HomeMy WebLinkAboutRound 6 kipnuk copyRenewable Energy Fund Round 6 Grant Application AEA 13-006 Application Page 1 of 42 7/3/2011 Application Forms and Instructions This instruction page and the following grant application constitutes the Grant Application Form for Round 6 of the Renewable Energy Fund. An electronic version of the Request for Applications (RFA) and this form are available online at: http://www.akenergyauthority.org/RE_Fund-6.html • If you need technical assistance filling out this application, please contact Shawn Calfa, the Alaska Energy Authority Grant Administrator at (907) 771-3031 or at scalfa@aidea.org. • If you are applying for grants for more than one project, provide separate application forms for each project. • Multiple phases for the same project may be submitted as one application. • If you are applying for grant funding for more than one phase of a project, provide milestones and grant budget for each phase of the project. • In order to ensure that grants provide sufficient benefit to the public, AEA may limit recommendations for grants to preliminary development phases in accordance with 3 ACC 107.605(1). • If some work has already been completed on your project and you are requesting funding for an advanced phase, submit information sufficient to demonstrate that the preceding phases are satisfied and funding for an advanced phase is warranted. • If you have additional information or reports you would like the Authority to consider in reviewing your application, either provide an electronic version of the document with your submission or reference a web link where it can be downloaded or reviewed. REMINDER: • Alaska Energy Authority is subject to the Public Records Act AS 40.25, and materials submitted to the Authority may be subject to disclosure requirements under the act if no statutory exemptions apply. • All applications received will be posted on the Authority web site after final recommendations are made to the legislature. • In accordance with 3 AAC 107.630 (b) Applicants may request trade secrets or proprietary company data be kept confidential subject to review and approval by the Authority. If you want information is to be kept confidential the applicant must: o Request the information be kept confidential. o Clearly identify the information that is the trade secret or proprietary in their application. o Receive concurrence from the Authority that the information will be kept confidential. If the Authority determines it is not confidential it will be treated as a public record in accordance with AS 40.25 or returned to the applicant upon request. Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 2 of 42 7/3//2012 SECTION 1 – APPLICANT INFORMATION Name (Name of utility, IPP, or government entity submitting proposal) Kipnuk Light Plant Type of Entity: Fiscal Year End Electric Utility Tax ID # Tax Status: For-profit or X non-profit ( check one) Mailing Address P.O. Box 071 Kipnuk, Alaska 99614 Physical Address Kipnuk Alaska Telephone 907-896- 5427 Fax 907-896-5022 Email scarl@yahoo.com 1.1 APPLICANT POINT OF CONTACT / GRANTS MANAGER Name c/o Sam Carl General Manager Kipnuk Light Plant Title General Manager Mailing Address P.O. Box 71 Kipnuk, Alaska Telephone same Fax same Email same 1.2 APPLICANT MINIMUM REQUIREMENTS Please check as appropriate. If you do not to meet the minimum applicant requirements, your application will be rejected. 1.2.1 As an Applicant, we are: (put an X in the appropriate box) x An electric utility holding a certificate of public convenience and necessity under AS 42.05, or An independent power producer in accordance with 3 AAC 107.695 (a) (1), or A local government, or A governmental entity (which includes tribal councils and housing authorities); Yes 1.2.2 Attached to this application is formal approval and endorsement for its project by its board of directors, executive management, or other governing authority. If the Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 3 of 42 7/3//2012 or No applicant is a collaborative grouping, a formal approval from each participant’s governing authority is necessary. (Indicate Yes or No in the box ) Yes or No 1.2.3 As an applicant, we have administrative and financial management systems and follow procurement standards that comply with the standards set forth in the grant agreement. Yes or No 1.2.4 If awarded the grant, we can comply with all terms and conditions of the attached grant form. (Any exceptions should be clearly noted and submitted with the application.) Yes or No 1.2.5 We intend to own and operate any project that may be constructed with grant funds for the benefit of the general public. If no please describe the nature of the project and who will be the primary beneficiaries. Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 4 of 42 7/3//2012 SECTION 2 – PROJECT SUMMARY This is intended to be no more than a 1-2 page overview of your project. 2.1 Project Title – (Provide a 4 to 5 word title for your project) Kipnuk Wind Diesel Power Generation and Heating 2.2 Project Location – Include the physical location of your project and name(s) of the community or communities that will benefit from your project in the subsections below. The proposed project is a wind diesel system for the community of Kipnuk. The traditional council has selected and allocated land for the wind project. This property is west of the present and proposed power plant. 2.2.1 Location of Project – Latitude and longitude, street address, or community name. Latitude and longitude coordinates may be obtained from Google Maps by finding you project’s location on the map and then right clicking with the mouse and selecting “What is here? The coordinates will be displayed in the Google search window above the map in a format as follows: 61.195676.-149.898663. If you would like assistance obtaining this information please contact AEA at 907-771-3031. Kipnuk is a Yup”ik Eskimo community with a population of 680, located on the west bank of the Kugkaktlik River in the Yukon-Kuskokwim Delta,. Kipnuk is 85 air miles southwest of Bethel. It lies four miles inland from the Bering Sea coast. The community lies approximately 59.938890 degrees North Latitude and -164.041390 degrees West Longitude. ( Section 10, T003S, R086W, Seward Meridian.) Kipnuk is located in the Bethel Recording District. The community is located in a northerly marine climate. Annual precipitation averages 22 inches, with 43 inches of snow fall annually. Summer temperatures range from 41 to 57 F, and winter temperatures average 6 to 24 F. According to early BIA records, the village was established around 1922. A federally-recognized tribe is located in the community -- the Native Village of Kipnuk. Kipnuk is a traditional Yup'ik Eskimo community, maintaining a subsistence lifestyle. Commercial fishing is an important income source. The sale and importation of alcohol is banned in the village. According to Census 2010, there were 176 housing units in the community and 153 were occupied. Its population was 97.7 percent American Indian or Alaska Native; 2 percent white; 0.3 percent of the local residents had multi-racial backgrounds. Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 5 of 42 7/3//2012 Population data for Kipnuk shows a constant population growth since 1990. The current population is 680. Data for the last 5 years shows a growth of 7% that has slowed to 1.5% in the last year. 2.2.2 Community benefiting – Name(s) of the community or communities that will be the beneficiaries of the project. The primary beneficiary of this project is the community of Kipnuk ( pop 680). The secondary beneficiaries of this project will be the villages of Konginganak, Kwigillingok and Tuntutuliak, which are members of the Chaninik Wind Group (CWG). The CWG is an affiliation of village utilities which have formed a non profit group dedicated to working together to lower energy costs, decrease dependency on fossil fuels and foster economic development in their member villages. The CWG is working to develop wind based power systems in the region. The addition of wind turbines in Kipnuk will strengthen the Chaninik Wind Group as part of a regional support network. CWG provides training and many forms of technical support and assistance to its member villages. The shared activities are built around wind-diesel systems, and include collaboration on part and equipment, inventories, information services, metering, monitoring, and regional skills development and technology implementation. The wind equipment, training and operational system components will be common across the Chaninik Communities. This level of cooperation among villages has improved the reliability, performance and cost effectiveness of the wind systems. 2.3 PROJECT TYPE Put X in boxes as appropriate 2.3.1 Renewable Resource Type X Wind Biomass or Biofuels Hydro, including run of river Transmission of Renewable Energy Geothermal, including Heat Pumps Small Natural Gas Heat Recovery from existing sources Hydrokinetic Solar X Storage of Renewable Other (Describe) 2.3.2 Proposed Grant Funded Phase(s) for this Request (Check all that apply) Pre-Construction Construction Reconnaissance x Design and Permitting Feasibility x Construction and Commissioning Conceptual Design 2.4 PROJECT DESCRIPTION Provide a brief one paragraph description of your proposed project. Kipnuk Light Plant is proposing to complete the final design, permitting and construction of a community wind diesel system for the community of Kipnuk, Alaska. The project will be owned and operated by the Kipnuk Light Plant and the community of Kipnuk. Construction of the wind Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 6 of 42 7/3//2012 plant will be conducted in conjunction with the construction of a new school, powerplant and bulk fuel facility in the community. The new school is currently under construction and is anticipated to completed in late 2013, early 2014. Funding has been received for a new diesel powerplant and bulk fuel storage facility. The new powerplant construction will take place in the winter of 2014. The wind project would be completed at the same time. The design of the wind system has been completed and is straightforward, in that is similar to the systems which have been installed in Kongiganak, Kwigillingok and Tuntutuliak. The only design elements remaining to be completed, are: the installation and wiring diagrams for the specific installation of the load balancing boiler, system master control, communications gateways and static var compensation in the new powerplant. These design elements will be conducted concurrently with the design and construction of the new diesel powerhouse. Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 7 of 42 7/3//2012 2.5 PROJECT BENEFIT Briefly discuss the financial and public benefits that will result from this project, (such as reduced fuel costs, lower energy costs, etc.) The primary financial benefit from this project will be reduced fuel costs for the residents of Kipnuk. This in turn will result in lower stable, long term electrical generation and heating fuel costs. Simulations of wind resource versus load demand result in an estimated annual gross fuel savings of 71,385 gallons of diesel fuel used for power generation, and 7766 gallons in home heating fuel in 30 residences. These savings take into account the diesel generated electricity and heat displaced by the wind, and as well as the anticipated efficiency improvements due to new automated switchgear and improved diesel generation efficiency to be incorporated into the new powerplant. This estimate also recognizes a growth in the load, due to improvements in system reliability, and the end of power rationing measures which were the result of insufficient generation capacity. The wind system will also provide supplemental heat to the waste heat recovery loop from the power plant to community buildings, by plumbing a load balancing boiler with excess electrical energy from the wind turbines into this loop. Regional and local wind turbine operating experience, is rapidly growing throughout the Chaninik communities, and coupled with shared local experience, continued training and support, along with remote monitoring of the 17s wind turbines, CWG’s experience and is demonstrating good, reliable and high availability performance from the wind machines. The addition of wind will reduce fuel used for power production by 40%. with anticipated annual fuel displacements of 71,385 gallons for power generation and 7700 gallons of heating fuel. Kipnuk’s average price of fuel is in excess of $4.43/gallon. This equates to annual utility fuel savings exceeding $316,000 per year (over an average course of 20 years assuming a 4% escalation). Addition benefits accrue to the community in three ways. First lower heating costs to residential customers with electric thermal storage devices, secondly, increased revenues to the utility through increased electrical sales, and finally reduced electrical costs to consumers. Lower heating costs: Home owners who have the electric thermal storage devices can expect to have saving of 220 gallons of diesel fuel per year, displaced with excess wind energy. Excess wind energy is sold into electric thermal storage devices at around $.10 per kilowatt hour, which is equivalent to approximately $2.50/gallon heating fuel. Residential customers are currently purchasing in excess of 770 gallons of fuel for nearly $8.00 per gallon. (Savings (8.00- 2.50)x 220 = $1210 annual savings. 30 residential units x $1210 = $36,300 Increase revenues to the utility, result from an estimated sales of 250,000 kWhrs of excess electricity as heat, for $25,000. A business plan for the Kipnuk Wind project was developed. Under this plan, residential customers exceeding the 500 kWhrs per month of PCE subsidized electricity, would see a reduction in their effective residential rate of $.05 per kilowatt/hour, or more, depending on the additional rate requirements of the utility. For about 1/3 of residential customer, this would represent a saving of from $5 to $25.00 per month, or $60 to $300 annually. Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 8 of 42 7/3//2012 Two system economic models were run. One was a spreadsheet model developed for the Chaninik Wind Group business planning purposes. The other model was the Homer model which indicated a 5-turbine system could be expected to annually displace 71385 gallons of diesel fuel used for power generation and 7700 gallons of heating fuel. The community would decide the most beneficial allocation of excess electrical energy. Electric boilers will reduce fuel consumption in the community building that houses city offices and the community water plant/washeteria. The system will provide a control and integration backbone that enables the easy addition of wind turbines and thermal storage devices. Beyond a reduction in fuel use, reduce fuel purchases, stable power and lower heating costs, additional benefits of the project include: - Increased local employment and training opportunities - Reduced reliance on the volatility of fuel prices - Reduced risk of fuel spills - Reduced local air pollution and contribution to climate change - Increased revenue to the utility company - Reduced impact on PCE program - Improved efficiency of utility management and operations 2.6 PROJECT BUDGET OVERVIEW Briefly discuss the amount of funds needed, the anticipated sources of funds, and the nature and source of other contributions to the project. The total project cost is $3,886,450. The Kipnuk Light Plant will contribute $1,200,000 in matching funds. Total request from the renewable energy fund is $2,686,450. 2.7 COST AND BENEFIT SUMARY Include a summary of grant request and your project’s total costs and benefits below. Grant Costs (Summary of funds requested) 2.7.1 Grant Funds Requested in this application. $2,567,778 2.7.2 Cash match to be provided $1,500,000 Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 9 of 42 7/3//2012 2.7.3 In-kind match to be provided 2.7.4 Other grant applications not yet approved $ 2.7.5 Total Grant Costs (sum of 2.7.1 through 2.7.3) $ 4,067,778 Project Costs & Benefits (Summary of total project costs including work to date and future cost estimates to get to a fully operational project) 2.7.6 Total Project Cost (Summary from Cost Worksheet including estimates through construction) $ 4,067,778 2.7.7 Estimated Direct Financial Benefit (Savings) $ 360,000 plus annually for 20 years 2.7.8 Other Public Benefit (If you can calculate the benefit in terms of dollars please provide that number here and explain how you calculated that number in your application (Section 5.) $ Local jobs, $45,000 annually, reduced power costs, Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 10 of 42 7/3//2012 SECTION 3 – PROJECT MANAGEMENT PLAN Describe who will be responsible for managing the project and provide a plan for successfully completing the project within the scope, schedule and budget proposed in the application. 3.1 Project Manager Tell us who will be managing the project for the Grantee and include contact information, a resume and references for the manager(s). If the applicant does not have a project manager indicate how you intend to solicit project management support. If the applicant expects project management assistance from AEA or another government entity, state that in this section. Project supervision: Sam Carl Kipnuk Light and Power Utility Board, and Dennis Meiners of IES. Sam Carl is the utility manager. Dennis Meiners, Ben May and Ona Brause of Intelligent Energy Systems (IES), will provide technical assistance, design, construction and operational support required to build, operate and manage this project. IES will coordinate, engineering and construction activities, drawing on experience in similar project experience and the abilities of a number of experts in the field of wind, wind diesel and wind heating systems. Construction assistance by the Chaninik Wind group technicians, and construction crews mobilized for the construction of the new school. The project management oversight will consist of the Kipnuk local utility board and the Board of Directors of the Chaninik Wind Group. The project will benefit greatly from the construction of previous wind projects using local personnel and the close coordination of shipping and equipment mobilization in conjunction with the construction of the new school. The project engineers are Albert Sakata, P.E. and Carl Brothers, P.E. The chief electrical engineer is: Albert Sakata, P.E. System Control and Integration: Carl Brothers, P.E. On site supervisor: Ben May, IES Local project manager: Sam Carl Local power system operators have received wind tech and climbing certifications for wind turbine construction and maintenance. Assistance for wind turbine and diesel maintenance is to be provided by surrounding village operators from the Chaninik Wind Group villages of Kongiganak, Kwigillingok and Tuntutuliak. Web based monitoring and SCADA support tools. System components, control and integration; power system stability components are well proven and readily available. The wind turbines and hybrid power system have advanced remote diagnostics capability. These components can be monitored and controlled via phone modem or Ethernet connection without the need for special software, through the use of visualization software. Full product warranties for controls, power conditioning, battery systems, wind turbines, metering systems and electric thermal storage devices are available from the suppliers, as well as application support, training, installation, commissioning and emergency assistance. Kipnuk has several residents who are certified welders, and an experienced crane operator. Construction: The project will benefit from the coordination of wind turbine installation with the construction of the new school. The specific crane/foundation and erection subcontractor is Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 11 of 42 7/3//2012 likely to be STG Inc. STG is currently in Kipnuk installing the foundations for the new school. A cost savings is expected for the installation of the wind turbines through close coordination with the construction of the new diesel powerplant and bulk fuel storage system. 3.2 Project Schedule and Milestones Please fill out the schedule below. Be sure to identify key tasks and decision points in in your project along with estimated start and end dates for each of the milestones and tasks. Please clearly identify the beginning and ending of all phases of your proposed project. Final design and engineering, completed for wind project, some components ordered and installed. Complete final engineering coordination with new power system, final January 2013 Procurement of Turbines and long lead time items – January through July 2013 Delivery to barge for shipment - August 2013 Delivery unloading - Fall 2013 Construction of control and integration systems winter 2013 for shipment - July 2014 Installation of Power module, and wind turbines, and power pole foundations March – May 2014 Installation of heat recovery boiler and storage - Summer 2014 Commissioning - Summer 2014 Project support – January thru December 2014 Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 12 of 42 7/3//2012 3.3 Project Resources Describe the personnel, contractors, accounting or bookkeeping personnel or firms, equipment, and services you will use to accomplish the project. Include any partnerships or commitments with other entities you have or anticipate will be needed to complete your project. Describe any existing contracts and the selection process you may use for major equipment purchases or contracts. Include brief resumes and references for known, key personnel, contractors, and suppliers as an attachment to your application. This project benefits greatly from the experience gained in the three similar wind diesel projects in the nearby Chaninik Wind Group Communities. The project team will also benefitting from piggyback the mobilization and availability of construction equipment in the region that is mobilized for the construction of the new school in Kipnuk, as well as the work and training that has occurred on wind projects in nearby communities. Project supervision: Chaninik Wind Group Board of Directors, Kipnuk Light Plant Utility Board, Dennis Meiners and Ben May of Intelligent Energy Systems will manage this project. The Chaninik Wind Group has benefited from the assistance of STG Inc. to provide pile driving, and crane services to install turbine towers and nacelles. However, CWG utility crews, will perform the majority of the wind turbine installation, electrical distribution, communications, construction of support structures, installation of metering and electric thermal storage devices. IES has successfully in the past assisted