Loading...
HomeMy WebLinkAboutFeature 23 - Drainage Tunnel/A\ CURRENT REV /'.IVJi V u n v J J E c r A Cl_� O'� 3: T _cD TIN N O O o� N cN m 0 0 � r O w o 75 -:I-- CD w J J •N 255 250 245 240 235 230 z 225 0 Q w J w 220 215 210 205 200 195 190 i 0 6" 1 FOOT SCALE 3"=1'-p„ 0 5 10 FEET SCALE A 1 "=5' ARCHITECTURAL I CIVIL ELECTRICAL I MECHANICAL SECTION A -A (DWG 109-23-001) DEVOLOPED PORTAL ELEVATION SCALE 1 "=5' 03-23-12 VAN ISSUED FOR BID DATE REV DESCRIPTION OF ISSUES & REVISIONS GEOTECHNICAL - 6 A MMMn\/IAA ATr I IA AITC` nr- INSTALL AS NEEDE (SEE NOTE r L .�L�.1 iviv u—u �uwu luy-,Z,�-uu1) SLOPE CUT SCALE 1 "=5' 1 ILLU llu I /'1J NECESSARY S ECTI 0 N A -A SCALE 3"=1 ' -0" I�fi IF A NOTCH MIN 1 „ DEPTH AT BOTH SIDES — --_ --'f It1_rr FILL ANNULUS WITH STRUCTURAL GROUT FIELD AS NECESSARY \ 1�" 2 SET ANGLE g0 L I NOTES: 1. CONTRACTOR MAY MODIFY ROCK SUPPORT DESIGN AS NEEDED WITH REVIEW BY RPR. 2. EXECUTE SCALING OF ROCK SLOPE AS DIRECTED BY RPR. AREA DELINEATED FOR SCALING IS APPROXIMATE. 3. ROCK FACES TO BE EVALUATED BY RPR DURING CONSTRUCTION. 4. INSTALL ROCK BOLTS AS DIRECTED BY RPR IMMEDIATELY AFTER SCALING IS COMPLETE AND ROCK SUPPORT REQUIREMENTS ARE CONFIRMED. FOR THE BASIS OF BID ASSUME EACH #8 ROCK BOLT IN PORTAL IS INSTALLED TO AN AVERAGE DEPTH OF 20 FEET. 5. INSTALL ADDITIONAL DRAIN HOLES ON THE PORTAL FACE AS DIRECTED BY RPR. 6. PROVIDE W4 STEEL RIBS OR OTHER PROTECTION MEASURES AS NEEDED FOR TEMPORARY ROCK FALL PROTECTION CANOPY OUTSIDE THE PORTAL. 7. SLOPE ROAD TO TRENCH DRAIN. 8. INSTALL 2" DIA DRAIN HOLES TO 10 FT DEPTH WITH 5° UPSLOPE INCLINATION. 9. REMOVE LOOSE BLOCK U/S OF PORTAL IN CONSULTATION WITH RPR. REMOVE ALL SCALED ROCK FROM THE PLUNGE POOL DURING DEWATERING FOR SCOUR WALL CONSTRUCTION. 10. CONTRACTOR DESIGNED TEMPORARY RETAINING WALL TO SUPPORT TEMPORARY ROAD FILL. 11. PROVIDE SS THREADED ANCHOR MEETING AISI 304 AND HILTI HY 150 ADHESIVE. LEGEND 1 /2" DIA SS x 9" ADH ANCHOR. �_I— EMBED A MINIMUM 6" IN SOUND 11 1 1 ROCK. (NOTE 1 1) Li Li 1 2 LEVEL AND PLUMB DETAIL 1 V—NOTCH SEEPAGE WEIR SCALE 3"=V-0" DESIGN ENGINEER DAIS D.M. JURICH 03-28-12 ANY ITEM TO WHICH A PROFESSIONAL ENGINEER HAS APPLIED THEIR SEAL UNDER THE "ARCHITECTS, ENGINEERS, LAND SURVEYORS, AND LANDSCAPE ARCHITECTS REGISTRATION ACT" (ALASKA STATUTE 'AS 08.48') MAY NOT BE ALTERED BY OTHER ANY PERSON, UNLESS HE IS ACTING UNDER THE DIRECTION OF OR IS A LICENSED PROFESSIONAL ENGINEER. THE ALTERING ENGINEER SHALL AFFIX TO THE ITEM THEIR SEAL, THE NOTATION "ALTERED BY", SIGNATURE, AND THE DATE OF SUCH ALTERATION, WITH A SPECIFIC DESCRIPTION OF THE ALTERATION IN THE REVISION AREA. NON COMPLIANCE IS A VIOLATION OF ALASKA STATUTE, TITLE 8, CHAPTER 48, SECTIONS 281, 291 & 295. DESIGN CHECKED BY DATE P.C. FRIZ 03-28-12 DRAWN BY DATE CREATED D.C. JOHNSTON 03-28-12 0HATCH ASSOCIATES CONSULTANTS, INC. HATCH DRAWING CHECKED BY DATE J.H. RUTHERFORD 03-28-12 DISCIPLINE LEAD ENGINEER DATE J.H. RUTHERFORD 03-28-12 CITY AND BOROUGH OF SITKA, ALASKA PROJECT ENGINEER DATE P.R. RODRIGUE 03-28-12 DJ KM PF BLUE LAKE EXPANSION PROJECT PROJECT MANAGER DATE S.M. HART 03-28-12 DRAFTING COORD COORD EN�R 5 1 4 1 3 1 2 0 #8 ROCK BOLT DRAIN HOLE DRAINAGE TUNNEL PORTAL ELEVATION DRAWING NUMBER 109-23-002 PROJECT No. A\ H332360 CURRENT 1 SAVED. 04-03-2012 1,19pm By JOHN64914 E FBI c n. A CV O N M O V O W F- C) O J 00 N 00 N O N V O L1J CD J N O N co O O W CD 0 W W