130,000   Turbine / Generator $300,000   Controls / Switchgear $60,000   Construction Equipment $90,000   Shipping $80,000 Direct Construction Cost Total $1,320,000   Project Management $70,000   Construction Engineering $70,000 Total Installed Cost $1,800,000   Contingency (25%) $450,000 Project Cost Estimate $2,250,000