the CWG communities with design assistance, construction management and project assistance. The primary contact for the project in Kipnuk is Sam Carl. He is the manager of Kipnuk Light plant and is responsible for the overall operation of the power system and will provide on-site coordination. The chief electrical engineer is: Albert Sakata, P.E. The project engineers are Albert Sakata, P.E. The geotechnical consultant: Richard Mitchells of Golder and Associates. Mechanical Engineering is provided by Coffman Engineers The control and integration of the wind diesel systems is provided by: IES, Sakata Engineering and Frontier Power Systems. Metering and meter data management systems are supported by SAIC corporation. The CWG utility managers and power system operators continue to provide technical and construction assistance with the wind, wind diesel and utility management issues. The power system operators from the CWG villages are familiar with the construction methods, operation of the wind diesel systems, and will provide primary installation and operation not only of the wind turbines, but other system components. Regional crews have many hours of direct experience with the machines, ETS units, metering, and system control. The CWG has trained 14 wind turbine technicians for these wind turbines in the region. Two technicians reside in Kipnuk. Construction management and on site project supervision will be provided by Ben May, Ona Brause and other project managers at IES. Specialized control and load integration hardware and software has been developed and deployed in the CWG communities. These components will be utilized in this project. The power system control has built in monitoring and web based support tools. These include Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 13 of 42 7/3//2012 remote diagnostics, remote visualization, historical data capture and trending. Recently high speed broadband internet service is provided to the village of Kipnuk. This improves monitored and remote assistance. Construction: As with other CWG projects, the project will draw primarily from the local Kipnuk workforce, but multi village crews, made up of operators and others who have worked on the Chaninik Wind Group projects will complete the majority of the installation. The majority of the work will require supervision and technical assistance from more qualified personnel, such as heavy equipment, electric and diesel specialists, and controls and communications specialists. This work will be coordinated by IES. 3.4 Project Communications Discuss how you plan to monitor the project and keep the Authority informed of the status. Please provide an alternative contact person and their contact information. Project communications, include: project status reports, project communications and project accounting. The project point of contact for project communications would be Ona Brause, of IES. Ms. Brause has provided this assistance with other Chaninik Wind Group wind heat projects. Ms. Brause will coordinate all reports, meetings, audits, accounting requirements, as well as maintain project records maintenance and insure that project management, progress and accounting reports are completed and provided to the agencies in an appropriate and timely manner. 3.5 Project Risk Discuss potential problems and how you would address them. Similar wind diesel heat projects to the one proposed by Kipnuk have been build by the Chaninik Wind Group, in the communities of Kongiganak, Kwigillingok and Tuntutuliak. The Kipnuk project will benefit from the experiences gained in the surrounding villages. Primary risks related to logistics, remote community operations, unpredictable weather are well understood, and have been taken into consideration. The technical risks related to the project have been dealt with in other communities. The integration of the wind system is well understood, and a base of experience has been built to insure the projects will perform as expected. The greatest area of risk has been insuring that the wind turbines will provide the long term fuel savings they are expected to produce in a harsh environment. The Chaninik Wind group management, recognized the importance of being able to rely on the turbines year after year, and as such set out three primary requirements for wind turbine selection. 1. The turbines should be of a robust mechanical design which can be maintained by local crews. The managers selected the Windmatic 17s. This is a mechanical based turbine design. Component parts are readily available. This turbine, is of similar design to the Vestas V15/17. This design is one of the most proven wind turbine designs, with many years of reliable performance throughout the world, and has provided the design basis for the growth of the wind industry. 2. Community wind systems should be made up of greatest number of reasonable sized turbines for the available funds. The managers recognize that the communities will be Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 14 of 42 7/3//2012 relying on wind machines to provide many years of fuel displacement. As reliance on the wind turbines increases, the host communities will reduce diesel fuel purchases and diesel fuel storage inventories. The loss of a single large turbine due to maintenance or some other unforeseen problem, could risk a wintertime fuel emergency. System redundancy, in this instance the installation of 5 turbines, insures high fuel displacements and that the fuel savings still materialize through the remaining machines. 3. The Chaninik Wind Group managers have made an effort to standardize their operations the greatest extent possible across villages. Kipnuk is a participating member of this Chaninik Wind Group, and working together these managers have created a strong and supportive mutual assistance network in the region. This cooperation and assistance includes expanded access to tools, equipment training, spare parts, and transportation and service options. The collaborative will be able to insure a high level of wind turbine performance. Many questions involved in the installation of wind turbine in villages have been answered and integration problems have been solved over the last few years. Progress has resulted in increasing the cost effectiveness of the projects and simplifying operations and reducing maintenance. The project integration is built around a fully tested, power control and conditioning system. The project will integrate this system into the new proposed Kipnuk power plant. The new power plant will have an expanded waste heat recovery system, which will be integrated with the wind production. This project will benefit greatly from the lessons learned on similar CWG projects. The primary risk will be insuring high wind turbine availability. This can and will be monitored on a daily basis. Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 15 of 42 7/3//2012 SECTION 4 – PROJECT DESCRIPTION AND TASKS • The level of information will vary according to phase(s) of the project you propose to undertake with grant funds. • If some work has already been completed on your project and you are requesting funding for an advanced phase, submit information sufficient to demonstrate that the preceding phases are satisfied and funding for an advanced phase is warranted. 4.1 Proposed Energy Resource Describe the potential extent/amount of the energy resource that is available. Discuss the pros and cons of your proposed energy resource vs. other alternatives that may be available for the market to be served by your project. For pre-construction applications, describe the resource to the extent known. For design and permitting or construction projects, please provide feasibility documents, design documents, and permitting documents (if applicable) as attachments to this application. The Alaska Energy Authority established a regional wind-monitoring program in 2003-4. This program was directed by Rueben Lowen, and was planned with the assistance of John Wade under contract to the National Renewable Energy Laboratory. At the time it was determined that due to the geography of the region, and proximity of the communities, that sufficient wind resource was available that a regional wind monitoring system in Kongiganak would provide sufficient wind resource data, which when correlated to long term weather data, would be sufficient to meet wind feasibility and economic performance thresholds. Rregional wind monitoring was placed in Kongiganak by the Alaska Energy Authority to collect data representative for the region. Kipnuk is 30 miles away and not a tree or hill in sight. This data was correlated with long term airport data by meteorologist, Ed McCarthy of WECTEC, and J.P Pinard, P.E, PhD of JP Pinard Engineering to confirm the suitability of the resource. The results of the wind resource evaluation indicate an outstanding wind resource with an average wind speed of 7.78 m/s and with a wind power distribution well suited for the capture of wind energy. Additional wind monitoring equipment is on site and will be installed, in October to provide additional wind resource collaborative data. This equipment will be placed at both the current and a proposed future site where the wind project may be expanded in the future. The data was analyzed in the HOMER and Windographer software models and compared with the power curves of various candidate wind turbines. The two primary wind turbines considered were the Northwind 100 B model with a 22 meter rotor diameter on a 37 meter tower, and the Windmatic 17s meter wind turbine on a 24 meter tower. Cost estimates for the installation and operation of the turbines was based on previous installation costs and known foundation conditions. The HOMER modeling indicated the installation of the five windmatic turbines. These turbines are expected to produce 2/3 of the energy of the Northwind 100 at ½ the cost. Larger turbines were not proposed for this project because the estimated installation cost exceeded the available budget and did not meet the design approach of the community for system redundancy. The installation of a single turbine does not offer sufficient redundancy, should the turbine incur problems. However, the EWT 900 was considered. It has the ability to provide sufficient additional excess wind capacity to displace 54,000 gallons of home heating fuel and 66,000 gallons of diesel fuel used for power generation, which is sufficient to heat most of the homes in the community. It is estimated that the installation of the EWT 900 would require a budget of $6,000,000, which is beyond the limits of this program. Additionally, the community, flight services and the FAA had concerns about the height of the turbine with Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 16 of 42 7/3//2012 respected to the proximity and height of the turbine to the location of the airport. 