FINAL 40 FEET OF INTAKE TUNNEL TO BE EXCAVATED DURING
STATION GENERATION OUTAGE. EXCAVATED ROCK MAY BE
DISPOSED OF IN THE EXISTING TUNNEL UPSTREAM OF STATION
66+00 AT THE CONTRACTOR'S CONVENIENCE.
EXISTING HOIST HOUSE, CABLES, SHEAVES AND VENT PIPE WILL
REMAIN IN SERVICE PRIOR TO THE GENERATION OUTAGE.
CONTRACTOR SHALL PROTECT THESE ITEMS FROM DAMAGE. ANY
DAMAGE SHALL BE IMMEDIATELY REPAIRED.
ALL ACCESS ROADS SHALL BE CONSTRUCTED WITH SUPER
ELEVATION TOWARD THE INLAND SIDE SO THAT ROAD RUNOFF IS
COLLECTED AND ROUTED TO A DRAINAGE SUMP. NO ROAD
RUNOFF SHALL BE ALLOWED TO ENTER THE LAKE DURING
CONSTRUCTION. REFER TO EROSION AND SEDIMENTATION
CONTROL PLAN.
PORTAL ACCESS ROAD AND RELATED EXCAVATION, INCLUDING
EXISTING ROCK COFFERDAM ARE SHOWN FOR THE CONTRACTORS
INFORMATION. CONSTRUCTION OF PORTAL ACCESS ROAD AND THE
ROCK COFFERDAM AS SHOWN ARE NOT REQUIRED. CONTRACTOR
SHALL BE RESPONSIBLE FOR DEVELOPMENT OF ACCESS TO THE
PORTAL AND COFFERDAM ARRANGEMENT.
REFER TO DWG'S 109-05-005, 109-05-017 AND 109-05-018
FOR ADDITIONAL INFORMATION.
RESERVOIR ACCESS ROAD SHALL BE 15 FEET WIDE (MINIMUM)
AND PROVIDE CLEAR ACCESS TO THE LAKE AT ELEVATION 360.
= TUNNEL STA 65+07
INVERT ELEVATION = 171.6f
TUNNEL WORKPOINT COORDINATES
NUMBER
NORTHING
EASTING
ELEVATION
TWP 1
1913170.73
2380667.04
311.22
TWP2
1913154.15
2380614.77
430.20
TWP3
1 1912921.85
1 2379881.75
1 172.30
ARCHITECTURAL 1 CIVIL 1 ELECTRICAL 1 MECHANICAL 1 GEOTECHNICAL
DETAIL 1
TURNOUT
SCALE B
04-20-12 A ISSUED FOR BID
DATE REV DESCRIPTION OF ISSUES & REVISIONS
6
5
I
2
1 1
EXISTING HOIST
END OF
RESERVOIR
EXISTING MAX �� ( �/A )
CABLES, SHEAVES AND
ACCESS
ROAD START OF
POOL EL 3 ---EXISTING MIN
VENT PIPE (NOTE 2)
PORTAL ACCESS ROAD AT
PO EL 270
;TING H07OUSE
ROAD EL
360 (NOTE 6)
TE 2)
\ _
360 0
PLAN 0 30 60 FEET
SCALE A SCALE A
1 "=30'
DESIGN ENGINEER
DATE
ANY ITEM TO WHICH A PROFESSIONAL ENGINEER HAS APPLIED THEIR SEAL UNDER THE "ARCHITECTS, ENGINEERS, LAND SURVEYORS, AND
S.W. PERKINS
03-23-12
LANDSACTIINGGAPE UNDERCTHECTS DIRECTOINTOFION OR IST" (ALASKA A LICENSED STATUTE 'AS 08.48') MAY PROFESSIONALL ENGINEER. NOT BE ALTERED BY THEE ALTERING ENGINEER RANY PERSON, SHALL AFFIX TOUTHESS HTEMEIS
THEIR
"ALTERED
DESIGN CHECKED BY DATE
03-23-12
SEAL, THE NOTATION BY", SIGNATURE, AND THE DATE OF SUCH ALTERATION, WITH A SPECIFIC DESCRIPTION OF THE ALTERATION IN
THE REVISION NON COMPLIANCE A VIOLATION OF STATUTE, TITLE 8, CHAPTER SECTIONS 281, 291 295.
P. FRIZ
AREA. IS ALASKA 48, &
DRAWN BY DATE CREATED
M.L. CHARDSON 03-23-12
0 HATCH TM
HATCH ASSOCIA TES CONSULTANTS, INC.
