HomeMy WebLinkAboutFeature 24 - Intake TunnelL L 0 c 0 I1 N O 0 o_ -o CV O r O O N V CV O CV 0-)i O ,'I- C:) w 75 o z O w J J n ANSI D 8 NOTES: 11 FINAL 40 FEET OF INTAKE TUNNEL TO BE EXCAVATED DURING STATION GENERATION OUTAGE. EXCAVATED ROCK MAY BE DISPOSED OF IN THE EXISTING TUNNEL UPSTREAM OF STATION 66+00 AT THE CONTRACTOR'S CONVENIENCE. EXISTING HOIST HOUSE, CABLES, SHEAVES AND VENT PIPE WILL REMAIN IN SERVICE PRIOR TO THE GENERATION OUTAGE. CONTRACTOR SHALL PROTECT THESE ITEMS FROM DAMAGE. ANY DAMAGE SHALL BE IMMEDIATELY REPAIRED. ALL ACCESS ROADS SHALL BE CONSTRUCTED WITH SUPER ELEVATION TOWARD THE INLAND SIDE SO THAT ROAD RUNOFF IS COLLECTED AND ROUTED TO A DRAINAGE SUMP. NO ROAD RUNOFF SHALL BE ALLOWED TO ENTER THE LAKE DURING CONSTRUCTION. REFER TO EROSION AND SEDIMENTATION CONTROL PLAN. PORTAL ACCESS ROAD AND RELATED EXCAVATION, INCLUDING EXISTING ROCK COFFERDAM ARE SHOWN FOR THE CONTRACTORS INFORMATION. CONSTRUCTION OF PORTAL ACCESS ROAD AND THE ROCK COFFERDAM AS SHOWN ARE NOT REQUIRED. CONTRACTOR SHALL BE RESPONSIBLE FOR DEVELOPMENT OF ACCESS TO THE PORTAL AND COFFERDAM ARRANGEMENT. REFER TO DWG'S 109-05-005, 109-05-017 AND 109-05-018 FOR ADDITIONAL INFORMATION. RESERVOIR ACCESS ROAD SHALL BE 15 FEET WIDE (MINIMUM) AND PROVIDE CLEAR ACCESS TO THE LAKE AT ELEVATION 360. = TUNNEL STA 65+07 INVERT ELEVATION = 171.6f TUNNEL WORKPOINT COORDINATES NUMBER NORTHING EASTING ELEVATION TWP 1 1913170.73 2380667.04 311.22 TWP2 1913154.15 2380614.77 430.20 TWP3 1 1912921.85 1 2379881.75 1 172.30 ARCHITECTURAL 1 CIVIL 1 ELECTRICAL 1 MECHANICAL 1 GEOTECHNICAL DETAIL 1 TURNOUT SCALE B 04-20-12 A ISSUED FOR BID DATE REV DESCRIPTION OF ISSUES & REVISIONS 6 5 I 2 1 1 EXISTING HOIST END OF RESERVOIR EXISTING MAX �� ( �/A ) CABLES, SHEAVES AND ACCESS ROAD START OF POOL EL 3 ---EXISTING MIN VENT PIPE (NOTE 2) PORTAL ACCESS ROAD AT PO EL 270 ;TING H07OUSE ROAD EL 360 (NOTE 6) TE 2) \ _ 360 0 PLAN 0 30 60 FEET SCALE A SCALE A 1 "=30' DESIGN ENGINEER DATE ANY ITEM TO WHICH A PROFESSIONAL ENGINEER HAS APPLIED THEIR SEAL UNDER THE "ARCHITECTS, ENGINEERS, LAND SURVEYORS, AND S.W. PERKINS 03-23-12 LANDSACTIINGGAPE UNDERCTHECTS DIRECTOINTOFION OR IST" (ALASKA A LICENSED STATUTE 'AS 08.48') MAY PROFESSIONALL ENGINEER. NOT BE ALTERED BY THEE ALTERING ENGINEER RANY PERSON, SHALL AFFIX TOUTHESS HTEMEIS THEIR "ALTERED DESIGN CHECKED BY DATE 03-23-12 SEAL, THE NOTATION BY", SIGNATURE, AND THE DATE OF SUCH ALTERATION, WITH A SPECIFIC DESCRIPTION OF THE ALTERATION IN THE REVISION NON COMPLIANCE A VIOLATION OF STATUTE, TITLE 8, CHAPTER SECTIONS 281, 291 295. P. FRIZ AREA. IS ALASKA 48, & DRAWN BY DATE CREATED M.L. CHARDSON 03-23-12 0 HATCH TM HATCH ASSOCIA TES CONSULTANTS, INC. CH DRAWING CHECKED BY DATE S.W. PERKINS 03-23-12 DISCIPLINE LEAD ENGINEER DATE S.W. PERKINS 03-23-12 1 CITY AND BOROUGH OF SITKA, ALASKA MLR SWP I PRR P.R. RODRIGUE 03-23-12 PROJECT MANAGER DATE DRAFTING PRIME PR°I COORDS.M. HART 03-23-12 COORD COORD ENGR 2 BLUE LAKE EXPANSION PROJECT 3 2 DRAWING NUMBER 109-24-001 PORTAL ,ACCESS ROAD (NOTE 4) TWP 1 73+70,86 IIII 1 III 2glCK) � EL 330 i EL 335 OTE 4) r\/Ifl-rlLl % MALA 0 10 20 FEET SCALE B INTAKE TUNNEL PLAN PROJECT No. 4cuRER H332360 1 SAVED: 04-20-201210:02am Bysuth64534 A E c 0 I1 N N O CV O i O 0 W r O J Q 0 0 0 CV O N O N O L.LJ J d 0 ANSI D r-1 5 4 3 2 NOTES: E 0 c M. Q� Lp CV O r O 0 CV V i N O CV C � r C:)w o z O w J J �o Z)LU I IUIV U—U 109-24-002 SCALE A 04-20-12 A ISSUED FOR BID DATE REV DESCRIPTION OF ISSUES & REVISIONS ARCHITECTURAL CIVIL ELECTRICAL MECHANICAL GEOTECHNICAL — I 6 0 5 DESIGN ENGINEER DATE S.W. PERKINS 03-23-12 DESIGN CHECKED BY DATE P. FRIZ 03-23-12 DRAWN BY DATE CREATED M.L. RICHARDSON 03-23-12 DRAWING CHECKED BY DATE S.W. PERKINS 03-23-12 DISCIPLINE LEAD ENGINEER DATE S.W. PERKINS 03-23-12 MLR SWP PRR PROJECT ENGINEER DATE P.R. RODRIGUE 03-23-12 PROJECT MANAGER DATE S.M. HART 03-23-12 DR G COORD PRI"'E COORD PR° ENGR 2 '2 CL 1. TUNNEL ROCK SUPPORT DETAILS SHOWN ON DWG 109-90-004 AS DIRECTED BY THE RPR. THIS DRAWING SHOWS LINER ARRANGEMENT WITH CLASS 3 ROCK SUPPORT. HYDRAULIC LINER SECTIONS WITH THE SAME CONFIGURATION SHALL ALSO BE INSTALLED IN AREAS OF CLASS 2 SUPPORT, AS DIRECTED BY THE RPR. 2. BLOCKING BETWEEN STEEL SETS AND ROCK NOT SHOWN. 3. CONCRETE TO BE MIX C. BLOCKING (AS REQUIRED) 6'-0" (TYP) SECTION C1-C1 SCALE A ANY ITEM TO WHICH A PROFESSIONAL ENGINEER HAS APPLIED THEIR SEAL UNDER THE "ARCHITECTS, ENGINEERS, LAND SURVEYORS, AND LANDSCAPE ARCHITECTS REGISTRATION ACT" (ALASKA STATUTE 'AS 08.48') MAY NOT BE ALTERED BY OTHER ANY PERSON, UNLESS HE IS ACTING UNDER THE DIRECTION OF OR IS A LICENSED PROFESSIONAL ENGINEER. THE ALTERING ENGINEER SHALL AFFIX TO THE ITEM THEIR SEAL, THE NOTATION "ALTERED BY", SIGNATURE, AND THE DATE OF SUCH ALTERATION, WITH A SPECIFIC DESCRIPTION OF THE ALTERATION IN THE REVISION AREA. NON COMPLIANCE IS A VIOLATION OF ALASKA STATUTE, TITLE 8, CHAPTER 48, SECTIONS 281, 291 & 295. 0 HATCH HATCH ASSOCIATES CONSULTANTS, INC. CITY AND BOROUGH OF SITKA, ALASKA BLUE LAKE EXPANSION PROJECT 3 2 INSTALL CONCRETE SLAB W/ ROCK SUPPORT (NOTE 1) PRESSURE RELIEF DRAIN (TYP) 0 2 4 FEET SCALE A 4 INTAKE TUNNEL HYDRAULIC LINER CONCRETE AND REINFORCING SECTIONS AND DETAIL DRAWING NUMBER 109-24-004 PROJECT No. A' H332360 RED 1 SAVED: 04-20-2012 9:59am By suth64534 A C0 If n n ANSI D CURRENT REV II LUMBER DECK D 4"x10" PRESS LUMBER CUT c M. A M O � oI� N O r O 0 N V i N N N CT)� o h'J T CDw o z O w -i J n = Y4" SS THREA STATI O N 64+70 DC'DQ0NINICI (`DATINI(` < AS REQUIRED TO TE BEARING SURFACE PLAN `I II j 32'-2" 17% SLOPE (109-24-002) iN� 13" ARCHITECTURAL I CIVIL I ELECTRICAL I MECHANICAL 9'-03/» 8 GEOTECHNICAL 8'—OY» 2 SECTION 1 A-1 A DETAIL 1 109-24-002 SCALE A 03-23-12 A ISSUED FOR BID DATE REV DESCRIPTION OF ISSUES & REVISIONS 6 8'—Oy» 2 9'-05/»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o. A RAFTING COORD PRIME COORD PRO ENGR PROJECT MANAGER DATE S.M. HART 03-23-12 H332360 CURRENT 5 1 4 1 3 1 2 1 1 SAVED: 03-22-2012 6:03pm By karc48563 A C I« 19 A Q m 0 0 CV O CV O CV O L.LJ CD J d