Loading...
HomeMy WebLinkAboutFeature 46 - FVU PowerhouseQ N co N O N N CYD LU CD n AM E C C C A a -- STEP-UP TRANSFORMER FENCE (TYP) CAMPGROUND TRANSFORMER a- - RETAINING WALL RETAINING WALL - RECLOSER UNIT — STATION SERVICE TRANSFORMER TAILRACE LADDER r� r co N N cz) r � 0 N co cn i cn � T ow o z o w J J ARCHITECTURAL CIVIL ELECTRICAL MECHANICAL GEOTECHNICALcl- - A 12'-6" UNIT HEATER (TYP) DC PANELBOARD OIL SEPARATOR BATTERY CHARGERS AC PANEL BOARD AC SUB - PANEL TERMINAL UPPER ACCESS BOARD Box DOOR TERMINAL BOX (RE -USED) L INVERTER ° 0 TAILRACE ACCESS WALKWAY 12'-6" ACCESS BULKHEAD I NEW EXHAUST FAN (EF-1 FVU) WITH BACKDRAFT DAMPER AND LOUVER LV-1 FVU (36" x36") WATER �rl HEATER n� 5'-2"f (� CROSSOVER ® WALKWAY I NEW TURBINE GENERATOR SET .N amm _ MEN RETAINING WALL 4A 109-46-003 PLAN SCALE A CROSSOVER WALKWAY _ (109-46-013) BATTERY RACK -! 'lllllllll�-- Innm!;;all ,� v I IIIII!dlll;ll ��" C ,I immm�m Illu;llullll � 11 lumil,!mi I �_ �= Ili �,iillllll LV-2FVU (NEW INTAKE LOUVER/DAMPER 04-20-12 A ISSUED FOR BID DATE REV DESCRIPTION OF ISSUES & REVISIONS 6 BULKHEAD /_ THRUST BLOCK BATTERY DISCONNECT SWI_ PENSTI PRESS NEW III\ BYPASS GUARD INLET VAL CONTROL BYPASS CONTROL STATION -BYPASS VALVE ENERGY DISSIPATING FITTING K.P. DARBY 03-23-12 DESIGN CHECKED BY DATE D.M. SUTHERLAND 03-23-12 DRAWN BY DATE CREATED M.L. RICHARDSON 03-23-12 DRAWING CHECKED BY DATE S.W. PERKINS 03-23-12 DISCIPLINE LEAD ENGINEER DATE S.W. PERKINS 03-23-12 PROJECT ENGINEER DATE P.R. RODRIGUE 03-23-12 MLR SWP PRR PROJECT MANAGER DATE S.M. HART 03-23-12 DRAFTING PRIME COORD PROJ ENGR 5 1 4 HANDRAILS SERVICE WATER (SW) (NOTE 7) NEW VACUUM BREAKER (NOTE 10) ° go rlure�i � I I p O o 0 0 �0 b o �'—� o 0 0 0 � II i II II II p i i II II II DRAIN (DR) NOTE 8 I I NEW BALL VALVE (V-920D) ;; T i II II 00 II II I NOTES: 1. ALL EQUIPMENT IS EXISTING EXCEPT AS NOTED. 2. FVU TURBINE EQUIPMENT BASED ON GILKES DRAWING 20678; REV 5; DATED 04/20/2011. 3. WORK INCLUDES: E - SALVAGE AND REMOVE EXISTING TURBINE - GENERATOR SET, INLET VALVE AND EXHAUST FAN. - DEMOLITION AND NEW CONCRETE ASSOCIATED WITH UNIT INSTALLATION. - INSTALLATION OF OWNER SUPPLIED (CONTRACT 1) TURBINE -GENERATOR SET WITH INLET VALVE AND DRAFT TUBE. - REUSE GENERATOR TERMINAL BOX. - SUPPLY AND INSTALLATION OF MISCELLANEOUS METALS. 