CH
DRAWING CHECKED BY DATE
S.W. PERKINS
03-23-12
DISCIPLINE LEAD ENGINEER DATE
S.W. PERKINS 03-23-12 1 CITY AND BOROUGH OF SITKA, ALASKA
MLR SWP I PRR P.R. RODRIGUE 03-23-12
PROJECT MANAGER DATE
DRAFTING PRIME PR°I COORDS.M. HART 03-23-12
COORD COORD ENGR
2
BLUE LAKE EXPANSION PROJECT
3
2
DRAWING NUMBER
109-24-001
PORTAL
,ACCESS ROAD
(NOTE 4)
TWP 1
73+70,86
IIII 1 III
2glCK)
� EL 330
i EL 335
OTE 4)
r\/Ifl-rlLl % MALA
0 10 20 FEET
SCALE B
INTAKE TUNNEL
PLAN
PROJECT No. 4cuRER
H332360
1 SAVED: 04-20-201210:02am Bysuth64534
A
E
c
0
I1
N
N
O
CV
O
i
O
0
W
r
O
J
Q
0
0
0
CV
O
N
O
N
O
L.LJ
J
d
0
ANSI D
r-1
5
4
3
2
NOTES:
E
0
c
M.
Q�
Lp
CV O
r O
0
CV V
i N
O
CV C
� r
C:)w
o z
O w
J J
�o
Z)LU I IUIV U—U 109-24-002
SCALE A
04-20-12
A
ISSUED
FOR
BID
DATE
REV
DESCRIPTION OF ISSUES & REVISIONS
ARCHITECTURAL CIVIL ELECTRICAL MECHANICAL GEOTECHNICAL — I 6
0
5
DESIGN ENGINEER DATE
S.W. PERKINS 03-23-12
DESIGN CHECKED BY DATE
P. FRIZ 03-23-12
DRAWN BY DATE CREATED
M.L. RICHARDSON 03-23-12
DRAWING CHECKED BY DATE
S.W. PERKINS 03-23-12
DISCIPLINE LEAD ENGINEER DATE
S.W. PERKINS 03-23-12
MLR
SWP
PRR
PROJECT ENGINEER DATE
P.R. RODRIGUE 03-23-12
PROJECT MANAGER DATE
S.M. HART 03-23-12
DR G
COORD
PRI"'E
COORD
PR°
ENGR
2
'2 CL
1. TUNNEL ROCK SUPPORT DETAILS SHOWN ON DWG 109-90-004
AS DIRECTED BY THE RPR. THIS DRAWING SHOWS LINER
ARRANGEMENT WITH CLASS 3 ROCK SUPPORT. HYDRAULIC LINER
SECTIONS WITH THE SAME CONFIGURATION SHALL ALSO BE
INSTALLED IN AREAS OF CLASS 2 SUPPORT, AS DIRECTED BY THE
RPR.
2. BLOCKING BETWEEN STEEL SETS AND ROCK NOT SHOWN.
3. CONCRETE TO BE MIX C.
BLOCKING
(AS REQUIRED)
6'-0" (TYP)
SECTION C1-C1
SCALE A
ANY ITEM TO WHICH A PROFESSIONAL ENGINEER HAS APPLIED THEIR SEAL UNDER THE "ARCHITECTS, ENGINEERS, LAND SURVEYORS, AND
LANDSCAPE ARCHITECTS REGISTRATION ACT" (ALASKA STATUTE 'AS 08.48') MAY NOT BE ALTERED BY OTHER ANY PERSON, UNLESS HE IS
ACTING UNDER THE DIRECTION OF OR IS A LICENSED PROFESSIONAL ENGINEER. THE ALTERING ENGINEER SHALL AFFIX TO THE ITEM THEIR
SEAL, THE NOTATION "ALTERED BY", SIGNATURE, AND THE DATE OF SUCH ALTERATION, WITH A SPECIFIC DESCRIPTION OF THE ALTERATION IN
THE REVISION AREA. NON COMPLIANCE IS A VIOLATION OF ALASKA STATUTE, TITLE 8, CHAPTER 48, SECTIONS 281, 291 & 295.
