Loading...
HomeMy WebLinkAboutSupporting Engineering Documents Project: Project #: Title: Engineer: Input Date:Tok Biomass12082ANCustomer Equip. ListNEK/DTR8/4/1212082ANTok BiomassJJE MJLDescription Manufacturer/Product ID Units Qty System Unit Cost Unit Labor Cost Total CostGeneral Demolition batch 1 Customer Connection $0 $500 $500Expansion Tank Taco ea 1 Customer Connection$595 $725 $725Air Separator Taco ea 1 Customer Connection$179 $249 $249Brazed Plate Heat Exchanger Trantor ea 1 Customer Connection$1,220 $1,655 $1,655Circulation Pump Taco ea 1 Customer Connection$765 $885 $885Pressure Guages Trerice ea 7 Customer Connection$53 $79 $553Double Check Valve Watts 009 ea 1 Customer Connection$765 $840 $840Pressure Reducing Valve Watts ea 1 Customer Connection$645 $685 $685Check Valve Nibco ea 1 Customer Connection$350 $435 $435Isolation Valve Nibco ea 9 Customer Connection$56 $122 $1,098Auto Air Vent & Isolation Valve Nibco ea 1 Customer Connection$299 $395 $395Drain Valve w/ Hose Connection Nibco ea 5 Customer Connection$13 $37 $186Balance Valve Taco ea 1 Customer Connection$75 $117 $1172-Way Control Valve Nibco/Honeywell ea 1 Customer Connection$845 $990 $990Thermostat Honeywell ea 1 Customer Connection$31 $111 $111Thermometer Trerice ea 4 Customer Connection$61 $88 $350Piping Insulation Johnson Mansville lf 60 Customer Connection$10 $5 $3001-1/2" Black Steel Arctic Pipe Fittings batch 1 Customer Connection$555 $781 $7811-1/2" Black Steel Fittings batch 1 Customer Connection$54 $151 $1511-1/2" Copper Fittings batch 1 Customer Connection$555 $781 $7811-1/2" Black Steel Pipe lf 20 Customer Connection$11 $27 $5401-1/2" Black Steel Arctic Pipe lf 180 Customer Connection$35 $50 $9,0001-1/2" Copper Pipe lf 40 Customer Connection$21 $36 $1,440Total Install Cost$7,192 $9,244 $22,267Notes / Assumptions:Use "RSMeans Mechanical Cost Data and RSMeans Plumbing Cost Data" - 2012 editions Sections include: Maintenance and Repair / Preventive Maintenance / General Maintenance (cleaning)Dollar Values Given are for "Total Costs, Including Overhead&Profit"City Multiplier = Fairbanks, AK, Weighted Avg = 119.1 = will use 150 for Tok.All cost values will be USD$, Estimate does not include administrative or permitting costs.Black Steel Arctic Pipe includes insulation, jacketting, trenching, and backfill.General Demolition includes demo work within the customers building.P:\2012\12082AN\Tok_Biomass_equip.xlsPage 1 of 1 Project: Tok Biomass StudyProject #: 12082ANTitle: Basis of Design CriteriaEngineer DTRInput Date: 6/25/2012Basis of Design CriteriaUnits CommentFluid50% Ethylene Glycol/50% Water MixtureProvides freeze protection down to -30F and burst protection to -60F. Do we need this much protection? There are some heat transfer and pumping viscocity penalties for using glycol.Glycol Supply Temp200 FMaximizing supply tempGlycol Return Temp160 FPuts us comfortably with in a 6" pipie size with plenty of room for growth.Glycol dT40 FA 60FdT would get us down to 240 GPM, but 3X the pumping energy and poor control at HX's.Maximum Heating Demand6400000 mmBTUFrom 6/8/12 Meeting w/ Dahlson. Typically the envelope heat loss in this climate is appox. 50 BTU/ft2/hr. This does not include DHW demand.Fluid Flowrate356.3 GPMFlow = Heat/dT*CpFluid Velocity3.8 FPSRough based on pipe size and flow rate.Fluid Pressure Drop0.9 Ft wgBased on pipe size and flow rate.Operating Pressure50.6 PSIGAssume 1 mile of distribution piping, additional 50% for fittings and valves, 10' for HX, 10' for balancing valve, 20' for boiler.Maximum Allowable Pressure150 PSIGBased on piping, valves, and HX'sMaximum Allowable Temp210 FDon't want Glycol to boil.Supply Size6 INCHESReturn Size6 INCHESPiping MaterialASTM A53 Grade B SteelStandard Carbon Steel, recommended preinsulated piping manufacturers; Permapipe, Rovanco, ThermacorInsulation Typeed Cell Polyisocyanurate or Polyeurethane Foam 2lb/ft3 densityEither prefabbed polyisocyanurate or field installed polyeurethaneInsulation Thickness3 INCHESHeatloss Approx. 20 BTU/ft/hr @ min 4' depth, 12 Btu/h.ft2.F/ft soil conductivity, 50F soil temp.Jacketing Material125mil HDPE ASTM D1248/D3350Thermal Expansion Controlpre-fabricated/insulated expansion elbows, Z-bends, loops, and anchors.Per Manufacturer's recommendations, avoid mechanical expansion joints if possible as they cannot be direct burried and are a maintenance issue.Notes:1. Installed minimum separation distance 2' CTC. 2. Trench bedding and pipe cover: A 4” layer of sand or fine gravel tamped in the bottom of the trench, evenlybackfilled with the same material in 6” compacted lifts to a minimum height of 6”above the top of the piping system. 3. Piping welded per ASME 31.1 Power piping code.4. Based on the above information we would use a 356.3 GPM pump at 50.6 PSIG of pressure loss. This would be equivelant to a B&G 80 3X3X7B with a 15 HP motor.P:\2012\12082AN Tok Biomass Study\Tok Biomass Calcs.xlsPage 1 of 1 Project: Tok BiomassProject #: 12082ANTitle: Yearly O&M Costs Per Customer ConnectionEngineer NEK/DTRInput Date: 8/4/2012Building Name Item QTY Units Cost Customer Cost Utility CostTypical BuildingExpansion Tank 1EA $20 $20 -Air Separator 1EA $20 $20 -Brazed Plate Heat Exchanger 1EA $82 - $82Circulation Pump 1EA $20 $20 -Pressure Guages 7EA $14 $14 $14Double Check Valve 1EA $20 $20 -Pressure Reducing Valve 1EA $20 $20 -Check Valve 1EA $10 $10 -Isolation Valve 9EA $10 $10 -Auto Air Vent & Isolation Valve 1EA $12 $12 -Drain Valve w/ Hose Connection 5EA $10 $10 -Balance Valve 1EA $12 $12 -2-Way Control Valve (w/ Actuator) 1EA $15 - $15Thermostat 1EA $10 - $10Thermometer 4EA $5 $5 -Piping Insulation 60LF $5 $5 -1-1/2" Black Steel Fittings 1BATCH $20 - $201-1/2" Black Steel Pipe 200LF $75 - $751-1/2" Copper Fittings 1BATCH $20 $20 -1-1/2" Copper Pipe 40LF $65 $65 -Total Cost/Yr$465 $263 $216Notes / Assumptions:Use "RSMeans Facilities Maintenance & Repair Cost Data" - 2012 edition Sections include: Maintenance and Repair / Preventive Maintenance / General Maintenance (cleaning)Dollar Values Given are for "Total Costs, Including Overhead&Profit"City Multiplier = Fairbanks, AK, Weighted Avg = 119.1 = will use 150 for Tok.All cost values will be $/yrAssume contract HVAC service at $100/hrP:\2012\12082AN\Tok Biomass OM costs.xlsxPage 1 of 1