4. DEMOLISH EXISTING DRAFT TUBE (DT). DEMOLISH EXISTING CONCRETE TO SUIT NEW DRAFT TUBE. INSTALL NEW DRAFT TUBE. 5. CONCRETE SHALL BE MIX C (UON) D 6. FIELD VERIFY DIMENSION, TO ACCOMMODATE PROPER CLEARANCES BETWEEN THE UNIT'S CLEAN OUT AND MANHOLE FLANGES, PRIOR TO MOUNTING THE CROSSOVER WALKWAY FRAME TO THE FLOOR. 7. FURNISHED UNDER CONTRACT No.1, INSTALLED UNDER CONTRACT No.9. 8. ROUTE PIPING AS CLOSE TO UNIT AS POSSIBLE SO AS NOT TO INTERFERE WITH ACCESS. PROVIDE UNIONS OR MECHANICAL CONNECTIONS AS NECESSARY TO ALLOW FOR REMOVAL IF NECESSARY TO MAINTAIN THE TURBINE AND/OR GENERATOR. 9. REPLACE EXISTING ISOLATION VALVE. ADD 90• ELBOW TO AVOID INTERFERNCE WITH INLET VALVE COUNTER WEIGHT. 10. FURNISH AND INSTALL VACUUM BREAKER AT HIGH POINT IN PIPING. KADANT JOHNSON SERIES V138 OR EQUAL. INSTALL 8'-0" ABOVE FINISHED FLOOR. SERVICE WATER (SW) (NOTE 7) ANY ITEM TO WHICH A PROFESSIONAL ENGINEER HAS APPLIED THEIR SEAL UNDER THE "ARCHITECTS, ENGINEERS, LAND SURVEYORS, AND LANDSCAPE ARCHITECTS REGISTRATION ACT" (ALASKA STATUTE 'AS 08.48') MAY NOT BE ALTERED BY OTHER ANY PERSON, UNLESS HE IS ACTING UNDER THE DIRECTION OF OR IS A LICENSED PROFESSIONAL ENGINEER. THE ALTERING ENGINEER SHALL AFFIX TO THE ITEM THEIR SEAL, THE NOTATION "ALTERED BY", SIGNATURE, AND THE DATE OF SUCH ALTERATION, WITH A SPECIFIC DESCRIPTION OF THE ALTERATION IN THE REVISION AREA. NON COMPLIANCE IS A VIOLATION OF ALASKA STATUTE, TITLE 8, CHAPTER 48, SECTIONS 281, 291 & 295. 0 HATCH HATCH ASSOCIA TES CONSULTANTS, INC. CITY AND BOROUGH OF SITKA, ALASKA IIIIIIIIIIIIIIIIIIIN[9 NEW SERVICE WATER ISOLATION VALVE V-919W (NOTE 9) 000 NEW STRAINER (FURNISHED UNDER CONTRACT No.1) 0 4 8 FEET SCALE A "=1'-0„ 4 FVU POWERHOUSE GENERAL ARRANGEMENT PLAN DRAWING NUMBER BLUE LAKE EXPANSION PROJECT 109-46-002 3 1 2 w ­1A PROJECT No. A H332360 CURRENT REV 1 SAVED: 04-19-2012_3:12pm By suth64534 W 7 1.1 4 I 3 2 E 1 N C I I B 1 I I 3 2 1 A B C 7 *2,_6IF 9, _ 1 1 8„ 4 CROSSOVER WALKWAY (NOTE 3) UNIT UNIT I TERMINAL BOX RECLOSER NEW TURBINE" 2'-111y6" 6'-8" f (RE —USED) HOIST MONORAIL __ _ NEW _TURBINE__ __ __ ENERGY DISSIPATING CONTROL -- I -- -- -- -- NEW TERMINAL BOX HOIST 1Y" BYPASS VALVE FITTING ° PANELS INLET VALVE (RE —USED) TERMINAL NEW ° o o Box GENERATOR 