0 HATCH HATCH ASSOCIATES CONSULTANTS, INC.
CITY AND BOROUGH OF SITKA, ALASKA
BLUE LAKE EXPANSION PROJECT
3
2
INSTALL
CONCRETE SLAB
W/ ROCK SUPPORT
(NOTE 1)
PRESSURE RELIEF
DRAIN (TYP)
0 2 4 FEET
SCALE A
4
INTAKE TUNNEL
HYDRAULIC LINER
CONCRETE AND REINFORCING
SECTIONS AND DETAIL
DRAWING NUMBER
109-24-004
PROJECT No. A'
H332360 RED
1 SAVED: 04-20-2012 9:59am By suth64534
A
C0
If
n
n
ANSI D
CURRENT
REV
II
LUMBER DECK
D 4"x10" PRESS
LUMBER CUT
c
M.
A
M
O �
oI�
N O
r O
0
N V
i N
N
N CT)� o
h'J T
CDw
o z
O w
-i J
n =
Y4" SS THREA
STATI O N
64+70
DC'DQ0NINICI (`DATINI(`
< AS REQUIRED TO
TE BEARING SURFACE
PLAN `I II j
32'-2"
17% SLOPE
(109-24-002)
iN� 13"
ARCHITECTURAL I CIVIL I ELECTRICAL I MECHANICAL
9'-03/»
8
GEOTECHNICAL
8'—OY»
2
SECTION 1 A-1 A
DETAIL 1 109-24-002
SCALE A
03-23-12 A ISSUED FOR BID
DATE REV DESCRIPTION OF ISSUES & REVISIONS
6
8'—Oy»
2
9'-05/»
8
NOTES:
1. ROCK TRAP EXCAVATION TO BE COMPLETED PRIOR TO GENERATION
OUTAGE. ROCK TRAP ERECTION TO BE COMPLETED DURING
GENERATION OUTAGE AND AFTER MUCKING ALL SPOILS FROM
EXCAVATION.
2. ATTACH PERSONNEL GRATING TO LUMBER WITH THROUGH BOLTING
PER GRATING SUPPLIER'S RECOMMENDED CONNECTIONS AND AT
SPACING OF NO GREATER THAN 2 FEET. GRATING SHALL HAVE
CONTINUOUS BANDING AT OUTSIDE EDGE.
3. ALL STRUCTURAL STEEL AND CONNECTION HARDWARE SHALL BE
HOT DIP GALVANIZED.
0 2 4 FEET
SCALE A
DESIGN ENGINEER DATE
S.W. PERKINS 03-23-12
ANY ITEM TO WHICH A PROFESSIONAL ENGINEER HAS APPLIED THEIR SEAL UNDER THE "ARCHITECTS, ENGINEERS, LAND SURVEYORS, AND
LANDSCAPE
TI GC UNDERCT ELCTS DIREC IONTOFTION OR IIST" (ALASKA A LCENSEDSTATUTE 'AS 08.48') MAY PROFESSIONAL ENGINEER .NOTHEEALTERED BY ALTERING ENGINNEERRANY SHALLPAFFIXONTOUTHESS HTEMEIS
ACTINGTHEIR
SEAL, THE NOTATION "ALTERED BY", SIGNATURE, AND THE DATE OF SUCH ALTERATION, WITH A SPECIFIC DESCRIPTION OF THE ALTERATION IN
THE REVISION AREA. NON COMPLIANCE IS A VIOLATION OF ALASKA STATUTE, TITLE 8, CHAPTER 48, SECTIONS 281, 291 & 295.
INTAKE TUNNEL
ROCK TRAP
DESIGN CHECKED BY DATE
P. FRIZ 03-23-12
DRAWN BY DATE CREATED
ON 03-2
M.L. RICKED
HATCH ASSOCIATES CONSULTANTS, INC.
RA HATCH
DRAWING CHECKED BY DATE
BY E
S.W. PERKINS 03-23-12
DISCIPLINE LEAD ENGINEER DATE
S.W. PERKINS 03-23-12
CITY AND BOROUGH OF SITKA, ALASKA
PROJECT ENGINEER DATE
P.R. RODRIGUE 03-23-12
MLR
SWP
PRR
BLUE LAKE EXPANSION PROJECT
DRAWING NUMBER
109-24-005
PROJECT No.
A
RAFTING
COORD
PRIME
COORD
PRO
ENGR
PROJECT MANAGER DATE
S.M. HART 03-23-12
H332360
CURRENT
5 1 4 1 3 1 2 1 1 SAVED: 03-22-2012 6:03pm By karc48563
A
C
I«
19
A
Q
m
0
0
CV
O
CV
O
CV
O
L.LJ
CD
J
d