HomeMy WebLinkAboutSt Marys Wind Final Application09222012Renewable Energy Fund Round 6 Grant Application St. Mary’s/Pitka’s Point Wind Construction Project AEA 13-006 Application Page 1 of 25 7/3/2011 SECTION 1 – APPLICANT INFORMATION Name (Name of utility, IPP, or government entity submitting proposal) Alaska Village Electric Cooperative, Inc. Type of Entity: Not-for-profit corporation Fiscal Year End: December 31 Tax ID # 92-0035763 Tax Status: For-profit or X non-profit ( check one) Mailing Address 4831 Eagle Street Anchorage, AK 99503 Physical Address 4831 Eagle Street Anchorage, AK 99503 Telephone 800-478-1818 Fax 800-478-4086 Email 1.1 APPLICANT POINT OF CONTACT / GRANTS MANAGER Name Brent Petrie Title Manager, Community Development and Key Accounts Mailing Address 4831 Eagle Street Anchorage, AK 99503 Telephone 907.565.5531 Fax 907.562.4086 Email BPetrie@avec.org 1.2 APPLICANT MINIMUM REQUIREMENTS Please check as appropriate. If you do not to meet the minimum applicant requirements, your application will be rejected. 1.2.1 As an Applicant, we are: (put an X in the appropriate box) X An electric utility holding a certificate of public convenience and necessity under AS 42.05, or An independent power producer in accordance with 3 AAC 107.695 (a) (1), or A local government, or A governmental entity (which includes tribal councils and housing authorities); Yes 1.2.2. Attached to this application is formal approval and endorsement for its project by its board of directors, executive management, or other governing authority. If the applicant is a collaborative grouping, a formal approval from each participant’s governing authority is necessary. (Indicate Yes or No in the box ) Yes 1.2.3. As an applicant, we have administrative and financial management systems and follow procurement standards that comply with the standards set forth in the grant agreement. Yes 1.2.4. If awarded the grant, we can comply with all terms and conditions of the attached grant form. (Any exceptions should be clearly noted and submitted with the application.) Yes 1.2.5 We intend to own and operate any project that may be constructed with grant funds for the benefit of the general public. Renewable Energy Fund Round 6 Grant Application St. Mary’s/Pitka’s Point Wind Construction Project AEA13-006 Grant Application Page 2 of 25 7/3//2012 SECTION 2 – PROJECT SUMMARY This is intended to be no more than a 1-2 page overview of your project. 2.1 Project Title – (Provide a 4 to 5 word title for your project) St. Mary’s / Pitka’s Point Wind Energy Project 2.2 Project Location – Include the physical location of your project and name(s) of the community or communities that will benefit from your project in the subsections below. This project will be constructed near Pitka’s Point and will service that community and its neighbor St. Mary’s, five miles away. Both communities are approximately 450 air miles west- northwest of Anchorage. 2.2.1 Location of Project – Latitude and longitude, street address, or community name. Latitude and longitude coordinates may be obtained from Google Maps by finding you project’s location on the map and then right clicking with the mouse and selecting “What is here? The coordinates will be displayed in the Google search window above the map in a format as follows: 61.195676.-149.898663. If you would like assistance obtaining this information please contact AEA at 907-771-3031. This project will be located near Pitka’s Point which lies at approximately 62.032780 North Latitude and -163.287780 West Longitude. (Sec. 06, T022N, R076W, Seward Meridian.) 2.2.2 Community benefiting – Name(s) of the community or communities that will be the beneficiaries of the project. This project will benefit St. Mary’s (2011 population of 554) and Pitka’s Point (2011 population of 93), which have intertied electrical systems. Pitka’s Point is located in the Bethel Recording District. Pitka’s Point is about three miles from the St. Mary’s airport. The City of St. Mary's encompasses the Yup'ik villages of St. Mary's and Andreafsky. It lies at approximately 62.053060 North Latitude and -163.165830 West Longitude. (Sec. 26, T023N, R076W, Seward Meridian.) AVEC anticipates that through future community interties, Pilot Station and Mountain Village will also benefit from this wind energy project. 2.3 PROJECT TYPE Put X in boxes as appropriate 2.3.1 Renewable Resource Type X Wind Biomass or Biofuels Hydro, including run of river Transmission of Renewable Energy Geothermal, including Heat Pumps Small Natural Gas Renewable Energy Fund Round 6 Grant Application St. Mary’s/Pitka’s Point Wind Construction Project AEA13-006 Grant Application Page 3 of 25 7/3//2012 Heat Recovery from existing sources Hydrokinetic Solar Storage of Renewable Other (Describe) 2.3.2 Proposed Grant Funded Phase(s) for this Request (Check all that apply) Pre-Construction Construction Reconnaissance Design and Permitting Feasibility X Construction and Commissioning Conceptual Design 2.4 PROJECT DESCRIPTION Provide a brief one paragraph description of your proposed project. Alaska Village Electric Cooperative, Inc. (AVEC) is seeking $5,538,592 from this Grant Program to add a wind energy component to the existing diesel power generation system that presently serves St. Mary’s and Pitka’s Point. The project will construct one 900 kW EWT turbine at a location 2.5 miles from St. Mary’s and 1 miles east of Pitka’s Point, and will connect it to the existing power generation system. The EWT is expected to produce 2,717,000 kWh annually at 80% turbine availability. This project would also involve upgrading the existing power line between St. Mary’s and the new wind turbine site from 2-phase to 3-phase. The total estimated project cost is $6,153,991 with AVEC contributing $615,399 as its match. This project, using previously awarded REF funds, is currently under design. Geotechnical work has been completed and permit applications have been submitted. The FAA approval has been obtained. Permits are expected to be in hand by December 2012. Final design will be completed by the end of 2012. 2.5 PROJECT BENEFIT Briefly discuss the financial and public benefits that will result from this project, (such as reduced fuel costs, lower energy costs, etc.) St. Mary’s, which is connected to Pitka’s Point via an existing power line, uses diesel fuel for electrical power generation, heating oil for boiler and home heating, thermal heat recovered from the power plant for heating community facilities, and diesel and gasoline for transportation needs. The proposed project would add one 900 kW wind turbine to supplement the existing the electrical power system. The turbine is expected to produce approximately 26 % of the electricity consumed by the villages. This will result in:  Reduction in diesel fuel used for village power generation in St. Mary’s and Pitka’s Point by about 97,126 gallons/yr. or $439,981 the first year (expected to be in 2014; based on cost of fuel at $4.53/gallon from AEA). Renewable Energy Fund Round 6 Grant Application St. Mary’s/Pitka’s Point Wind Construction Project AEA13-006 Grant Application Page 4 of 25 7/3//2012  Reduction in diesel fuel used for heat by about 2,250 gallons/year or $10,196 the first year.  A reduction in operation and maintenance costs.  Stabilized energy costs for both villages and with the future, planned interties to Pilot Station and to Mountain Village.  A reduction in fossil fuel emissions which results in improved air quality and decreased contribution to global climate change. In addition, excess energy from the wind turbines will be used to heat important community facilities, decreasing the cost to operate those facilities and further reducing the consumption of heating oil in the communities. It is also a step forward in achieving state and federal renewable energy goals. 2.6 PROJECT BUDGET OVERVIEW Briefly discuss the amount of funds needed, the anticipated sources of funds, and the nature and source of other contributions to the project. AVEC is proposing to construct a 900kW EWT wind turbine in Pitka’s Point. The project will cost $6,153,991. AVEC requests $5,538,592 from the State of Alaska through a Renewable Energy Fund award. AVEC will provide $615,399 as a match contribution. 2.7 COST AND BENEFIT SUMARY Include a summary of grant request and your project’s total costs and benefits below. Grant Costs (Summary of funds requested) 2.7.1 Grant Funds Requested in this application. $5,538,592 2.7.2 Cash match to be provided $615,399 2.7.3 In-kind match to be provided $ 2.7.4 Other grant applications not yet approved $ 2.7.5 Total Grant Costs (sum of 2.7.1 through 2.7.3) $6,153,991 Project Costs & Benefits (Summary of total project costs including work to date and future cost estimates to get to a fully operational project) 2.7.6 Total Project Cost (Summary from Cost Worksheet including estimates through construction) $6,153,991 2.7.7 Estimated Direct Financial Benefit (Savings) $630,000 (if serving only the St. Mary’s system); $2,556,944 (if serving combined St. Mary’s and Pilot Station system) (assuming 20 year project period and 3% discount Renewable Energy Fund Round 6 Grant Application St. Mary’s/Pitka’s Point Wind Construction Project AEA13-006 Grant Application Page 5 of 25 7/3//2012 rate) 2.7.8 Other Public Benefit (If you can calculate the benefit in terms of dollars please provide that number here and explain how you calculated that number in your application (Section 5.) $ SECTION 3 – PROJECT MANAGEMENT PLAN Describe who will be responsible for managing the project and provide a plan for successfully completing the project within the scope, schedule and budget proposed in the application. 3.1 Project Manager Tell us who will be managing the project for the Grantee and include contact information, a resume and references for the manager(s). If the applicant does not have a project manager indicate how you intend to solicit project management support. If the applicant expects project management assistance from AEA or another government entity, state that in this section. AVEC, as the electric utility serving St. Mary’s and Pitka’s Point, will provide overall project management and oversight. Brent Petrie, Manager, Community Development and Key Accounts, will lead the project management team consisting of AVEC staff, consultants, and contractors. He has worked for Alaska Village Electric Cooperative since 1998, where he manages the development of alternatives to diesel generation for AVEC such as using wind, hydropower, solar and heat recovery. He also is the program manager for AVEC’s major construction projects. Mr. Petrie has worked in the energy and resource field for more than thirty ye ars, having worked for the federal and state governments as consultant, planner, and project manager. He has been a utility manager or management consultant since 1993. As General Manager of Iliamna-Newhalen-Nondalton Electric Cooperative from 1994 to 1998, he reported to a seven-member, elected board of directors, and served as project manager on its hydroelectric project development. He is an elected member of the Board of Directors of the Utility Wind Interest Group representing rural electric coopera tives and serves on the Renewable Energy and Distributed Generation Advisory Group of the National Rural Electric Cooperative Association. Mr. Petrie has a Master’s Degree in Water Resource Management and a Bachelor's Degree in Geography. His resume is attached. Meera Kohler, the President and CEO of AVEC. Meera Kohler has more than 30 years of experience in the Alaska electric utility industry. She was appointed Manager of Administration and Finance at Cordova Electric Cooperative in 1983, General Manager of Naknek Electric Association in 1990, and General Manager of Municipal Light & Power in Anchorage in 1997. Since May 2000, Ms. Kohler has been the President and CEO of AVEC and in this position has Renewable Energy Fund Round 6 Grant Application St. Mary’s/Pitka’s Point Wind Construction Project AEA13-006 Grant Application Page 6 of 25 7/3//2012 the ultimate grant and project responsibilities. 3.2 Project Schedule and Milestones Please fill out the schedule below. Be sure to identify key tasks and decision points in in your project along with estimated start and end dates for each of the milestones and tasks. Please clearly identify the beginning and ending of all phases of your proposed project. The key tasks and their completion dates are: Grant Award Announcement: May 2013 Turbine Procurement: July 2013 Construction Activities: July – September 2014 Project Startup: November 2012 The schedule organized by AEA milestones is as follows: Confirmation that all design and feasibility requirements are complete. Complete Completion of bid documents Complete Contractor/vendor selection and award July 2013 Construction activities 2013-2014 Turbine Procurement July, 2013 Mobilization June, 2014 Site Access Improvements July, 2014 Foundation Installation August, 2014 Turbine Installation August, 2014 Electrical Distribution Improvements September, 2014 Demobilization September, 2014 Integration and testing September, 2014 Decommissioning old systems N/A Final Acceptance, Commissioning and Start-up November, 2014 Operations Reporting December, 2014 3.3 Project Resources Describe the personnel, contractors, accounting or bookkeeping personnel or firms, equipment, and services you will use to accomplish the project. Include any partnerships or commitments with other entities you have or anticipate will be needed to complete your project. Describe any existing contracts and the selection process you may use for major equipment purchases or contracts. Include brief resumes and references for known, key personnel, contractors, and suppliers as an attachment to your application. AVEC will use a project management approach, that includes a team of AVEC staff and external consultants, that has been successful in the design and construction of wind turbines Renewable Energy Fund Round 6 Grant Application St. Mary’s/Pitka’s Point Wind Construction Project AEA13-006 Grant Application Page 7 of 25 7/3//2012 throughout rural Alaska: AVEC staff and their role on this project includes:  Meera Kohler, President and Chief Executive Officer, will act as Project Executive and will maintain ultimate authority programmatically and financially.  Brent Petrie, Manager of Community Development and Key Accounts, would lead the project management team consisting of AVEC staff, consultants, and contractors. Together with his group, Brent would provide coordination of the installation of the wind turbine project. The group’s resources include a project coordinator, accountant, project/construction manager (PM/CM), and a community liaison. Mr. Petrie will be the program manager for this project and will assign project manager resources to implement the project.  Debbie Bullock, Manager of Administrative Services, would provide support in accounting, payables, financial reporting, and capitalization of assets in accordance with AEA guidelines.  Bill Stamm, Manager of Engineering, leads AVEC’s Engineering Department which is responsible for the in-house design of power plants, distribution lines, controls, and other AVEC facilities. Mr. Stamm has worked at AVEC since 1994. Mr. Stamm was an AVEC line superintendent before he was appointed to Manager of Engineering in 2012. Mr. Stamm’s unit will provide engineering design and supervision.  Mark Bryan, the Manager of Operations, is a Certified Journeyman Electrician and supervises the AVEC’s line operations, generation operations and all field construction programs. He has worked at AVEC since 1980, was appointed Manager of Construction in May 1998 and was promoted to Manager of Operations in June 2003. Mr. Bryan’s unit will oversee operation of this project as part of the AVEC utility system.  Anna Sattler, Community Liaison, will communicate directly with St. Mary’s and Pitka’s Point residents to ensure that the community is inf ormed. Material and equipment procurement packages will be formulated by the construction manager in collaboration with AVEC’s purchasing manager. Purchase orders will be formulated with delivery dates consistent with dates required for barge or air tran sport consolidation. Multiple materials and/or equipment will be detailed for consolidated shipments to rural staging points, where secondary transport to the village destination is provided. The construction manager will track the shipments and arrange handling services to and around the destination project sites. The construction manager will be responsible for the construction activities for all project components of the facility upgrade. Local labor forces will be utilized to the maximum extent possible to construct the projects. Local job training will be provided as a concurrent operation under the management and direction of the construction manager. All construction costs, direct and indirect will be reimbursed on a cost-only basis to the construction manager, or paid directly by AVEC. Renewable Energy Fund Round 6 Grant Application St. Mary’s/Pitka’s Point Wind Construction Project AEA13-006 Grant Application Page 8 of 25 7/3//2012 For this project, AVEC is responsible for managing the commissioning process in concert with the construction manager, designers and vendors. That entails testing and training of operational personnel, as well as completing all contract closeout documents. Selection Process for Contractors: The construction contractor selection will be made from a pre-qualified list of contractors with a successful track record with AVEC. Pre-qualified contractors have been selected based upon technical competencies, past performance, written proposal, quality, cost, and general consensus from an internal AVEC steering committee. The selection of the constructor will occur in strict conformity with AVEC’s procurement policies and conformance with OMB circulars. 3.4 Project Communications Discuss how you plan to monitor the project and keep the Authority informed of the status. Please provide an alternative contact person and their contact information. AVEC has systems in place to accomplish reporting requirements successfully. In 2011, AVEC successfully met reporting requirements for 16 state and 19 federal grants. An independent financial audit and an independent auditor’s management letter completed for AVEC for 2011 did not identify any deficiencies in internal control over financial reporting that were considered to be material weaknesses. In addition, the letter stated that AVEC complied with specific loan and security instrument provisions. The project will be managed out of AVEC’s Community Development Department. For financial reporting, the Community Development Department’s accountant, supported by the Administrative Services Department, will prepare financial reports. The accountant will be responsible for ensuring that vendor invoices and internal labor charges are documented in accordance with AEA guidelines and are included with financial reports. AVEC has up-to-date systems in place for accounting, payables, financial reporting, and capitalization of assets in accordance with AEA guidelines. AVEC will require that monthly written progress reports be provided with each invoice submitted from contractor(s). The progress reports will include a summary of tasks completed, issues or problems experienced, upcoming tasks, and contractor’s needs from AVEC. Project progress reports will be collected, combined, and supplemented as necessary, and forwarded as one report to the AEA project manager each quarter. Quarterly face-to-face meetings will occur between AVEC and AEA to discuss the status of all projects funded through the AEA Renewable Energy Grants program. Individual project meetings will be held, as required or requested by AEA. Meera Kohler, AVEC’s President and CEO, may be contacted as an alternative manager. Renewable Energy Fund Round 6 Grant Application St. Mary’s/Pitka’s Point Wind Construction Project AEA13-006 Grant Application Page 9 of 25 7/3//2012 3.5 Project Risk Discuss potential problems and how you would address them. The project site, though very robust as a Class 6 wind resource, is prone to rime icing conditions in winter. Rime icing is more problematic for wind turbine operations than freezing rain (clear ice) given its tenacity and longevity in certain climatic conditions. Anti-icing and/or de-icing features would be examined as necessary to sustain wind turbine availability during the winter months. AVEC recognizes and makes plans to avoid major consequences for falling behind schedule on this project. Since -- for the most part-- installation cannot occur in the winter, missing upfront tasks like ordering parts and assigning labor could result in missing the summer window . The project could be delayed an entire year if the tasks are not completed on schedule. Weather could delay shipping materials into the community; weather can impact the construction schedule. However, an experienced Alaskan contractor, expecting bad weather, will be selected and will be reasonably prepared for weather-related problems. AVEC is responsible to its member communities and a board of directors , provides a cash match towards the project, and is liable for project cost overruns, therefore staying on schedule and within budget is essential. This project will result in decreasing electricity costs, and AVEC’s member communities are very interested in this project because energy costs can be a large portion of their budgets. AVEC member communities expect status updates on village projects including when and what work will occur, who will be involved, and when it will be completed. If work does not occur according to the schedule, AVEC’s CEO and Board of Directors are usually alerted by member communities, and there are repercussions. SECTION 4 – PROJECT DESCRIPTION AND TASKS  The level of information will vary according to phase(s) of the project you propose to undertake with grant funds.  If some work has already been completed on your project and you are requesting funding for an advanced phase, submit information sufficient to demonstrate that the preceding phases are satisfied and funding for an advanced phase is warranted. 4.1 Proposed Energy Resource Describe the potential extent/amount of the energy resource that is available. Discuss the pros and cons of your proposed energy resource vs. other alternatives that may be available for the market to be served by your project. For pre-construction applications, describe the resource to the extent known. For design and permitting or construction projects, please provide feasibility documents, design documents, and permitting documents (if applicable) as attachments to this application. The wind resource measured at the St. Mary’s/Pitka’s Point met tower site is outstanding with measured wind power class 6 by measurement of wind power density and wind speed. Renewable Energy Fund Round 6 Grant Application St. Mary’s/Pitka’s Point Wind Construction Project AEA13-006 Grant Application Page 10 of 25 7/3//2012 Extensive wind resource analysis has been conducted in the St. Mary’s region, with met towers at a lower elevation site closer to the village of St. Mary’s and near Mountain Village, in addition to the Pitka’s Point met tower. Documented in St.Mary’s Area Wind Power Report by V3 Energy, LLC, dated July 20, 2010, the wind resource measured at the nearby St. Mary’s met tower site is less robust than that measured at Pitka’s Point and appears to experience similar icing problems. Considering the inland location of St. Mary’s/Pitka’s Point, the wind resource measure at the Pitka’s Point met tower site is highly unusual, and very favorable, with its combination of a high annual average wind speed, relatively low elevation, likely good geotechnical conditions, and proximity to existing roads and infrastructure. The Pitka’s Point wind resource is comprehensively described in Pitka’s Point, Alaska Wind Resource Report by V3 Energy, LLC, dated April 25, 2012 (Tab F). 