4.2 Existing Energy System 4.2.1 Basic configuration of Existing Energy System Briefly discuss the basic configuration of the existing energy system. Include information about the number, size, age, efficiency, and type of generation. Kipnuk’s electrical load has grown by nearly 30% since the commissioning of the new water system in December of 2010. A new school is being constructed in Kipnuk during the winter of 2012/2013. This new school will increase the average electrical load from 50 to 75 kW with a commensurate increase in heating fuel usage estimated at over 20,000 gallons. Construction of the school in Kipnuk is scheduled to begin the Fall 2012 and continue through 2013. Coordination with the school construction could result in cost savings sufficient to install a 4th wind turbine. Significant savings would result from the day rental of heavy equipment such as cranes, loaders and pile drivers, and specialized personnel that will be mobilized for the school construction. The control and integration capacity in the proposed design can accommodate up to 5 wind turbines. Power produced from a possible fourth wind turbine would result in additional fuel savings of up to 18,000 gallons. Cost savings would result from unburdening the wind project from carrying the full cost of heavy equipment mobilization, rental, and overwintering from the Fall of 2012 to the Spring of 2013. This wind diesel system architecture is scalable through the addition of wind turbines, new diesel gensets, and energy storage. Kipnuk is a productive wind site in which each Windmatic 17S wind turbine has the potential to annually produce 225,000 kWhrs of electricity. This equates to annual per turbine potential fuel displacements of 14,000 to gallon of diesel fuel and a total displacement for 5 turbines of upwards of 70,000 gallons. The community of Kipnuk has received funds to rebuild their diesel powerplant and bulk fuel system. The Chaninik Wind Group, received $1.5 million toward the construction of a wind system. This project is currently in the design phase of the diesel power plant and bulk fuel system will be completed by Spring of 2013. Construction is scheduled for winter 2014. The installation of the wind system would be scheduled for the same period. The wind system has been design. Final designs for the incorporation of the power system master controls, load balancing boiler and static var compensation into the new power plant. The hardware and software components of these systems have been designed and finals designs would include concurrent incorporation of these components, with the physical placement, monitoring and control optimization in the new diesel powerplant. Concurrent construction of the wind system, heat recovery, diesel powerplant and wind system distribution and communications could result in significant cost savings and performance improvements. Any savings realized could be directed to much needed upgrades, repairs and reliability improvements needed in the community electrical distribution network. Kipnuk’s diesel plant has been increasing unreliable. The past 3 winters have experienced numerous outages, and extended ( November to March) periods of electricity rationing, and the Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 17 of 42 7/3//2012 use of onsite generation at the School and water plants. Recent improvements to the existing diesel plant include the rebuilding of a Cummins 350 kW genset and the installation of a rebuilt Cat 3456 electronically fuel injected generator. The Cummins generator, as well as an existing Cat 3406 generator have limited operating capacity. The community primarily relies on the Caterpillar 3456, which has a rated capacity of 410 kW and a peaking capacity of 457 kW. The Cat 3456 is designed for efficient load following and will work efficiently in parallel with the wind system as it is able to maintain its fuel efficiency even at very low loads. The installation of the Cat 3456 generator has been responsible for improving fuel efficiency from 10.5 kWh/gal to the 13 kWh/gal range. System load and fuel usage: The average community electrical load is 200 kW during the summer and under a rationing scheme, 250 kW during the winter. Once the new power plant is in place, average loads are expected to exceed 250 kW year round and peak loads could approach 400 kW during the winter. Completion of the new school will increase the average summer load by 25 kW to 275 kW and by as much as 75 kW in the winter to peak loads to 425 kW. The existing power generation facility has a heat recovery system providing heat to the Kugkaktlik Limited Traditional Council, Kipnuk Light Plant offices, and community hall. The wind system installation will include the installation of a 300 kW load balancing boiler. This boiler will serve a number of purposes, the first is to act as a shock absorber to smooth out fluctuations in wind power. The boiler will also protect the diesel generator sets from reverse power outages, and provide energy to heat the power plant and the waste heat recovery system. All other excess wind energy will be diverted to 30, electric thermal storage devices in homes throughout the community. These devices will have a combined peak capacity of 300 kW, and can be modulated to accept both small and large amounts of wind energy as it is made available. The control and integration capabilities of the wind project would enable expansion of the wind project, through the addition of wind turbine capacity and additional energy capture and storage devices. Annual electrical load growth and step increases in demand were projected through 2017. Demand grows from a peak of 359 kW now to a projected potential peak of 709 kW. The new washeteria/water system uses diesel fuel to heat and treat potable water and provide heat for the facility and clothes dryers. A location has been provided in the waterplant to plumb in an electric boiler, which would use wind to reduce heating fuel usage (currently projected fuel use at the washetria water treatment plant is 20,000 gallons annually). The following new facilities have been or are scheduled to be added in the near future: Average load Peak increase AVCP housing, 25 units 2012-2014 12.5 kW 30 kW ANTHC clinic 2012 5 kW 15 kW CVRF fisheries 2013 Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 18 of 42 7/3//2012 support improvements Water and Sewer 2011-2014 10 kW 20 kW New School 2013-2014 50 kW 75kW Airport lighting 2012-2013 3 kW 20 kW Church improvements 2012 5 kW 10 kW The electric load in Kipnuk has varied from 1,657,658 kWhrs in 2008 to 1,588,874 kWhrs in 2010. This is primarily due to inadequate generation capacity. Residential customers have been on power rationing, and the school and washeteria have been operating their own generators for many months each year. Load data at each meter began being collected in July 2012, through the advanced metering system. Hourly electrical usage averages are being collected from each single phase customer, and each three phase customer’s usage is measured in 15 minute intervals. Load growth is estimated to be near 2,000,000 kWhrs in 2012, when onsite/not utility generation is taken into account. The electrical load is expected to exceed 2,300,000 kWhrs by 2014. It should be noted that Kipnuk light plant has been unable to service the entire community electrical load for at least the last 3 years, due to lack of generation capacity. In 2012, Kipnuk Light Plant purchased 124,000 gallons of diesel fuel for power generation at a price of $4.486 per gallon. Home heating fuel is currently being sold at the village store for $7.26 per gallon. This price is anticipated to rise $.25 per gallon this winter. The Kipnuk power system can benefit greatly from automated control system and improvements to metering of existing power. Other funding for a new diesel plant is uncertain. The wind project will improve the efficiency and reduce demands on the existing diesel system and interface directly with any future power plant. Immediate benefits of installation of an integrated control module include: voltage and frequency regulation for improved power quality, automation of diesel power plant operation, capacity to receive energy storage for peak shaving, fault ride through and frequency and voltage regulation in diesel off operations. These will reduce diesel- operating costs and result in immediate and long term savings to the utility. 4.2.2 Existing Energy Resources Used Briefly discuss your understanding of the existing energy resources. Include a brief discussion of any impact the project may have on existing energy infrastructure and resources. The viability of various sources of energy was assessed in the Kipnuk, Alaska Rural Power System Upgrade Conceptual Design Report 2007. “The report on page 11 states: It is assumed that upgrades to the community electrical power system incorporating supplemental wind energy is a priority and will be conducted within the next ten years.” This report was conducted when fuel prices were below $2.00 per gallon delivered in bulk to the utility. Last year bulk fuel wholesale purchases were $4.38 per gallon. This translated to home heating fuel costs of $7.50 per gallon, at the local village store. Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 19 of 42 7/3//2012 Fuel is delivered to Kipnuk via barge twice a year, once in the Spring and again in the Fall. Due to limited bulk fuel storage capacity, Kipnuk Light Plant has nearly run out of fuel for the past two years. 4.2.3 Existing Energy Market Discuss existing energy use and its market. Discuss impacts your project may have on energy customers. Kipnuk is located on the west bank of the Kugkaktlik River in the Yukon-Kuskokwim Delta, 85 air miles southwest of Bethel. It is four miles inland from the Bering Sea coast. The community is located in a marine climate. Precipitation averages 22 inches, with 43 inches of snowfall annually. Summer temperatures range from 41 to 57, winter temperatures typically range from 6 to 24. F. Kipnuk is accessible only by air or by snow machine in winter, and boat in summer. In a recent RUBA report, it was indicated that Kipnuk meets all Essential indicators and most all Sustainability indicators. Kipnuk relies on electricity to maintain home lighting, street lighting, telephone service, school service, clinic hours, and freezers to maintain a subsistence lifestyle. Reliable electricity is crucial to the residents of Kipnuk. A survey was conducted of heating fuel usage of each residence. These results have being correlated with other record and this information indicates that on average, a typical residence in Kipnuk uses 766 gallons of heating fuel annually, leaving an estimated 136,000 gallons of residential heating fuel, and another 100,000 gallons of public and commercial facility heating fuel available for displacement with wind. Heating fuel represents the single highest expense in operation of residential and public facilities. The community center receives most of its heat from the recovered waste heat from the diesel generators. This will continue and be supplemented by the load controller boiler. The excess wind will be diverted to the electric boiler at the washeteria that now uses 20,000 gallons of heating fuel. The washeteria and water plant are directly related to the health and well being of the local residents and the high cost of heating fuel has resulted in a cost of $15.00 to wash and dry a load of laundry. The city will determine the value of this heating energy and the wind energy will lower the cost of operations of the water plant to the community. Kipnuk light plant purchase 124,000 gallons of fuel this year for power generation. It is anticipated that the electric load will increase by as much as 30% in the next 2 years. Even with efficiency improvements in the design of the diesel power plant, fuel usage can be projected to exceed 160,000 gallons by 2014. Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 20 of 42 7/3//2012 4.3 Proposed System Include information necessary to describe the system you are intending to develop and address potential system design, land ownership, permits, and environmental issues. 4.3.1 System Design Provide the following information for the proposed renewable energy system: • A description of renewable energy technology specific to project location • Optimum installed capacity • Anticipated capacity factor • Anticipated annual generation • Anticipated barriers • Basic integration concept • Delivery methods Funding is being requested for concurrent construction of the wind system with the new diesel power plant, and bulk fuel storage. Concurrent construction is anticipated to result in considerable saving. These savings if realized could be used for much needed repairs to the community electrical distribution system. The wind project will be similar to the wind diesel system which have been installed in Tuntutuliak, Kwigillingok and Kongiganak. The project consists of the following components: • Five Windmatic 17S wind turbines, ( 95 kW nominal rating/total 495 kW) • Wind Diesel Supervisory Control and Data Acquisition System, with multiple remote unit control for distributed device control, • 300 kWe load balancing boiler plumbed into the waste heat recovery system of the new diesel powerplant, • 30 Electric thermal storage (ETS) devices, distributed in community buildings and residences, • Advanced metering system to track diesel and wind sales, and provide financial management tools for the utility, • Static Var compensation device, to improve grid stability and diesel efficiency during wind diesel operations, • Underground 12470 Volt 3 phase power line with fiber optic communications to wind turbines This wind diesel system architecture is proven, and is being utilized in Kongiganak, Kwigillingok, and Tuntutuliak. The system is scalable through the addition of wind turbines, diesel gensets, addition of residential electric thermal storage devices, thermal storage devices for commercial building, and real energy storage. The system being provided is ready for expansion when additional wind energy capacity becomes available. The wind diesel system master control, voltage support cabinet and boiler would be the main components in the new powerhouse. The new powerhouse would house all communication hubs, metering data collection gateways, and internet service connections. The voltage support module would be located in the power plant and connected to the generation bus. The load controlled boiler would be connected to the power plant electrical system, plumbed into the heat recovery loop and connected into the system master supervisory control system. The switchgear bus, breakers, conductors and cabinets as well as the floor plan and heat Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 21 of 42 7/3//2012 recovery plumbing would be configured to accept the wind energy, as well as be expandable to meet expected load growth, and future energy storage options. The wind diesel power control and conditioning system will incorporate directly into diesel controls and switchgear, and into the power plant heat recovery system. The 30 electric thermal storage devices will be dispatched and managed through the system supervisory control and enable the capture and storage of excess wind for residential heating. The proposed wind system is a duplication of systems in other Chaninik villages. Improvements have been incorporated into the system design, and these include: a wind turbine central control building for on site service, additional static var compensation and improved metering and data collection systems. The wind turbines are well proven in Alaska and the control and integration method is well understood. Geotechnical investigations have already been conducted and the wind turbines, power poles and power/control module will be placed on driven piles. Property has been provided by the community for the installation of 5 or more wind turbines. Turbine foundation designs have been completed, and foundation materials have been purchased and shipped to the site. The power line, power conditioning, communications, and control designs have been completed. Some of the construction materials such as power conductors and transformers have been purchased. Similar design have been implemented in the other Chaninik Wind group projects. The power system is designed for expansion through the addition of increased numbers of wind turbines, use of thermal storage devices and increased power conditioning and energy storage capacity The five wind turbines have a rated output of 495 kilowatts. The installation of excess capacity enables high penetration of wind energy into the power grid, at low wind speeds, and excess wind energy production for heating at moderate to high wind speeds. Grid stability will be provide by keeping at least one diesel engine generator on line running at low load, and the static var compensation to provide additional voltage support. The voltage support system will enable smaller generators to be operated at high wind penetration, in order to increase fuel saving. The electric load balancing boiler is configured to rapidly adjust the system load balance by absorbing and releasing excess power in the system to regulate power system frequency as the wind power fluctuates. Excess wind energy will be injected into the heat recovery system of the power plant, until it reaches a sufficient level that it may be dispatched to electric thermal storage devices located in homes. The supervisory control system monitors the electrical load demand and configures the various system components - wind turbines, diesel gensets and controllable loads - to an optimize fuel savings and maximize wind capture. Below is a diagram of the complete proposed future system, which integrates the wind with distributed energy managed devices and the metering system. This diagram depicts some advanced capabilities of the smart metering system, such as electric vehicle charging, interactive two way user interfaces, and control of multiple appliances in the home through the meter. The metering system is installed with the hardware and communications backbone. The Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 22 of 42 7/3//2012 implementation of all of these advanced features will dependent on the use of high speed internet access to the community. The electric thermal storage devices are proxies for the various types of distributed residential energy storage, such as plug in vehicles for local transportation, which can easily be incorporated in this system. The advanced metering system will enable separate accounting of diesel generated and excess wind generated electricity. This drawing is provided to indicate the extent of the metering systems potential. The proposed wind diesel system is capable of high wind penetration at all times with the existing power system. The controls, boilers and diesel gensets work together to stabilize the integration of wind and support any changes to the power system components that are needed to accommodate increased village power requirements, and large variations in wind power output, with the goal of decreasing overall community diesel fuel usage. The wind turbines are provided with a user interface to the wind turbine controller (WTC), as well as a remote operator interface built into the power system supervisory control. The wind turbines and wind diesel supervisory control send and receive information such as the state of the machine (running, stopped, on-line and off-line, power generated, alarms, nacelle position, etc.), and provide instructions to start and stop machines, and control power set points. The WTC would communicate via fiber optic cable. The majority of the wind energy produced will be used to reduce fuel used for power generation. The remainder of the wind energy will be directed to the boiler in the heat recovery system and the remote ETS units. In low winds, the diesel power system will operate with the least amount of diesel generation required for stable operation. As wind speeds increase, greater proportions of wind energy are captured as heat. Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 23 of 42 7/3//2012 Wind Turbines Cost estimates for turbine installation were developed after geotechnical investigations, and foundation designs were completed. Cost estimates compare to actual project experience in the region. Installation costs estimates were developed for several types of turbines. Gross annual estimated energy production for each turbine was arrived at through comparison of power curves and wind resource information using HOMER. The results are summarized in Table 3. A 20-year investment horizon and a 5% nominal interest rate were used for economic analysis. These are the same investment guidelines as proposed in the Alaska Rural Energy Plan, April 2004. Table 3 – Wind Turbine Assumptions Turbine Model Rated Power (kW) Hub Height (m) Lifetime (Yr.) Per-Turbine Costs Fuel Saving gallons Capital Replacement O&M Generation* equivalent gallons 5 17s 495 24 20 $2,348,000 $ 1,425,660 $45,000 1,125,000 79,151 These turbines will be placed approximately 250 feet apart and located 1000 feet from the existing 12.47 kV transmission line. The community has set aside property for the wind system. The sub-second response of the power conditioning frequency controlled boiler is supplemented by the multi-second response of the diesel generators. Other system changes can occur on the minute-to-minute time frames in which diesel generators and wind turbines can be reconfigured and loads in the community can be turned on and off. The integration of the power system increases the value of the available wind. Properly integrated advanced control capability decreases the contribution of the diesel generators and optimizes the use of wind power. The community has reported a number of problems with the electrical metering systems. This shows up as either line losses or poor generation efficiency. The management of the power system requires accurate, timely and convenient manner of managing its energy sales and to understand the effect of wind on the system in relation to the sales. A new automated meter reading system will be installed. This system is needed for the Kipnuk Light plant to better manage their utility and is essential to their sustainability. Metering system: The need for low cost residential heating represents the largest potential load for the Utility. This will require precise metering of wind generated versus diesel generated electricity. The metering system will consist of 3 collector meters, one at the school, one at the washeteria/water plant, and the last at the powerhouse. Residential customers will have a single- phase meter at their home. These meters will communicate with the data collecting 3 phase meters to create a mesh network. The meters are designed for plug and go capability, which eliminates programming and simplifies installation. This same metering system has been selected for use as it has proven to be a best practice management tool for the Alaska Village Electric Cooperative. The community has reported a number of problems with the older electrical metering systems. This shows up as either line losses or poor generation efficiency. The management of the power Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 24 of 42 7/3//2012 