6 -6Y2 SUMP ' -- I I N o BYPASS EL-158.00 ° UNIT 6' UNIT EL 156.7604 EL 15 .7604 I- I' 1 I I EL 154.40 *TIE IN WP EL 156.33 I EL 153.14 EL 153.43 c° EL 153.43 ° IIII I NEW RESTRAINED EL 152.0 � 1 I ���, I_-_, fir_-- ' FLEXIBLE COUPLING II II ' III ili ° III �_=_� i ' EL 152.00 i l ° d d III ° 7 7° °I I I ° I I � ° I �° J ° ° d d ° d ° d d d i ° NEW CONCRETE BASE ° d Q EL 149.00 ° -- -- ° -- -- a -- AND ANCHORS FOR ° NORMAL WS ° d d ° a a INLET VALVE NEW CONCRETE BASE ° EL 147.0 ° 12" AMP (SLOTTED d4 ° d� NEW CONCRETE BASE AND ANCHORS FOR I = d ON TOP) a TURBINE AND ANCHORS FOR ° STOP LOG GUIDES d a d a ° ° d ° ° d TURBINE d ° d d a d � d ° ° d ° d DRAFT TUBE d ° d d I ° a EL 141.0 d TAILRACE d a ° a ° a ° ° a ° d d Q ° ° d d In ° * FIELD MEASURED ON 1 1-04-2010 SECTION A -A 109-46-002 SECTION B-B 109-46-002 SCALE A SCALE A -- -- -- -- -- -- -- — -- -- -- -- -- -- -- VACUUM VACUUM BREAKER LBREAKER TERMINAL EL 160 , EL 160 , 1 , , BOX J o771 0 Mt3 s r—Z I � Z/_ Ea- 0— — — I— — I 0 1 I 1 0 0 0 SERVICE WATER (SW) 0 ° ° V-920D I SERVICE WATER (SW) 1 , DRAIN (DR) fat Q 1 DRAIN (DR) IIll Jill 1 I IF- �STRAINER�11�1, _ a III III III III a�IL NE / 7Lu (FURNISHED UNDER LJ LJ LJ a LJ a LJ a I a a CONTRACT N0.1) �n a' Q I IL I I I Q Q LJ Q LJ Q . Q . -- ^ -- -- -- -- -- -- -- -- -- -- -- --� CV C�? CjTI N cZD r � 0 N c9 o a, N p : r CDw o z CDw J J ARCHITECTURAL CIVIL ELECTRICAL MECHANICAL GEOTECHNICAL - 04-20-12 q ISSUED FOR BID DATE REV DESCRIPTION OF ISSUES & REVISIONS 6 DESIGN ENGINEER DATE K.P. DARBY 03-23-12 DESIGN CHECKED BY DATE D.M. SUTHERLAND 03-23-12 DRAWN BY DATE CREATED M.L. RICHARDSON 03-23-12 DRAWING CHECKED BY DATE S.W. PERKINS 03-23-12 DISCIPLINE LEAD ENGINEER DATE S.W. PERKINS 03-23-12 PROJECT ENGINEER DATE P.R. RODRIGUE 03-23-12 MLR SWP PRR PROJECT MANAGER DATE S.M. HART 03-23-12 °CORD 1PCRF EN0R 5 14 ANY ITEM TO WHICH A PROFESSIONAL ENGINEER HAS APPLIED THEIR SEAL UNDER THE "ARCHITECTS, ENGINEERS, LAND SURVEYORS, AND LANDSCAPE ARCHITECTS REGISTRATION ACT" (ALASKA STATUTE 'AS 08.48') MAY NOT BE ALTERED BY OTHER ANY PERSON, UNLESS HE IS ACTING UNDER THE DIRECTION OF OR IS A LICENSED PROFESSIONAL ENGINEER. THE ALTERING ENGINEER SHALL AFFIX TO THE ITEM THEIR SEAL, THE NOTATION "ALTERED BY", SIGNATURE, AND THE DATE OF SUCH ALTERATION, WITH A SPECIFIC DESCRIPTION OF THE ALTERATION IN THE REVISION AREA. NON COMPLIANCE IS A VIOLATION OF ALASKA STATUTE, TITLE 8, CHAPTER 48, SECTIONS 281, 291 & 295. HATCH HATCH ASSOCIATES CONSULTANTS, INC. -0 CITY AND BOROUGH OF SITKA, ALASKA NOTES: 1. FVU TURBINE EQUIPMENT BASED ON GILKES DRAWING 20678; REV 5; DATED 04/20/2011. 