4.2 Existing Energy System 4.2.1 Basic configuration of Existing Energy System Briefly discuss the basic configuration of the existing energy system. Include information about the number, size, age, efficiency, and type of generation. The existing diesel power plant in St. Mary’s consists of three generators: a 499 kW Cummins QSX15G9, a 611 kW Caterpillar 3508, and a 908 kW Caterpillar 3512. These generators were installed in 2006, 1987 and 1995, respectively. Aggregate generator efficiency in St. Mary’s in 2011 was 13.83 kWh/gal. 4.2.2 Existing Energy Resources Used Briefly discuss your understanding of the existing energy resources. Include a brief discussion of any impact the project may have on existing energy infrastructure and resources. St. Mary’s and Pitka’s Point use diesel fuel for electrical power generation, heating oil for boiler (thermal) and home heating, thermal heat recovery from the diesel en gines at the power plant, and diesel and gasoline fuel for transportation needs. The proposed project would add one EWT 900 kW direct drive turbine to the electrical power system. The anticipated effects are less usage of diesel fuel for electrical power generation, and less usage of heating fuel for boiler operations due to injection of excess wind power to the thermal heat recovery loop in St. Mary’s. Between January and December 2011, 232,843 gallons of diesel fuel were consumed to generate 3,220,283 kWh (total) for the communities of St. Mary’s and Pitka’s point. Installation of a wind turbine for the communities would decrease the amount of diesel fuel used for power generation and heating. Diesel generator use would be curtailed thereby decreasing generator operations and maintenance costs, and enabling generators to last longer and need fewer overhauls. Renewable Energy Fund Round 6 Grant Application St. Mary’s/Pitka’s Point Wind Construction Project AEA13-006 Grant Application Page 11 of 25 7/3//2012 4.2.3 Existing Energy Market Discuss existing energy use and its market. Discuss impacts your project may have on energy customers. St. Mary's is located on the north bank of the Andreafsky River, 5 miles from its confluence with the Yukon River. It lies 450 air miles west-northwest of Anchorage. The area encompasses 44.0 square miles of land and 6.3 square miles of water. The climate is continental with a significant maritime influence. Temperatures range between -44 and 83 °F. Annual precipitation averages 16 inches, with 60 inches of snowfall. Pitka’s Point is located near the junction of the Yukon and Andreafsky Rivers, 5 miles nort hwest of St. Mary's on the Yukon-Kuskokwim Delta. The Yukon River is ice-free from June through October. Pitka’s Point lies 3 miles by road from the St. Mary's airport. The climate is both maritime and continental. Temperatures range from -44 to 83 °F. Annual precipitation averages 16 inches, with 60 inches of snowfall. St. Mary’s and Pitka’s Point are connected by an intertie with the power plant in St. Mary’s. The electricity produced at the St. Mary’s power plant in 2011 was 3,220,283 kWh. The load is highest during the winter months with the bulk of electricity consumed by residences and t he school. The addition of wind turbines to the electric generation system would reduce the amount of diesel fuel used for power generation, and energy costs would be stabilized in St. Mary’s and Pitka’s Point. Like all of Alaska, St. Mary’s and Pitka’s Point are subject to long periods of darkness in the winter. Reliable and affordable electric service is essential for the operation of home lighting, streetlights, and security lighting. Residents rely on subsistence resources including salmon, moose, bear, and waterfowl. Subsistence food is gathered and harvested and stored in refrigerators and freezers. Refrigeration is essential for the extended storage of perishable foodstuffs, and reliable electric service is essential for proper freeze storage of food. The construction of the proposed project would augment and improve the existing power generation system by incorporating a locally available renewable resource. Additional socio-economic impacts are discussed in Section 5: Project Benefits. Renewable Energy Fund Round 6 Grant Application St. Mary’s/Pitka’s Point Wind Construction Project AEA13-006 Grant Application Page 12 of 25 7/3//2012 4.3 Proposed System Include information necessary to describe the system you are intending to develop and address potential system design, land ownership, permits, and environmental issues. 4.3.1 System Design Provide the following information for the proposed renewable energy system:  A description of renewable energy technology specific to project location  Optimum installed capacity  Anticipated capacity factor  Anticipated annual generation  Anticipated barriers  Basic integration concept  Delivery methods Renewable Energy Technology. The project would construct a 900 kW 52-900 EWT near Pitka’s Point. The project site is Pitka’s Point Native Corporation land on and near the location of the Pitka’s Point met tower, with boundaries of the Pitka’s Point/St. Mary’s Airport road to the north, a rock quarry to the east, the bluff to the south, and a Native Allotment to the west. More specifically, AVEC has obtained site control on Lot 6 within these general boundaries for turbine siting. Site control of Lot 6 is adequate to place one EWT 52-900 turbine. (See the Concept Design Report for this project under Tab F.) Optimum installed capacity/Anticipated annual generation. The EWT turbine, with 80% wind turbine availability (6.75 m/s mean wind speed) would produce 2,483,000 kWh/year when serving St. Mary’s/Pitka’s Point. The capacity factor would be 34.5%. Generation could be increased once the system is connected to Pilot Station and/or to Mountain Village. Anticipated barriers. No barriers to successful installation and integration of wind turbines in St.Mary’s/Pitka’s Point are expected. The project will be constructed using knowledge of previous successful wind-diesel projects. Basic integration concept. AVEC is currently developing the integration concept for this project. Final design will be completed by the end of 2012. The existing St. Mary’s power plant already contains some of the equipment necessary (upgraded engine controls and switchgear) to accept wind-generated electric power. Delivery methods. The project will connect to the existing intertie between St. Mary’s and Pitka’s Point. This project proposes to upgrade the line to 3 -phase. 4.3.2 Land Ownership Identify potential land ownership issues, including whether site owners have agreed to the project or how you intend to approach land ownership and access issues. Renewable Energy Fund Round 6 Grant Application St. Mary’s/Pitka’s Point Wind Construction Project AEA13-006 Grant Application Page 13 of 25 7/3//2012 The proposed turbine site in Pitka’s Point and St. Mary’s is shown in the figures as part of the Concept Design Report (Tab F). The preferred wind site is the Pitka’s Point location due to its superior wind resource. At the present time, AVEC has a lease for the turbine site. Meetings for site control for interties to other villages are scheduled for late September 2012, and success in obtaining all necessary site control is expected and will be reported to AEA in October 2012. 4.3.3 Permits Provide the following information as it may relate to permitting and how you intend to address outstanding permit issues.  List of applicable permits  Anticipated permitting timeline  Identify and discussion of potential barriers A FAA Determination of No Hazard to Air Traffic has been obtained (Tab F). A Section 404 Permit (Wetlands Permit) application has been submitted to the U.S. Army Corps of Engineers. The permit is expected by the end of 2012. Agencies have been sent scoping letters regarding the projects and AVEC is waiting for responses. There are no barriers identified for the successful permitting of this project. 4.3.4 Environmental Address whether the following environmental and land use issues apply, and if so how they will be addressed:  Threatened or Endangered species  Habitat issues  Wetlands and other protected areas  Archaeological and historical resources  Land development constraints  Telecommunications interference  Aviation considerations  Visual, aesthetics impacts  Identify and discuss other potential barriers Threatened or Endangered species. According to the U.S. Fish and Wildlife Service, Anchorage Field Office, Section 7 Consultation Guide, there are no endangered or listed species, or federally designated critical habitat listed near St. Mary’s or Pitka’s Point. Habitat issues. During permitting, the project team would work with agencies to ensure that the project would not impact any State refuges, sanctuaries or critical habitat areas, federal refuges or wilderness areas, or national parks. Wetlands and other protected areas. A Section 404 Permit (Wetlands Permit) application has been submitted to the U.S. Army Corps of Engineers. The permit is expected by the end of 2012. (Tab F). Renewable Energy Fund Round 6 Grant Application St. Mary’s/Pitka’s Point Wind Construction Project AEA13-006 Grant Application Page 14 of 25 7/3//2012 Archaeological and historical resources. There are no known cultural resources within the area that could be affected by St. Mary's/Pitka’s Point Wind Turbine Project. The specific project locale has not been archaeologically surveyed, but is located in an area of low probability for undiscovered historic and archaeological properties. With the understanding that this undertaking would still need to be reviewed by archaeologists at the State Office of History and Archaeology, and the provision that any previously undiscovered cultural remains should be immediately reported to the State Historic Preservation Officer, Cultural Resource Consultants LLC (CRC) does not recommend a field survey for the project. See Memorandum from CRC under Tab F. Land development constraints. AVEC has site control for the wind turbine. Aviation considerations. A FAA Determination of No Hazard to Air Traffic has been obtained for the project. Visual, aesthetics impacts. The turbine would be placed between St. Mary’s and Pitka’s Point. Because it is likely that the turbine would be constructed between the communities, it is likely that there would be little concern for visual or aesthetic impacts. Communities often note that the turbines offer a helpful visual guide point when traveling outside the village. AVEC would conduct community meetings to discuss visual impacts and how they co uld be minimized, in the unlikely event that visual issues arise. Please see attached Final St. Mary’s Project Description R-4 under Tab F for additional environmental information. 4.4 Proposed New System Costs and Projected Revenues (Total Estimated Costs and Projected Revenues) The level of cost information provided will vary according to the phase of funding requested and any previous work the applicant may have done on the project. Applicants must reference the source of their cost data. For example: Applicants records or analysis, industry standards, consultant or manufacturer’s estimates. 4.4.1 Project Development Cost Provide detailed project cost information based on your current knowledge and understanding of the project. Cost information should include the following:  Total anticipated project cost, and cost for this phase  Requested grant funding  Applicant matching funds – loans, capital contributions, in-kind  Identification of other funding sources  Projected capital cost of proposed renewable energy system  Projected development cost of proposed renewable energy system AVEC is proposing to construct a 900kW EWT wind turbine in Pitka’s Point. The project will cost Renewable Energy Fund Round 6 Grant Application St. Mary’s/Pitka’s Point Wind Construction Project AEA13-006 Grant Application Page 15 of 25 7/3//2012 $6,153,991. AVEC requests $5,538,592 from the State of Alaska through a Renewable Energy Fund award. AVEC will provide $615,399 cash as a match contribution. 4.4.2 Project Operating and Maintenance Costs Include anticipated O&M costs for new facilities constructed and how these would be funded by the applicant. (Note: Operational costs are not eligible for grant funds however grantees are required to meet ongoing reporting requirements for the purpose of reporting impacts of projects on the communities they serve.) O&M costs for the installed turbine in St. Mary’s/Pitka’s Point are $48,250 annually. This number is based on $0.018/kWh, which is the O&M cost for urban wind turbines. This is a judgment call based on AVEC’s experience with many turbines. The maintenance costs would be funded through ongoing energy sales to AVEC’s customers (member owners) in the villages. 4.4.3 Power Purchase/Sale The power purchase/sale information should include the following:  Identification of potential power buyer(s)/customer(s)  Potential power purchase/sales price - at a minimum indicate a price range  Proposed rate of return from grant-funded project AVEC, the existing electric utility serving St. Mary’s and Pitka’s Point, is a member owned cooperative electric utility and typically owns and maintains the generation, fuel sto rage, and distribution facilities in the villages it serves. Identification of potential power buyer(s)/customer(s). Energy produced from the completed wind project would be integrated in to AVEC’s power supply system and sold to AVEC’s existing customer base in the communities of St. Mary’s and Pitka’s Point. Potential power purchase/sales price/Proposed rate of return from grant -funded project. The sales price for the wind-generated electricity would be determined by the Regulatory Commission of Alaska as is done in all AVEC villages. The delivered cost of energy would be reduced as much as possible for customers within St. Mary’s/Pitka’s Point under current regulations. Currently, of AVEC’s 55 villages, those with wind power systems experience the lowest electricity cost within the utility. Similar energy cost reductions are expected upon project completion, as proposed in this application. The project has an expected payback of:  13.6 years (simple), 17.9 years (discounted) for St. Mary’s only;  11.3 years (simple), 13.9 years (discounted) for St. Mary’s + Pilot Station 4.4.4 Project Cost Worksheet Renewable Energy Fund Round 6 Grant Application St. Mary’s/Pitka’s Point Wind Construction Project AEA13-006 Grant Application Page 16 of 25 7/3//2012 Complete the cost worksheet form which provides summary information that will be considered in evaluating the project. Please fill out the form provided below Renewable Energy Source The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Annual average resource availability. Class 6 (outstanding); mean annual speed 7.63 m/s at 38 m; Weibull k=1.94; Weibull c=8.64 m/s; mean annual power density=559 W/m^2; classifies as IEC Class II-c site Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel) Existing Energy Generation and Usage a) Basic configuration (if system is part of the Railbelt1 grid, leave this section blank) i. Number of generators/boilers/other 3 ii. Rated capacity of generators/boilers/other 499 kW; 611 kW, 908 kW iii. Generator/boilers/other type generators iv. Age of generators/boilers/other 5 years, 24 years, and 16 years v. Efficiency of generators/boilers/other 13.83 (AVEC 2011) b) Annual O&M cost (if system is part of the Railbelt grid, leave this section blank) i. Annual O&M cost for labor $64,406 (based on $0.02/kWh) labor and non-labor ii. Annual O&M cost for non-labor c) Annual electricity production and fuel usage (fill in as applicable) (if system is part of the Railbelt grid, leave this section blank) i. Electricity [kWh] 3,220,283 kWh (2011 total); 3,083,325 (2011 sold) ii. Fuel usage Diesel [gal] 232,843 gallons (2011) Other iii. Peak Load 616 kWh (December 2011) iv. Average Load 368 kWh (2011) v. Minimum Load vi. Efficiency 13.83 (AVEC 2011) 1 The Railbelt grid connects all customers of Chugach Electric Association, Homer Electric Association, Golden Valley Electric Association, the City of Seward Electric Department, Matanuska Electric Association and Anchorage Municipal Light and Power. Renewable Energy Fund Round 6 Grant Application St. Mary’s/Pitka’s Point Wind Construction Project AEA13-006 Grant Application Page 17 of 25 7/3//2012 vii. Future trends d) Annual heating fuel usage (fill in as applicable) i. Diesel [gal or MMBtu] ii. Electricity [kWh] iii. Propane [gal or MMBtu] iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] vi. Other Proposed System Design Capacity and Fuel Usage (Include any projections for continued use of non-renewable fuels) a) Proposed renewable capacity (Wind, Hydro, Biomass, other) [kW or MMBtu/hr] One 900 kW EWT 52-900 wind turbine b) Proposed annual electricity or heat production (fill in as applicable) i. Electricity [kWh] 2,483,000 kWh/yr (80% availability) ii. Heat [MMBtu] c) Proposed annual fuel usage (fill in as applicable) i. Propane [gal or MMBtu] ii. Coal [tons or MMBtu] iii. Wood [cords, green tons, dry tons] iv. Other Project Cost a) Total capital cost of new system $6,153,991 b) Development cost c) Annual O&M cost of new system $48,250 (based on $0.018/kWh) d) Annual fuel cost Cost/benefit analysis based on projected fuel price average of $5.03/gal in St. Mary’s during project life Project Benefits a) Amount of fuel displaced for i. Electricity 97,126 gallons/year (80% turbine availability) ii. Heat 2,250 gallons/year (80% turbine availability) iii. Transportation Renewable Energy Fund Round 6 Grant Application St. Mary’s/Pitka’s Point Wind Construction Project AEA13-006 Grant Application Page 18 of 25 7/3//2012 b) Current price of displaced fuel $3.67 (2011 St. Mary’s, AVEC data) c) Other economic benefits d) Alaska public benefits Power Purchase/Sales Price a) Price for power purchase/sale Project Analysis a) Basic Economic Analysis Project benefit/cost ratio B/C = 1.03 if serving only St. Mary’s system; B/C = 1.06 if serving St. Mary’s plus Pilot Station. Please see analysis in Tab F. Payback (years) 13.6 years (simple), 17.9 years (discounted) for St. Mary’s only; 11.3 years (simple), 13.9 years (discounted) for St. Mary’s + Pilot Station 4.4.5 Proposed Biomass System Information Please address the following items, if know. (For Biomass Projects Only) n/a SECTION 5– PROJECT BENEFIT Explain the economic and public benefits of your project. Include direct cost savings, and how the people of Alaska will benefit from the project. The benefits information should include the following:  Potential annual fuel displacement (gallons and dollars) over the lifetime of the evaluated renewable energy project  Anticipated annual revenue (based on i.e. a Proposed Power Purchase Agreement price, RCA tariff, or cost based rate)  Potential additional annual incentives (i.e. tax credits)  Potential additional annual revenue streams (i.e. green tag sales or other renewable energy subsidies or programs that might be available)  Discuss the non-economic public benefits to Alaskans over the lifetime of the project Potential annual fuel displacement: The possible displacement of diesel fuel used for village power generation in St. Mary’s and Pitka’s Point could be about 99,377 gallon/year total, and 1,987,540 gallons over the project’s 20-year lifetime (assuming 80% turbine availability). About 97,126 gallons/year would be displaced for village power generation, and about 2,250 Renewable Energy Fund Round 6 Grant Application St. Mary’s/Pitka’s Point Wind Construction Project AEA13-006 Grant Application Page 19 of 25 7/3//2012 gallons/year would be displaced from heat generation. This project could save $450,177 during its first full year of operation (based on an estimated 2014 cost of $4.53/gallon from AEA), or $439,981 from power generation and $10,192 from heat generation. AVEC is also submitting Round 6 applications for the construction of an intertie to Pilot Station, and design and permitting of an intertie to Mountain Village in order to take full advantage of the EWT’s full generation potential. When the interties are completed, a wind power project in St. Mary’s/Pitka’s Point would benefit Mountain Village and Pilot Station, as well as St. Mary’s and Pitka’s Point. Anticipated annual revenue/Potential additional annual incentives/Potential additional annual revenue streams. Tax credits are not expected to be beneficial to the project due to AVEC’s status as a non-profit entity. Nonetheless, in addition to saving the direct cost of fuel, AVEC could sell green tags from the project. Non-economic public benefits. In St. Mary’s and Pitka’s Point, the average annual price for residential electricity for the calendar year 2011 was $0.5902 per kilowatt hour (kWh), which far exceeds the national benchmark of $0.264/kWh. The average annual residential cost of electricity per household in 2011 was $4,197.18. According to the 2010 Census, 15.6% of St. Mary’s residents and 32.6% of Pitka’s Point residents had incomes below the poverty level. The median household income in St. Mary’s was $38,000, and in Pitka’s Point it was $38,125. The poorest residents in rural Alaska, including St. Mary’s and Pitka’s Point, use almost half of their household incomes for home energy costs, according to a study by the Institute of Social and Economic Research. Furthermore, these households use less than half as much energy as those whose power comes from natural gas or hydro-electric sources. This project is part of the solution. The anticipated benefits from the installation of the wind turbine would be reducing the negative impact of the cost of energy by provid ing a renewable energy alternative. This project could help stabilize energy costs and provide long-term socio-economic benefits to village households. Locally produced, affordable energy would empower community residents and could help avert rural-to-urban migration. Stabilized energy costs would allow community entities, including the cities and Tribes to plan and budget for important economic, land use, recreation, community service, and environmental goals listed in the St. Mary’s Community Economic Development Strategy (Alaska Department of Community and Economic Development, September 2000). This project will increase efficiencies as well as stabilize the costs of the energy system in St. Mary’s and Pitka’s Point. Both are isolated villages, accessible only by airplane, barge, snowmachine or small boat, and so rely mainly on air transportation, especially for delivery of medical goods and the transport of sick or injured individuals, or mothers nearing childbirth. Reliable electric service is essential to maintaining vital navigation aids for the safe operation of Renewable Energy Fund Round 6 Grant Application St. Mary’s/Pitka’s Point Wind Construction Project AEA13-006 Grant Application Page 20 of 25 7/3//2012 aircraft, runway lights, automated weather observation stations, VASI lights, DMEs and VORs (aircraft navigation systems) are all powered by electricity. Emergency medical service is provided in the health clinic by a health aide. Medical problems and emergencies must be relayed by telephone or by some other communication means for outside assistance. Tele-medicine is rapidly growing in rural Alaska as a means of regular and emergency care. Reliable telephone service and tele-medicine require reliable and affordable electric service. In both communities, water is obtained from wells and is treated. Community facilities--such as the school and homes--are connected to a piped water and sewer system. Reliable and affordable electric service is required for the continuous operation of the water and wastewater systems and to prevent freezing of the systems, which would cause extensive damage and interruptions in service. Like all of Alaska, St. Mary’s and Pitka’s Point are subject to long periods of winter darkness. Reliable and affordable electric service is essential for the operation of home lighting, streetlights, and security lighting. Outside lighting ensures safety, especially of childr en, in the many dark hours during the winter months of the year. Area residents’ health and safety would be enhanced from the environmental benefits resulting from a reduction of hydrocarbon use, including:  Reduced potential for fuel spills or contamination during transport, storage, or use (thus protecting vital water and subsistence food sources);  Improved air quality; and  Decreased contribution to global climate change from fossil fuel use . The wind turbine would provide a visual landmark for river, air, and overland travelers, which would help navigation in the area. Wind turbine orientation and rotor speed would provide visual wind information to residents. SECTION 6– SUSTAINABILITY Discuss your plan for operating the completed project so that it will be sustainable. Include at a minimum:  Proposed business structure(s) and concepts that may be considered.  How you propose to finance the maintenance and operations for the life of the project  Identification of operational issues that could arise.  