system requires accurate, timely and convenient manner of managing its energy sales and to understand the effect of wind on the system in relation to the sales. A new automated meter reading system will be installed. This system is needed for the Kipnuk Light plant to better manage their utility and is essential to their sustainability. More importantly the metering system is needed to account for wind generated electricity at a different rate than diesel generated electricity. Electric Thermal Storage An average home in Kipnuk uses over 766 gallons of heating fuel annually. During a windy week in the winter a single home can consume and entire 55 gallon drum of heating fuel. This project proposes to capture the wind and use it to heat homes, throughout the year using Electric Thermal Storage (ETS). ETS is the method of capturing excess wind generated electricity as heat and storing it for use at a later time. An ETS unit is an insulated metal box, about the same size as a Toyo Stove, which contains electric heating elements, which lie within special, high- density ceramic bricks. These bricks are capable of storing vast amounts of heat for extended periods of time. During periods of excess wind energy, a signal from the power plant supervisory controller is sent to the metering system. The ETS controllers then enable the relays, which turn on elements, which heat the bricks. Operation of the system is completely automatic. A sensor monitors the outdoor temperature to regulate the amount of heat the systems stores in the bricks. A thermostat regulates the delivery of the heat to the room. Each unit has a built in microprocessor that allows the owner to configure the operation for their needs. There are over 100,000 of these units in operation in the mid-west states and off-peak heating is common in Europe. The system provides a lower cost low maintenance method of home heating using wind. The control of multiple ETS units across the grid is accomplished by the wind diesel supervisory control system. 4.3.2 Land Ownership Identify potential land ownership issues, including whether site owners have agreed to the project or how you intend to approach land ownership and access issues. The land needed for the project has been given to Kipnuk Light Plant by the village corporation and site control has been obtained. 4.3.3 Permits Provide the following information as it may relate to permitting and how you intend to address outstanding permit issues. • List of applicable permits • Anticipated permitting timeline • Identify and discussion of potential barriers Permit review will be for a 5 turbine project. The construction of the wind and power project will require some of the following review and/or permitting, no potential barriers have been identified. 1. Coastal Project Questionnaire Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 25 of 42 7/3//2012 Since Kipnuk is located in a coastal zone, the project requires submittal of a Coastal Project Questionnaire to the State of Alaska, Department of Natural Resources (DNR). The DNR coordinates review of the questionnaire by various state agencies and assists in identifying required permits pertinent to the project. The standard review spans about a 30-day period. 2. Fire Marshall Plan Review The construction of the new power control module will require submittal of a set of construction documents to the State of Alaska, Department of Public Safety, Division of Fire Protection (Fire Marshal) for plan review and approval. The State Fire Marshal then issues a Plan Review Certificate to verify compliance with adopted Building, Fire, and Life Safety codes. Final stamped drawings will be submitted along with the application fee for project review. Anticipate a minimum of one month before comments may be received from Fire Marshal. 3. Alaska Department of Transportation The construction does not effect existing Department of Transportation (DOT) right-of-ways. None exist. 4. Regulatory Commission of Alaska Certification The Regulatory Commission of Alaska (RCA) regulates public utilities by certifying qualified providers of public utility and pipeline services and facilities at just and reasonable rates, terms, and conditions. The commission also determines the eligibility and the per kilowatt-hour support for electric utilities under the Power Cost Equalization program. The Kipnuk Light Plant is conducting a review of rates with respect to a future wind project. 5. State Historic Preservation Office The State Historic Preservation Office (SHPO) is required, under Section 106 of the National Historic Preservation Act, to review any state of federally funded project for potential of disturbing cultural resources. The wind site has already been reviewed for compliance. 7. Federal Requirements • U.S. Fish and Wildlife Service The U.S. Department of the Interior Fish and Wildlife Service has been consulted based on a 5 wind turbine project and consultation occurred with respect for impact to endangered species. The Fish and Wildlife Service has noted that this project is near known designated critical habitat in the action area, but not in an action area of the suspected presence of listed species. Because of the absence of federal funds no formal consultation is required. • U.S. Army Wetlands Permit This projects will not significantly disturb or place fill material on existing soil in a wetlands determination from the U.S. Army Corps of Engineers as this project for Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 26 of 42 7/3//2012 the placement of piling falls under the general nationwide permits. • Federal Aviation Administration Review The FAA has been contacted and the site reviewed. Due primarily to the lower height of the tower and rotors, the project complies with of all FAA regulations. The FAA has been very responsive and typically provided project determinations within one week of the completed submittals. 4.3.4 Environmental Address whether the following environmental and land use issues apply, and if so how they will be addressed: • Threatened or Endangered species • Habitat issues • Wetlands and other protected areas • Archaeological and historical resources • Land development constraints • Telecommunications interference • Aviation considerations • Visual, aesthetics impacts • Identify and discuss other potential barriers The land for the project has been provided by the local village corporation, and there no Federal monies involved, no significant filling of wetlands is to take place, there are no endangered species present, there are no anticipated conflicts or threats to migratory birds, the sites selected do not represent hazards to flight operations, and are not located in archeological sensitive areas. After contacting the USFWS, the FAA and the Corp of Engineers, it is determined that no permits to construct this project are needed. In each location, the power lines to the wind turbines will extend underground from nearby 3-phase power. No power poles will be installed and no aerial transmission lines, that could present a hazard to migrating birds, are being constructed. The wind turbines are being constructed on pile foundations that will not require any filling of wetlands, and do not require a Section 404 permit. It is not anticipated that any of the Chaninik projects will interfere with or result in the mortalities of any endangered species or migratory birds. The USFWS, Corp of Engineers, FAA and State permitting agencies have been contacted. USFWS concerns have requested that power lines be buried if possible, to refrain from using guyed towers, and to maintain lattice towers by keeping them free of raven nests. Preliminary locations were presented to the FAA, and they have requested a final review of the selected sites and that the wind turbines be surveyed in within one month of installation. We will be providing the USFWS, the Corp of Engineers, the FAA and the Alaska State Division of Governmental Coordination. Andrew Grossman serves as an environmental consultant for the Chaninik Wind Group projects. He is retired USFWS and NMFS biologist experienced in permitting of construction projects in Alaska. 4.4 Proposed New System Costs and Projected Revenues (Total Estimated Costs and Projected Revenues) The level of cost information provided will vary according to the phase of funding requested and Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 27 of 42 7/3//2012 any previous work the applicant may have done on the project. Applicants must reference the source of their cost data. For example: Applicants records or analysis, industry standards, consultant or manufacturer’s estimates. 4.4.1 Project Development Cost Provide detailed project cost information based on your current knowledge and understanding of the project. Cost information should include the following: • Total anticipated project cost, and cost for this phase • Requested grant funding • Applicant matching funds – loans, capital contributions, in-kind • Identification of other funding sources • Projected capital cost of proposed renewable energy system • Projected development cost of proposed renewable energy system The total project cost is $4,067,776. The Kipnuk Light Plant will contribute $1,500,000 in matching funds. Total request from the renewable energy fund is $2,567,778. 4.4.2 Project Operating and Maintenance Costs Include anticipated O&M costs for new facilities constructed and how these would be funded by the applicant. (Note: Operational costs are not eligible for grant funds however grantees are required to meet ongoing reporting requirements for the purpose of reporting impacts of projects on the communities they serve.) Operations and Maintenance Summary: Annual Control and Integration Support $ 2,000 Wind Turbines $ 45,000 Repair/Replace/Insurance $ 15,000 Total Estimated O&M Costs Increase $ 62,000 Explanation: Control System: The control, monitoring and integration system is provided with a two-year warranty. A reserve is set aside for changes and/repairs of $1000 per month. The local operators will be trained to use the control and integration system. Typically automated operation reduces the local labor burden. Wind Turbines: The wind system is estimated to operate 350 days or 50 weeks per year with 2 weeks of scheduled maintenance. Service and maintenance agreements as well as loss or damage insurance is available from the manufacturer, and the cost of the turbine includes a 24 month service agreement. A budget of $9000 per year turbine, or $.04/kWhr per year is set aside. This budget is divided Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 28 of 42 7/3//2012 into parts ($0.01/kWhr) and labor ($.03/Kwhr) This includes daily attention, as well as on going quarterly maintenance by local wind technicians. The turbines have advanced diagnostic package with remote diagnostics that enable full time monitoring, remote programming and remote technical assistance. Maintenance can be divided into three categories, routine, unscheduled and scheduled. Routine maintenance is required to maximize performance, maintain safety, and ensure a full operating life of each turbine. An estimate of the cost of annual and 10 year maintenance is provided below. This estimate includes setting aside an amount annually for extended and unscheduled maintenance. Excluding major component inspections and replacements, the following maintenance schedules generally apply to each turbine type. 4.4.3 Power Purchase/Sale The power purchase/sale information should include the following: • Identification of potential power buyer(s)/customer(s) • Potential power purchase/sales price - at a minimum indicate a price range • Proposed rate of return from grant-funded project Energy Purchases: Kipnuk Light Plant provides electricity to the community and holds the certificate of public convenience. The water system is sufficiently large to accept wind energy any time, 24 hours per day, year round. This will be provided based on the final design of the heat recovery system of the new powerplant. The community owns and operates both facilities that will be recipients of excess wind energy. The rate at which this energy will be sold to residential customers, through the metering and ETS system, will typically be offered at a rate equivalent to 50 or 60% of the equivalent cost of heating fuel. Approximately, $.10/kWhr will be charged for wind electricity into the ETS units. 