2. ALL EQUIPMENT IS EXISTING EXCEPT AS NOTED. 3. FIELD VERIFY DIMENSION, TO ACCOMMODATE PROPER E CLEARANCES BETWEEN THE UNIT'S CLEAN OUT AND MANHOLE FLANGES, PRIOR TO MOUNTING THE CROSSOVER WALKWAY FRAME TO THE FLOOR. 4. COOLING WATER PIPING IS PRELIMINARY. REFER TO REFERENCE DOCUMENTS (GILKES DRAWINGS). LEGEND EXISTING CONCRETE IN SECTION 1ST STAGE (NEW PRIMARY) CONCRETE IN SECTION (NOTE 6, DWG 109-46-01 1) 0 4 8 FEET SCALE A 4 FVU POWERHOUSE GENERAL ARRANGEMENT SECTIONS DRAWING NUMBER BLUE LAKE EXPANSION PROJECT 109-46-003 3 1 2 PROJECT No. A� H332360 G REVNT 1 SAVED: 04-20-2012 11:32am By rich220533 C Cf' U1 Q N O N O N co N c+m 0 0 LU 0 Q N O N O N co N c+m 0 0 LU 0 N N O N CV CYD LU O J n ANSI D CURRENT REV II B UNIT CROSSOVER WALKWAY D 5'-2' t - NOTE 3 OIT.O. GRATING EL 157.33 HR, 1y2" Sl PIPE (TYP) C801.5 (TYP; B IT.O. FLOOR EL 152.00 A N � N � 0 N � 6, CV O c" r CDw 75 o z O w —i J n= ARCHITECTURAL I CIVIL VIEW A -A ELECTRICAL REMOVABLE HR T 1)/2" ALUM. 1)/2" STD PIPE REMOVABLE GRATING (NOTE 4) UNIT HSS3x3x/4 SUPPORT POST HSS3x3 (4) TOTAL 3 i s" 5 THREADS_ C� 45/6 = 1,-9/6» r*A C8x 1 1.5 C8x 1 1.5 B HR, 1)/2"0 STD PIPE (TYP) L*A C8x 1 1.5 C8x 1 1.5 TOE PL y4"x4" (TYP) DETAIL 3 7 PLAN (NOTE 3) T.O. GRATING EL 157.33 " ALUM. MOVABLE ATING (NOTE 4) S3x2X1/4 S3x2x1/4 %" DIA ANCHOR BOLT AB1 (TYP) (NOTE 5) /" (TYP) LMBEDMENT NOTE: CW1. SHOP WELDED FRAME TO BE GALVANIZED (NOTE 1). PROVIDE PROPER VENT HOLES, PRIOR TO GALVANIZING. CROSSOVER WALKWAY DETAIL 109-46-002 SCALE A SECTION B-B 03-23-12 VAN ISSUED FOR BID DATE REV I DESCRIPTION OF ISSUES & REVISIONS MECHANICAL GEOTECHNICAL - 6 EMBEDMENT 1/4" DIA SS PIN BENT PL 1/4" B REMOVABLE HR 1y2" STD PIPE r" l �116" DIA HSS3x3 SUPPOR PL Y "xF K.P. DARBY 03-23-12 DESIGN CHECKED BY DATE D.M. SUTHERLAND 03-23-12 DRAWN BY DATE CREATED M.L. RICHARDSON 03-23-12 DRAWING CHECKED BY DATE S.W. PERKINS 03-23-12 DISCIPLINE LEAD ENGINEER DATE S.W. PERKINS 03-23-12 