A description of operational costs including on-going support for any back-up or existing systems that may be require to continue operation  Commitment to reporting the savings and benefits As a local utility that has been in operation since 1968, AVEC is completely able to oversee Renewable Energy Fund Round 6 Grant Application St. Mary’s/Pitka’s Point Wind Construction Project AEA13-006 Grant Application Page 21 of 25 7/3//2012 construction of, operate, and maintain this project for the design life. AVEC has capacity and experience to operate this project. AVEC has been operating wind projects throughout the state- familiar with planning, constructing, operating, and maintaining wind systems. Business Plan Structures and Concepts which may be considered: The wind turbines would be incorporated into AVEC’s power plant operation. Local plant operators provide daily servicing. AVEC technicians provide periodic preventative or corrective maintenance and are supported by AVEC headquarters staff, purchasing, and warehousing. The sales of excess electric heat would be incorporated into agreements with the City of St. Mary’s. Operating costs: O&M costs for the installed turbine in St. Mary’s/Pitka’s Point is $48,250 annually. How O&M would be financed for the life of the project: The costs of operations and maintenance would be funded through ongoing energy sales to AVEC’s consumers (member owners) in the villages. Operational issues which could arise: Integration of the secondary load controllers for thermal dump (of excess wind-generated energy) and frequency controls would need to be addressed. AVEC would use the knowledge gained through the operations of other village wind-diesel systems, including its own, to address these issues. Commitment to reporting the savings and benefits: AVEC is fully committed to sharing the savings and benefits information accrued from this project with its mem ber owners, and with AEA. SECTION 7 – READINESS & COMPLIANCE WITH OTHER GRANTS Discuss what you have done to prepare for this award and how quickly you intend to proceed with work once your grant is approved. Tell us what you may have already accomplished on the project to date and identify other grants that may have been previously awarded for this project and the degree you have been able to meet the requirements of previous grants. Work provided under this grant award will be initiated immediately. Once funding is known to be secured, AVEC will prepare and sign contracts with selected contractors. Site control has been obtained. This project, using previously awarded REF funds, is currently under design. FAA approval has been obtained. Geotechnical work has been completed and permit applications have been submitted. Permits are expected to be in hand by December 2012. Final design will be completed by the end of 2012. SECTION 8– LOCAL SUPORT Renewable Energy Fund Round 6 Grant Application St. Mary’s/Pitka’s Point Wind Construction Project AEA13-006 Grant Application Page 22 of 25 7/3//2012 Discuss what local support or possible opposition there may be regarding your project. Include letters of support from the community that would benefit from this project. The communities of St. Mary’s and Pitka’s Point support this project. Letters of support have been received from Pitka’s Point Traditional Council and Native Corporation, and the City of St. Mary’s, Nerklikmute (St. Mary’s) Native Corporation, and the Yupiit of Andreafski (tribe). Please see attached letters of support under Tab B. SECTION 9 – GRANT BUDGET Tell us how much you want in grant funds Include any investments to date and funding sources, how much is being requested in grant funds, and additional investments you will make as an applicant. AVEC is proposing to construct a 900kW EWT wind turbine in Pitka’s Point. The project will cost $6,153,991. AVEC requests $5,538,592 from the State of Alaska through a Renewable Energy Fund award. AVEC will provide $615,399 as a match contribution. A detailed budget follows. Milestone or Task Anticipated Completion RE- Fund Grantee Matching Source of Matching TOTALS Renewable Energy Fund Round 6 Grant Application St. Mary’s/Pitka’s Point Wind Construction Project AEA13-006 Grant Application Page 23 of 25 7/3//2012 Date Funds: Grant Funds Funds Confirmation that all design and feasibility requirements are complete. Complete $ - $ - $ - Completion of bid documents Complete $ - $ - $ - Contractor/vendor selection and award Complete $ - $ - $ - Construction activities 2013-2014 $ - $ - $ - Turbine Procurement July, 2013 $1,748,250 $194,250 Cash $1,942,500 Mobilization June, 2014 $643,877 $71,542 Cash $715,419 Site Access Improvements July, 2014 $335,662 $37,296 Cash $372,958 Foundation Installation Aug, 2014 $335,662 $37,296 Cash $372,958 Turbine Installation Aug, 2014 $503,494 $55,943 Cash $559,437 Electrical Distribution Improvements Sept 2014 $538,650 $59,850 Cash $598,500 Demobilization Sept, 2014 $251,747 $27,972 Cash $279,719 Integration and testing Sept, 2014 $1,181,250 $131,250 Cash $1,312,500 Decommissioning old systems N/A $ - $ - $ - Final Acceptance, Commissioning and Start-up Nov, 2014 $ - $ - Cash $ - Operations Reporting Dec, 2014 $ - $ - Cash $ - TOTALS $5,538,592 $615,399 $6,153,991 Budget Categories: Direct Labor & Benefits $ - $ - $ - Travel & Per Diem $ - $ - $ - Equipment $1,748,250 $194,250 Cash $1,942,500 Materials & Supplies $ 1,137,102 $126,345 Cash $1,263,447 Contractual Services $ - $ - $ - Construction Services $ 2,653,240 $294,804 Cash $2,948,044 Other $ - $ - $ - TOTALS $5,538,592 $615,399 $6,153,991 Tab A Resumes Tab B Letters of Support St. Mary’s Native Corporation P.O. Box 149 * St. Mary’s, Alaska 99658 * Phone 907-438-2315 * Fax 907-438-2961 September 20, 2012 Alaska Village Electric Cooperative, Inc. Attn: Anna Sattler, Community Liaison 4831 Eagle Street Anchorage, Alaska 99503 RE: St. Mary’s Native Corporation Zone Easements Dear Ms. Sattler: The zone easements, as written, would need modification and board approval. Would AVEC be willing to have a public notice and informational meeting to disseminate information about the project and zone easements? Most corporations meet on a quarterly basis. However, we do support AVEC in their efforts to provide alternative energy and a lowered cost for the benefit of our shareholder’s and our community. Sincerely, ST. MARY’S NATIVE CORPORATION Nancy Andrew, CEO File Tab D Governing Body Resolution Tab E Certification Tab F Additional Materials 5%#.'241,'%6#4'#/#2 )4#2*+% 95% DESIGN SUBMITTAL SHEET INDEX WIND ENERGY PROJECT SEPTEMBER 2012 Anchorage, Alaska 995034831 Eagle Street ST. MARY'S RUSSIA ANCHORAGE NOME KOTZEBUE BARROW JUNEAU FAIRBANKS CANADA KODIAK BETHEL UNALASKA SAINT MARY'S / PITKAS POINT, ALASKA Anchorage, Alaska 995034831 Eagle Street Anchorage, Alaska 995034831 Eagle Street Anchorage, Alaska 995034831 Eagle Street5%#.'8+%+0+6;/#2 )4#2*+% Anchorage, Alaska 995034831 Eagle Street5%#.'5+6'2.#0 )4#2*+% Anchorage, Alaska 995034831 Eagle Street Anchorage, Alaska 995034831 Eagle Street5%#.'2#46+#.'.'%64+%#.&+564+$7+6102.#0 )4#2*+% Saint Mary’s, Alaska Wind Power Conceptual Design Analysis September 17, 2012 Douglas Vaught, P.E. dvaught@v3energy.com V3 Energy, LLC Eagle River, Alaska Saint Mary’s, Alaska Wind Power Conceptual Design Analysis Page | i This report was prepared by V3 Energy, LLC under contract to Alaska Village Electric Cooperative to assess the technical and economic feasibility of installing wind turbines at the Pitka’s Point wind site near the villages of Saint Mary’s and Pitka’s Point. This analysis is part of a conceptual design report and final project design funded in Round IV of the Renewable Energy Fund administered by Alaska Energy Authority Contents Introduction .................................................................................................................................................. 1 Synopsis of Economic Modeling Results ................................................................................................... 1 Village of St. Mary’s/Andreafsky ............................................................................................................... 1 Wind Resource at Pitka’s Point and Saint Mary’s ......................................................................................... 2 Wind Speed ............................................................................................................................................... 4 Extreme Winds .......................................................................................................................................... 5 Wind Direction .......................................................................................................................................... 6 Temperature and Density ......................................................................................................................... 6 Wind-Diesel System Design and Equipment ................................................................................................. 7 Diesel Power Plant .................................................................................................................................... 8 Wind Turbines ........................................................................................................................................... 8 Northern Power 100 ARCTIC ................................................................................................................. 8 EWT52-900 ............................................................................................................................................ 9 Load Demand ................................................................................................................................................ 9 St. Mary’s Electric Load ............................................................................................................................. 9 Combined Saint Mary’s-Pilot Station Electric Load ................................................................................ 10 Thermal Load .......................................................................................................................................... 11 Diesel Generators ................................................................................................................................... 11 WAsP Modeling, Wind Turbine Layout ....................................................................................................... 12 Orographic Modeling .............................................................................................................................. 12 Wind Turbine Project Site ....................................................................................................................... 14 Northern Power 100 ARCTIC Turbine Layout ......................................................................................... 14 WAsP Modeling Results for Northern Power 100 ARCTIC Array ........................................................ 14 EWT52-900 Turbine Layout .................................................................................................................... 16 WAsP Modeling Results for EWT 52-900 Turbine ............................................................................... 16 Economic Analysis ....................................................................................................................................... 18 Saint Mary’s, Alaska Wind Power Conceptual Design Analysis Page | ii Wind Turbine Costs ................................................................................................................................. 18 St. Mary’s to Pilot Station Intertie Cost .................................................................................................. 18 Fuel Cost .................................................................................................................................................. 19 Modeling Assumptions ........................................................................................................................... 19 Homer Software Modeling Results ......................................................................................................... 22 Configuration 1: St. Mary’s Only; No Intertie to Pilot Station, NP 100 Turbine Option .................... 22 Configuration 2: St. Mary’s Only; No Intertie to Pilot Station, EWT Turbine Option ......................... 23 Configuration 3: St. Mary’s Intertied to Pilot Station, EWT Turbine Option...................................... 24 Appendix A, WAsP Wind Farm Report, Pitka’s Point Site, NP 100 Turbines............................................... 25 Appendix B, WAsP Turbine Site Report, Pitka’s Point Site, EWT Turbine ................................................... 26 Appendix C, HOMER System Report, St. Mary’s, 3 NP 100 Turbines .......................................................... 27 Appendix D, HOMER System Report, St. Mary’s, 1 EWT-500 Turbine ........................................................ 28 Appendix E, HOMER System Report, St. Mary’s + Pilot Station, 1 EWT-500 Turbine ................................. 29 Saint Mary’s, Alaska Wind Power Conceptual Design Analysis Page | 1 Introduction Alaska Village Electric Cooperative (AVEC) is the electric utility for the City of Saint Mary’s/Andreafsky as well as the interconnected village of Pitka’s Point. AVEC was awarded a grant from the Alaska Energy Authority (AEA) to complete feasibility and design work for installation of wind turbines, with planned construction in 2014. Wind resource studies of the St. Mary’s area began in 2007 with identification of possible wind turbine sites on Pitka’s Point Corporation land and Saint Mary’s corporation land, located relatively near each other between the villages of Saint Mary’s and Pitka’s Point. Both sites were equipped with 40 meter met towers, but the Pitka’s Point site eventually proved to have the superior wind resource and was chosen as the primary site for conceptual design and feasibility work. CRW Engineering Group, LLC was contracted by AVEC to develop a conceptual design report and design package for a wind turbine project in Saint Mary’s. This analysis is a component of that larger effort. Synopsis of Economic Modeling Results Three wind turbine options were modeled for energy balance and economic benefit and cost with Homer software. • Configuration 1 considers three Northern Power 100 turbines serving only the Saint Mary’s electrical and thermal load. • Configuration 2 serves the same load, but substitutes one EWT 52-900 turbine in place of the Northern Power turbines. • Configuration 3 maintains use of the EWT turbine, but adds the Pilot Station electrical load via construction of an intertie. Basic economic modeling results are presented in the table below. Project configuration economic modeling results Configuration No. Wind Turbine Type and Electric Loads Served Benefit-to-Cost Ratio Simple Payback Period 1 NP 100’s; Saint Mary’s 0.94 n/a 2 EWT 52-900; Saint Mary’s 1.03 13.6 years 3 EWT 52-900; Saint Mary’s + Pilot Station 1.06 10.9 years Village of St. Mary’s/Andreafsky St. Mary's is located 450 air miles west-northwest of Anchorage on the north bank of the Andreafsky River, five miles from its confluence with the Yukon River. The City of St. Mary's encompasses the Yupik villages of St. Mary's and Andreafsky. St. Mary's is a Yupik Eskimo community that maintains a fishing and subsistence lifestyle. The sale of alcohol is prohibited in the city. According to Census 2010, 507 people live in St. Mary’s and Andreafsky. There are 209 housing units in the community and 151 are occupied. Its population is 91.5 percent Alaska Native, 3.8 percent Caucasion, and 4.7 percent multi- racial. Saint Mary’s, Alaska Wind Power Conceptual Design Analysis Page | 2 Water is derived from Alstrom Creek reservoir and is treated. Most homes in the village have complete plumbing and are connected to the piped water and sewer system. Waste heat from the power plant supports the circulating water system. A 1.7-million-gallon sewage lagoon provides waste treatment. A washeteria is available nearby at Pitka's Point. An unpermitted landfill is shared with Pitka's Point. Electricity is provided by AVEC with interconnection to the village of Pitka’s Point and the St. Mary’s airport (station code KSM). There is one school located in the community, attended by 185 students. There is a local health clinic staffed by a health practitioner and four health aides. Emergency Services have river, limited highway, and air access. Wind Resource at Pitka’s Point and Saint Mary’s The wind resource measured at the Pitka’s Point met tower site is outstanding with measured wind power class 6 by measurement of wind power density and wind speed. Extensive wind resource analysis has been conducted in the Saint Mary’s region, with met towers at a lower elevation site closer to the village of Saint Mary’s and near Mountain Village, in addition to the Pitka’s Point met tower. Documented in Saint Mary’s Area Wind Power Report by V3 Energy, LLC, dated July 20, 2010, the wind resource measured at the nearby Saint Mary’s met tower site is less robust than that measured at Pitka’s Point and appears to experience similar icing problems. The Mountain Village wind resource is very good as well with mean wind speed near that measured at Pitka’s Point. Considering the inland location of Saint Mary’s/Pitka’s Point, the wind resource measure at the Pitka’s Point met tower site is highly unusual, and very favorable, with its combination of a high annual average wind speed, relatively low elevation, likely good geotechnical conditions, and proximity to existing roads and infrastructure. A 40 meter NRG Systems, Inc. tubular-type meteorological (met) tower was installed on Pitka’s Point Native Corporation land on the bluff immediately above the Yukon River with excellent exposure to northeasterly winds down the Andreafsky River, northerly winds from the mountains and southerly winds from the flat, tundra plains leading toward Bethel. The met tower site is near an active rock quarry and visual inspection of that quarry indicates the likelihood of excellent geotechnical conditions for wind turbine foundations. Also of advantage for the site is near proximity of the road connecting Saint Mary’s to Pitka’s Point, the airport and Mountain Village. A two-phase power distribution line (connecting the St. Mary’s powerplant to Pitka’s Point as one phase and to the airport as the second phase) routes on the south side of the road. This line could be upgraded to three-phase at minimal cost to connect wind turbines to three-phase distribution in Saint Mary’s. The Pitka’s Point wind resource is comprehensively described in Pitka’s Point, Alaska Wind Resource Report by V3 Energy, LLC, dated April 25, 2012. Pitka’s Point met tower data synopsis Data dates October 26, 2007 to February 12, 2009 (16 months) Wind power class Class 6 (excellent), based on wind power density Saint Mary’s, Alaska Wind Power Conceptual Design Analysis Page | 3 Wind power density mean, 38 m 558 W/m2 Wind speed mean, 38 m 7.62 m/s (17.0 mph) Max. 10-min wind speed 29.5 m/s Maximum 2-sec. wind gust 26.3 m/s (81.2 mph), January 2008 Weibull distribution parameters k = 1.93, c = 8.63 m/s Wind shear power law exponent 0.176 (low) Roughness class 2.09 (description: few trees) IEC 61400-1, 3rd ed. classification Class II-c (at 38 meters) Turbulence intensity, mean (at 38 m) 0.076 (at 15 m/s) Calm wind frequency (at 38 m) 20% (< 4 m/s) (16 mo. measurement period) Google Earth image, Pitka’s Point and Saint Mary’s Pitka’s Point met tower location St. Mary’s Saint Mary’s, Alaska Wind Power Conceptual Design Analysis Page | 4 Wind Speed Anemometer data obtained from the met tower, from the perspectives of both mean wind speed and mean wind power density, indicate an outstanding wind resource. Note that cold temperatures contributed to a higher wind power density than standard conditions would yield for the measured mean wind speeds. Anemometer data summary Variable Speed 38 m Speed 29 m Speed 28 m IceFree Speed 21 m Measurement height (m) 38 28.8 28.2 21 Mean wind speed (m/s) 7.68 7.29 7.33 6.83 MoMM wind speed (m/s) 7.62 7.24 7.33 6.78 Median wind speed (m/s) 7.20 6.80 7.00 6.40 Max wind speed (m/s) 29.50 29.20 27.50 28.40 Weibull k 1.94 1.89 2.22 1.88 Weibull c (m/s) 8.64 8.20 8.26 7.68 Mean power density (W/m²) 573 502 441 414 MoMM power density (W/m²) 559 490 441 404 Mean energy content (kWh/m²/yr) 5,015 4,396 3,861 3,627 MoMM energy content (kWh/m²/yr) 4,897 4,294 3,861 3,541 Energy pattern factor 1.95 2.00 1.73 2.01 Frequency of calms (%) (< 4 m/s) 20.4 21.9 17.6 24.7 MoMM = mean of monthly means Time series calculations indicate high mean wind speeds during the winter months with more moderate, but still relatively high, mean wind speeds during summer months. This correlates well with the Saint Mary’s/Andreafsky/Pitka’s Point village load profile where winter months see high demand for electricity and heat and the summer months have lower demand for electricity and heat. The daily wind profiles indicate relatively even wind speeds throughout the day with slightly higher wind speeds during night hours. 38 m anemometer data summary Mean Median Max 10- min avg Max gust (2 sec) Std. Dev. Weibull k Weibull c Month (m/s) (m/s) (m/s) (m/s) (m/s) (-) (m/s) Jan 10.17 10.70 29.5 35.9 5.34 1.97 11.45 Feb 9.21 9.20 20.1 23.3 4.07 2.41 10.36 Mar 8.62 8.50 21.8 26.3 4.33 2.07 9.71 Apr 7.98 7.80 16.9 20.6 2.83 3.05 8.90 May 7.27 6.90 21.8 27.1 3.67 2.06 8.19 Jun 5.70 5.80 13.2 15.3 2.62 2.28 6.40 Jul 7.98 7.70 21.7 26.3 3.33 2.55 8.99 Aug 5.89 5.70 15.3 17.9 2.95 2.05 6.62 Saint Mary’s, Alaska Wind Power Conceptual Design Analysis Page | 5 Sep 6.37 6.70 12.5 16.8 2.44 2.85 7.11 Oct 6.80 6.60 20.1 24.8 3.81 1.80 7.62 Nov 7.32 6.40 24.1 29.8 4.48 1.72 8.23 Dec 8.97 8.90 22.9 27.5 4.69 1.95 10.07 Annual 7.62 7.20 29.5 35.9 4.09 1.94 8.64 Monthly time series, mean wind speeds Extreme Winds A modified Gumbel distribution analysis, based on monthly maximum winds vice annual maximum winds, was used to predict extreme winds at the Pitka’s Point met tower site. Sixteen months of data though are minimal at best and hence results should be viewed with caution. Nevertheless, with data available the predicted Vref (maximum ten-minute average wind speed) in a 50 year return period (in other words, predicted to occur once every 50 years) is 41.6 m/s. This result classifies the site as Class II by International Electrotechnical Commission 61400-1, 3rd edition (IEC3) criteria. IEC extreme wind probability classification is one criteria – with turbulence the other – that describes a site with respect to suitability for particular wind turbine models. Note that the IEC3 Class II extreme wind classification, which clearly applies to the Pitka’s Point met tower site, indicates relatively energetic winds and turbines installed at this location should be IEC3 Class II rated. Site extreme wind probability table, 38 m data Vref Gust IEC 61400-1, 3rd ed. Period (years) (m/s) (m/s) Class Vref, m/s 3 29.2 35.5 I 50.0 10 35.4 43.1 II 42.5 20 37.0 45.0 III 37.5 30 39.6 48.2 S designer- specified 50 41.6 50.6 100 44.2 53.8 average gust factor: 1.22 Saint Mary’s, Alaska Wind Power Conceptual Design Analysis Page | 6 Wind Direction Wind frequency rose data indicates that winds at the Pitka’s Point met tower site are primarily bi- directional, with northerly and east-northeasterly winds predominating. The mean value rose indicates that east-northeasterly winds are of higher intensity than northerly winds, but interesting, the infrequent south-southeasterly winds, when they do occur, are highly energetic and likely indicative of storm winds. Wind frequency rose (38 m vane) Wind energy rose (38 m anem.) Temperature and Density The Pitka’s Point met tower site experiences cool summers and cold winters with resulting higher than standard air density. Calculated annual air density during the met tower test period exceeds the 1.204 kg/m3 standard air density for a 177 meter elevation by 5.7 percent. This is advantageous in wind power operations as wind turbines produce more power at low temperatures (high air density) than at standard temperature and density. Temperature and density table Temperature Air Density Mean Min Max Mean Min Max Mean Min Max Month (°F) (°F) (°F) (°C) (°C) (°C) (kg/m³) (kg/m³) (kg/m³) Jan 4.7 -20.2 39.0 -15.1 -29.0 3.9 1.325 1.204 1.416 Feb 4.1 -24.7 32.4 -15.5 -31.5 0.2 1.343 1.264 1.430 Mar 11.0 -14.3 38.8 -11.7 -25.7 3.8 1.275 1.204 1.397 Apr 19.5 -6.3 44.2 -7.0 -21.3 6.8 1.299 1.235 1.372 May 39.4 13.8 65.5 4.1 -10.1 18.6 1.247 1.185 1.314 Jun 49.2 29.5 70.2 9.5 -1.4 21.2 1.223 1.174 1.272 Jul 50.5 37.9 81.9 10.3 3.3 27.7 1.220 1.149 1.250 Saint Mary’s, Alaska Wind Power Conceptual Design Analysis Page | 7 Aug 51.3 33.1 70.9 10.7 0.6 21.6 1.218 1.173 1.263 Sep 45.1 30.0 64.6 7.3 -1.1 18.1 1.233 1.187 1.270 Oct 22.7 5.0 37.2 -5.2 -15.0 2.9 1.290 1.252 1.339 Nov 16.3 -14.6 44.6 -8.7 -25.9 7.0 1.308 1.234 1.398 Dec 13.9 -16.2 45.0 -10.1 -26.8 7.2 1.307 1.204 1.403 Annual 27.4 -24.7 81.9 -2.5 -31.5 