Loading...
HomeMy WebLinkAboutAppendixF_AddlInfoCARLO CREEK HYDROELECTRIC PROJECT RECONNAISSANCE STUDY GRANT APPLICATION   NATIVE VILLAGE OF CANTWELL  APPENDIX F  AEA RFA 2014‐006: ROUND 7,RENEWABLE ENERGY FUND  PAGE 1 OF 7                      APPENDIX F: SUPPLEMENTAL PROJECT INFORMATION      F1: Project Maps      pages 2‐5  F2: Preliminary Project Cost Estimate    page 6  F3: Preliminary Hydrology Estimate    page 7  CARLO CREEK HYDROELECTRIC PROJECT RECONNAISSANCE STUDY GRANT APPLICATION   NATIVE VILLAGE OF CANTWELL  APPENDIX F  AEA RFA 2014‐006: ROUND 7,RENEWABLE ENERGY FUND  PAGE 2 OF 7  Map 1:  Project Location  R7W    R6W  T15S  T16S  CARLO CREEK HYDROELECTRIC PROJECT RECONNAISSANCE STUDY GRANT APPLICATION NATIVE VILLAGE OF CANTWELL  APPENDIX F AEA RFA 2014‐006: ROUND 7,RENEWABLE ENERGY FUND PAGE 3 OF 7 Map 2:  General Land Status in Project Area (Downloaded from BLM SDMS Website, September 6, 2013)                       Proposed Project Study AreaProposed Penstock RouteParks HighwayT15S  T16S R7W   R6W CARLO CREEK HYDROELECTRIC PROJECT RECONNAISSANCE STUDY GRANT APPLICATION NATIVE VILLAGE OF CANTWELL  APPENDIX F AEA RFA 2014‐006: ROUND 7,RENEWABLE ENERGY FUND PAGE 4 OF 7 Map 3:  ADF&G Anadromous Fish Atlas for Project Area (Downloaded from ADFG Website, September 6, 2013)  Nearest Listed Anadromous Fish Habitat (downstream on Nenana River)Carlo Creek Parks Highway CARLO CREEK HYDROELECTRIC PROJECT RECONNAISSANCE STUDY GRANT APPLICATION NATIVE VILLAGE OF CANTWELL  APPENDIX F AEA RFA 2014‐006: ROUND 7,RENEWABLE ENERGY FUND PAGE 5 OF 7 Map 4:  Topography in Project Area and Proposed Penstock Profile APPROXIMATE INTERTIE LOCATION  CARLO CREEK HYDROELECTRIC PROJECT RECONNAISSANCE STUDY GRANT APPLICATION  NATIVE VILLAGE OF CANTWELL  APPENDIX F  AEA RFA 2014‐006: ROUND 7,RENEWABLE ENERGY FUND PAGE 6 OF 7  F.2:  Preliminary Cost Estimate for Carlo Creek  A preliminary cost estimate (Table 1) was developed for Carlo Creek based on the assumed  project configuration shown on the maps in section F.1, project technical data as described in  this application, preliminary estimates of material quantities, and estimated unit costs for these  materials.    Table 1: Preliminary Carlo Creek Hydroelectric Project Cost Estimate  Item Estimated Cost  Preconstruction Cost (reconnaissance, feasibility, design, permitting) $470,000 Construction    Power Line Extension  $110,000   Site Access Roads / Trails $530,000   Diversion / Intake Structure $520,000   Penstock $1,500,000   Powerhouse Building, Tailrace $600,000   Turbine / Generator $990,000   Controls / Switchgear $200,000   Construction Equipment $550,000   Shipping $210,000 Direct Construction Cost Total $5,210,000   Project Management $250,000   Construction Engineering $250,000 Total Installed Cost $6,180,000   Contingency (35%) $2,160,000 Project Cost Estimate $8,340,000 Estimated Installed Cost per kW $5,215 Comparison of project cost estimate against comparable Alaska hydro projects.    Carlo Creek Estimate:  Project Year  Commissioned Capacity  (kW)  Installed  Cost per kW Notes  Carlo Creek (Estimate) NA 1,600 $5,215 Initial Estimate  Kasidaya Creek   (Skagway, AK) 2008 3,000 $3,300  Remote site south of Skagway.  Cost from Skagway News, Nov.  26, 2008.  South Fork   (Eagle River, AK) 2013 1,000 $3,000 Cost as reported by Owner.  CARLO CREEK HYDROELECTRIC PROJECT RECONNAISSANCE STUDY GRANT APPLICATION  NATIVE VILLAGE OF CANTWELL  APPENDIX F  AEA RFA 2014‐006: ROUND 7,RENEWABLE ENERGY FUND PAGE 7 OF 7  Preliminary Hydrology Estimate for Carlo Creek Hydro Project (showing existing normalized hydrology data for select regional streams and rivers) 0 1 2 3 4 5 6 7 January February March April May June July August September October November December Day of YearCFS per Square Mile of BasinSusitna at Gold Creek Seattle C nr Cantwell Nenana R nr Windy Nenana R nr Healy Nenana R at Healy Lignite C ab Mouth nr Healy Teklanika R nr Lignite Carlo Creek Model 40 cfs design flow (40 cfs / 15.2 mi2= 2.6 cfs/mi2) F.3:  Preliminary Hydrology Estimate for Carlo Creek  Existing hydrology information collected by the U.S. Geological Survey for rivers and streams in  the general vicinity of Carlo Creek was reviewed to develop preliminary estimates of hydrology  for Carlo Creek.  Figure 1 presents normalized stream flow for several gauged rivers in the Carlo  Creek region, and estimated hydrology for Carlo Creek.  The preliminary design flow of 40 cubic  feet per second (cfs, equal to 2.6 cfs per square mile of basin area) is also shown on Figure 1.   The plant capacity factor is estimated at 45%.      Figure 1:  Preliminary Hydrology Estimate for Carlo Creek