PROJECT ENGINEER DATE P.R. RODRIGUE 03-23-12 MLR SWP PRR PROJECT MANAGER DATE S.M. HART 03-23-12 D COORD COORD PRIME COORD PRG ENGR 5 14 3/16 PLAN r*A 1 4" 2" _ BENT PL Y4" --/ L+A 1 - ELEVATION HSS3x3X/4 SUPPORT POST R=1 I REMOVABLE HR 1y2" STD PIPE "3/ 16 SECTION Al -Al DETAIL 1 REMOVABLE HANDRAIL CONNECTION SCALE B ANCHOR BOLTS (AB 1) (NOTE 5) � X i BENT PL 4" 5/s" DIA HOLE FOR 1/4" DIA SS PIN (TYP) DETAIL BP-1 SCALE B ANY ITEM TO WHICH A PROFESSIONAL ENGINEER HAS APPLIED THEIR SEAL UNDER THE "ARCHITECTS, ENGINEERS, LAND SURVEYORS, AND LANDSCAPE ARCHITECTS REGISTRATION ACT" (ALASKA STATUTE 'AS 08.48') MAY NOT BE ALTERED BY OTHER ANY PERSON, UNLESS HE IS ACTING UNDER THE DIRECTION OF OR IS A LICENSED PROFESSIONAL ENGINEER. THE ALTERING ENGINEER SHALL AFFIX TO THE ITEM THEIR SEAL, THE NOTATION "ALTERED BY", SIGNATURE, AND THE DATE OF SUCH ALTERATION, WITH A SPECIFIC DESCRIPTION OF THE ALTERATION IN THE REVISION AREA. NON COMPLIANCE IS A VIOLATION OF ALASKA STATUTE, TITLE 8, CHAPTER 48, SECTIONS 281, 291 & 295. HATCH HATCH ASSOCIATES CONSULTANTS, INC. _0 CITY AND BOROUGH OF SITKA, ALASKA BLUE LAKE EXPANSION PROJECT 3 1 2 NOTES: 1. REFER TO DWG 109-01-011 FOR CIVIL/STRUCTURAL GENERAL NOTES. 2. REFER TO DWG 109-90-002 FOR CIVIL/STRUCTURAL STAIR CONNECTION AND FRAMING DETAILS. E 3. REFER TO DWG'S 109-46-002 AND 109-46-003 FOR CROSSOVER WALKWAY LOCATION. 4. CROSSOVER WALKWAY (STAIR AND GRATING REQUIREMENTS) A. FLOOR GRATING SHALL BE ALUMINUM RECTANGULAR BAR GRATING, TYPE GAL 11/2"x3/6" BEARING BARS SPACED AT 1 16" C—C AND CROSS BARS SPACED AT 4" C—C, AS MANUFACTURED BT McNICHOLS, OR APPROVED EQUAL. B. GRATING SHALL BE ATTACHED TO SUPPORTING STEEL MEMBERS WITH STANDARD STEEL SADDLE CLIPS, PER THE GRATING MANUFACTURERS SPECIFICATIONS. C. CUT EDGES OF GRATING SHALL BE BANDED. D. STAIR TREADS SHALL BE TYPE GW, 1Y4" x 16" STEEL SERRATED WELDED GRATING WITH CHECKERED PLATE NOSING. STAIR TREADS SHALL BE GALVANIZED. D E. ALL GRATING STAIR TREADS SHALL BE BOLTED IN PLACE. 5. CONCRETE ANCHOR (AB1) SHALL BE HIT —RE 500 EPDXY BOLTS JTS OF ksi) AS 0 6"" 1 FOOT SCALE B 3"=1'-p„ 0 2 4 FEET SCALE A 4 FVU POWERHOUSE CROSSOVER WALKWAY DETAILS DRAWING NUMBER 109-46-013 PROJECT No. A\ H332360 FE`' 1 SAVED: 03-26-2012 8:27am By suth64534 A L A N N N 0 w 0 J