27.7 1.273 1.149 1.430 Wind-Diesel System Design and Equipment Wind-diesel power systems are categorized based on their average penetration levels, or the overall proportion of wind-generated electricity compared to the total amount of electrical energy generated. Commonly used categories of wind-diesel penetration levels are low penetration, medium penetration, and high penetration. The wind penetration level is roughly equivalent to the amount of diesel fuel displaced by wind power. Note however that the higher the level of wind penetration, the more complex and expensive a control system and demand-management strategy is required. This is a good compromise between of displaced fuel usage and relatively minimal system complexity and is AVEC’s preferred system configuration. Installation of three Northern Power 100 wind turbines or one EWT52/54-900 wind turbine at the Pitka’s Point would be configured at the medium penetration level. Categories of wind-diesel penetration levels Penetration Penetration Level Operating characteristics and system requirements Instantaneous Average Low 0% to 50% Less than 20% Diesel generator(s) run full time at greater than minimum loading level. Requires minimal changes to existing diesel control system. All wind energy generated supplies the village electric load; wind turbines function as “negative load” with respect to diesel generator governor response. Medium 0% to 100+% 20% to 50% Diesel generator(s) run full time at greater than minimum loading level. Requires control system capable of automatic generator start, stop and paralleling. To control system frequency during periods of high wind power input, system requires fast acting secondary load controller matched to a secondary load such as an electric boiler augmenting a generator heat recovery loop. At high wind power levels, secondary (thermal) loads are dispatched to absorb energy not used by the primary (electric) load. Without secondary loads, wind turbines must be curtailed to control frequency. High (Diesels-off Capable) 0% to 150+% Greater than 50% Diesel generator(s) can be turned off during periods of high wind power levels. Requires sophisticated new control system, significant wind turbine capacity, secondary (thermal) load, energy storage such as batteries or a flywheel, and possibly additional components such as demand- managed devices. HOMER energy modeling software was used to analyze the Saint Mary’s power System. HOMER was designed to analyze hybrid power systems that contain a mix of conventional and renewable energy Saint Mary’s, Alaska Wind Power Conceptual Design Analysis Page | 8 sources, such as diesel generators, wind turbines, solar panels, batteries, etc. and is widely used to aid development of Alaska village wind power projects. Diesel Power Plant Electric power (comprised of the diesel power plant and the electric power distribution system) in Saint Mary’s is provided by AVEC. The existing power plant in Saint Mary’s consists of one Cummins diesel generator model QSX15G9 rated at 499 kW output, and two Caterpillar diesel generators, a model 3508 rated at 611 kW output and a model 3512 rated at 908 kW output. St. Mary’s power plant diesel generators Generator Electrical Capacity Diesel Engine Model 1 499 kW Cummins QSX15G9 2 611 kW Caterpillar 3508 3 908 kW Caterpillar 3512 Wind Turbines This report considers installation of three Northern Power 100 ARCTIC turbines for 300 kW installed wind capacity to serve only the Saint Mary’s load, or one EWT 52-900 for 900 kW installed wind capacity to serve Saint Mary’s initially but then both Saint Mary’s and Pilot Station upon completion of the intertie, which can be considered a companion project. With capacity considerations, three Northern Power 100 turbines best match the St. Mary’s load while the EWT52-900 turbine, given its much higher energy output, works best when serving an intertied St. Mary’s-to-Pilot Station load. Northern Power 100 ARCTIC The Northern Power 100 ARCTIC, formerly known as the Northwind 100 (NW100) Arctic, is rated at 100 kW and is equipped with a permanent magnet, synchronous generator, is direct drive (no gearbox), and is equipped with heaters and has been tested to ensure operation in extreme cold climates. The turbine has a 21 meter diameter rotor operating at a 37 meter hub height. The turbine is stall-controlled and in the proposed version will be equipped with an arctic package enabling continuous operation at temperatures down to -40° C. The Northern Power 100 ARCTIC is the most widely represented village- scale wind turbine in Alaska with a significant number of installations in the Yukon-Kuskokwim Delta and on St. Lawrence Island. The Northern Power 100 ARCTIC wind turbine is manufactured in Barre, Vermont, USA. More information can be found at http://www.northernpower.com/. The turbine power curve is shown below. Northern Power 100 ARCTIC power curve Saint Mary’s, Alaska Wind Power Conceptual Design Analysis Page | 9 EWT52-900 The EWT52-900 is an IEC Class II-A wind turbine rated at 900 kW, equipped with a direct drive, permanent magnet, synchronous generator, a 52 meter diameter rotor, and 40, 50 or 75 meter high towers. The turbine is pitch-controlled, variable speed, and can be equipped with an arctic package enabling continuous operation at temperatures down to -40° C. A variant of this turbine is the EWT54- 900 which is identical to the EWT52-900 but equipped with a 54 meter diameter rotor and limited to IEC Class III sites. The wind resource analysis of the Pitka’s Point met tower indicated sufficiently strong wind gust potential to classify the site as IEC Class II by extreme wind probability (see earlier discussion in this report). Three EWT-900 wind turbines are presently operational in Alaska, one in Delta Junction and two in Kotzebue. The EWT52-900 wind turbine is manufactured in Amersfoort, The Netherlands, with North American representation in Bloomington, Minnesota. More information can be found at http://www.ewtinternational.com/?id=4 . The turbine power curve is shown below. EWT52-900 power curve Load Demand This analysis includes stand-alone electric and thermal load demand in St. Mary’s (which includes Andreafsky and Pitka’s Point) and the combined electric load demand of St. Mary’s and nearby Pilot Station once the proposed electrical intertie is complete. St. Mary’s Electric Load Saint Mary’s/Andreafsky load data, collected from December 26, 2009 to October 27, 2011, was received from Mr. Bill Thompson of AVEC. These data are in 15 minute increments and represent total electric load demand during each time step. The data were processed by adjusting the date/time stamps nine hours from GMT to Yukon/Alaska time, multiplying each value by four to translate kWh to kW (similar to processing of the wind turbine data), and creating a January 1 to December 31 hourly list for export to HOMER software. The resulting load is shown graphically below. Average load is 354 kW with a 621 kW peak load and an average daily load demand of 8,496 kWh. Saint Mary’s, Alaska Wind Power Conceptual Design Analysis Page | 10 St. Mary’s electric load Combined Saint Mary’s-Pilot Station Electric Load Pilot Station is not equipped with automated logging equipment to document the electric load. But, with plant operator logs, AVEC tracks the electric load which is documented in AVEC’s annual generation report and also in the power cost equalization reports that AVEC submits to Regulatory Commission of Alaska. It is assumed that the Pilot Station electrical load is similar to that of St. Mary’s load on a daily and monthly basis. Hence, the measured St. Mary’s load was scaled to a daily load demand of 13,726 kWh to represent a combine St. Mary’s-Pilot Station electrical system when the intertie is complete. St. Mary’s-Pilot Station combined electric load Saint Mary’s, Alaska Wind Power Conceptual Design Analysis Page | 11 Thermal Load The thermal load demand in St. Mary’s is well quantified and described in a report entitled St. Mary’s, Alaska Heat Recovery Study, prepared for the Alaska Energy Authority by Alaska Energy and Engineering, Inc. and dated August 31, 2011. This report is quite comprehensive and won’t be summarized here. Thermal load data needed for HOMER modeling was extracted from a heat demand/heat available graph on page 5 of the report. Monthly thermal heat demand is graphed as a heating fuel equivalent in gallons per month, which was converted to kW demand with a conversion of 0.0312 gallons heating fuel per kWh. Although not entirely precise, the monthly heat demand was equalized across the entire day for each month and then randomized a bit with a five percent day-to-day and five percent time step-to- time step random variability. Resulting thermal load is show below. Saint Mary’s thermal load Diesel Generators The HOMER model was constructed with all three St. Mary’s generators. For cost modeling purposes, AEA assumes a generator O&M cost of $0.020/kWh. For HOMER modeling purposes, this was converted to $2.50/operating hour for each diesel generator. Other diesel generator information pertinent to the HOMER model is shown in the table below. Note that the Saint Mary’s power plant operates is equipped with automated switchgear and can operate in automatic mode with generators in parallel. Diesel generator HOMER modeling information Diesel generator Cummins QSX15G9 Caterpillar 3508 Caterpillar 3512 Power output (kW) 499 611 908 Intercept coeff. (L/hr/kW rated) .0222 0.0233 0.0203 Slope (L/hr/kW output) 0.215 0.238 0.233 Minimum electric load (%) 0% (0 kW) 0% (0 kW) 0% (0 kW) Saint Mary’s, Alaska Wind Power Conceptual Design Analysis Page | 12 Diesel generator Cummins QSX15G9 Caterpillar 3508 Caterpillar 3512 Heat recovery ratio (% of waste heat that can serve the thermal load) 22 22 22 Intercept coefficient – the no-load fuel consumption of the generator divided by its capacity Slope – the marginal fuel consumption of the generator Fuel efficiency curve, QSX15G9 Fuel efficiency curve, Cat 3508 Fuel efficiency curve, Cat 3508 WAsP Modeling, Wind Turbine Layout WAsP (Wind Atlas Analysis and Application Program) and is PC-based software for predicting wind climates, wind resources and power production from wind turbines and wind farms and was used to model the Pitka’s Point terrain and wind turbine performance. WAsP software calculates gross and net annual energy production (AEP) for turbines contained within wind farms, such as an array of two or more turbines in proximity to each other. For s single turbine array, WAsP calculates gross AEP. With one turbine, net AEP is identical to gross AEP as there is no wake loss to consider. Orographic Modeling WAsP modeling begins with import of a digital elevation map (DEM) of the subject site and surrounding area and conversion of coordinates to Universal Transverse Mercator (UTM). UTM is a geographic coordinate system that uses a two-dimensional Cartesian coordinate system to identify locations on the surface of Earth. UTM coordinates reference the meridian of its particular zone (60 longitudinal zones are further subdivided by 20 latitude bands) for the easting coordinate and distance from the equator for the northing coordinate. Units are meters. Elevations of the DEMs are converted to meters if necessary for import into WAsP software. A met tower reference point is added to the digital elevation map, wind turbine locations identified, and a wind turbine(s) selected to perform the calculations. WAsP considers the orographic (terrain) effects on the wind (plus surface roughness and obstacles) and calculates how wind flow increases or decreases at each node of the DEM grid. The mathematical model has a number of limitations, including the assumption of overall wind regime of the turbine site is the same as the met tower reference site, prevailing weather conditions are stable over time, and the surrounding terrain at both sites is Saint Mary’s, Alaska Wind Power Conceptual Design Analysis Page | 13 sufficiently gentle and smooth to ensure laminar, attached wind flow. WAsP software is not capable of modeling turbulent wind flow resulting from sharp terrain features such as mountain ridges, canyons, shear bluffs, etc. Orographic modeling of the wind across the site, with the Pitka’s Point met tower as the reference site, indicates an outstanding wind resource on the top edge of the bluff, especially downhill from the met tower toward the Yukon River and the village of Pitka’s Point. Orographic modeling of Pitka’s Point site area, plan view Orographic modeling of Pitka’s Point site area, view to west Saint Mary’s, Alaska Wind Power Conceptual Design Analysis Page | 14 Wind Turbine Project Site The project site is Pitka’s Point Native Corporation land on and near the location of the Pitka’s Point met tower, with boundaries of the Pitka’s Point/Saint Mary’s Airport road to the north, a rock quarry to the east, the bluff to the south, and a Native Allotment to the west. More specifically, AVEC has obtained site control on Lot 6 within these general boundaries for turbine siting. Site control of Lot 6 is adequate to site one EWT52-900 turbine, but lease rights to additional Pitka’s Point Native Corporation property on the bluff edge would be necessary for an ideal layout of Northern Power 100 turbines. It is important to note that winds at the project site, though very robust as a Class 6 wind resource, are prone to rime icing conditions in winter. Rime icing is more problematic for wind turbine operations than freezing rain (clear ice) given its tenacity and longevity in certain climatic conditions. Anti-icing and/or de-icing features may be necessary to sustain availability during the winter months. Northern Power 100 ARCTIC Turbine Layout The Northern Power turbines are located on the bluff edge, which is on and near Lot 6 on Pitka’s Point Native Corporation land. Using WAsP software, turbine locations were selected that have high gross energy production based on predicted site wind speeds, but at the same time result in minimal array loss, thus yielding a high net energy production. NP 100 Turbine Layout Turbine UTM (easting, northing) Latitude, Longitude NP 100 wtg 1 Zone 3V 591577, 6879392 62.035691° N, 163.24939° W NP 100 wtg 2 Zone 3V 591646, 6879471 62.036383° N, 163.24803° W NP 100 wtg 3 Zone 3V 591715, 6879552 62.037093° N, 163.24667° W WAsP Modeling Results for Northern Power 100 ARCTIC Array The following table presents the WAsP software analysis of energy production and capacity factor performance of the Northern Power 100 in a three turbine array at 100% turbine availability (percent of time that the turbine is on-line and available for energy production). The Northern Power 100 performs very well in the Pitka’s Point wind regime with excellent annual energy production and minimal array wake loss. Note that the standard (atmospheric conditions) power curve was compensated to the measured mean annual site air density of 1.273 kg/m3. For the stall-controlled Northern Power 100, power output (for each m/s wind speed step) of the standard power curve was multiplied by the ratio of site air density to standard air density of 1.225 kg kg/m3 and capped at a maximum 100 kW output. Northern Power 100 annual energy production 3 turbine array, 100% availability Parameter Total (MWh/yr) Average Each (MWh/yr) Minimum Each (MWh/yr) Maximum Each (MWh/yr) Net AEP 1,025 341.8 337.6 345.1 Gross AEP 1,043 347.8 345.9 350.6 Wake loss 1.71 % - - - Saint Mary’s, Alaska Wind Power Conceptual Design Analysis Page | 15 Northern Power 100 turbines, view to north Northern Power 100 turbines, view to south Saint Mary’s, Alaska Wind Power Conceptual Design Analysis Page | 16 EWT52-900 Turbine Layout Although orographic modeling indicates highest wind resource on the bluff edge downhill from the met tower, toward the Yukon River and the village of Pitka’s Point, land use restrictions dictated placement of the turbine in the southeast corner of Lot 6. This location, though, should still be considered highly desirable for wind energy production by any standard. EWT 52-900 Turbine Layout Turbine UTM (easting, northing) Latitude, Longitude EWT 52-900 Zone 3V 591648, 6879454 62.036230° N, 163.24800 W° WAsP Modeling Results for EWT 52-900 Turbine The following table presents the WAsP software analysis of energy production for the EWT 52-900 wind turbine at 100% turbine availability (percent of time that the turbine is on-line and available for energy production). The EWT turbine is predicted to perform extremely well in the Pitka’s Point wind regime with excellent capacity factors and annual energy productions. Note that the standard (atmospheric conditions) power curve was compensated to the measured mean annual site air density of 1.273 kg/m3. For the pitch-controlled EWT 52-, power output (for each m/s wind speed step) is multiplied by the ratio of site air density to standard air density of 1.225 kg kg/m3, raised to the one-third power. EWT 52-900 annual energy production, variable turbine availability EWT 52-900 (50 meter hub height) Turbine Availability Energy Production (KWh/yr) Capacity Factor (%) 100% 3,397,000 43.1 95% 3,227,000 40.9 80% 2,717,000 34.5 Saint Mary’s, Alaska Wind Power Conceptual Design Analysis Page | 17 EWT turbine, view to southwest (village of Pitka’s Point top center) EWT turbine, view to east (village of St. Mary’s top right) Saint Mary’s, Alaska Wind Power Conceptual Design Analysis Page | 18 Economic Analysis Homer software was used to model static energy balance of the Saint Mary’s electrical and thermal power system at one hour increments of time. For both wind turbines considered, they are modeled as connected to the electrical distribution system with first priority to serve the electrical load and second priority to serve the thermal load via a secondary load controller and electric boiler. Wind Turbine Costs Capital and installation costs of three Northern Power 100 ARCTIC wind turbines to serve the village of St. Mary’s are based on AVEC’s cost estimate in their Renewable Energy Fund Round V proposal. Total proposed project cost, including distribution system extension and AVEC cost share, is $4,443,244, based on a cost estimate developed in 2011 for a Renewable Energy Fund Round 5 analysis. An alternative consideration, which would serve only the village of St. Mary’s initially but later would also serve the village of Pilot Station once the intertie is complete, is installation of one EWT52-900 wind turbine on a 50 meter tower. Total project cost for the EWT52-900 turbine, including distribution system extension and power plant upgrades, is $6,153,991. St. Mary’s to Pilot Station Intertie Cost An economic analysis of the EWT 52-900 wind turbine in a combined Saint Mary’s/Pilot Station electrical system must include the cost of connection as the intertie does not presently exist. This cost, though, is more than simply the cost to build the intertie. It includes avoided costs such as a power plant and bulk fuel upgrade in Pilot Station that will not be built if an intertie to Saint Mary’s is constructed instead. Interestingly, this also includes the opportunity of wind power. Airspace restrictions around Pilot Station preclude the option of wind turbines for the village, but with an intertie, the wind power project plan for St. Mary’s will be available to also serve Pilot Station. A preliminary cost analysis of non-intertie vs. intertie scenarios is presented in the table below. Although the intertie itself is projected to cost $5.95 million, the net cost of the intertie, with avoided capital costs considered, is a very modest $260,000. Without Intertie With Intertie St. Mary’s Pilot Station St. Mary’s Pilot Station Notes Powerplant capital cost $5.50 M $5.50 M $5.80 M $0.75 M Bulk fuel capital cost $4.61 M $2.39 M $5.76 M 0 Wind turbine capital cost $4.44 M 0 $6.15 M 0 NP100’s for St. M., or EWT for both Intertie capital cost $5.95 M Cost Difference (no turbines) Total Cost (wind turbines not included) $18.00 M $18.26 M $260,000 Saint Mary’s, Alaska Wind Power Conceptual Design Analysis Page | 19 Beyond the avoided capital costs, the benefits of an electrical intertie between Saint Mary’s and Pilot Station include increased efficiency of the diesel generators in Saint Mary’s as they will operate at higher loading levels and hence more efficient points of their fuel curves, reduced operating and maintenance expenses with fewer diesel generators on line, lower labor costs, reduced maintenance expenses, and reduced repair and emergency expenses with operations consolidated in Saint Mary’s. A separate economic analysis indicates a benefit-to-cost ratio of approximately 1.20 for 20 to 50 year evaluation periods. Fuel Cost A fuel price of $5.02/gallon ($1.33/Liter) was chosen for the initial HOMER analysis by reference to Alaska Fuel Price Projections 2012-2035, prepared for Alaska Energy Authority by the Institute for Social and Economic Research (ISER), dated July, 2012. The $5.02/gallon price reflects the average value of all fuel prices between the 2014 (assumed project start year) fuel price of $4.53/gallon and the 2033 (20 year project end year) fuel price of $5.48/gallon using the medium price projection analysis with social cost of carbon (SCC) included (see ISER spreadsheet for Renewable Energy Fund Round 6 analysis). By comparison, the fuel price for Stebbins (without social cost of carbon) reported to Regulatory Commission of Alaska for the 2011 PCE report is $2.71/gallon ($0.716/Liter). Fuel cost table Cost Scenario 2014 (/gal) 2033 (/gal) Average (/gallon) Average (/Liter) Medium w/ SCC $4.53 $5.48 $5.02 $1.33 Modeling Assumptions HOMER energy modeling software was used to analyze the Saint Mary’s power System. HOMER is a static energy model designed to analyze hybrid power systems that contain a mix of conventional and renewable energy sources, such as diesel generators, wind turbines, solar panels, batteries, etc. Homer software is widely used in the State of Alaska to aid development of village wind-diesel power projects. HOMER modeling assumptions are detailed in the table below. Many assumptions, such as project life, discount rate, operations and maintenance (O&M) costs, etc. are AEA default values. Other assumptions, such as diesel overhaul cost and time between overhaul are based on general rural Alaska power generation experience. The base or comparison scenario is the existing St. Mary’s/Andreafsky powerplant with its present configuration of diesel generators. Also assumed in the base or comparison scenario is that excess powerplant heat serves the thermal load via a heat recovery loop. Wind turbines constructed at the Pitka’s Point site are assumed to operate in parallel with the diesel generators. Excess energy will serve thermal loads via a secondary load controller and electric boiler. Installation cost of either three NW100 wind turbines or one EWT-500 wind turbine assumes a three- phase distribution line extension from the road to the wind turbine site plus a two-phase to three-phase Saint Mary’s, Alaska Wind Power Conceptual Design Analysis Page | 20 upgrade of the distribution system from the line extension tie-in to an existing three-phase distribution point on the west side of the village of St. Mary’s. Basic modeling assumptions Economic Assumptions Project life 20 years (2014 to 2033) Discount rate 3% System fixed O&M cost (non-fuel) $683,198/year (St. Mary’s only); $964,500/year (St. Mary’s + Pilot Station) Operating Reserves Load in current time step 10% Wind power output 50% Fuel Properties (both types) Heating value 43.2 MJ/kg (18,600 BTU/lb) Density 820 kg/m3 (6.85 lb/gal) Price $5.02/gal ($1.33/Liter) Diesel Generators Generator capital cost $0 (gensets already exist) O&M cost $2.50/hour (at $0.02/kWh) Time between overhauls 20,000 hours (run time) Overhaul cost (all diesel gensets) $75,000 Minimum load 0 kW; based on AVEC’s inverter/battery integration plan to enable diesels-off operation of the wind-diesel system Schedule Optimized Wind Turbines Availability 80% (note that EWT turbine is guaranteed by manufacturer to achieve 95% availability, less downtime due to icing) O&M cost $0.0469/kWh for NP 100 and $0.018/kWh for EWT 52-900 (equates to $41,900/year for 3 NP 100 turbines and $48,250/year for EWT 52-900; based on 34% turbine CF both turbines) Wind speed 7.69 m/s at the Pitka’s Point wind; scaled to 6.75 m/s in Homer software for 80% turbine availability (38 meter level) Energy Loads Electric: St. Mary’s 8.74 MWh/day measured in St. Mary’s power plant Electric: St. Mary’s + Pilot Station 13.73 MWh/day; St. Mary’s power plant data scaled to accommodate Pilot Station load Thermal 5.22 MWh/day based on recovered heat report written by AEE, Inc. Project Cost Assumptions Three basic project configuration and benefit-to-cost evaluations are considered with Homer modeling, as listed below. Configuration Number: 1. Three Northern Power 100 wind turbines serving only the Saint Mary’s electrical and thermal load; total project cost of $4,443,244. Saint Mary’s, Alaska Wind Power Conceptual Design Analysis Page | 21 2. One EWT 52-900 wind turbine serving only the Saint Mary’s electrical and thermal load; total project cost of $6,153,991. 