4.4.4 Project Cost Worksheet Complete the cost worksheet form which provides summary information that will be considered Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 29 of 42 7/3//2012 in evaluating the project. Please fill out the form provided below See attached cost worksheet. Renewable Energy Source The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Annual average resource availability. 7.78m/s Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel) Existing Energy Generation and Usage a) Basic configuration (if system is part of the Railbelt1 grid, leave this section blank) i. Number of generators/boilers/other 3 diesel gensets, in current powerplant 4 ii. Rated capacity of generators/boilers/other Currently, Cat 3246 ( 425 kW), Cummins 250 kW limited 2 each iii. Generator/boilers/other type iv. Age of generators/boilers/other Condition of existing generators is poor, new diesel powerplant is in design phase v. Efficiency of generators/boilers/other Cat 3246, approx. 13.0 kWjh/gal b) Annual O&M cost (if system is part of the Railbelt grid, leave this section blank) i. Annual O&M cost for labor $494,000 ii. Annual O&M cost for non- labor $900,000 c) Annual electricity production and fuel usage (fill in as applicable) (if system is part of the Railbelt grid, leave this section blank) i. Electricity [kWh] 1,600,000 kWhrs/ in restricted mode, rationing of electricity, 2,000,0000 plus ii. Fuel usage Diesel [gal] 269,532 Other iii. Peak Load 385 iv. Average Load 250 v. Minimum Load 200 vi. Efficiency 13.0 kWhr/gal vii. Future trends 75 kW average increase, new school/airport improvements/housing d) Annual heating fuel usage (fill in as applicable) 1  The  Railbelt  grid  connects  all  customers  of  Chugach  Electric  Association,  Homer  Electric  Association,  Golden  Valley  Electric   Association,  the  City  of  Seward  Electric  Department,  Matanuska  Electric  Association  and  Anchorage  Municipal  Light  and  Power.     Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 30 of 42 7/3//2012 i. Diesel [gal or MMBtu] Estimated 300,000 gal heating fuel ii. Electricity [kWh] iii. Propane [gal or MMBtu] iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] vi. Other Proposed System Design Capacity and Fuel Usage (Include any projections for continued use of non-renewable fuels) a) Proposed renewable capacity (Wind, Hydro, Biomass, other) [kW or MMBtu/hr] 495 kW wind, 5 ea, 95 kW rated b) Proposed annual electricity or heat production (fill in as applicable) i. Electricity [kWh] 1,125,000 kWhr ii. Heat [MMBtu] 931 MMbtu c) Proposed annual fuel usage (fill in as applicable) i. Propane [gal or MMBtu] ii. Coal [tons or MMBtu] iii. Wood [cords, green tons, dry tons] iv. Other Project Cost a) Total capital cost of new system $ 4.067,776 b) Development cost c) Annual O&M cost of new system $62,000 d) Annual fuel cost $ 800,000 (fuel savings estimated,$370,000) Project Benefits a) Amount of fuel displaced for i. Electricity 70,000 ii. Heat 7766 iii. Transportation b) Current price of displaced fuel $4.38/gallon utility, heating fuel $7.23/gal c) Other economic benefits Local jobs, keep dollars in community, $45,000 d) Alaska public benefits Improve local economy, lower energy costs Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 31 of 42 7/3//2012 Power Purchase/Sales Price a) Price for power purchase/sale $.57 Project Analysis a) Basic Economic Analysis Project benefit/cost ratio (annual benefit $377,000 less $17,000 maintenance = $353,000 annual) = 1.19 @ 4% 20 years Payback (years) 11.5 years 4.4.5 Proposed Biomass System Information Please address the following items, if know. (For Biomass Projects Only) • What woody biomass technology will be installed (cord wood, pellets, chips, briquettes, pucks). • Efficiency of the biomass technology. • Thermal or electric application. • Boiler efficiency. • Displaced fuel type and amount. • Estimated tons of wood pellets or chips (specify) to be used per year, and average moisture percentage. • Estimated cords of wood to be used per year, specify whether dry or green and the moisture percentage. • Ownership/Accessibility. Who owns the land and are their limitations and restrictions to accessing the biomass resource? • Inventory data. How much biomass is available on an annual basis and what types (species) are there, if known? Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 32 of 42 7/3//2012 SECTION 5– PROJECT BENEFIT Explain the economic and public benefits of your project. Include direct cost savings, and how the people of Alaska will benefit from the project. The benefits information should include the following: • Potential annual fuel displacement (gallons and dollars) over the lifetime of the evaluated renewable energy project • Anticipated annual revenue (based on i.e. a Proposed Power Purchase Agreement price, RCA tariff, or cost based rate) • Potential additional annual incentives (i.e. tax credits) • Potential additional annual revenue streams (i.e. green tag sales or other renewable energy subsidies or programs that might be available) • Discuss the non-economic public benefits to Alaskans over the lifetime of the project The primary project benefits include: • This project will use wind to displace in excess of 71,385 gallons of fuel annually, @ $5 per gallon, • With additional 7766 gallons of displaced home heating fuel • Fewer local and state dollars spent on diesel fuel, thus improving the local economy • Job opportunities during construction and increased local operations • Advanced training opportunities • Energy price stability • Reduction in bulk fuel storage requirements • Power cost equalization savings • Fewer greenhouse emissions Diesel fuel used to generate electricity in Kipnuk was reported as 158,794 gallons in 2010. The power system has experienced a number of extended outages which has resulted in rationing of electricity. While generation efficiency has improved significantly from 6 to 10 kWhrs/gallon with the installation of a new Caterpillar 3456 diesel generator improvements to the powerplant switchgear bus and automated controls which will be provided by this proposed project are expected to lead to further increases in fuel efficiency. Efficiency gains will result from automated controls and updated switchgear will improve operational safety and reliability of the power system. New monitoring and metering will aid in the diagnosis and correction of line and revenue loss and revenue losses. It has shown that monitoring and meter alone can result in increasing up to 10% fuel saving. According to the plant operators undetected electrical metering is suspected to be inaccurately recording and account for customer usage. The installation of new monitoring meter and switchgear will enable the identification and implementation of conservation and efficiency programs, resulting in additional fuel savings of 15,000 gallons. SECTION 6– SUSTAINABILITY Discuss your plan for operating the completed project so that it will be sustainable. Include at a minimum: • Proposed business structure(s) and concepts that may be considered. • How you propose to finance the maintenance and operations for the life of the project Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 33 of 42 7/3//2012 • Identification of operational issues that could arise. • A description of operational costs including on-going support for any back-up or existing systems that may be require to continue operation • Commitment to reporting the savings and benefits Kipnuk is a member of the Chaninik Wind Group. This is a regional alliance of village utilities which includes the communities of Kwigillingok (20 miles), Kongignanak ( 30 miles) and Tuntutuliak (40 miles). These utilities formed a collabora communities formed to collaborate on the development, maintenance operations and management of wind diesel power systems in this region. The group is formally organized and actively working on all aspects of sustainable power system operations and management in this region. Between Kipnuk, Kongiganak and Kwigillingok there are 8 certified Level 1 wind turbine technicians and a closely working group of utility managers. This group has created and is working toward strengthening a regional utility collaborative. Most importantly, a wind management plan has been developed to allocate the costs of operating a profitable utility to insure that sufficient funding is available to pay for system maintenance and overall administration. The greater the number of wind turbines, the more fuel displaced, the more viable the financial strength of the group. One of the principles of successful operation will be to create a well-paid job in each community to support the wind system operation and to create a network of trained operators - one in each village who can support each other. The Chaninik Wind Group managers and electric boards are actively engaged in creating sustainable systems. They are assisted by IES, and funding from the Denali Commission and Tribal Energy program of the National Renewable Energy Laboratory. The administration of the local utility will be improved with the assistance of the automated meter reading and information technology systems. In each village the system would be administered through the use of prepaid meters. The collaborative business plan in development will provide a detailed management and financial plan and outline utility performance standards. A business plan spreadsheet is available. SECTION 6– SUSTAINABILITY Discuss your plan for operating the completed project so that it will be sustainable. Include at a minimum: • Proposed business structure(s) and concepts that may be considered. • How you propose to finance the maintenance and operations for the life of the project • Identification of operational issues that could arise. • A description of operational costs including on-going support for any back-up or existing systems that may be require to continue operation • Commitment to reporting the savings and benefits Most employment in Kipnuk is in seasonal activities such as commercial fishing and construction. Subsistence activities are a major component of the Kipnuk lifestyle. In 2010, 42 residents held Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 34 of 42 7/3//2012 commercial fishing permits. Coastal Villages Seafood, Inc., processes halibut and salmon in Kipnuk. Income is also obtained by trapping. The 2006-2010 American Community Survey (ACS) estimated 1811 