Loading...
HomeMy WebLinkAboutGunnuk Creek Appendix BSeptember 3, 2013 Jodi Mitchell General Manager Inside Passage Electric Cooperative 12480 Mendenhall Loop Rd. Juneau, AK 99821 Subject: Gunnuk Creek Hydroelectric Project Feasibility Study -Budgetary Estimate Dear Ms. Mitchell: HDR Alaska, Inc. is pleased to provide you this estimate to conduct a feasibility study for a potential hydroelectric project on Gunnuk Creek near Kake, Alaska. Previous reconnaissance studies have indicated that the area may be well -suited for development of a small hydroelectric project that could reduce or eliminate the Kake Community's dependence upon expensive. diesel fuel generation. A detailed feasibility study is the logical next step towards development of a project. A feasibility study would include the following elements: • Installation of stream gages and development of long-term flow projections necessary to estimate the amount of energy; s Preliminary geotechnical investigations; • Development of preliminary engineering designs necessary to establish technical feasibility and develop cost estimates; • An assessment of fisheries, wildlife, wetlands, endangered species and cultural resources within the project area; • A jurisdictional analysis of the regulatory requirements for the project. A budgetary estimate for the feasibility study outlined above would be $300,000. We would be happy to provide you with a more detailed scope and budget upon request. If you have any questions, or would like to discuss further, please don't hesitate to contact myself or Paul Berkshire (paul.berkshirena,hdrinc.com) or at 907/360-1015. Sincerely, HDR Alaska, Inc. Mark Dalton Senior Vice President RDR Alaska, Inc. 2525CStreet Phone: (907) 644.2000 _ - I Suite 305 I Fax: (907) 644-2022 Anchorage, AK 99503-2632 wvwIttinnc.com