3. One EWT 52-900 wind turbine serving an intertied Saint Mary’s and Pilot Station electrical load and Saint Mary’s thermal load; total project cost of $6,413,991. This cost estimate reflects the cost of installing one EWT 52-900 turbine in St. Mary’s plus the cost the St. Mary’s to Pilot Station intertie less the avoided capital costs when closing the Pilot Station powerhouse and consolidating generation operations to Saint Mary’s (see below). Configuration 3: Saint Mary’s to Pilot Station cost summary Project Item Cost EWT turbine project cost, St. Mary’s $6.15 M Intertie project cost + $5.95 M Combined powerplant and bulk fuel upgrades (if intertied) + $12.31 M Individual village powerplant and bulk fuel upgrades (no intertie - $18.00 M Total cost: turbine project + St. Mary’s-to-Pilot Station intertie = $6.41 M Percent cost increase from turbine project alone +4.2% Saint Mary’s, Alaska Wind Power Conceptual Design Analysis Page | 22 Homer Software Modeling Results Configuration 1: St. Mary’s Only; No Intertie to Pilot Station, NP 100 Turbine Option Three NP 100’s, 80% wind turbine availability (6.75 m/s mean wind speed) NP100 Initial capital Operating cost ($/yr) Total NPC COE ($/kWh) Wind fraction Diesel (L) Heating oil arctic (L) Gen 1 (hrs) Gen 2 (hrs) Gen 3 (hrs) Fuel use avoided (gal) Wind energy (MWh) Excess electric (%) Excess thermal (%) Base $0 1,905,939 $28,355,560 0.515 0.00 772,756 112,770 8,006 753 1 - - - - 3 $4,443,244 1,734,959 $30,255,056 0.556 0.17 586,700 138,341 8,486 274 0 42,400 836 - - Project economics, turbine project compared to base case Metric Value Present worth ($1,899,513) Annual worth $ -127,677/yr Return on investment 3.86% Internal rate of return n/a Simple payback n/a Discounted payback n/a Benefit-to-cost ratio 0.94 Saint Mary’s, Alaska Wind Power Conceptual Design Analysis Page | 23 Configuration 2: St. Mary’s Only; No Intertie to Pilot Station, EWT Turbine Option One EWT 52-900, 80% wind turbine availability (6.75 m/s mean wind speed) EWT Initial capital Operating cost ($/yr) Total NPC COE ($/kWh) Wind fraction Diesel (L) Heating oil arctic (L) Gen 1 (hrs) Gen 2 (hrs) Gen 3 (hrs) Fuel use avoided (gal) Wind energy (MWh) Excess electric (%) Excess thermal (%) 1 $6,153,991 1,449,923 $27,725,176 0.502 0.43 405,133 104,250 7,865 154 0 99,377 2,484 21.5 18.6 Base $0 1,905,939 $28,355,560 0.515 0.00 772,756 112,770 8,006 753 1 - - - - Project economics, turbine project compared to base case Metric Value Present worth $630,370 Annual worth $ 42,371/yr Return on investment 7.42% Internal rate of return 4.08% Simple payback 13.6 yrs Discounted payback 17.9 yrs Benefit-to-cost ratio 1.03 Saint Mary’s, Alaska Wind Power Conceptual Design Analysis Page | 24 Configuration 3: St. Mary’s Intertied to Pilot Station, EWT Turbine Option EWT 52-900 turbine option, 80% wind turbine availability (6.75 m/s mean wind speed) EWT Initial capital Operating cost ($/yr) Total NPC COE ($/kWh) Wind fraction Diesel (L) Heating oil arctic (L) Gen 1 (hrs) Gen 2 (hrs) Gen 3 (hrs) Fuel use avoided (gal) Wind energy (MWh) Excess electric (%) Excess thermal (%) 1 $6,413,689 2,205,058 $39,219,376 0.465 0.33 778,409 85,173 4,478 2143 2137 128,075 2,484 6.3 9.9 Base $0 2,801,976 $41,686,320 0.498 0.00 1,301,806 46,540 1,478 2675 4654 - - - - Project economics, turbine project compared to base case Metric Value Present worth $2,466,946 Annual worth $ 165,818/yr Return on investment 9.30% Internal rate of return 6.82% Simple payback 10.9 yrs Discounted payback 13.6 yrs Benefit-to-cost ratio 1.06 Saint Mary’s, Alaska Wind Power Conceptual Design Analysis Page | 25 Appendix A, WAsP Wind Farm Report, Pitka’s Point Site, NP 100 Turbines 9/12/12 Wind farm report for 'Northern Pow er 100' 1/7file:///C:/Users/Doug/AppData/Local/Temp/WaspReportingTemporaryFile.html 'Northern P ower 100' wind farm P ro d u ce d o n 9 /1 2 /2 0 1 2 a t 1 0 :4 9 :3 0 AM b y lice n ce d u s e r: Do u g la s J . Va u g h t, V3 En e rg y, U SA u s in g W As P ve rs io n : 1 0 .0 2 .0 0 1 0 Summary re s ults Pa r a m e te r To ta l A v e r a ge Minimum Ma x imum Ne t AE P [MWh]1 0 2 5 .5 0 7 3 4 1 .8 3 6 3 3 7 .6 4 7 3 4 5 .1 0 5 Gross AE P [MWh]1 0 4 3 .3 6 5 3 4 7 .7 8 8 3 4 5 .9 4 2 3 5 0 .6 2 8 Wa k e lo ss [%]1 .7 1 --- Site re s ults Site Lo c a tion [m]Tur bine Ele v a tion [m ]He ight [m]Ne t AE P [MWh]Wa k e lo s s [%] wtg 1 (5 9 1 5 7 7 , 6 8 7 9 3 9 2 )NW P 1 0 0 1 6 2 .1 8 0 9 3 8 3 3 7 .6 4 7 2 .4 wtg 2 (5 9 1 6 4 6 , 6 8 7 9 4 7 1 )NW P 1 0 0 1 6 9 .5 6 1 1 3 7 3 4 2 .7 5 6 2 .2 5 wtg 3 (5 9 1 7 1 5 , 6 8 7 9 5 5 2 )NW P 1 0 0 1 7 0 3 8 3 4 5 .1 0 5 0 .4 9 Site wind climate s Site Lo c a tion [m]H [m]A [m/s]k U [m/s ]E [W/m²]RIX [%]dRIX [%] wtg 1 (5 9 1 5 7 7 , 6 8 7 9 3 9 2 )3 8 8 .5 2 .0 2 7 .5 6 5 1 9 4 .0 0 .7 wtg 2 (5 9 1 6 4 6 , 6 8 7 9 4 7 1 )3 7 8 .6 2 .0 1 7 .6 3 5 3 6 3 .6 0 .4 wtg 3 (5 9 1 7 1 5 , 6 8 7 9 5 5 2 )3 8 8 .5 2 .0 2 7 .5 7 5 2 1 3 .5 0 .3 T h e win d fa rm lie s in a m a p ca lle d KW I GU Ku tm DV. 9/12/12 Wind farm report for 'Northern Pow er 100' 2/7file:///C:/Users/Doug/AppData/Local/Temp/WaspReportingTemporaryFile.html T h e win d fa rm is in a p ro je ct ca lle d P itca P o in t_te s tca s e A win d a tla s ca lle d W in d a tla s 2 wa s u s e d to ca lcu la te th e p re d icte d win d clim a te s Calculation of annual output for 'Northe rn Powe r 100' De ca y co n s ta n ts : 0 .0 7 5 0 .0 7 5 0 .0 7 5 0 .0 7 5 0 .0 7 5 0 .0 7 5 0 .0 7 5 0 .0 7 5 0 .0 7 5 0 .0 7 5 0 .0 7 5 0 .0 7 5 0 .0 7 5 0 .0 7 5 0 .0 7 5 0 .0 7 5 0 .0 7 5 0 .0 7 5 0 .0 7 5 0 .0 7 5 0 .0 7 5 0 .0 7 5 0 .0 7 5 0 .0 7 5 0 .0 7 5 0 .0 7 5 0 .0 7 5 0 .0 7 5 0 .0 7 5 0 .0 7 5 0 .0 7 5 0 .0 7 5 0 .0 7 5 0 .0 7 5 0 .0 7 5 0 .0 7 5 Se cto r 1 (0 °) T ur bine A [m/s ]k F r e q. [%]U [m/s]MWh (f r e e )MWh (pa r k )Eff. [%] wtg 1 9 .7 2 .2 9 5 .6 4 8 .5 8 2 4 .1 1 1 2 4 .1 1 1 1 0 0 .0 wtg 2 9 .9 2 .2 8 5 .7 8 8 .7 4 2 5 .3 2 7 2 5 .3 2 7 1 0 0 .0 wtg 3 9 .7 2 .3 0 5 .6 2 8 .6 0 2 4 .0 7 4 2 4 .0 7 4 1 0 0 .0 Se cto r 1 to ta l ----7 3 .5 1 2 7 3 .5 1 2 1 0 0 .0 Se cto r 2 (1 0 °) T ur bine A [m/s ]k F r e q. [%]U [m/s]MWh (f r e e )MWh (pa r k )Eff. [%] wtg 1 9 .4 2 .2 5 5 .5 1 8 .2 9 2 2 .3 6 8 2 2 .3 6 8 1 0 0 .0 wtg 2 9 .5 2 .2 4 5 .6 0 8 .4 3 2 3 .2 7 3 2 3 .2 7 3 1 0 0 .0 wtg 3 9 .4 2 .2 5 5 .5 6 8 .3 4 2 2 .7 7 5 2 2 .7 7 5 1 0 0 .0 Se cto r 2 to ta l ----6 8 .4 1 7 6 8 .4 1 7 1 0 0 .0 Se cto r 3 (2 0 °) 9/12/12 Wind farm report for 'Northern Pow er 100' 3/7file:///C:/Users/Doug/AppData/Local/Temp/WaspReportingTemporaryFile.html T ur bine A [m/s ]k F r e q. [%]U [m/s]MWh (f r e e )MWh (pa r k )Eff. [%] wtg 1 8 .7 2 .1 2 4 .5 9 7 .7 2 1 6 .6 5 1 1 6 .6 5 1 1 0 0 .0 wtg 2 8 .8 2 .1 0 4 .5 8 7 .7 9 1 6 .8 2 9 1 6 .8 2 9 1 0 0 .0 wtg 3 8 .8 2 .1 3 4 .6 9 7 .8 0 1 7 .2 9 8 1 7 .2 9 8 1 0 0 .0 Se cto r 3 to ta l ----5 0 .7 7 8 5 0 .7 7 8 1 0 0 .0 Se cto r 4 (3 0 °) T ur bine A [m/s ]k F r e q. [%]U [m/s]MWh (f r e e )MWh (pa r k )Eff. [%] wtg 1 8 .1 2 .0 9 3 .7 8 7 .1 7 1 2 .1 2 3 1 0 .7 3 9 8 8 .5 8 wtg 2 8 .2 2 .1 0 3 .7 7 7 .2 5 1 2 .3 3 6 1 0 .9 8 4 8 9 .0 4 wtg 3 8 .2 2 .0 9 3 .8 4 7 .2 3 1 2 .5 1 3 1 2 .5 1 3 1 0 0 .0 Se cto r 4 to ta l ----3 6 .9 7 2 3 4 .2 3 6 9 2 .6 Se cto r 5 (4 0 °) T ur bine A [m/s ]k F r e q. [%]U [m/s]MWh (f r e e )MWh (pa r k )Eff. [%] wtg 1 8 .1 2 .3 4 3 .5 2 7 .1 6 1 1 .2 6 8 7 .0 4 2 6 2 .4 9 wtg 2 8 .2 2 .3 3 3 .5 7 7 .2 8 1 1 .7 9 7 8 .5 8 6 7 2 .7 8 wtg 3 8 .2 2 .3 4 3 .5 8 7 .2 3 1 1 .6 4 5 1 1 .6 4 5 1 0 0 .0 Se cto r 5 to ta l ----3 4 .7 1 0 2 7 .2 7 3 7 8 .5 7 Se cto r 6 (5 0 °) T ur bine A [m/s ]k F r e q. [%]U [m/s]MWh (f r e e )MWh (pa r k )Eff. [%] wtg 1 8 .9 2 .4 0 4 .1 1 7 .8 7 1 5 .5 0 3 1 2 .8 4 6 8 2 .8 6 wtg 2 8 .9 2 .3 9 4 .0 8 7 .9 1 1 5 .4 8 7 1 3 .6 1 2 8 7 .8 9 wtg 3 9 .0 2 .4 0 4 .1 8 7 .9 5 1 6 .0 1 3 1 6 .0 1 3 1 0 0 .0 Se cto r 6 to ta l ----4 7 .0 0 2 4 2 .4 7 0 9 0 .3 6 Se cto r 7 (6 0 °) T ur bine A [m/s ]k F r e q. [%]U [m/s]MWh (f r e e )MWh (pa r k )Eff. [%] wtg 1 1 0 .0 2 .2 2 5 .1 9 8 .8 7 2 3 .0 6 4 2 3 .0 3 7 9 9 .8 8 wtg 2 1 0 .1 2 .2 1 5 .2 0 8 .9 3 2 3 .2 8 4 2 3 .2 8 4 1 0 0 .0 wtg 3 1 0 .1 2 .2 2 5 .2 9 8 .9 7 2 3 .8 1 8 2 3 .8 1 8 1 0 0 .0 Se cto r 7 to ta l ----7 0 .1 6 7 7 0 .1 3 9 9 9 .9 6 Se cto r 8 (7 0 °) T ur bine A [m/s ]k F r e q. [%]U [m/s]MWh (f r e e )MWh (pa r k )Eff. [%] wtg 1 9 .8 2 .1 0 4 .9 3 8 .6 6 2 1 .0 1 9 2 1 .0 1 9 1 0 0 .0 wtg 2 9 .7 2 .0 8 4 .8 0 8 .6 1 2 0 .2 9 8 2 0 .2 9 8 1 0 0 .0 wtg 3 9 .8 2 .0 9 4 .9 6 8 .7 0 2 1 .2 3 0 2 1 .2 3 0 1 0 0 .0 Se cto r 8 to ta l ----6 2 .5 4 8 6 2 .5 4 8 1 0 0 .0 Se cto r 9 (8 0 °) T ur bine A [m/s ]k F r e q. [%]U [m/s]MWh (f r e e )MWh (pa r k )Eff. [%] wtg 1 9 .1 2 .0 3 4 .2 3 8 .0 4 1 6 .2 1 9 1 6 .2 1 9 1 0 0 .0 wtg 2 9 .0 2 .0 2 4 .1 2 8 .0 0 1 5 .6 5 7 1 5 .6 5 7 1 0 0 .0 wtg 3 9 .1 2 .0 3 4 .2 2 8 .0 4 1 6 .1 6 3 1 6 .1 6 3 1 0 0 .0 Se cto r 9 to ta l ----4 8 .0 3 9 4 8 .0 3 9 1 0 0 .0 Se cto r 1 0 (9 0 °) T ur bine A [m /s ]k F r e q. [%]U [m/s ]MWh (fr e e )MWh (pa r k )E ff. [%] wtg 1 8 .3 2 .1 3 3 .6 7 7 .3 8 1 2 .3 6 9 1 2 .3 6 9 1 0 0 .0 wtg 2 8 .3 2 .1 2 3 .5 8 7 .3 5 1 2 .0 0 5 1 2 .0 0 5 1 0 0 .0 wtg 3 8 .3 2 .1 3 3 .6 6 7 .3 8 1 2 .3 4 1 1 2 .3 4 1 1 0 0 .0 Se cto r 1 0 to ta l ----3 6 .7 1 5 3 6 .7 1 5 1 0 0 .0 Se cto r 1 1 (1 0 0 °) T ur bine A [m /s ]k F r e q. [%]U [m/s ]MWh (fr e e )MWh (pa r k )E ff. [%] 9/12/12 Wind farm report for 'Northern Pow er 100' 4/7file:///C:/Users/Doug/AppData/Local/Temp/WaspReportingTemporaryFile.html wtg 1 8 .0 2 .1 5 3 .4 1 7 .0 9 1 0 .7 5 3 1 0 .7 5 3 1 0 0 .0 wtg 2 8 .0 2 .1 4 3 .3 5 7 .0 8 1 0 .5 2 6 1 0 .5 2 6 1 0 0 .0 wtg 3 8 .0 2 .1 5 3 .3 7 7 .0 7 1 0 .5 7 7 1 0 .5 7 7 1 0 0 .0 Se cto r 1 1 to ta l ----3 1 .8 5 5 3 1 .8 5 5 1 0 0 .0 Se cto r 1 2 (1 1 0 °) T ur bine A [m /s ]k F r e q. [%]U [m/s ]MWh (fr e e )MWh (pa r k )E ff. [%] wtg 1 7 .8 2 .1 0 2 .8 8 6 .9 0 8 .6 5 1 8 .6 5 1 1 0 0 .0 wtg 2 7 .8 2 .0 9 2 .8 6 6 .9 0 8 .5 7 7 8 .5 7 7 1 0 0 .0 wtg 3 7 .8 2 .1 0 2 .8 3 6 .8 8 8 .4 3 7 8 .4 3 7 1 0 0 .0 Se cto r 1 2 to ta l ----2 5 .6 6 4 2 5 .6 6 4 1 0 0 .0 Se cto r 1 3 (1 2 0 °) T ur bine A [m /s ]k F r e q. [%]U [m/s ]MWh (fr e e )MWh (pa r k )E ff. [%] wtg 1 8 .0 2 .1 0 2 .3 2 7 .0 8 7 .2 8 3 7 .2 8 3 1 0 0 .0 wtg 2 8 .0 2 .0 9 2 .3 2 7 .0 8 7 .2 8 2 7 .2 8 2 1 0 0 .0 wtg 3 8 .0 2 .1 0 2 .2 7 7 .0 5 7 .0 8 9 7 .0 8 9 1 0 0 .0 Se cto r 1 3 to ta l ----2 1 .6 5 4 2 1 .6 5 4 1 0 0 .0 Se cto r 1 4 (1 3 0 °) T ur bine A [m /s ]k F r e q. [%]U [m/s ]MWh (fr e e )MWh (pa r k )E ff. [%] wtg 1 8 .4 2 .1 2 1 .9 3 7 .4 6 6 .6 1 6 6 .6 1 6 1 0 0 .0 wtg 2 8 .5 2 .1 1 1 .9 4 7 .4 9 6 .7 0 7 6 .7 0 7 1 0 0 .0 wtg 3 8 .4 2 .1 2 1 .8 9 7 .4 1 6 .4 2 6 6 .4 2 6 1 0 0 .0 Se cto r 1 4 to ta l ----1 9 .7 4 9 1 9 .7 4 9 1 0 0 .0 Se cto r 1 5 (1 4 0 °) T ur bine A [m /s ]k F r e q. [%]U [m/s ]MWh (fr e e )MWh (pa r k )E ff. [%] wtg 1 8 .9 1 .9 4 2 .0 0 7 .9 1 7 .4 2 4 7 .4 2 4 1 0 0 .0 wtg 2 9 .0 1 .9 6 1 .9 9 7 .9 4 7 .4 5 5 7 .4 5 5 1 0 0 .0 wtg 3 8 .8 1 .9 4 1 .9 6 7 .8 5 7 .2 0 9 7 .2 0 9 1 0 0 .0 Se cto r 1 5 to ta l ----2 2 .0 8 7 2 2 .0 8 7 1 0 0 .0 Se cto r 1 6 (1 5 0 °) T ur bine A [m /s ]k F r e q. [%]U [m/s ]MWh (fr e e )MWh (pa r k )E ff. [%] wtg 1 9 .5 1 .6 7 2 .2 6 8 .4 5 8 .8 0 2 8 .8 0 2 1 0 0 .0 wtg 2 9 .6 1 .6 7 2 .2 9 8 .5 8 9 .0 6 2 9 .0 6 2 1 0 0 .0 wtg 3 9 .4 1 .6 7 2 .2 2 8 .4 0 8 .6 1 4 8 .6 1 4 1 0 0 .0 Se cto r 1 6 to ta l ----2 6 .4 7 7 2 6 .4 7 7 1 0 0 .0 Se cto r 1 7 (1 6 0 °) T ur bine A [m /s ]k F r e q. [%]U [m/s ]MWh (fr e e )MWh (pa r k )E ff. [%] wtg 1 9 .6 1 .6 9 2 .4 2 8 .6 0 9 .6 5 1 9 .6 5 1 1 0 0 .0 wtg 2 9 .8 1 .6 7 2 .4 7 8 .7 4 9 .9 7 4 9 .9 7 4 1 0 0 .0 wtg 3 9 .6 1 .6 8 2 .3 9 8 .5 5 9 .4 4 6 9 .4 4 6 1 0 0 .0 Se cto r 1 7 to ta l ----2 9 .0 7 1 2 9 .0 7 1 1 0 0 .0 Se cto r 1 8 (1 7 0 °) T ur bine A [m /s ]k F r e q. [%]U [m/s ]MWh (fr e e )MWh (pa r k )E ff. [%] wtg 1 9 .7 1 .8 2 2 .4 3 8 .6 0 9 .9 1 0 9 .9 1 0 1 0 0 .0 wtg 2 9 .9 1 .8 2 2 .4 8 8 .7 7 1 0 .3 6 6 1 0 .3 6 6 1 0 0 .0 wtg 3 9 .7 1 .8 2 2 .4 2 8 .6 0 9 .8 6 4 9 .8 6 4 1 0 0 .0 Se cto r 1 8 to ta l ----3 0 .1 3 9 3 0 .1 3 9 1 0 0 .0 Se cto r 1 9 (1 8 0 °) T ur bine A [m /s ]k F r e q. [%]U [m/s ]MWh (fr e e )MWh (pa r k )E ff. [%] wtg 1 8 .4 1 .7 2 2 .1 0 7 .5 2 7 .1 5 0 7 .1 5 0 1 0 0 .0 9/12/12 Wind farm report for 'Northern Pow er 100' 5/7file:///C:/Users/Doug/AppData/Local/Temp/WaspReportingTemporaryFile.html wtg 2 8 .6 1 .7 1 2 .1 5 7 .6 4 7 .4 5 6 7 .4 5 6 1 0 0 .0 wtg 3 8 .5 1 .7 3 2 .1 2 7 .6 0 7 .3 2 4 7 .3 2 4 1 0 0 .0 Se cto r 1 9 to ta l ----2 1 .9 3 1 2 1 .9 3 1 1 0 0 .0 Se cto r 2 0 (1 9 0 °) T ur bine A [m /s ]k F r e q. [%]U [m/s ]MWh (fr e e )MWh (pa r k )E ff. [%] wtg 1 7 .2 1 .7 9 1 .8 7 6 .3 7 4 .9 0 2 4 .9 0 2 1 0 0 .0 wtg 2 7 .3 1 .7 9 1 .9 0 6 .4 5 5 .1 0 0 5 .1 0 0 1 0 0 .0 wtg 3 7 .2 1 .7 8 1 .8 9 6 .4 4 5 .0 4 1 5 .0 4 1 1 0 0 .0 Se cto r 2 0 to ta l ----1 5 .0 4 3 1 5 .0 4 3 1 0 0 .0 Se cto r 2 1 (2 0 0 °) T ur bine A [m /s ]k F r e q. [%]U [m/s ]MWh (fr e e )MWh (pa r k )E ff. [%] wtg 1 6 .4 1 .9 6 1 .5 4 5 .7 1 3 .2 1 8 3 .2 1 8 1 0 0 .0 wtg 2 6 .5 1 .9 5 1 .5 4 5 .7 6 3 .2 7 1 3 .2 7 1 1 0 0 .0 wtg 3 6 .5 1 .9 6 1 .5 8 5 .7 7 3 .3 6 4 3 .3 6 4 1 0 0 .0 Se cto r 2 1 to ta l ----9 .8 5 3 9 .8 5 3 1 0 0 .0 Se cto r 2 2 (2 1 0 °) T ur bine A [m /s ]k F r e q. [%]U [m/s ]MWh (fr e e )MWh (pa r k )E ff. [%] wtg 1 5 .9 2 .0 7 1 .2 0 5 .2 5 2 .0 1 8 2 .0 1 8 1 0 0 .0 wtg 2 6 .0 2 .0 7 1 .1 8 5 .3 0 2 .0 3 8 1 .7 2 3 8 4 .5 4 wtg 3 6 .0 2 .0 6 1 .2 2 5 .3 0 2 .1 0 8 1 .7 0 1 8 0 .7 3 Se cto r 2 2 to ta l ----6 .1 6 4 5 .4 4 3 8 8 .3 Se cto r 2 3 (2 2 0 °) T ur bine A [m /s ]k F r e q. [%]U [m/s ]MWh (fr e e )MWh (pa r k )E ff. [%] wtg 1 5 .7 2 .3 5 0 .9 7 5 .0 9 1 .4 3 7 1 .4 3 7 1 0 0 .0 wtg 2 5 .8 2 .3 7 0 .9 7 5 .1 6 1 .4 8 2 0 .8 0 0 5 4 .0 2 wtg 3 5 .8 2 .3 5 0 .9 9 5 .1 4 1 .4 9 9 0 .6 5 8 4 3 .8 8 Se cto r 2 3 to ta l ----4 .4 1 7 2 .8 9 5 6 5 .5 4 Se cto r 2 4 (2 3 0 °) T ur bine A [m /s ]k F r e q. [%]U [m/s ]MWh (fr e e )MWh (pa r k )E ff. [%] wtg 1 6 .1 2 .7 9 0 .9 2 5 .4 5 1 .5 3 5 1 .5 3 5 1 0 0 .0 wtg 2 6 .1 2 .7 8 0 .9 2 5 .4 7 1 .5 4 2 1 .1 1 0 7 2 .0 1 wtg 3 6 .2 2 .7 9 0 .9 4 5 .5 0 1 .6 0 2 1 .1 6 0 7 2 .4 Se cto r 2 4 to ta l ----4 .6 7 9 3 .8 0 6 8 1 .3 3 Se cto r 2 5 (2 4 0 °) T ur bine A [m /s ]k F r e q. [%]U [m/s ]MWh (fr e e )MWh (pa r k )E ff. [%] wtg 1 6 .0 2 .7 2 1 .1 7 5 .3 7 1 .8 8 9 1 .8 8 9 1 0 0 .0 wtg 2 6 .0 2 .7 1 1 .1 7 5 .3 7 1 .8 8 9 1 .8 8 2 9 9 .6 6 wtg 3 6 .1 2 .7 2 1 .1 9 5 .4 2 1 .9 6 9 1 .9 6 9 9 9 .9 9 Se cto r 2 5 to ta l ----5 .7 4 6 5 .7 4 0 9 9 .8 9 Se cto r 2 6 (2 5 0 °) T ur bine A [m /s ]k F r e q. [%]U [m/s ]MWh (fr e e )MWh (pa r k )E ff. [%] wtg 1 6 .0 2 .5 5 1 .1 4 5 .3 5 1 .8 6 8 1 .8 6 8 1 0 0 .0 wtg 2 6 .0 2 .5 3 1 .1 2 5 .3 3 1 .8 1 5 1 .8 1 5 1 0 0 .0 wtg 3 6 .1 2 .5 4 1 .1 5 5 .3 8 1 .9 1 6 1 .9 1 6 1 0 0 .0 Se cto r 2 6 to ta l ----5 .5 9 9 5 .5 9 9 1 0 0 .0 Se cto r 2 7 (2 6 0 °) T ur bine A [m /s ]k F r e q. [%]U [m/s ]MWh (fr e e )MWh (pa r k )E ff. [%] wtg 1 5 .9 2 .4 1 1 .0 1 5 .2 6 1 .6 0 9 1 .6 0 9 1 0 0 .0 wtg 2 5 .9 2 .4 0 0 .9 8 5 .2 3 1 .5 5 0 1 .5 5 0 1 0 0 .0 9/12/12 Wind farm report for 'Northern Pow er 100' 6/7file:///C:/Users/Doug/AppData/Local/Temp/WaspReportingTemporaryFile.html wtg 3 5 .9 2 .4 1 1 .0 1 5 .2 7 1 .6 1 8 1 .6 1 8 1 0 0 .0 Se cto r 2 7 to ta l ----4 .7 7 7 4 .7 7 7 1 0 0 .0 Se cto r 2 8 (2 7 0 °) T ur bine A [m /s ]k F r e q. [%]U [m/s ]MWh (fr e e )MWh (pa r k )E ff. [%] wtg 1 5 .9 2 .4 2 1 .0 5 5 .2 7 1 .6 7 7 1 .6 7 7 1 0 0 .0 wtg 2 5 .9 2 .4 2 1 .0 2 5 .2 5 1 .6 1 8 1 .6 1 8 1 0 0 .0 wtg 3 6 .0 2 .4 4 1 .0 7 5 .2 9 1 .7 2 8 1 .7 2 8 1 0 0 .0 Se cto r 2 8 to ta l ----5 .0 2 3 5 .0 2 3 1 0 0 .0 Se cto r 2 9 (2 8 0 °) T ur bine A [m /s ]k F r e q. [%]U [m/s ]MWh (fr e e )MWh (pa r k )E ff. [%] wtg 1 6 .4 2 .5 5 1 .4 3 5 .7 1 2 .7 6 3 2 .7 6 3 1 0 0 .0 wtg 2 6 .4 2 .5 4 1 .3 9 5 .6 8 2 .6 5 6 2 .6 5 6 1 0 0 .0 wtg 3 6 .5 2 .5 6 1 .4 3 5 .7 4 2 .7 9 5 2 .7 9 5 1 0 0 .0 Se cto r 2 9 to ta l ----8 .2 1 4 8 .2 1 4 1 0 0 .0 Se cto r 3 0 (2 9 0 °) T ur bine A [m /s ]k F r e q. [%]U [m/s ]MWh (fr e e )MWh (pa r k )E ff. [%] wtg 1 7 .1 2 .6 3 1 .6 3 6 .3 0 3 .9 5 9 3 .9 5 9 1 0 0 .0 wtg 2 7 .1 2 .6 2 1 .6 0 6 .2 8 3 .8 6 3 3 .8 6 3 1 0 0 .0 wtg 3 7 .1 2 .6 3 1 .6 2 6 .2 9 3 .9 0 9 3 .9 0 9 1 0 0 .0 Se cto r 3 0 to ta l ----1 1 .7 3 1 1 1 .7 3 1 1 0 0 .0 Se cto r 3 1 (3 0 0 °) T ur bine A [m /s ]k F r e q. [%]U [m/s ]MWh (fr e e )MWh (pa r k )E ff. [%] wtg 1 7 .6 2 .2 9 1 .7 1 6 .7 0 4 .8 3 4 4 .8 3 4 1 0 0 .0 wtg 2 7 .6 2 .3 1 1 .6 9 6 .7 1 4 .7 7 9 4 .7 7 9 1 0 0 .0 wtg 3 7 .5 2 .2 9 1 .6 9 6 .6 7 4 .7 2 7 4 .7 2 7 1 0 0 .0 Se cto r 3 1 to ta l ----1 4 .3 3 9 1 4 .3 3 9 1 0 0 .0 Se cto r 3 2 (3 1 0 °) T ur bine A [m /s ]k F r e q. [%]U [m/s ]MWh (fr e e )MWh (pa r k )E ff. [%] wtg 1 8 .1 2 .0 3 2 .1 3 7 .1 5 6 .7 9 8 6 .7 9 8 1 0 0 .0 wtg 2 8 .1 2 .0 3 2 .0 9 7 .1 8 6 .7 3 3 6 .7 3 3 1 0 0 .0 wtg 3 8 .0 2 .0 3 2 .1 0 7 .1 1 6 .6 3 8 6 .6 3 8 1 0 0 .0 Se cto r 3 2 to ta l ----2 0 .1 6 9 2 0 .1 6 9 1 0 0 .0 Se cto r 3 3 (3 2 0 °) T ur bine A [m /s ]k F r e q. [%]U [m/s ]MWh (fr e e )MWh (pa r k )E ff. [%] wtg 1 7 .5 2 .1 4 2 .8 2 6 .6 0 7 .7 9 1 7 .7 9 1 1 0 0 .0 wtg 2 7 .5 2 .1 0 2 .7 9 6 .6 8 7 .8 7 7 7 .8 7 7 1 0 0 .0 wtg 3 7 .4 2 .1 3 2 .7 7 6 .5 5 7 .5 2 6 7 .5 2 6 1 0 0 .0 Se cto r 3 3 to ta l ----2 3 .1 9 5 2 3 .1 9 5 1 0 0 .0 Se cto r 3 4 (3 3 0 °) T ur bine A [m /s ]k F r e q. [%]U [m/s ]MWh (fr e e )MWh (pa r k )E ff. [%] wtg 1 8 .2 2 .4 9 3 .4 2 7 .2 5 1 1 .1 8 8 1 1 .1 8 8 1 0 0 .0 wtg 2 8 .3 2 .4 7 3 .4 5 7 .3 3 1 1 .5 1 6 1 1 .5 1 6 1 0 0 .0 wtg 3 8 .1 2 .4 9 3 .3 6 7 .1 9 1 0 .8 1 4 1 0 .8 1 4 1 0 0 .0 Se cto r 3 4 to ta l ----3 3 .5 1 7 3 3 .5 1 7 1 0 0 .0 Se cto r 3 5 (3 4 0 °) T ur bine A [m /s ]k F r e q. [%]U [m/s ]MWh (fr e e )MWh (pa r k )E ff. [%] wtg 1 9 .0 2 .5 7 4 .1 1 8 .0 4 1 6 .1 0 4 1 6 .1 0 4 1 0 0 .0 wtg 2 9 .2 2 .5 6 4 .1 8 8 .1 6 1 6 .7 4 9 1 6 .7 4 9 1 0 0 .0 wtg 3 9 .0 2 .5 6 4 .0 4 7 .9 7 1 5 .6 3 8 1 5 .6 3 8 1 0 0 .0 9/12/12 Wind farm report for 'Northern Pow er 100' 7/7file:///C:/Users/Doug/AppData/Local/Temp/WaspReportingTemporaryFile.html Se cto r 3 5 to ta l ----4 8 .4 9 1 4 8 .4 9 1 1 0 0 .0 Se cto r 3 6 (3 5 0 °) T ur bine A [m /s ]k F r e q. [%]U [m/s ]MWh (fr e e )MWh (pa r k )E ff. [%] wtg 1 9 .7 2 .4 5 4 .9 5 8 .6 0 2 1 .4 1 7 2 1 .4 1 7 1 0 0 .0 wtg 2 9 .9 2 .4 4 5 .0 6 8 .7 6 2 2 .4 5 4 2 2 .4 5 4 1 0 0 .0 wtg 3 9 .7 2 .4 6 4 .8 9 8 .5 7 2 1 .0 4 7 2 1 .0 4 7 1 0 0 .0 Se cto r 3 6 to ta l ----6 4 .9 1 8 6 4 .9 1 8 1 0 0 .0 All Se cto rs T ur bine Lo c a tio n [m]MWh (fre e )MWh (pa r k )E ff. [%] wtg 1 (5 9 1 5 7 7 , 6 8 7 9 3 9 2 )3 4 5 .9 4 2 3 3 7 .6 4 7 9 7 .6 wtg 2 (5 9 1 6 4 6 , 6 8 7 9 4 7 1 )3 5 0 .6 2 8 3 4 2 .7 5 6 9 7 .7 5 wtg 3 (5 9 1 7 1 5 , 6 8 7 9 5 5 2 )3 4 6 .7 9 4 3 4 5 .1 0 5 9 9 .5 1 W in d f a rm -1 0 4 3 .3 6 5 1 0 2 5 .5 0 7 9 8 .2 9 Data origins information T h e m a p wa s im p o rte d b y 'U s e r' fro m a file ca lle d 'C :\U s e rs \U s e r\Do cu m e n ts \W in d C o n s u ltL L C \Ala s k a \M AP S\KW I GU Ku tm DV.m a p ', o n a co m p u te r ca lle d 'SER VER '. T h e m a p file d a ta we re la s t m o d if ie d o n th e 2 /7 /2 0 1 2 a t 6 :0 8 :3 7 P M T h e re is n o in fo rm a tio n a b o u t th e o rig in o f th e win d a tla s a s s o cia te d with th is win d f a rm . T h e win d tu rb in e g e n e ra to r a s s o cia te d with th is win d fa rm wa s im p o rte d b y 'Do u g ' f ro m a f ile ca lle d 'C :\U s e rs \Do u g \Do cu m e n ts \W in d T u rb in e s \W As P tu rb in e cu rve s \NW 1 0 0 B_2 1 , 3 7 m e te r.wtg ', o n a co m p u te r ca lle d 'V3 ENER GY AC ER -P C '. T h e win d tu rb in e g e n e ra to r file wa s la s t m o d if ie d o n th e 8 /2 9 /2 0 1 2 a t 1 0 :3 5 :4 8 AM Proje ct parame te rs T h e win d fa rm is in a p ro je ct ca lle d P itca P o in t_te s tca s e . H e re is a lis t o f a ll th e p a ra m e te rs with n o n -d e fa u lt va lu e s : Air d e n s ity: 1 .2 7 2 (d e f a u lt is 1 .2 2 5 ) Saint Mary’s, Alaska Wind Power Conceptual Design Analysis Page | 26 Appendix B, WAsP Turbine Site Report, Pitka’s Point Site, EWT Turbine 9/11/12 Turbine site report for 'EWT turbine site' 1/3file:///C:/Users/Doug/AppData/Local/Temp/WaspReportingTemporaryFile.html 'EWT turbine site' Turbine site P ro d u ce d o n 9 /1 1 /2 0 1 2 a t 1 1 :3 7 :1 9 P M b y lice n ce d u s e r: Do u g la s J . Va u g h t, V3 En e rg y, U SA u s in g W As P Ve rs io n : 1 0 .0 2 .0 0 1 0 Site information Locati on i n the map T h e tu rb in e is lo ca te d a t co -o rd in a te s (5 9 1 6 4 8 ,6 8 7 9 4 5 4 ) in a m a p ca lle d 'Kwig u k A3 '. T h e s ite e le va tio n is 1 7 0 .0 m a .s .l. Site e ffe cts Se c to r Angle [°]Or .Spd [%]Or.Tur [°]Obs.Spd [%]Rgh.Spd [%]Rix [%] 1 0 2 7 .4 8 -6 .1 0 .0 0 0 .0 0 0 .2 2 1 0 2 2 .7 1 -6 .4 0 .0 0 0 .0 0 1 .0 3 2 0 1 8 .0 3 -5 .9 0 .0 0 0 .0 0 0 .0 4 3 0 1 4 .0 6 -4 .5 0 .0 0 0 .0 0 0 .0 5 4 0 1 1 .3 6 -2 .5 0 .0 0 0 .0 0 1 .4 6 5 0 1 0 .3 6 -0 .1 0 .0 0 0 .0 0 2 .3 7 6 0 1 1 .2 4 2 .4 0 .0 0 0 .0 0 1 .7 9/11/12 Turbine site report for 'EWT turbine site' 2/3file:///C:/Users/Doug/AppData/Local/Temp/WaspReportingTemporaryFile.html 8 7 0 1 3 .8 4 4 .4 0 .0 0 0 .0 0 2 .1 9 8 0 1 7 .7 5 5 .8 0 .0 0 0 .0 0 2 .5 1 0 9 0 2 2 .4 0 6 .4 0 .0 0 0 .0 0 2 .7 1 1 1 0 0 2 7 .1 8 6 .2 0 .0 0 0 .0 0 3 .6 1 2 1 1 0 3 1 .5 4 5 .3 0 .0 0 0 .0 0 4 .4 1 3 1 2 0 3 5 .0 0 3 .8 0 .0 0 0 .0 0 5 .3 1 4 1 3 0 3 7 .2 4 2 .0 0 .0 0 0 .0 0 5 .5 1 5 1 4 0 3 8 .0 4 0 .1 0 .0 0 0 .0 0 6 .2 1 6 1 5 0 3 7 .3 3 -1 .9 0 .0 0 0 .0 0 6 .3 1 7 1 6 0 3 5 .1 9 -3 .7 0 .0 0 0 .0 0 6 .5 1 8 1 7 0 3 1 .7 9 -5 .2 0 .0 0 0 .0 0 5 .9 1 9 1 8 0 2 7 .4 8 -6 .1 0 .0 0 0 .0 0 5 .4 2 0 1 9 0 2 2 .7 1 -6 .4 0 .0 0 0 .0 0 5 .1 2 1 2 0 0 1 8 .0 3 -5 .9 0 .0 0 0 .0 0 6 .3 2 2 2 1 0 1 4 .0 6 -4 .5 0 .0 0 0 .0 0 6 .3 2 3 2 2 0 1 1 .3 6 -2 .5 0 .0 0 0 .0 0 7 .7 2 4 2 3 0 1 0 .3 6 -0 .1 0 .0 0 0 .0 0 2 .9 2 5 2 4 0 1 1 .2 4 2 .4 0 .0 0 0 .0 0 2 .8 2 6 2 5 0 1 3 .8 4 4 .4 0 .0 0 0 .0 0 2 .9 2 7 2 6 0 1 7 .7 5 5 .8 0 .0 0 0 .0 0 1 .0 2 8 2 7 0 2 2 .4 0 6 .4 0 .0 0 0 .0 0 2 .0 2 9 2 8 0 2 7 .1 8 6 .2 0 .0 0 0 .0 0 4 .7 3 0 2 9 0 3 1 .5 4 5 .3 0 .0 0 0 .0 0 1 0 .6 3 1 3 0 0 3 5 .0 0 3 .8 0 .0 0 0 .0 0 6 .1 3 2 3 1 0 3 7 .2 4 2 .0 0 .0 0 0 .0 0 1 .8 3 3 3 2 0 3 8 .0 4 0 .1 0 .0 0 0 .0 0 0 .8 3 4 3 3 0 3 7 .3 3 -1 .9 0 .0 0 0 .0 0 0 .0 3 5 3 4 0 3 5 .1 9 -3 .7 0 .0 0 0 .0 0 0 .0 3 6 3 5 0 3 1 .7 9 -5 .2 0 .0 0 0 .0 0 0 .0 T h e a ll-s e cto r R I X (ru g g e d n e s s in d e x ) f o r th e s ite is 3 .4 % The pre dicte d wind climate at the turbine s ite -T o ta l Wind a t ma x imum powe r de nsity dis tributio n Me a n wind s pe e d 8 .4 5 m /s 1 3 .3 9 m /s Me a n po we r de nsity 7 2 5 W /m ²6 3 (W /m ²)/(m /s ) 9/11/12 Turbine site report for 'EWT turbine site' 3/3file:///C:/Users/Doug/AppData/Local/Temp/WaspReportingTemporaryFile.html Re s ults Site Lo c a tion [m]Tur bine He ight [m ]Ne t AEP [GWh]Wa k e los s [%] EW T tu rb in e s ite (5 9 1 6 4 8 , 6 8 7 9 4 5 4 )EW T 5 2 -9 0 0 5 0 3 .3 9 7 0 .0 T h e co m b in e d (o m n id ire ctio n a l) W e ib u ll d is trib u tio n p re d icts a g ro s s AEP o f 3 .4 3 2 GW h a n d th e e m e rg e n t (s u m o f s e cto rs ) d is trib u tio n p re d icts a g ro s s AEP o f 3 .3 9 7 GW h . (T h e d if fe re n ce is 1 .0 2 % ) Proje ct parame te rs T h e s ite is in a p ro je ct ca lle d Sa in t M a ry's EW T . H e re is a lis t o f a ll th e p a ra m e te rs with n o n -d e fa u lt va lu e s : Air d e n s ity: 1 .2 7 3 (d e f a u lt is 1 .2 2 5 ) Data origins information T h e m a p wa s im p o rte d b y 'Do u g ' f ro m a f ile ca lle d 'C :\U s e rs \Do u g \Do cu m e n ts \AVEC \St M a rys \W As P \Su rf e r co n ve rs io n \Kwig u k A3 .m a p ', o n a co m p u te r ca lle d 'V3 ENER GY AC ER -P C '. T h e m a p file d a ta we re la s t m o d if ie d o n th e 8 /3 1 /2 0 1 2 a t 9 :4 7 :3 8 AM T h e re is n o in fo rm a tio n a b o u t th e o rig in o f th e win d a tla s f ile . T h e win d tu rb in e g e n e ra to r wa s im p o rte d b y 'Do u g ' fro m a file ca lle d 'C :\U s e rs \Do u g \Do cu m e n ts \W in d T u rb in e s \W As P tu rb in e cu rve s \EW T 5 2 -9 0 0 , 5 0 m .wtg ', o n a co m p u te r ca lle d 'V3 ENER GY AC ER -P C '. T h e win d tu rb in e g e n e ra to r file we re la s t m o d if ie d o n th e 8 /3 1 /2 0 1 2 a t 1 :1 2 :5 8 P M Saint Mary’s, Alaska Wind Power Conceptual Design Analysis Page | 27 Appendix C, HOMER System Report, St. Mary’s, 3 NP 100 Turbines 9/17/12 System Report - St Marys-Pilot Stn, RE F 6 analysis 1/6file:///C:/Users/Doug/AppData/Local/Temp/St_Marys-Pilot_Stn,_RE F_6_ana lysis.htm Sys te m Repor t - St M a r ys -Pilo t Stn, REF 6 a na lys is Sensitivity case Prim a ry Load 1 Scal ed Average:8,496 kWh/d Win d Data