residents as employed. The public sector employed 32.6%1 of all workers. The local unemployment rate was 21.6%1. The percentage of workers not in labor force was 40.3%1. The ACS surveys established that average median household income (in 2010 inflation-adjusted dollars) was $34,792 (MOE +/-$13,705)1. The per capita income (in 2010 inflation-adjusted dollars) was $11,123 (MOE +/-$1,800)1. About 23.7%1 of all residents had incomes below the poverty level. SECTION 7 – READINESS & COMPLIANCE WITH OTHER GRANTS Discuss what you have done to prepare for this award and how quickly you intend to proceed with work once your grant is approved. Tell us what you may have already accomplished on the project to date and identify other grants that may have been previously awarded for this project and the degree you have been able to meet the requirements of previous grants. The Chaninik Wind Group has been given a wind development grant which includes $1.5 milion dollars for Kipnuk Light plant. Funds have been spent to develop project designs, and purchase metering systems, engineering and construction management services, windturbine foundation piling, and electrical materials, and ship those to the project site. Approximately $850,000 of these funds are remaining to be expended. The remainder have been expended on project construction related expenses. The remainder of these funds will be allocated to long lead items so that the wind construction can proceed in an efficient manner concurrent to the new powerplant construction with completion in Spring 2014. The Chaninik Wind Group assisted Kipnuk in obtaining funds to build a new powerplant and bulk fuel system. This $4.5 million has been approved, and construction design will begin this winter with construction planned for 2014. Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 35 of 42 7/3//2012 SECTION 8– LOCAL SUPORT Discuss what local support or possible opposition there may be regarding your project. Include letters of support from the community that would benefit from this project. The Council and residents of Kipnuk have been entirely supportive of this project and the anticipated savings it will bring to their community along with the reduced carbon footprint, job opportunities, and increased self-sufficiency and sustainability. SECTION 9 – GRANT BUDGET Tell us how much you want in grant funds Include any investments to date and funding sources, how much is being requested in grant funds, and additional investments you will make as an applicant. Provide a narrative summary regarding funding sources and your financial commitment to the project. The System costs are arrived at based on construction experience and supplier quotations. Furnish and Install Wind Turbines $ 2,185,650 Integration, Control and Stabilization $ 785,118 Heat recovery/storage, metering and management $ 535,000 Project Engineering and Management $ 562,000 Total Project Cost $ 4,067,778 Cash Match From Utility/CWG $ 1,500,000 Grant Funds Requested $ 2,567,778 Note: This project cost estimate was developed on the basis of a stand alone project. Beneficts and cost savings are possible with close coordination with other projects, such as the school and powerplant and bulk fuel system construction. Some of the project funds have been expended toward the project. Applications should include a separate worksheet for each project phase that was identified in section 2.3.2 of this application, (Reconnaissance, Feasibility, Conceptual Design, Design and Permitting, and Construction). Please use the tables provided below to detail your proposed Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 36 of 42 7/3//2012 project’s budget. Be sure to use one table for each phase of your project. If you have any question regarding how to prepare these tables or if you need assistance preparing the application please feel free to contact AEA at 907-771-3031 or by emailing the Grant Administrator, Shawn Calfa, at scalfa@aidea.org. Milestone or Task Anticipat ed Completi on Date RE- Fund Grant Funds Grantee Matchin g Funds Source of Matching Funds: Cash/In- kind/Feder al Grants/Ot her State Grants/Ot her TOTALS (List milestones based on phase and type of project. See Milestone list below. ) $ $ $ Design/confirmation and coordination Jan 2013 $ $ 250,000 CWG/DCRA $ 250,000 Construction planning completed $ $ 256,000 CWG/DCRA $ 256,000 Purchasing long lead items Jan 2013 $ $ 543,600 CWG/DCRA $ 543,600 Purchase bulk materials July 2013 $ 1,281,230 $ $ 1,282,230 Shipping and misc materials August 2013 $406,246 $ $ 406,246 Install wind turbine foundations March 2014 $ 643,600 $ 456,400 CWG/DCRA $ 1,100,000 Install ETS Oct 2013 $ 45000 $ $ 45,000 Install distribution/coms Oct 2013 $ 60,000 $ $ 60,000 Install integration components May 2014 $ 76,000 $ $ 76,000 Commissioning May/June 2014 $ 50,902 $ $ 50,902 TOTALS $ 2,567,778 $ 1,500,000 $ 4,062,778 Budget Categories: Direct Labor & Benefits $ 169,100 $50,000 $ 219,100 Travel & Per Diem $ 49,200 $ 30,000 $ 79,200 Equipment $ 70,000 $ 10,000 $ 80,000 Materials & Supplies $ 1,687,478 $ 750,000 $ 2,437,478 Contractual Services $152,000 $ 410,000 $ 562,000 Construction Services $ 690,000 $ 440,000 $ 690,000 Other $ $ $ TOTALS $2,567,778 $1,500,00 0 $4,067,778 Milestone or Task Anticipat ed Completi on Date RE- Fund Grant Funds Grantee Matchin g Funds Source of Matching Funds: Cash/In- kind/Feder TOTALS Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 37 of 42 7/3//2012 al Grants/Ot her State Grants/Ot her (List milestones based on phase and type of project. See Milestone list below. ) $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ TOTALS $ $ $ Budget Categories: Direct Labor & Benefits $ $ $ Travel & Per Diem $ $ $ Equipment $ $ $ Materials & Supplies $ $ $ Contractual Services $ $ $ Construction Services $ $ $ Other $ $ $ TOTALS $ $ $ Milestone or Task Anticipat ed Completi on Date RE- Fund Grant Funds Grantee Matchin g Funds Source of Matching Funds: Cash/In- kind/Feder al Grants/Ot her State Grants/Ot her TOTALS (List milestones based on phase and type of project. See Milestone list below. ) $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 38 of 42 7/3//2012 $ $ $ TOTALS $ $ $ Budget Categories: Direct Labor & Benefits $ $ $ Travel & Per Diem $ $ $ Equipment $ $ $ Materials & Supplies $ $ $ Contractual Services $ $ $ Construction Services $ $ $ Other $ $ $ TOTALS $ $ $ Milestone or Task Anticipat ed Completi on Date RE- Fund Grant Funds Grantee Matchin g Funds Source of Matching Funds: Cash/In- kind/Feder al Grants/Ot her State Grants/Ot her TOTALS (List milestones based on phase and type of project. See Milestone list below. ) $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ TOTALS $ $ $ Budget Categories: Direct Labor & Benefits $ $ $ Travel & Per Diem $ $ $ Equipment $ $ $ Materials & Supplies $ $ $ Contractual Services $ $ $ Construction Services $ $ $ Other $ $ $ TOTALS $ $ $ Milestone or Task Anticipat ed Completi on Date RE- Fund Grant Funds Grantee Matchin g Funds Source of Matching Funds: Cash/In- kind/Feder TOTALS Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 39 of 42 7/3//2012 al Grants/Ot her State Grants/Ot her (List milestones based on phase and type of project. See Milestone list below. ) $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ TOTALS $ $ $ Budget Categories: Direct Labor & Benefits $ $ $ Travel & Per Diem $ $ $ Equipment $ $ $ Materials & Supplies $ $ $ Contractual Services $ $ $ Construction Services $ $ $ Other $ $ $ TOTALS $ $ $ Project Milestones that should be addressed in Budget Proposal Reconnaissance Feasibility Design and Permitting Construction 1. Project scoping and contractor solicitation. 2. Resource identification and analysis 3. Land use, permitting, and environmental analysis 4. Preliminary design analysis and cost 5. Cost of energy and market analysis 6. Simple economic analysis 1. Project scoping and contractor solicitation. 2. Detailed energy resource analysis 3. Identification of land and regulatory issues, 4. Permitting and environmental analysis 5. Detailed analysis of existing and future energy costs and markets 1. Project scoping and contractor solicitation for planning and design 2. Permit applications (as needed) 3. Final environmental assessment and mitigation plans (as needed) 4. Resolution of land use, right of way issues 5. Permit 1. Confirmation that all design and feasibility requirements are complete. 2. Completion of bid documents 3. Contractor/vend or selection and award 4. Construction Phases – Each project will have unique construction phases, limitations, and schedule Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 40 of 42 7/3//2012 7. Final report and recommendations 6. Assessment of alternatives 7. Conceptual design analysis and cost estimate 8. Detailed economic and financial analysis 9, Conceptual business and operations plans 10. Final report and recommendatio ns approvals 6. Final system design 7. Engineers cost estimate 8. Updated economic and financial analysis 9. Negotiated power sales agreements with approved rates 10. Final business and operational plan constraints which should be identified by the grantee 5. Integration and testing 6. Decommissioning old systems 7. Final Acceptance, Commissioning and Start-up 8. Operations Reporting Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 41 of 42 7/3//2012 SECTION 10 – AUTHORIZED SIGNERS FORM Community/Grantee Name: Regular Election is held: Date: Authorized Grant Signer(s): Printed Name Title Term Signature I authorize the above person(s) to sign Grant Documents: (Highest ranking organization/community/municipal official) Printed Name Title Term Signature Grantee Contact Information: Mailing Address: Phone Number: Fax Number: E-mail Address: Federal Tax ID #: Please submit an updated form whenever there is a change to the above information. Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 42 of 42 7/3//2012 SECTION 11 – ADDITIONAL DOCUMENTATION AND CERTIFICATION SUBMIT THE FOLLOWING DOCUMENTS WITH YOUR APPLICATION: A. Contact information, resumes of Applicant’s Project Manager, key staff, partners, consultants, and suppliers per application form Section 3.1 and 3.4. Applicants are asked to separate resumes submitted with applications, if the individuals do not want their resumes posted. B. Letters demonstrating local support per application form Section 8. C. An electronic version of the entire application on CD per RFA Section 1.7. D. Governing Body Resolution or other formal action taken by the applicant’s governing body or management per RFA Section 1.4 that: - Commits the organization to provide the matching resources for project at the match amounts indicated in the application. - Authorizes the individual who signs the application has the authority to commit the organization to the obligations under the grant. - Provides as point of contact to represent the applicant for purposes of this application. - Certifies the applicant is in compliance with applicable federal, state, and local, laws including existing credit and federal tax obligations. E. CERTIFICATION The undersigned certifies that this application for a renewable energy grant is truthful and correct, and that the applicant is in compliance with, and will continue to comply with, all federal and state laws including existing credit and federal tax obligations and that they can indeed commit the entity to these obligations. Print Name Signature Title Date