APPENDIX F: SUPPLEMENTAL PROJECT INFORMATION
F1: Project Maps pages 2‐5
F2: Preliminary Project Cost Estimate page 6
F3: Preliminary Hydrology Estimate page 7
CARLO CREEK HYDROELECTRIC PROJECT RECONNAISSANCE STUDY GRANT APPLICATION
NATIVE VILLAGE OF CANTWELL APPENDIX F
AEA RFA 2014‐006: ROUND 7,RENEWABLE ENERGY FUND PAGE 2 OF 7
Map 1: Project Location
R7W R6W
T15S
T16S
CARLO CREEK HYDROELECTRIC PROJECT RECONNAISSANCE STUDY GRANT APPLICATION NATIVE VILLAGE OF CANTWELL APPENDIX F AEA RFA 2014‐006: ROUND 7,RENEWABLE ENERGY FUND PAGE 3 OF 7 Map 2: General Land Status in Project Area (Downloaded from BLM SDMS Website, September 6, 2013) Proposed Project Study AreaProposed Penstock RouteParks HighwayT15S T16S R7W R6W
CARLO CREEK HYDROELECTRIC PROJECT RECONNAISSANCE STUDY GRANT APPLICATION NATIVE VILLAGE OF CANTWELL APPENDIX F AEA RFA 2014‐006: ROUND 7,RENEWABLE ENERGY FUND PAGE 4 OF 7 Map 3: ADF&G Anadromous Fish Atlas for Project Area (Downloaded from ADFG Website, September 6, 2013) Nearest Listed Anadromous Fish Habitat (downstream on Nenana River)Carlo Creek Parks Highway
CARLO CREEK HYDROELECTRIC PROJECT RECONNAISSANCE STUDY GRANT APPLICATION NATIVE VILLAGE OF CANTWELL APPENDIX F AEA RFA 2014‐006: ROUND 7,RENEWABLE ENERGY FUND PAGE 5 OF 7 Map 4: Topography in Project Area and Proposed Penstock Profile APPROXIMATE INTERTIE LOCATION
CARLO CREEK HYDROELECTRIC PROJECT RECONNAISSANCE STUDY GRANT APPLICATION
NATIVE VILLAGE OF CANTWELL APPENDIX F
AEA RFA 2014‐006: ROUND 7,RENEWABLE ENERGY FUND PAGE 6 OF 7
F.2: Preliminary Cost Estimate for Carlo Creek
A preliminary cost estimate (Table 1) was developed for Carlo Creek based on the assumed
project configuration shown on the maps in section F.1, project technical data as described in
this application, preliminary estimates of material quantities, and estimated unit costs for these
materials.
Table 1: Preliminary Carlo Creek Hydroelectric Project Cost Estimate
Item Estimated Cost
Preconstruction Cost (reconnaissance, feasibility, design, permitting) $470,000
Construction
Power Line Extension $110,000
Site Access Roads / Trails $530,000
Diversion / Intake Structure $520,000
Penstock $1,500,000
Powerhouse Building, Tailrace $600,000
Turbine / Generator $990,000
Controls / Switchgear $200,000
Construction Equipment $550,000
Shipping $210,000
Direct Construction Cost Total $5,210,000
Project Management $250,000
Construction Engineering $250,000
Total Installed Cost $6,180,000
Contingency (35%) $2,160,000
Project Cost Estimate $8,340,000
Estimated Installed Cost per kW $5,215
Comparison of project cost estimate against comparable Alaska hydro projects.
Carlo Creek Estimate:
Project Year
Commissioned
Capacity
(kW)
Installed
Cost per kW Notes
Carlo Creek (Estimate) NA 1,600 $5,215 Initial Estimate
Kasidaya Creek
(Skagway, AK) 2008 3,000 $3,300
Remote site south of Skagway.
Cost from Skagway News, Nov.
26, 2008.
South Fork
(Eagle River, AK) 2013 1,000 $3,000 Cost as reported by Owner.
CARLO CREEK HYDROELECTRIC PROJECT RECONNAISSANCE STUDY GRANT APPLICATION
NATIVE VILLAGE OF CANTWELL APPENDIX F
AEA RFA 2014‐006: ROUND 7,RENEWABLE ENERGY FUND PAGE 7 OF 7
Preliminary Hydrology Estimate for Carlo Creek Hydro Project
(showing existing normalized hydrology data for select regional streams and rivers)
0
1
2
3
4
5
6
7
January February March April May June July August September October November December
Day of YearCFS per Square Mile of BasinSusitna at Gold Creek
Seattle C nr Cantwell
Nenana R nr Windy
Nenana R nr Healy
Nenana R at Healy
Lignite C ab Mouth nr Healy
Teklanika R nr Lignite
Carlo Creek Model
40 cfs design flow
(40 cfs / 15.2 mi2= 2.6 cfs/mi2)
F.3: Preliminary Hydrology Estimate for Carlo Creek
Existing hydrology information collected by the U.S. Geological Survey for rivers and streams in
the general vicinity of Carlo Creek was reviewed to develop preliminary estimates of hydrology
for Carlo Creek. Figure 1 presents normalized stream flow for several gauged rivers in the Carlo
Creek region, and estimated hydrology for Carlo Creek. The preliminary design flow of 40 cubic
feet per second (cfs, equal to 2.6 cfs per square mile of basin area) is also shown on Figure 1.
The plant capacity factor is estimated at 45%.
Figure 1: Preliminary Hydrology Estimate for Carlo Creek