Scaled Avera ge:6.75 m /s EWT 5 2-900, rho=1.2 72 Capital Cos t Mu l tiplier:1 Sys te m Fixed O&M Cos t:683,1 98 $/yr System architecture Wind tu rbine 3 Northwin d100B, rho=1.272 QSX15 G9 499 kW Cat 3508 611 kW Cat 3512 908 kW Cost summary Total net pres ent cos t $ 30,255,056 Levelized cos t of energ y $ 0.556/kWh Operating cos t $ 1,734,959 /yr Ne t Pre se nt Costs Component Capital Replacement O&M Fuel Sa lvage Total ($)($)($)($)($)($) North w i nd100B, rho=1.27 2 4,443,24 4 0 623,366 0 0 5,066,61 1 QSX15G9 0 444,142 315,626 1 0,940,718 -21 ,344 11,679,14 2 Cat 35 08 0 0 10,191 668,347 -30 ,148 648,39 0 Cat 35 12 0 0 0 0 -40 ,695 -40,69 5 Boiler 0 0 0 2,737,356 0 2,737,35 6 Other 0 0 10,164,263 0 0 10,164,26 3 Sys te m 4,443,24 4 444,142 11,113,448 1 4,346,421 -92 ,187 30,255,06 4 Annua li z e d Costs Component Capital Replacement O&M Fue l Salvage Total 9/17/12 System Report - St Marys-Pilot Stn, RE F 6 analysis 2/6file:///C:/Users/Doug/AppData/Local/Temp/St_Marys-Pilot_Stn,_RE F_6_ana lysis.htm ($/yr)($/yr)($/yr)($/yr)($/yr)($/yr) North w i nd100B, rho=1.27 2 298,656 0 41,900 0 0 340,556 QSX15G9 0 29,853 21,215 735,3 88 -1,435 785,022 Cat 35 08 0 0 685 44,9 23 -2,026 43,582 Cat 35 12 0 0 0 0 -2,735 -2,735 Boiler 0 0 0 183,9 93 0 183,993 Other 0 0 683,198 0 0 683,198 Sys te m 298,656 29,853 746,998 964,3 05 -6,196 2 ,033,616 Electrical Com ponent Production Fraction (kWh/yr) Wind turbines 836,2 47 27% QSX15G9 2,140,2 60 69% Cat 35 08 125,7 17 4% Cat 35 12 0 0% Total 3,102,2 23 100% Load Consumption Fraction (kWh/yr) AC pri m a ry load 3,1 01,035 100 % Total 3,1 01,035 100 % Qua ntity Value Units Exces s electricity 1,183 kWh /yr 9/17/12 System Report - St Marys-Pilot Stn, RE F 6 analysis 3/6file:///C:/Users/Doug/AppData/Local/Temp/St_Marys-Pilot_Stn,_RE F_6_ana lysis.htm Unm et load 0.000549 kWh /yr Capa ci ty s hortage 0.00 kWh /yr Rene w able fraction 0.166 Thermal Component Pr oduction Fraction (kWh/yr) QSX15G9 72 6,109 38% Cat 35 08 4 5,463 2% Boiler 1,13 8,333 60% Exces s electricity 1,183 0% Total 1,91 1,089 100% Loa d Consumption Fraction (kWh /yr) Therm al load 1,905 ,663 100% Total 1,905 ,663 100% Quantity Value Units Exces s therm al energy 5,426 kWh/yr AC Wind Turbine: N orthw ind100B, rho=1.272 Variable Value Units Total rate d capacity 300 kW Mean output 95.5 kW Capa ci ty factor 31.8 % Total pro duction 8 36,247 kWh/yr Variable Value Units Minim um output 0.0 0 kW Maxim u m output 29 5 kW Wind pe netration 27 .0 % Hours of operation 7,33 9 hr/yr Levelized cos t 0.40 7 $/kWh 9/17/12 System Report - St Marys-Pilot Stn, RE F 6 analysis 4/6file:///C:/Users/Doug/AppData/Local/Temp/St_Marys-Pilot_Stn,_RE F_6_ana lysis.htm QSX15G9 Quantity Value Units Hours of operation 8,486 hr/yr Num ber of s tarts 88 s tarts /yr Operational life 2.36 yr Capa ci ty factor 49.0 % Fixed g eneration cos t 21.0 $/hr Margi nal generation co s t 0.285 $/kWhyr Quantity Value Units Electrical production 2,140,260 kWh/yr Mean electrical output 252 kW Min. ele ctrical output 1.32 kW Max. electrical output 453 kW Therm al production 726,109 kWh/yr Mean therm al output 85.6 kW Min. the rm al output 24.3 kW Max. therm al output 135 kW Quantity Value Units Fuel cons um ption 552,923 L /yr Specific fuel cons um ptio n 0.258 L /kWh Fuel ene rgy input 5,440,765 kWh/yr Mean electrical efficiency 39.3 % Mean total efficiency 52.7 % Cat 3508 Quantity Value Units Hours of operation 274 hr/yr 9/17/12 System Report - St Marys-Pilot Stn, RE F 6 analysis 5/6file:///C:/Users/Doug/AppData/Local/Temp/St_Marys-Pilot_Stn,_RE F_6_ana lysis.htm Num ber of s tarts 87 s tarts /yr Operational life 73.0 yr Capa ci ty factor 2.35 % Fixed g eneration cos t 25.2 $/hr Margi nal generation co s t 0.316 $/kWhyr Quantity Value Units Electrical production 125,717 kWh /yr Mean electrical output 459 kW Min. ele ctrical output 308 kW Max. electrical output 546 kW Therm al production 45,463 kWh /yr Mean therm al output 166 kW Min. the rm al output 121 kW Max. therm al output 192 kW Quantity Value Units Fuel cons um ption 33,777 L/yr Specific fuel cons um ptio n 0.269 L/kWh Fuel ene rgy input 332,366 kWh/yr Mean electrical efficiency 37.8 % Mean total efficiency 51.5 % Cat 3512 Quantity Value Units Hours of operation 0 hr/yr Num ber of s tarts 0 s tarts /yr Operational life 1,000 yr Capa ci ty factor 0.00 % Fixed g eneration cos t 30.8 $/hr Margi nal generation co s t 0.310 $/kWhyr Quantity Value Units Electrical production 0.00 kWh/yr Mean electrical output 0.00 kW Min. ele ctrical output 0.00 kW Max. electrical output 0.00 kW 9/17/12 System Report - St Marys-Pilot Stn, RE F 6 analysis 6/6file:///C:/Users/Doug/AppData/Local/Temp/St_Marys-Pilot_Stn,_RE F_6_ana lysis.htm Therm al production 0.00 kWh/yr Mean therm al output 0.00 kW Min. the rm al output 0.00 kW Max. therm al output 0.00 kW Quantity Value Units Fuel cons um ption 0 L/yr Specific fuel cons um ptio n 0.000 L/kWh Fuel ene rgy input 0 kWh /yr Mean electrical efficiency 0.0 % Mean total efficiency 0.0 % Emissions Pollutant Emissions (kg/yr) Carbon d i oxide 1,911,0 06 Carbon m onoxide 3,8 14 Unbu rne d hydocarbon s 4 22 Particula te m atter 2 87 Sulfur d i oxide 3,8 51 Nitrog en oxides 34,0 29 Saint Mary’s, Alaska Wind Power Conceptual Design Analysis Page | 28 Appendix D, HOMER System Report, St. Mary’s, 1 EWT-500 Turbine 9/17/12 System Report - St Marys-Pilot Stn, RE F 6 analysis 1/6file:///C:/Users/Doug/AppData/Local/Temp/St_Marys-Pilot_Stn,_RE F_6_ana lysis.htm Sys te m Repor t - St M a r ys -Pilo t Stn, REF 6 a na lys is Sensitivity case Prim a ry Load 1 Scal ed Average:8,496 kWh/d Win d Data Scaled Avera ge:6.75 m /s EWT 5 2-900, rho=1.2 72 Capital Cos t Mu l tiplier:1 Sys te m Fixed O&M Cos t:683,1 98 $/yr System architecture Wind tu rbine 1 EWT 52 -90 0, rho=1.272 QSX15 G9 499 kW Cat 3508 611 kW Cat 3512 908 kW Cost summary Total net pres ent cos t $ 27,725,176 Levelized cos t of energ y $ 0.502/kWh Operating cos t $ 1,449,923 /yr Ne t Pre se nt Costs Component Capital Re placement O&M Fuel Salvage Total ($)($)($)($)($)($) EWT 5 2-900, rho=1.272 6,153,991 0 717,838 0 0 6,871,830 QSX15G9 0 393,079 292,528 7,6 40,398 -5,60 6 8,320,399 Cat 35 08 0 0 5,728 3 75,983 -35,13 1 346,580 Cat 35 12 0 0 0 0 -40,69 5 -40,695 Boiler 0 0 0 2,0 62,807 0 2,062,807 Other 0 0 1 0,164,263 0 0 10,164,263 Sys te m 6,153,991 393,079 1 1,180,359 10,0 79,184 -81,43 2 27,725,180 Annua li z e d Costs Component Capital Replacement O&M Fuel Salvage Total 9/17/12 System Report - St Marys-Pilot Stn, RE F 6 analysis 2/6file:///C:/Users/Doug/AppData/Local/Temp/St_Marys-Pilot_Stn,_RE F_6_ana lysis.htm ($/yr)($/yr)($/yr)($/yr)($/yr)($/yr) EWT 5 2-900, rho=1.272 413,645 0 4 8,250 0 0 46 1,895 QSX15G9 0 26,421 1 9,663 513,555 -377 55 9,262 Cat 35 08 0 0 385 25,272 -2,361 2 3,296 Cat 35 12 0 0 0 0 -2,735 -2,735 Boiler 0 0 0 138,653 0 13 8,653 Other 0 0 68 3,198 0 0 68 3,198 Sys te m 413,645 26,421 75 1,496 677,480 -5,474 1,86 3,568 Electrical Component Production Fraction (kWh /yr) Wind turbine 2,483,95 0 63% QSX15G9 1,394,67 0 35% Cat 35 08 70,73 1 2% Cat 35 12 0 0% Total 3,949,35 1 100% Load Consumption Fraction (kWh/yr) AC pri m a ry load 3,1 01,035 100 % Total 3,1 01,035 100 % Qua ntity Value Units Exces s electricity 84 8,323 kWh /yr 9/17/12 System Report - St Marys-Pilot Stn, RE F 6 analysis 3/6file:///C:/Users/Doug/AppData/Local/Temp/St_Marys-Pilot_Stn,_RE F_6_ana lysis.htm Unm et load 0.000183 kWh /yr Capa ci ty s hortage 0.00 kWh /yr Rene w able fraction 0.425 Thermal Component Pr oduction Fraction (kWh/yr) QSX15G9 52 9,058 23% Cat 35 08 2 5,573 1% Boiler 85 7,821 38% Exces s electricity 84 8,323 38% Total 2,26 0,776 100% Loa d Consumption Fraction (kWh /yr) Therm al load 1,905 ,663 100% Total 1,905 ,663 100% Quantity Value Units Exces s therm al energy 355,113 kWh /yr AC Wind Turbine: E WT 52-900, rho=1.272 Variable Value Units Total rate d capacity 900 kW Mean output 284 kW Capa ci ty factor 31.5 % Total pro duction 2 ,483,950 kWh/yr Variable Value Units Minim um output 0.0 0 kW Maxim u m output 88 5 kW Wind pe netration 80 .1 % Hours of operation 8,21 8 hr/yr Levelized cos t 0.18 6 $/kWh 9/17/12 System Report - St Marys-Pilot Stn, RE F 6 analysis 4/6file:///C:/Users/Doug/AppData/Local/Temp/St_Marys-Pilot_Stn,_RE F_6_ana lysis.htm QSX15G9 Quantity Value Units Hours of operation 7,865 hr/yr Num ber of s tarts 232 s tarts /yr Operational life 2.54 yr Capa ci ty factor 31.9 % Fixed g eneration cos t 21.0 $/hr Margi nal generation co s t 0.285 $/kWhyr Quantity Value Units Electrical production 1,394,670 kWh/yr Mean electrical output 177 kW Min. ele ctrical output 0.188 kW Max. electrical output 453 kW Therm al production 529,058 kWh/yr Mean therm al output 67.3 kW Min. the rm al output 24.0 kW Max. therm al output 135 kW Quantity Value Units Fuel cons um ption 386,131 L /yr Specific fuel cons um ptio n 0.277 L /kWh Fuel ene rgy input 3,799,532 kWh/yr Mean electrical efficiency 36.7 % Mean total efficiency 50.6 % Cat 3508 Quantity Value Units Hours of operation 154 hr/yr 9/17/12 System Report - St Marys-Pilot Stn, RE F 6 analysis 5/6file:///C:/Users/Doug/AppData/Local/Temp/St_Marys-Pilot_Stn,_RE F_6_ana lysis.htm Num ber of s tarts 59 s tarts /yr Operational life 130 yr Capa ci ty factor 1.32 % Fixed g eneration cos t 25.2 $/hr Margi nal generation co s t 0.316 $/kWhyr Quantity Value Units Electrical production 70,731 kWh/yr Mean electrical output 459 kW Min. ele ctrical output 368 kW Max. electrical output 546 kW Therm al production 25,573 kWh/yr Mean therm al output 166 kW Min. the rm al output 139 kW Max. therm al output 192 kW Quantity Value Units Fuel cons um ption 19,001 L/yr Specific fuel cons um ptio n 0.269 L/kWh Fuel ene rgy input 186,974 kWh/yr Mean electrical efficiency 37.8 % Mean total efficiency 51.5 % Cat 3512 Quantity Value Units Hours of operation 0 hr/yr Num ber of s tarts 0 s tarts /yr Operational life 1,000 yr Capa ci ty factor 0.00 % Fixed g eneration cos t 30.8 $/hr Margi nal generation co s t 0.310 $/kWhyr Quantity Value Units Electrical production 0.00 kWh/yr Mean electrical output 0.00 kW Min. ele ctrical output 0.00 kW Max. electrical output 0.00 kW 9/17/12 System Report - St Marys-Pilot Stn, RE F 6 analysis 6/6file:///C:/Users/Doug/AppData/Local/Temp/St_Marys-Pilot_Stn,_RE F_6_ana lysis.htm Therm al production 0.00 kWh/yr Mean therm al output 0.00 kW Min. the rm al output 0.00 kW Max. therm al output 0.00 kW Quantity Value Units Fuel cons um ption 0 L/yr Specific fuel cons um ptio n 0.000 L/kWh Fuel ene rgy input 0 kWh /yr Mean electrical efficiency 0.0 % Mean total efficiency 0.0 % Emissions Pollutant Emissions (kg/yr) Carbon d i oxide 1,342,6 80 Carbon m onoxide 2,6 33 Unbu rne d hydocarbon s 2 92 Particula te m atter 1 99 Sulfur d i oxide 2,7 07 Nitrog en oxides 23,4 98 Saint Mary’s, Alaska Wind Power Conceptual Design Analysis Page | 29 Appendix E, HOMER System Report, St. Mary’s + Pilot Station, 1 EWT-500 Turbine 9/17/12 System Report - St Marys-Pilot Stn, RE F 6 analysis 1/6file:///C:/Users/Doug/AppData/Local/Temp/St_Marys-Pilot_Stn,_RE F_6_ana lysis.htm Sys te m Repor t - St M a r ys -Pilo t Stn, REF 6 a na lys is Sensitivity case Prim a ry Load 1 Scal ed Average:13,72 6 kWh/d Win d Data Scaled Avera ge:6.75 m /s EWT 5 2-900, rho=1.2 72 Capital Cos t Mu l tiplier:1.04 Sys te m Fixed O&M Cos t:964,5 00 $/yr System architecture Wind tu rbine 1 EWT 52 -90 0, rho=1.272 QSX15 G9 499 kW Cat 3508 611 kW Cat 3512 908 kW Cost summary Total net pres ent cos t $ 39,219,376 Levelized cos t of energ y $ 0.465/kWh Operating cos t $ 2,205,058 /yr Ne t Pre se nt Costs Component Capital Re placement O&M Fuel Salvage Total ($)($)($)($)($)($) EWT 5 2-900, rho=1.272 6,413,689 0 717,838 0 0 7,131,528 QSX15G9 0 218,024 166,553 3,8 32,180 -21,67 6 4,195,081 Cat 35 08 0 100,115 79,706 4,9 15,244 -35,58 8 5,059,477 Cat 35 12 0 100,004 79,483 6,6 54,991 -35,83 7 6,798,643 Boiler 0 0 0 1,6 85,331 0 1,685,331 Other 0 0 1 4,349,329 0 0 14,349,329 Sys te m 6,413,689 418,143 1 5,392,909 17,0 87,746 -93,10 1 39,219,392 Annua li z e d Costs Component Capital Replacement O&M Fuel Salvage Total 9/17/12 System Report - St Marys-Pilot Stn, RE F 6 analysis 2/6file:///C:/Users/Doug/AppData/Local/Temp/St_Marys-Pilot_Stn,_RE F_6_ana lysis.htm ($/yr)($/yr)($/yr)($/yr)($/yr)($/yr) EWT 5 2-900, rho=1.272 431,101 0 48,250 0 0 479,351 QSX15G9 0 14,655 11,195 257,5 83 -1,457 281,975 Cat 35 08 0 6,729 5,358 330,3 82 -2,392 340,076 Cat 35 12 0 6,722 5,343 447,3 20 -2,409 456,976 Boiler 0 0 0 113,2 81 0 113,281 Other 0 0 9 64,500 0 0 964,500 Sys te m 431,101 28,106 1,0 34,645 1,148,5 65 -6,258 2 ,636,159 Electrical Component Production Fraction (kWh /yr) Wind turbine 2,483,95 0 46% QSX15G9 672,03 8 13% Cat 35 08 916,91 7 17% Cat 35 12 1,275,51 8 24% Total 5,348,42 2 100% Load Consumption Fraction (kWh/yr) AC pri m a ry load 5,0 09,989 100 % Total 5,0 09,989 100 % Qua ntity Value Units Exces s electricity 338 ,447 kWh/yr 9/17/12 System Report - St Marys-Pilot Stn, RE F 6 analysis 3/6file:///C:/Users/Doug/AppData/Local/Temp/St_Marys-Pilot_Stn,_RE F_6_ana lysis.htm Unm et load 0.00555 kWh/yr Capa ci ty s hortage 0.00 kWh/yr Rene w able fraction 0 .332 Thermal Component Pr oduction Fraction (kWh/yr) QSX15G9 27 1,406 13% Cat 35 08 33 6,030 16% Cat 35 12 44 7,474 21% Boiler 70 0,847 33% Exces s electricity 33 8,447 16% Total 2,09 4,204 100% Loa d Consumption Fraction (kWh /yr) Therm al load 1,905 ,663 100% Total 1,905 ,663 100% Quantity Value Units Exces s therm al energy 188,542 kWh /yr AC Wind Turbine: E WT 52-900, rho=1.272 Variable Value Units Total rate d capacity 900 kW Mean output 284 kW Capa ci ty factor 31.5 % Total pro duction 2 ,483,950 kWh/yr Variable Value Units Minim um output 0.0 0 kW Maxim u m output 88 5 kW Wind pe netration 49 .6 % Hours of operation 8,21 8 hr/yr Levelized cos t 0.19 3 $/kWh 9/17/12 System Report - St Marys-Pilot Stn, RE F 6 analysis 4/6file:///C:/Users/Doug/AppData/Local/Temp/St_Marys-Pilot_Stn,_RE F_6_ana lysis.htm QSX15G9 Quantity Value Units Hours of operation 4,478 hr/yr Num ber of s tarts 431 s tarts /yr Operational life 4.47 yr Capa ci ty factor 15.4 % Fixed g eneration cos t 21.0 $/hr Margi nal generation co s t 0.285 $/kWhyr Quantity Value Units Electrical production 672,038 kWh /yr Mean electrical output 150 kW Min. ele ctrical output 0.413 kW Max. electrical output 499 kW Therm al production 271,406 kWh /yr Mean therm al output 60.6 kW Min. the rm al output 24.0 kW Max. therm al output 146 kW Quantity Value Units Fuel cons um ption 193,671 L /yr Specific fuel cons um ptio n 0.288 L /kWh Fuel ene rgy input 1,905,724 kWh/yr Mean electrical efficiency 35.3 % Mean total efficiency 49.5 % Cat 3508 Quantity Value Units Hours of operation 2,143 hr/yr 9/17/12 System Report - St Marys-Pilot Stn, RE F 6 analysis 5/6file:///C:/Users/Doug/AppData/Local/Temp/St_Marys-Pilot_Stn,_RE F_6_ana lysis.htm Num ber of s tarts 680 s tarts /yr Operational life 9.33 yr Capa ci ty factor 17.1 % Fixed g eneration cos t 25.2 $/hr Margi nal generation co s t 0.316 $/kWhyr Quantity Value Units Electrical production 916,917 kWh /yr Mean electrical output 428 kW Min. ele ctrical output 22.6 kW Max. electrical output 555 kW Therm al production 336,030 kWh /yr Mean therm al output 157 kW Min. the rm al output 37.4 kW Max. therm al output 194 kW Quantity Value Units Fuel cons um ption 248,407 L /yr Specific fuel cons um ptio n 0.271 L /kWh Fuel ene rgy input 2,444,326 kWh/yr Mean electrical efficiency 37.5 % Mean total efficiency 51.3 % Cat 3512 Quantity Value Units Hours of operation 2,137 hr/yr Num ber of s tarts 302 s tarts /yr Operational life 9.36 yr Capa ci ty factor 16.0 % Fixed g eneration cos t 30.8 $/hr Margi nal generation co s t 0.310 $/kWhyr Quantity Value Units Electrical production 1,275,518 kWh/yr Mean electrical output 597 kW Min. ele ctrical output 89.2 kW Max. electrical output 814 kW 9/17/12 System Report - St Marys-Pilot Stn, RE F 6 analysis 6/6file:///C:/Users/Doug/AppData/Local/Temp/St_Marys-Pilot_Stn,_RE F_6_ana lysis.htm Therm al production 447,474 kWh/yr Mean therm al output 209 kW Min. the rm al output 65.2 kW Max. therm al output 271 kW Quantity Value Units Fuel cons um ption 336,331 L /yr Specific fuel cons um ptio n 0.264 L /kWh Fuel ene rgy input 3,309,494 kWh/yr Mean electrical efficiency 38.5 % Mean total efficiency 52.1 % Emissions Pollutant Emissions (kg/yr) Carbon d i oxide 2,275,1 65 Carbon m onoxide 5,0 60 Unbu rne d hydocarbon s 5 60 Particula te m atter 3 81 Sulfur d i oxide 4,5 77 Nitrog en oxides 45,1 48 St. Marys Wind Turbines Golder Associates Inc. 2121 Abbott Road, Suite 100 Anchorage, AK 99507 USA Tel: (907) 344-6001 Fax: (907) 344-6011 www.golder.com Golder Associates: Operations in Africa, Asia, Australasia, Europe, North America and South America Golder, Golder Associates and the GA globe design are trademarks of Golder Associates Corporation September 11, 2012 113-95706 Mr. Jeff Stanley, PE CRW Engineering Group LLC 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503 RE: GEOTECHNICAL EXPLORATION AND CONCEPTUAL LEVEL FOUNDATION RECOMMENDATIONS FOR PROPOSED WIND ENERGY PROJECT, ST. MARYS, AK Dear Mr. Stanley: This report presents the results of Golder Associates Inc . (Golder) geotechnical exploration, laboratory testing and conceptual level foundation recommendations for the proposed wind energy project in St. Marys, Alaska. Our work has been conducted in general accordance with Golder’s proposal to CRW Engineering Group, LLC (CRW), dated August 23, 2011 and our Letter of Authorization from you. Wind turbines are proposed for both the Yukon River villages of St. Marys and Mountain Village, Figure 1. Golder conducted geotechnical reconnaissance in both villages and a subsequent geotechnical exploration at the St. Marys turbine site. This report discusses our reconnaissance findings for one tower array location in St. Marys and two tower array locations in Mountain Village as well as the geotechnical exploration effort and conceptual-level foundation recommendations for the St. Marys tower array location. The proposed St. Marys wind turbines site is an undeveloped area southwest of the village, near Pitkas Point Borrow Site No. 3, Figure 2. Based on information provided by CRW, we understand the Alaska Village Electric Cooperative (AVEC) is considering either three Northwind 100 or a single EWT 52/900 wind turbine system at the St. Marys site. The foundation design loads have not been developed nor provided to us at this time. 1.0 SITE INVESTIGATION 1.1 Site Reconnaissance A reconnaissance of the proposed wind turbine site at St. Marys and of the proposed wind turbine sites (primary and alternate) in Mountain Village was conducted on August 18 and 19, 2011 by Mr. Matt Dillon of Golder. Thaw probes were advanced at the sites to determine the active layer depth at the time of the reconnaissance. Thaw probes were conducted with ½-inch diameter by 5 foot long steel T-probe advanced by hand to refusal or the safe working length of the probe. In late summer, thaw probe penetration refusal is inferred to be the contact with permafrost or relict seasonal frost. 1.1.1 St. Marys Site The St. Marys site (where the former AVEC meteorological tower was located) is generally flat terrain on a gradual, north-facing slope. Probe refusal was typically between one to two feet below ground surface at the time of our site work (bgs). Tundra vegetation covers the site with some taller brush along drainage areas, primary in the north end of site. Surface mounds were noted in aerial photography as well as on the ground. Probe refusal on the top of the mounds was at about 2 feet bgs. Surface water was not noted at the proposed turbine locations. Jeff Stanley September 11, 2012 CRW 2 113-95706 St. Marys Wind Turbines 1.1.2 Mountain Village (Primary Site) The primary site for the wind turbines at Mountain Village had a meteorological tower at the time of our site visit. The site is several miles east of the village, north of the road to St. Marys, Figure 3. The site is located on a level plateau overlooking the Yukon River. Typical vegetation is tundra and short grass. Probe refusal was between 1 to 2 feet bgs. A shallow hand dug test pit was advanced to 2.1 feet bgs in a tundra area near the roadway. Organic soil (peat) was observed in the test pit to the refusal surface in frozen fibrous peat. 1.1.3 Mountain Village (Alternate Site) The alternate site for the wind turbines Mountain Village site is between the primary site and the village. The site is located on a level plateau overlooking the Yukon River, Figure 3. Typical vegetation includes tundra and short grass. Probe refusal at the site was typically between 1 to 2 feet bgs. Water-filled troughs were present on the west end of the site. The shallowest probe refusal depths in the wet areas on the west side were 4 feet bgs and probe refusal was not encountered to the 5-foot probe depth in some of the wet areas. 1.2 St. Marys Wind Turbine Site Geotechnical Field Exploration The field investigation and subsurface exploration was conducted October 26 and 27, 2011. The field exploration consisted of excavating and sampling a total of three test pits, Figure 4. The test pits were advanced with the city of St. Marys Public Works Cat 330 track excavator and operator. Mr. Jacob Randazzo was Golder’s on-site representative for the field explorations. One test pit was excavated at each proposed wind t urbine location as identified by CRW . The test pit locations were identified in the field with a hand held GPS instrument based on GPS coordinates provided by CRW . Utility locates were coordinated with statewide and local utilities by Golder prior to conducting the geotechnical explorations. The test pits were logged and sampled as they were excavated. Disturbed, but representative, soil samples were collected from either the excavator bucket or the stockpile of excavated soil. The recovered samples were visually classified in the field and sealed in plastic bags. The samples were transported to Golder’s Anchorage laboratory for further examination, cl assification, and geotechnical index property testing. Upon completion of the explorations, the test pits were backfilled with soil removed during the excavation. A sealed 1.25-inch inside diameter (ID) schedule-40 PVC casing was installed in test pit TP-1 prior to backfilling for future ground temperature measurements by others. The soils observed were visually classified in the field according to the Unified Soils Classification System (USCS) shown in Figure 5. Visual ice in recovered samples was classified in general accordance with the American Society of Testing and Materials (ASTM D4083 -89) for frozen soil classification, as described in Figure 6. The test pit logs are presented in Figures 7 through 9. Consistency or density of the subsurface materials, as described in this report and shown in the test pit logs, was estimated based on excavation effort and sidewall stability and should be considered approximate. Groundwater levels were noted during the excavation are presented on the respective test pit logs, where observed. Groundwater monitoring standpipes were not installed in any of the test pits. 1.3 Laboratory Testing Laboratory tests were performed to determine index properties of select soil samples to confirm field classifications and to determine geotechnical properties for engineering analysis . Moisture content tests were generally conducted according to procedures described in ASTM D -2216. Particle size distributions were conducted in general conformance with procedures described in AST M D-422. A summary of laboratory test results is presented in the Sample Summary, Appendix A. Laboratory test results are also summarized graphically on the test pit logs. Jeff Stanley September 11, 2012 CRW 3 113-95706 St. Marys Wind Turbines 2.0 REGIONAL GEOLOGY AND CLIMATE 2.1 Regional Geologic Conditions St. Marys is located on the Andreafsky River near its confluence with the Yukon River. The village is located near the southern termination of the Nulato Hills. The village occupies a gently sloping hillside on the north bank of the Andreafsky River. The Nu lato Hills rise to the north and the Yukon-Kuskokwim Delta extends to the south and west. Local terrain is characterized by gently sloping hills covered with tundra, moss, grass, scattered patches of dense willow brush and occasional black spruce. The Nul ato Hills are composed of Cretaceous sedimentary bedrock, consisting mostly of siltstone, shale, and fine-grained sandstone. Bedrock is generally overlain by a mantel of fine-grained alluvial, colluvial and eolian deposits. Solifluction lobes are apparent on some upper slopes. In many places, fragments of the weathered bedrock surface have been incorporated into the overlying silt by wind, frost, and gravity action. 2.2 Regional Climate Conditions St. Marys lies in an area influenced by both maritime and continental climate. Temperatures average about 50°F in summer and about 15°F in winter, with extremes from -44 to 83°F. Annual snowfall averages 60 inches, and total annual precipitation averages 16 inches. The Yukon River is typically ice- free from June through October. Design climate data, including average thawing and freezing indices, are summarized below for the St. Marys area. The indices are calculated from data available by the University of Alaska Fairbanks (UAF) Scenarios Network for Alaska Planning (SNAP). Design indices are based on the three coldest winters (Design Freezing Index) and the three warmest summers (Design Thawing Index) observed or projected during the analysis period. Climate indices for the thirty year periods for 1947-1978 and 1979-2009 are based on the UAF SNAP data. The projected climate indices for 2012-2042 are based on SNAP model scenarios. St. Marys Recommended Climate Indices 1947-1978 1979-2009 2012-2042 Average Air Temperature 29.4 °F 31.4 °F 33.7 °F Average Freezing Index 3730 °F-days 3220 °F-days 2560 °F-days Design Freezing Index 4710 °F-days 4190 °F-days 3180 °F-days Average Thawing Index 2770 °F-days 3010 °F-days 3740 °F-days Design Thawing Index 3100 °F-days 3440 °F-days 3945 °F-days SNAP data are distributed as two separate products , historical data and forward looking projections. Historical records were calculated using the PRISM model by combining climate data from multiple meteorological records across the state of Alaska from 1901 to 2009 . These data area modeled across the state in a manner that accounts for variations in slope, aspect, elevation, and coastal proximity. Forward-looking projections were prepared from 2009 to 2099 utilizing multiple global climate models and several carbon emission scenarios. The ECHAM5 global climate model results were used for the 2012 - 2042 climate data projection. The ECHAM5 model was determined by the SNAP group to be most applicable to Alaska. The A1B carbon emission scenario was used for our projected climate data. This carbon emission model is considered a mid-range future emissions scenario. Climate trends show that air temperatures in Alaska are rising. As indicated by the reviewe d data, the average air temperature from 1979 to 2009 is approximately 2°F higher than the prior 30-year period. As Jeff Stanley September 11, 2012 CRW 4 113-95706 St. Marys Wind Turbines a result of increasing air temperatures, the near surface permafrost in the area is expected to warm and possibly thaw in some areas. 3.0 GENERALIZED SITE AND SUBSURFACE CONDITIONS The general subsurface conditions at the wind turbine site consist of a thin surficial organic mat one to two feet thick, overlying a wind-blown silt to a contact with shallow weathered bedrock. The bedrock is weathered and fractured near the bedrock contact becoming more difficult to excavate with depth. The greater excavation effort is inferred to represent increasing rock competency. The highly fractured bedrock is weathered to soil-like fabric and has been logged as dense gravel with cobble size clasts with some silt. Less fractured bedrock was observed and is logged as bedrock on the test pit logs. Observations conducted at the nearby Pitkas Point material site indicate that within the competent bedrock, silt infilling within rock fractures and discontinuities is not significant. The site is generally underlain by shallow permafrost observed within at 2 feet bgs in test pits TP-1 and TP-2. Frozen ground was not inferred by excavator action or behavior in test pit TP-3 where granular material was observed beneath the organic mat. Test pit TP-1 is located nearest to the road and was excavated to 11 feet bgs. The upper two feet consisted of soft, wet peat and organic silt. Ground water was observed at one foot deep in the test pit near the permafrost contact. Frozen ice-rich silt was observed to eight feet deep . Frozen gravelly material with silt was observed between 8 and 11 feet deep and is interpreted as highly fractured and weathered bedrock. The test pit was excavated to refusal in a less fractured weathered bedrock at 11 feet bgs. Test pit TP-2 was excavated to 12 feet bgs. An unfrozen organic layer was observed in the upper two feet, consisting of peat and organic silt. Frozen ice-rich silt was observed to 9 feet bgs. Silty gravel was observed between 9 and 11 feet, and is interpreted as highly fractured, weathered bedrock. Less fractured, more competent bedrock was observed at 11 to 12 feet bgs. Test pit TP-3 was located at the highest elevation of the three proposed turbine sites and was excavated to a depth of 12 feet bgs. . An unfrozen organic layer consisting of peat and organic silt was observed to 1 foot bgs, underlain by medium dense gravel sized material, interpreted as highly fractured and weathered bedrock. Less fractured, weathered bedrock was observed at 6 feet to 11 feet bgs, becoming harder between 11 and 12 feet bgs. The fractured rock did not exhibit significant ice-bonding and may be unfrozen or if frozen, it is considered an ice-poor, unbonded material. 4.0 LABORATORY RESULTS Laboratory test results conducted on frozen silty material above the bedrock indicates soil moisture contents in excess of thawed state saturation levels are present. Soil moisture contents in the weathered bedrock samples are significantly lower than in the overlying ice -rich silt y material. Summary soil moisture content as a percent of dry weight and general soil type are shown below. Jeff Stanley September 11, 2012 CRW 5 113-95706 St. Marys Wind Turbines 5.0 GEOTECHNICAL CONSIDERATIONS AND CONCEPTUAL-LEVEL FOUNDATION RECOMMEND ATIONS The locations explored at the proposed St. Marys wind turbine site should be suitable for gravity mat foundation systems for the Northwind 100 units. A gravity mat foundation system will most likely be suitable for an EWT 52/900 unit also. The foundations must extend to the competent bedrock (siltstone) and should not be founded on the ice-rich silty soil or highly fractured bedrock . The reinforced concrete mat foundations may be cast on a properly prepared rock surface. Alternatively, a non-frost susceptible structural fill can be placed between the exposed bedrock and the base of the foundation as a leveling course, if needed. Structural fill should be well graded sand and gravel placed in a fully thawed state and compacted to at least 95 percent of modified Proctor, ASTM D-1557. A material meeting the Alaska Department of Transportation and Public Facilities (ADOT&PF) Subbase “A” specification is considered suitable for structural fill. We recommended at least two feet of structural fill be placed under the wind turbine foundations. Backfill above the wind turbine foundations should be clean, well graded sand and gravel. Backfill above the foundations should be compacted as recommended for structural fill. The foundation embedment depth will be determined once final design loads are provided and we are able to coordinate with the structural engineer. However, the depth of embedment must be sufficiently deep to resist overturn load with an appropriate factor of safety and not allow the foundation mat to experience a tension load state under any load condition. If a tension load state is expected based on foundation geometry and environmental loads, we should be contacted during the design phase. If structural fill is placed over bedrock as discussed above, a prel iminary allowable bearing capacity of 3,500 pounds per square foot (psf) can be used. A 50-percent increase in the allowable bearing capacity can be used for short-term transient loads. The structural fill should extend at least three feet horizontally from the foundation perimeter then at a 1H:1V (horizontal:vertical) slope to the exposed bedrock surface, provided the structural fill is fully constrained by in-place soil or bedrock. If the foundations are prepared as discussed above, settlements are expected to be less than 1-inch total with 0.5-inch differential. The site has ice-rich permafrost and the overlying icy soils that may produce water and the material may slough as it thaws. Construction methods should anticipate and control sidewall slough and water. It is critical the excavations extend to a bedrock surface with minimal silt filling along rock discontinuities to control settlement. If overexcavation is required to expose a suitable bedrock surface, structural fill is required to the base of the foundation mat. We should be retained to observe the exposed bedrock 0 ft 2 ft 4 ft 6 ft 8 ft 10 ft 12 ft 0% 20% 40% 60% 80% 100% Depth below ground sruface (% of dry weight) Soil Moisture Content Silt (ML) Gravel (GP - GM, GM) ≤ REFERENCE TOPOGRAPHIC BASE MAP PROVIDED U.S. GEOLOGIC SURVEY CHECK REVIEW DESIGN CADD SCALE FILE No. PROJECT No. TITLEAS SHOWN REV.J:\2011 jobs\113-95706 avec st marys mtn village wind recon\CAD\Vicinity Map.dwg | 9/10/2012 10:04 AM | MFurrer | ALASKA1 NA ---- DBC 1/9/11 RAM 9/10/12 RAM 9/10/12 0 ---- FIG. 113-95706 Vicinity Map.dwg AVEC / ST MARYS/ AK VICINITY MAP PROPOSED WIND TURBINES SAINT MARYS , ALASKA SAINT MARYS PROJECT AREA MOUNTAIN VILLAGE PROJECT AREA SCALE 0 MILES 5 5 PROJECT AREA J:\2011 jobs\113-95706 avec st marys mtn village wind recon\CAD\site-map.dwg | 9/10/2012 10:06 AM | MFurrer | ALASKA 2--------DBC1/5/12RAM9/10/12RAM9/10/120----FIG.113-95706site-map.dwgAVEC / ST MARYS/ AKSAINT MARYS PROJECT AREA MAPPROPOSED WIND TURBINES SAINT MARYS, ALASKACHECKREVIEWDESIGNCADDSCALEFILE No.PROJECT No.TITLEAS SHOWNREV.SCALE01/21/2MILESAINT MARYSAIR P O R T R DPROJECT LOCATIONAIRPORTIMAGE DATED:SUPPLIED BY AND SOURCED UNDER LICENCEFROM GOOGLE EARTH PRO ON :IMAGE GEOREFERENCED BY GOLDER ANDINTENDED FOR INDICATIVE PURPOSES ONLYSource: Google Earth Pro 201009/03/200609/03/2006 J:\2011 jobs\113-95706 avec st marys mtn village wind recon\CAD\Mointain_Village.dwg | 9/10/2012 10:08 AM | MFurrer | ALASKA 3NA----DBC1/10/12RAM9/10/12RAM9/10/120----FIG.113-95706Mointain_Village.dwgAVEC / MOINTAIN VILLAGE / AKMOUNTAIN VILLAGE PROJECTAREA MAPPROPOSED WIND TURBINES MOUNTAIN VILLAGE, ALASKACHECKREVIEWDESIGNCADDSCALEFILE No.PROJECT No.TITLEAS SHOWNREV.REFERENCE1.BASE MAP IMAGERY COLLECTED BYGEOEYE DATED 06/09/2006 AND PROVIDEDBY ALASKA STATEWIDE DIGITAL MAPPINGINITIATIVE.2.TOPO BASEMAP IS DRG PROVIDED BYU.S.GEOLOGIC SURVEY.SCALE01/21/2MILEPRIMARY SITEALTERNATE SITE TP-1TP-2TP-31.BASE MAP PROVIDED BY CRW ENGINEERING GROUP LLC.FROM SAINT MARYS ALASKA, WIND TURBINE PROJECTDATED 8/17/11.LEGENDLEGENDTP-1GOLDER TEST PIT NAME ANDAPPROXIMATE LOCATIONJ:\2011 jobs\113-95706 avec st marys mtn village wind recon\CAD\site-map.dwg | 9/10/2012 10:09 AM | MFurrer | ALASKA 4--------DBC1/5/12RAM9/10/12RAM9/10/120----FIG.113-95706site-map.dwgAVEC / ST MARYS/ AKSAINT MARYS TEST PIT LOCATION MAPPROPOSED WIND TURBINES SAINT MARYS, ALASKACHECKREVIEWDESIGNCADDSCALEFILE No.PROJECT No.TITLEAS SHOWNREV.REFERENCESAINTMARYSAIRPORTAIRPORT RDPITKA'S P O I N T A C C E S S R D SCALE0FEET15001500 DESCRIPTIVE TERMINOLOGY FOR PERCENTAGES (ASTM D 2488-00) CU 6 AND 1 CC 3 CU < 6 AND/OR 1 > CC > 3 CLEAN SANDS <5% FINES SANDS AND FINES >12% FINES SANDS HIGHLY ORGANIC SOILS SILTS AND CLAYS LIQUID LIMIT <50 SILTS AND CLAYS LIQUID LIMIT 50 50% OF COARSE FRACTION PASSES ON NO 4. SIEVE If soil contains 15% gravel, add"with gravel"VERY LOOSE LOOSE COMPACT DENSE VERY DENSE VERY SOFT SOFT FIRM STIFF VERY STIFF HARD CONSISTENCY 0 - 2 2 - 4 4 - 8 8 - 15 15 - 30 OVER 30 0 - 0.25 0.25 - 0.50 0.50 - 1.0 1.0 - 2.0 2.0 - 4.0 OVER 4.0 RELATIVE DENSITY 0 - 4 4 - 10 10 - 30 30 - 50 OVER 50 COHESIONLESS SOILS (a)COHESIVE SOILS(b) RELATIVE DENSITY / CONSISTENCY ESTIMATE USING STANDARD PENETRATION TEST (SPT) VALUES D 30( ) 2 PRIMARILY ORGANIC MATTER, DARK IN COLOR, AND ORGANIC ODOR SOIL GROUP NAMES & LEGEND >50% OF COARSE FRACTION RETAINED ON NO 4. SIEVE DPLASTICITY INDEX (PI)Figure 5SOIL CLASSIFICATION / LEGEND LIBRARY-ANC(9-20-11).GLB [ANC_SOIL_LEGEND] 1/12/12Gravels or sands with 5% to 12% fines require dual symbols (GW-GM, GW-GC, GP-GM, GP-GC, SW-SM, SW-SC, SP-SM, SP-SC) and add "with clay" or "with silt" to group name. If fines classify as CL-ML for GM or SM, use dual symbol GC-GM or SC-SM. Optional Abbeviations: Lower case "s" after USCS group symbol denotes either "sandy" or "with sand" and "g" denotes either "gravelly" or "with gravel" N1 (BLOWS/ FOOT)(c) N1 (BLOWS/ FOOT)(c) UNCONFINED COMPRESSIVE STRENGTH (TSF)(d) 10D = LL (oven dried) LL (not dried) ORGANIC CLAY OR SILT (OH, OL) if: (4 PI 7) x 60 DC 60 PEATCOARSE-GRAINED SOILS>50% RETAINED ONNO. 200 SIEVEGRAVELS CLEAN GRAVELS <5% FINES GRAVELS WITH FINES >12% FINES 0 10 20 30 40 50 60 7 CC 10D=U GW GP GM GC SW SP SM SC CL ML OL CH MH OH TRACE FEW LITTLE SOME MOSTLY DESCRIPTIVE TERMS RANGE OF PROPORTION 0 - 5% 5 - 10% 10 - 25% 30 - 45% 50 - 100% LABORATORY TEST ABBREVIATIONS C TW MS GP RC AG Core (Rock) Thin Wall (Shelby Tube) Modified Shelby Geoprobe Air Rotary Cuttings Auger Cuttings SS SSO HD BD CA GS SAMPLER ABBREVIATIONS CRITERIA FOR DESCRIBING MOISTURE CONDITION (ASTM D 2488-00) SIZE RANGE ABOVE 12 IN. 3 IN. TO 12 IN. 3 IN. TO NO. 4 (4.76 mm) 3 IN. TO 3/4 IN. 3/4 IN. TO NO. 4 (4.76 mm) NO. 4 (4.76 mm) TO NO. 200 (0.074 mm) NO. 4 (4.76 mm) TO NO. 10 (2.0 mm) NO. 10 (2.0 mm) TO NO. 40 (0.42 mm) NO. 40 (0.42 mm) TO NO. 200 (0.074 mm) SMALLER THAN NO. 200 (0.074 mm) 0.074 mm TO 0.005 mm LESS THAN 0.005 mm SPT Sampler (2 in. OD, 140 lb hammer) Oversize Split Spoon (2.5 in. OD, 140 lb typ.) Heavy Duty Split Spoon (3 in. OD, 300/340 lb typ.) Bulk Drive (4 in. OD, 300/340 lb hammer typ.) Continous Core (Soil in Hollow-Stem Auger) Grab Sample from Surface / Testpit BOULDERS COBBLES GRAVEL COARSE GRAVEL FINE GRAVEL SAND COARSE SAND MEDIUM SAND FINE SAND SILT AND CLAY SILT CLAY COMPONENT DEFINITIONS BY GRADATION COMPONENT ABSENCE OF MOISTURE, DUSTY, DRY TO THE TOUCH DAMP BUT NO VISIBLE WATER VISIBLE FREE WATER, USUALLY SOIL IS BELOW WATER TABLE DRY MOIST WET WELL-GRADED GRAVEL POORLY GRADED GRAVEL SILTY GRAVEL CLAYEY GRAVEL WELL-GRADED SAND POORLY GRADED SAND SILTY SAND CLAYEY SAND LEAN CLAY SILT ORGANIC CLAY OR SILT FAT CLAY ELASTIC SILT ORGANIC CLAY OR SILT 4 MATERIAL TYPES FINE-GRAINED SOILS>50% PASSESNO. 200 SIEVELIQUID LIMIT (LL) 0 10 20 30 40 50 60 70 80 90 100 FINES CLASSIFY AS ML OR CL FINES CLASSIFY AS CL OR CH (PI > 7) FINES CLASSIFY AS ML OR MH FINES CLASSIFY AS CL OR CH PT GROUP SYMBOL If soil contains 15% sand, add"with sand"If soil contains coarse-grained soil from15% to 29%, add "with sand" or "withgravel" for whichever type is prominent,or for 30%, add "sandy" or "gravelly"PLASTICITY CHARTUNIFIED SOIL CLASSIFICATION (ASTM D 2487-00) (a) Soils consisting of gravel, sand, and silt, either separately or in combination possessing no characteristics of plasticity, and exhibiting drained behavior. (b) Soils possessing the characteristics of plasticity, and exhibiting undrained behavior. (c) Refer to ASTM D 1586-99 for a definition of N. Values shown are based on N values corrected for overburden pressure (N1). N values may be affected by a number of factors including material size, depth, drilling method, and borehole disturbance. N values are only an approximate guide for frozen soil or cohesive soil. (d) Undrained shear strength, su= 1/2 unconfined compression strength, Uc. Note that Torvane measures su and Pocket Penetrometer measures Uc < 0.75 CRITERIA FOR ASSIGNING SOIL GROUP NAMES AND GROUP SYMBOLS USING LABORATORY TESTS (PI < 4) Con Comp Dd K MA NP OLI Consolidation Proctor Compaction (D698/D1557) Dry Density Thermal Conductivity Sieve and Hydrometer Analysis Non-plastic Organic Loss Percent Fines (Silt & Clay) Soil pH Photoionization Detector Modified Proctor Pocket Penetrometer Point Load Sieve Analysis P200 pH PID PM PP PTLD SA Specific Gravity Thaw Consolidation/Strain Torvane Unconfined Compression Liquid Limit (LL) Plastic Limit (PL) Soil Resistivity SpG TC TV TX WC WP (a t o r a b o v e "A " lin e )ML CL MH CH CU 4 AND 1 CC 3 CU < 4 AND/OR 1 > CC > 3 CL-ML (LL < 50)(LL 50)"A " L IN E (b e lo w "A " lin e ) Excess ice Well bonded Individual ice crystals or inclusions FROZEN SOIL CLASSIFICATION / LEGEND LIBRARY-ANC(9-20-11).GLB [ANC_ICE_LEGEND] 1/12/12No ice-bonded soil observed Poorly bonded or friable Well bonded ICE BONDING SYMBOLS Figure 6 3. MODIFY SOIL DESCRIPTION BY DESCRIPTION OF SUBSTANTIAL ICE STRATA 2. MODIFY SOIL DESCRIPTION BY DESCRIPTION OF FROZEN SOIL 1. DESCRIBE SOIL INDEPENDENT OF FROZEN STATE DEFINITIONS DESIGNATION Nf Nbn Nbe Vx Vc Vr Vs Vu ICE+soil type ICE SUBGROUP DESIGNATION N V ICE FROZEN SOIL CLASSIFICATION (ASTM D 4083-89) TYPICAL USCS SOIL CLASSGENERAL SOIL TYPE % FINER THAN 0.02 mm BY WEIGHT (a) Gravels Crushed stone Crushed rock (b) Sands GW, GP SW, SP (a) Gravels Crushed stone Crushed rock (b) Sands GW, GP SW, SP PFS(4) [MOA NFS] S1 [MOA F1]Gravelly soils GW, GP GW-GM, GP-GM, GW-GC, GP-GC [MOA F2] S2 [MOA F2]Sandy soils SW, SP SW-SM, SP-SM, SW-SC, SP-SC Gravelly soils GM, GC, GM-GC, GW-GM, GP-GM, GW-GC, GP-GC GW, GP GW-GM, GP-GM, GW-GC, GP-GC(a) Gravelly soils (b) Sands FROST GROUP(2) 1.5 to 3 3 to 10 3 to 6 3 to 6 6 to 10 10 to 20 6 to 15 F1 [MOA F1] SM, SW-SM, SP-SM, SC, SW-SC, SP-SC, SM-SC (a) Gravelly soils (b) Sands, except very fine silty sands (c) Clays, PI>12 GM, GC, GM-GC SM, SC, SM-SC CL, CH (a) Silts (b) Very fine silty sands (c) Clays, PI<12 ML, MH, ML-CL SM, SC, SM-SC CL, ML-CL FROST DESIGN SOIL CLASSIFICATION (1) -- Over 15 -- (d) Varved clays or other fine- grained banded sediments --CL or CH layered with ML, MH, ML-CL, SM, SC, or SM-SC DESCRIPTION MAJOR GROUP Segregated ice not visible by eye Segregated ice visible by eye (ice less than 25 mm thick) F3 [MOA F3] F4 [MOA F4] Over 20 Over 15 -- Ice greater than 25 mm thick DESCRIPTION Poorly bonded of friable Ice without soil inclusions Ice with soil inclusions Uniformly distributed ice Stratified or distincltly oriented ice formations Random or irregularly oriented ice formations Ice coatings on particles CLASSIFY SOIL BY THE UNIFIED SOIL CLASSIFICATION SYSTEM No excess ice Candled Ice is ice which has rotted or otherwise formed into long columnar crystals, very loosely bonded together. Clear Ice is transparent and contains only a moderate number of air bubbles. Cloudy Ice is translucent, but essentially sound and non-pervious Friable denotes a condition in which material is easily broken up under light to moderate pressure. Granular Ice is composed of coarse, more or less equidimensional, ice crystals weakly bonded together. Ice Coatings on particles are discernible layers of ice found on or below the larger soil particles in a frozen soil mass. They are sometimes associated with hoarfrost crystals, which have grown into voids produced by the freezing action. Ice Crystal is a very small individual ice particle visible in the face of a soil mass. Crystals may be present alone or in a combination with other ice formations. Ice Lenses are lenticular ice formations in soil occurring essentially parallel to each other, generally normal to the direction of heat loss and commonly in repeated layers. Ice Segregation is the growth of ice as distinct lenses, layers, veins and masses in soils, commonly but not always oriented normal to direction of heat loss. Massive Ice is a large mass of ice, typically nearly pure and relatively homogeneous. Poorly-bonded signifies that the soil particles are weakly held together by the ice and that the frozen soil consequently has poor resistance to chipping or breaking. Porous Ice contains numerous voids, usually interconnected and usually resulting from melting at air bubbles or along crystal interfaces from presence of salt or other materials in the water, or from the freezing of saturated snow. Though porous, the mass retains its structural unity. Thaw-Stable frozen soils do not, on thawing, show loss of strength below normal, long-time thawed values nor produce detrimental settlement. Thaw-Unstable frozen soils show on thawing, significant loss of strength below normal, long-time thawed values and/or significant settlement, as a direct result of the melting of the excess ice in the soil. Well-Bonded signifies that the soil particles are strongly held together by the ice and that the frozen soil possesses relatively high resistance to chipping or breaking. NFS(3) [MOA NFS] F2 [MOA F2] (1) From U.S. Army Corps of Engineers (USACE), EM 1110-3-138, "Pavement Criteria for Seasonal Frost Conditions," April 1984 (2) USACE frost groups directly correspond to frost groups listed in Municipality of Anchorage (MOA) design criteria manual (DCM), 2007; except as noted. (3) Non-frost susceptible (4) Possibly frost susceptible, requires lab test for void ratio to determine frost design soil classification. Gravel with void ratio > 0.25 would be NFS; Gravel with void ratio < 0.25 would be S1; Sands with void ratio > 0.30 would be NFS; Sands with void ratio < 0.30 would be S2 or F2 0 to 1.5 0 to 3 1 2 3 Test Pit w/ excavatorPT OL ML GM Notes: 1) Test pit excavated to refusal on inferred bedrock, at 11 feet deep 2) Groundwater observed at 1 foot during excavation 3) Frozen ground observed at 2 feet during excavation 3) Sealed 1.25 inch schedule 40 PVC installed to 11 feet 4) Test pit backfilled with excavated material 1.0 2.0 8.0 0.0 - 1.0 Moist, dark brown, PEAT (PT) 1.0 - 2.0 Wet, brown, ORGANIC SILT (OL) 2.0 - 8.0 Frozen, brown, SILT, well bonded with approximately 10-15% visible ice by volume as individual ice crystals (ML-Vx) 8.0 - 11.0 Frozen, brown, SILTY GRAVEL, angular gravel up to 3 inch diameter, some silt, well bonded (GM) Borehole completed at 11.0 ft. GS GS GS 1.25 inch schedule 40 PVC 1 ft during excavationTYPEDESCRIPTIONELEV.BORING METHOD10 20 30 40 10 20 30 40 DEPTH (ft)WL UNCORRECTED BLOWS / FT SALINITY (ppt) WATER CONTENT (PERCENT) (inch)BLOWSPER FTWP REC ATT RECORD OF BOREHOLE TP-1 VEGETATION: Tundra SOIL PROFILE GRAPHICLOGW ICE BONDSAMPLES USCSNUMBERNOTES TESTS WATER LEVELS GRAPHICDEPTH(ft)0 5 10 15 20 PROJECT: Saint Marys Wind Turbines PROJECT NUMBER: 113-95706 LOCATION: Saint Marys, Alaska CLIENT: CRW Engineering Group, LLC DRILLING DATE: 10/26/2011 EQUIPMENT: CAT 330 CL w/ 4' bucket Figure 7 DATUM: NAD 83 ELEVATION: n/a COORDS: 62.03892° N 163.24719° W LOGGED: J. Randazzo CHECKED: M. Hess CHECK DATE: 12/21/2011 SHEET 1 of 1 DEPTH SCALE: 1 inch to 2.5 feet DRILLING CONTRACTOR: City of St. Marys DRILLER: Max 113-95706 LOGS.GPJ LIBRARY-ANC(7-2-12).GLB [ANC BOREHOLE] MFurrer 9/10/1280 1 2 3 Test Pit w/ excavatorPT OL ML ML ML GM Notes: 1) Groundwater observed at 2 feet during excavation 2) Frozen ground observed at 2 feet during excavation 2) Test pit backfilled with excavated material 1.0 2.0 3.0 4.0 9.0 11.0 0.0 - 1.0 Moist, dark brown, PEAT (PT) 1.0 - 2.0 Moist to wet, brown, ORGANIC SILT (OL) 2.0 - 3.0 Frozen, brown, SILT, well bonded with approximately 25% visible ice by volume as individual ice crystals (ML, Vx) 3.0 - 4.0 Frozen, light gray, SILT, trace subrounded gravel up to 0.75 inch diameter, well bonded with approximately 20% visible ice by volume as individual ice crystals (ML, Vx) 4.0 - 9.0 Frozen, gray, SILT, well bonded (ML, Nb) 9.0 - 11.0 Frozen, gray, SILTY GRAVEL, angular gravel up to 3 inch diameter, some silt, well bonded (GM) 11.0 - 12.0 Gray, BEDROCK, flat, fractured rock, mostly flat, angular cobble sized clasts, well bonded Borehole completed at 12.0 ft. GS GS GS Backfilled with excavated material 2 ft during excavationTYPEDESCRIPTIONELEV.BORING METHOD10 20 30 40 10 20 30 40 DEPTH (ft)WL UNCORRECTED BLOWS / FT SALINITY (ppt) WATER CONTENT (PERCENT) (inch)BLOWSPER FTWP REC ATT RECORD OF BOREHOLE TP-2 VEGETATION: Tundra SOIL PROFILE GRAPHICLOGW ICE BONDSAMPLES USCSNUMBERNOTES TESTS WATER LEVELS GRAPHICDEPTH(ft)0 5 10 15 20 PROJECT: Saint Marys Wind Turbines PROJECT NUMBER: 113-95706 LOCATION: Saint Marys, Alaska CLIENT: CRW Engineering Group, LLC DRILLING DATE: 10/26/2011 EQUIPMENT: CAT 330 CL w/ 4' bucket Figure 8 DATUM: NAD 83 ELEVATION: n/a COORDS: 62.03683° N 163.24900° W LOGGED: J. Randazzo CHECKED: M. Hess CHECK DATE: 12/21/2011 SHEET 1 of 1 DEPTH SCALE: 1 inch to 2.5 feet DRILLING CONTRACTOR: City of St. Marys DRILLER: Bossa 113-95706 LOGS.GPJ LIBRARY-ANC(7-2-12).GLB [ANC BOREHOLE] MFurrer 9/10/12193 1 2 3 Test Pit w/ excavatorPT OL GP-GM Notes: 1) Groundwater not encountered during excavation 2) Frozen ground not encountered during excavation 3) Test pit backfilled with excavated material 0.5 1.0 6.0 9.0 0.0 - 0.5 Dry to moist, brown, PEAT (PT) 0.5 - 1.0 Brown, ORGANIC SILT, fibrous roots (OL) 1.0 - 6.0 Dry to moist, brown, poorly graded GRAVEL with silt and sand, angular gravel up to 3 inch diameter, few silt (GP-GM) 6.0 - 9.0 Gray, BEDROCK, fractured rock, mostly flat, angular cobble sized clasts 9.0 - 12.0 Gray to white, BEDROCK, flat plates up to 48 inch diameter Borehole completed at 12.0 ft. GS GS GS Backfilled with excavated materialTYPEDESCRIPTIONELEV.BORING METHOD10 20 30 40 10 20 30 40 DEPTH (ft)WL UNCORRECTED BLOWS / FT SALINITY (ppt) WATER CONTENT (PERCENT) (inch)BLOWSPER FTWP REC ATT RECORD OF BOREHOLE TP-3 VEGETATION: Tundra SOIL PROFILE GRAPHICLOGW ICE BONDSAMPLES USCSNUMBERNOTES TESTS WATER LEVELS GRAPHICDEPTH(ft)0 5 10 15 20 PROJECT: Saint Marys Wind Turbines PROJECT NUMBER: 113-95706 LOCATION: Saint Marys, Alaska CLIENT: CRW Engineering Group, LLC DRILLING DATE: 10/27/2011 EQUIPMENT: CAT 330 CL w/ 4' bucket Figure 9 DATUM: NAD 83 ELEVATION: n/a COORDS: 62.03464° N 163.25083° W LOGGED: J. Randazzo CHECKED: M. Hess CHECK DATE: 12/21/2011 SHEET 1 of 1 DEPTH SCALE: 1 inch to 2.5 feet DRILLING CONTRACTOR: City of St. Marys DRILLER: Max 113-95706 LOGS.GPJ LIBRARY-ANC(7-2-12).GLB [ANC BOREHOLE] MFurrer 9/10/12 APPENDIX A LABORATORY TEST RESULTS TP-1 1 3.0 3.5 100 GS 80 ML TP-1 2 9.5 10.0 100 GS 11 ML TP-1 3 10.0 10.5 100 GS Rock TP-2 1 2.0 2.5 100 GS 193 ML TP-2 2 3.0 3.5 100 GS 46 ML TP-2 3 10.0 10.5 100 GS 23 GM TP-3 1 1.5 2.0 100 GS 7 GP-GM TP-3 2 10.0 10.5 100 GS Rock TP-3 3 11.0 11.5 100 GS RockTOPBOTTOMDEPTH (ft)SAMPLE LOCATIONSAMPLING DATA CLASSIFICATION AND INDEX TEST RESULTS TABLE 1: SAMPLE SUMMARY Sheet 1 of 1 11/28/2011S. WilsonReviewed By: QA/QC By:11/28/2011J. Randazzo Date: Date:SAMPLE NUMBERProject: Location: Client:Project No.: Golder Associates: Operations in Africa, Asia, Australasia, Europe, North America and South America Golder Associates Inc. Saint Marys, Alaska Saint Marys Wind Turbines CRW Engineering Group, LLC 113-95706 2121 Abbott Road, Suite 100, Anchorage, AK Tel: (907) 344-6001 Fax: (907) 344-6011 www.golder.com113-95706 LOGS.GPJ LIBRARY-ANC(7-2-12).GLB [ANC_SAMPLE_SUMMARY] MFurrer 9/10/12PLASTIC LIMIT(PL) (%)LIQUID LIMIT(LL) (%)PLASTICITY INDEX(PI) (%)FINES(SILT & CLAY)GRAVELSANDGRADATION (%)ORGANICCONTENT (%)DESCRIPTION(USCS)SALINITY (ppt)[ (d) is directly meas.]SAMPLE TYPERECOVERY (%)BLOWS PER FOOTNATURAL MOISTURECONTENT (%)TESTS /OTHER TESTS Mail Processing Center Federal Aviation Administration Southwest Regional Office Obstruction Evaluation Group 2601 Meacham Boulevard Fort Worth, TX 76137 Aeronautical Study No. 2012-WTW-5187-OE Prior Study No. 2011-WTW-11803-OE Page 1 of 8 Issued Date: 09/04/2012 Matt Metcalf AVEC 4831 Eagle Street Anchorage, AK 99503 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure:Wind Turbine Wind Turbine 4 Location:Pitkas Point, AK Latitude:62-02-09.67N NAD 83 Longitude:163-15-02.69W Heights:585 feet site elevation (SE) 250 feet above ground level (AGL) 835 feet above mean sea level (AMSL) This aeronautical study revealed that the structure would have no substantial adverse effect on the safe and efficient utilization of the navigable airspace by aircraft or on the operation of air navigation facilities. Therefore, pursuant to the authority delegated to me, it is hereby determined that the structure would not be a hazard to air navigation provided the following condition(s) is(are) met: As a condition to this Determination, the structure is marked/lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: _____ At least 10 days prior to start of construction (7460-2, Part I) __X__ Within 5 days after the construction reaches its greatest height (7460-2, Part II) See attachment for additional condition(s) or information. This determination expires on 03/04/2014 unless: (a)the construction is started (not necessarily completed) and FAA Form 7460-2, Notice of Actual Construction or Alteration, is received by this office. (b)extended, revised, or terminated by the issuing office. Page 2 of 8 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE E-FILED AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. AFTER RE-EVALUATION OF CURRENT OPERATIONS IN THE AREA OF THE STRUCTURE TO DETERMINE THAT NO SIGNIFICANT AERONAUTICAL CHANGES HAVE OCCURRED, YOUR DETERMINATION MAY BE ELIGIBLE FOR ONE EXTENSION OF THE EFFECTIVE PERIOD. This determination is subject to review if an interested party files a petition that is received by the FAA on or before October 04, 2012. In the event a petition for review is filed, it must contain a full statement of the basis upon which it is made and be submitted in triplicate to the Manager, Airspace Regulations & ATC Procedures Group, Federal Aviation Administration, Airspace Regulations & ATC Procedures Group, 800 Independence Ave, SW, Room 423, Washington, DC 20591. This determination becomes final on October 14, 2012 unless a petition is timely filed. In which case, this determination will not become final pending disposition of the petition. Interested parties will be notified of the grant of any review. For any questions regarding your petition, please contact Airspace Regulations & ATC Procedures Group via telephone -- 202-267-8783 - or facsimile 202-267-9328. This determination is based, in part, on the foregoing description which includes specific coordinates, heights, frequency(ies) and power. Any changes in coordinates, heights, and frequencies or use of greater power will void this determination. Any future construction or alteration, including increase to heights, power, or the addition of other transmitters, requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. Any failure or malfunction that lasts more than thirty (30) minutes and affects a top light or flashing obstruction light, regardless of its position, should be reported immediately to (800) 478-3576 so a Notice to Airmen (NOTAM) can be issued. As soon as the normal operation is restored, notify the same number. This aeronautical study considered and analyzed the impact on existing and proposed arrival, departure, and en route procedures for aircraft operating under both visual flight rules and instrument flight rules; the impact on all existing and planned public-use airports, military airports and aeronautical facilities; and the cumulative impact resulting from the studied structure when combined with the impact of other existing or proposed structures. The study disclosed that the described structure would have no substantial adverse effect on air navigation. An account of the study findings, aeronautical objections received by the FAA during the study (if any), and the basis for the FAA's decision in this matter can be found on the following page(s). If we can be of further assistance, please contact Robert van Haastert, at (907) 271-5863. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2012-WTW-5187-OE. Page 3 of 8 Signature Control No: 166981165-172541923 ( DNH -WT ) Sheri Edgett-Baron Manager, Obstruction Evaluation Group Attachment(s) Additional Information Map(s) Page 4 of 8 Additional information for ASN 2012-WTW-5187-OE AERONAUTICAL STUDY NO. 2012-WTW-5187-OE Abbreviations AGL - above ground level MSL - mean sea level RWY - runway IFR - instrument flight rules VFR - visual flight rules nm - nautical mile Part 77 - Title 14 CFR Part 77, Safe, Efficient Use and Preservation of the Navigable Airspace 1. LOCATION OF PROPOSED CONSTRUCTION The proposed 250 AGL/835 MSL wind turbine would be located approximately 10,994 feet southeast of the RWY 35 threshold at St. Mary's Airport (KSM), AK. KSM elevation: 312 MSL. It would be located southeast of Andreafsky Mountain on the top of the cliffs overlooking Pitkas Point. This proposal was previously studied as a 190 AGL wind turbine, aeronautical study number 2011- WTW-11803-OE. At 190 AGL, this proposal received a favorable FAA Determination. This new proposal is for a 60 foot increase in wind turbine height. 2. OBSTRUCTION STANDARDS EXCEEDED Section 77.17(a)(2) -- The transitional surface area designated to protect Category C and Category D aircraft traffic patterns and VFR aircraft transitioning to/from the enroute phase of flight. This proposed structure would exceed these transitional surfaces at KSM by 50 feet. Section 77.17(a)(3) -- A structure that causes less than the required obstacle clearance within a terminal obstacle clearance area, including an initial approach segment, a departure area, and a circling approach area resulting in increases to an IFR terminal minimum altitude. This proposed structure will penetrate the 40:1 departure surface in the initial climb area (ICA) by 28 feet. Section 77.19(b) -- A surface extending outward and upward from the periphery of the horizontal surface at a slope of 20:1 for a horizontal distance of 4,000 feet. This proposed structure would exceed the KSM conical surface by 324 feet. 3. EFFECT ON AERONAUTICAL OPERATIONS a. The impact on arrival, departure, and en route procedures for aircraft operating under VFR follows: The transitional surface area designated to protect Category C and Category D aircraft traffic patterns and VFR aircraft transitioning to/from the enroute phase of flight. This proposed structure would exceed these transitional surfaces at KSM by 50 feet. The KSM Airport Master Record can be viewed at http://www.gcr1.com/5010web/airport.cfm?Site=KSM. It states that there are eight (8) single engine aircraft based at KSM. For the 12 months ending 31 August 2005 (latest information) there were no reported operations. b. The impact on arrival, departure, and en route procedures for aircraft operating under IFR follows: None. The proposed structure would not increase any currently published climb gradient. The current Take-off Minimums and (Obstacle) Departure procedures for KSM can be viewed/downloaded at http://aeronav.faa.gov/ d-tpp/1207/AKTO.PDF. They are extracted below ST. MARYS (KSM) AMDT 1 87043 (FAA) Page 5 of 8 TAKE-OFF MINIMUMS: RWYs 6, 17, 24, 200-1. DEPARTURE PROCEDURE: RWYs 6, 17, 24, 35, climb straight ahead to 1000, continue climb on course. c. The impact on all planned public-use airports and aeronautical facilities follow: None. d. The cumulative impact resulting from the proposed construction or alteration of a structure when combined with the impact of other existing or proposed structures follows: None. 4. CIRCULATION AND COMMENTS RECEIVED The proposal was circularized for public comment on 23 July 2012 and one public comment was received from the State of Alaska, Department of Transportation and Public Facilities (DOT&PF) The State of Alaska DOT&PF would like to stress that the proposed increase in height is in an area that is transited by aircraft approaching St. Mary's Airport. Due to the proximity to the KSM and the height of the tower the State of Alaska DOT&PF request that, if the structure is increased in height, it be lit and/or the blades are painted a contrasting color to make them visible to low-flying aircraft. The FAA concurs that obstruction marking and lighting would be required, however, the wind turbine marking and lighting national standard does not include painted (aviation red) wind turbine blades. Painting wind turbine blades were evaluated and not deemed effective. Additionally, adding paint would impact the balance of the blades and this imbalance could cause the wind turbine blade to nick the wind turbine base and cause destruction. The national standard for marking and lighting wind turbines includes painting the structure white and during the hours of darkness, synchronized flashing red obstruction lights. 5. DETERMINATION - NO HAZARD TO AIR NAVIGATION It is determined that the proposed construction would not have a substantial adverse effect on the safe and efficient use of navigable airspace by aircraft. 6. BASIS FOR DECISION The proposed wind turbine structure would exceed the KSM Category C and Category D aircraft traffic patterns and VFR aircraft transitional surfaces by 50 feet. Additionally, the conical surface is exceeded by 324 feet and the 40:1 departure surface in the ICA would be exceed by 28 feet. However, the terrain also penetrates the conical surface by 74 feet. There are no IFR effects and there were no public objections to the proposal. The incorporation of obstruction marking and lighting will provide additional pilot conspicuity to address the VFR concerns and for pilots flying near this area. 7. CONDITIONS This structure shall be marked and lighted with white paint and red lights as outlined in chapters 4, 12, and 13 (Turbines) of Advisory Circular AC 70/7460-1K. The synchronization shall match with the other identified wind turbines in this project requiring synchronized red obstruction lights. The advisory circular is available online at https://oeaaa.faa.gov/oeaaa/external/content/AC70_7460_1K.pdf. It is also free of charge, from the Department of Transportation, Subsequent Distribution Office, SVC-121-23 Ardmore East Business Center, 3341 Q 75th Avenue, Landover, MD 20785 (301-322-4961; fax 301-386-5394) Within five days after the structure reaches its greatest height, proponent is required to file a FAA form 7460-2, Actual Construction notification, at the OE/AAA website (http://oeaaa.faa.gov). This Actual Construction notification will be the source document detailing the site location, site elevation, structure height, and date structure was built for the FAA to map the structure on aeronautical charts and update the national obstruction database. Page 6 of 8 -x- Page 7 of 8 TOPO Map for ASN 2012-WTW-5187-OE Page 8 of 8 Sectional Map for ASN 2012-WTW-5187-OE St. Mary’s/Pitkas Point Wind Energy Project Introduction Alaska Village Electric Cooperative, Inc. (AVEC) is proposing to install one 900 kW wind turbine in St.  Mary’s to the serve the communities of St. Mary’s and Pitkas Point.  As part of the project AVEC will also  upgrade the existing electrical distribution line between St. Mary’s and the wind turbine site.    St. Mary's is located on the north bank of the Andreafsky River, 5 miles from its confluence with the  Yukon River.  It lies 450 air miles west‐northwest of Anchorage. The City of St. Mary's encompasses the  Yup'ik villages of St. Mary's and Andreafsky. The community lies at approximately 62.053060° North  Latitude and ‐163.165830° West Longitude. (Sec. 26, T023N, R076W, Seward Meridian.  St. Mary’s has a  population of 554 (2011 DCCED Commissioner Certified Estimate).  Pitkas Point is located near the junction of the Yukon and Andreafsky Rivers, 5 road miles northwest of  St. Mary's on the Yukon‐Kuskokwim Delta. It lies 3 miles by road from the St. Mary's airport. The  community lies at approximately 62.032780° North Latitude and ‐163.287780° West Longitude. (Sec. 06,  T022N, R076W, Seward Meridian). Pitkas Point has a population of 93 (2011 Department of Labor  Estimate).  Purpose and Need St. Mary’s, which also supplies electricity to Pitkas Point, uses diesel fuel for electrical power generation,  heating oil for boiler and home heating, thermal heat recovered from the power plant for heating  community facilities, and diesel and gasoline for transportation needs.  The proposed project would add  one 900 kW wind turbine to supplement the existing the electrical power system.  The one turbine is  expected to produce approximately 26 percent of the electricity consumed by the villages.  This will  result in:   A reduction in diesel fuel use, up to 65,000‐gallons per year.  This equates a savings of about  $350,000 during its first year of operation (expected to be 2014), with savings increasing each  year.    A reduction in operation and maintenance costs.    Stabilized energy costs for both villages.   A reduction in fossil fuel emissions which results in improved air quality and decreased  contribution to global climate change.  In addition, excess energy from the wind turbines will be used to heat important community facilities,  decreasing the cost to operate those facilities and further reducing the consumption of heating oil in the  communities.  It is also a step forward in achieving state and federal renewable energy goals.  AVEC ‐ St. Mary’s/Pitkas Point Wind Energy Project    Page 2 Letters of support have been received from the City of St. Mary’s, the Tribal Council for the Yupiit of  Andreafski, the Nerklikmute Native Corporation, and the Pitka’s Point Village Council.    Project Description The site was selected based wind resource studies, its central location between communities  (approximately 2.5 miles southwest of St. Mary’s and 1 mile east of Pitkas Point), its proximity to the  existing power line, ease of access, and suitable foundation conditions.  Project figures are attached.   Installation of a 900 kW wind turbine will initially serve the already intertied communities of St. Mary’s  and Pitkas Point and at some future date the communities of Pilot Station and Mountain Village.  The  work will include the following primary components:   Gravel access road.  Approximately 1,275 feet long, 30 feet wide, and 4 feet thick. The road will  be constructed as an overlay section on the existing grade and consist of gravel from a local  borrow pit. Total fill quantity:  7,200 cubic yards,  total surface area: 1.4 acres.    Gravel pad for wind turbine. 150 feet by 250 feet, and 4 feet thick. Total fill quantity: 6,100  cubic yards, total surface area: 1.0 acres.   Wind turbine foundation (buried reinforced concrete foundation on bedrock).  Required  excavation: 610 cubic yards.   Surface area disturbed: 0.06 acres. (Note: This area is under and a  part of the gravel pad area.)   900 kW wind turbine.   50 meter hub height and 52 meter rotor diameter.    New 3‐phase overhead power line.  1,650 feet long from the proposed wind turbine to the  existing overhead power line between St Mary’s and the St. Mary’s airport.   Upgrade of the existing 2‐phase power line between St. Mary’s and the new wind turbine line.  This task will involve changing the framing on the existing power poles and installing a fourth  conductor. The existing poles will be reused. The total length of the upgrade is approximately  2.6 miles.   Secondary Load Controls.  Upgrades to the St Mary’s power plant or an adjacent building.            AVEC ‐ St. Mary’s/Pitkas Point Wind Energy Project    Page 3 Environmental Considerations The proposed site is  approximately 65 to 80  miles inland from the coast  line of Norton Sound.  It is  on a ridge line on the north  bank of the Andreafsky  River at its confluence with  the Yukon River. The  horizontal distance from  the site to the river is  approximately 1,200 feet,  The site is approximately  560 feet above the river at an elevation of 585 feet.   The USFWS National Wetlands Inventory indicates that the proposed site consists of Freshwater  Emergent wetlands (Figure attached).   According to the US Fish and Wildlife Service, Anchorage Field Office, Section 7 Consultation  Guide, there are no endangered or listed species, or federally designated critical habitat listed  near St. Mary’s, Pitkas Point, or Mountain Village.  A field investigation and subsurface exploration was conducted in October 2011. Tundra vegetation  covers the site with some taller brush along drainage areas, primary in the north end of site. The general  subsurface conditions at site consist of a thin surficial organic mat one to two feet thick, overlying wind‐ blown silt to a contact with shallow weathered bedrock. The highly fractured bedrock is weathered to  soil‐like fabric and has been logged as dense gravel with cobble size clasts with some silt. Surface water  was not noted during the geotechnical investigation.  Three test pits were excavated.    Test pit 1 is located nearest to the road and was excavated to 11 feet bgs. The upper two feet  consisted of soft, wet peat and organic silt. Ground water was observed at one foot deep in the  test pit near the permafrost contact. Frozen ice‐rich silt was observed to eight feet deep. Frozen  gravelly material with silt was observed between 8 and 11 feet deep and is interpreted as highly  fractured and weathered bedrock.    Test pit 2 was excavated to 12 feet bgs.  An unfrozen organic layer was observed in the upper  two feet, consisting of peat and organic silt. Frozen ice‐rich silt was observed to 9 feet bgs. Silty  gravel was observed between 9 and 11 feet, and is interpreted as highly fractured, weathered  bedrock.    Test pit 3 was excavated to a depth of 12 feet bgs. . An unfrozen organic layer consisting of peat  and organic silt was observed to 1 foot bgs, underlain by medium dense gravel sized material,  interpreted as highly fractured and weathered bedrock. Less fractured, weathered bedrock was  observed at 6 feet to 11 feet bgs, becoming harder between 11 and 12 feet bgs.   Proposed site    AVEC ‐ St. Mary’s/Pitkas Point Wind Energy Project    Page 4   Representative site conditions  between Airport Road and wind  turbine site.   AVEC ‐ St. Mary’s/Pitkas Point Wind Energy Project    Page 5 Representative view of slope  down to Andreafsky River  Representative conditions  near wind turbine site.  AVEC ‐ St. Mary’s/Pitkas Point Wind Energy Project    Page 6 Proposed Mitigation Statement This statement concludes that there is not a practicable alternative to the construction in wetlands for  the proposed project designated as “St. Mary’s/Pitkas Point Wind Energy Project,” and the proposed  action includes all practicable measures to minimize harm to wetlands.     Avoidance Local terrain is characterized by gently sloping hills covered with tundra, moss, grass, scattered patches  of dense willow brush and occasional black spruce.  Wetlands, ponds, and streams dominate the region.  Suitable sites for wind turbine installation are based on specific site selection criteria including exposure  to the prevailing wind resource, terrain features and orientation, compatibility with land uses, proximity  to electrical infrastructure, property boundaries, aviation and communication factors, and  environmental and community factors.  Based on these criteria, alternatives sites suitable for wind  generation are extremely limited.  Wind data was collected for more than a year to verify that sites are  suitable for development as a wind resource.  Two other sites were evaluated and determined to be  suitable; however, both also impacted similar terrain and either freshwater emergent or freshwater  forested shrub wetlands.    Minimization of Unavoidable Impacts  Rather than using three smaller turbines, as originally designed, the project will use a single 50  meter hub height and 52 meter rotor diameter turbine.  This minimizes the overall project  footprint.   Primary access is from an existing road and site development only requires a 1,275 foot long  driveway/access to the turbine.    The authorized limits of construction in wetlands will be clearly delineated with flagging, stakes,  construction fencing, and/or silt fencing prior to the initiation of any work in or adjacent to  wetlands. All equipment operators and laborers will be advised that there must be no  disturbance to areas beyond the delineated wetland boundaries.      The contractor will design, implement, and maintain appropriate and effective erosion,  sediment, and storm water controls, before, during and after construction.     All fills and disturbed areas subject to potential erosion will be permanently stabilized by  vegetation or other suitable means to prevent erosion and the introduction of sediments and/or  contaminants into surrounding wetlands beyond the authorized fill footprint.    No vehicles or equipment will be fueled or serviced in wetland or other aquatic areas within or  adjacent to the project footprint.  Fueling and service vehicles shall be equipped adequate  materials such as sorbent pads, booms, etc. to immediately contain and commence cleanup of  spilled fuels and other petroleum products.    The new 1,650 foot long overhead power line from the wind turbine to the existing power line  will have bird diverters.   The proposed design uses tubular supports (vs. lattice) and does not use guy wires. Both of  these features will minimize the potential for bird strikes.  AVEC ‐ St. Mary’s/Pitkas Point Wind Energy Project    Page 7  Red, or dual red and white strobe, strobe‐like, or flashing lights, not steady burning lights will be  used to meet Federal Aviation Administration (FAA) requirements for visibility lighting of wind  turbine.  Compensation for Unavoidable Impacts   Based upon the above facts and considerations, at this time it is determined that there is no practicable  alternative to the proposed construction in and adjacent to wetlands.  Wetlands dominate the area.   Impacted wetlands represent only a small fraction of the total wetland resources in the area and are not  unique.  Given that the project is a re‐newable energy resource, and will reduce dependence on diesel  fuel, associated bulk tank infrastructure, and potential adverse environmental impacts from spills,  additional compensatory mitigation is not proposed.   St. Mary's Wind Turbine Site Aug 27, 2012 This map is for general reference only. The US Fish and Wildlife Service is not responsible for the accuracy or currentness of the base data shown on this map. All wetlands related data should be used in accordance with the layer metadata found on the Wetlands Mapper web site. User Remarks: