Grant Application
SECTION 1 -APPLICANT INFORMATION
Name (Name of utility, IPP, or government entity submitting proposal)
The Lake and Peninsula Borough
Type of Entity: Borough Fiscal Year End: June 30
Tax 10 # 92-0128922
Tax Status: For-profit or _x_non-profit (check one)
Mailing Address Physical Address
PO Box 495 King Salmon, AK 99613 100 Jensen Road, King Salmon, AK 99613
Telephone Fax Email
907-246-3421 907-246-6602 iordankeeler®lakeandoen.com
1.1 APPLICANT POINT OF CONTACT I GRANTS MANAGER
Name Title
Jordan Keeler Community Development Coordinator
Mailing Address
PO Box 495 King Salmon AK 99613
Telephone Fax Email
907-246-3421 907-246-6602 jordankeeler@lakeandpen.com
1.2 APPLICANT MINIMUM REQUIREMENTS
Please check as appropriate. If you do not to meet the minimum applicant requirements, your
application will be rejected.
1.2.1 As an Applicant, we are: (put an X in the appropriate box)
An electric utility holding a certificate of public convenience and necessity under AS
42.05, or
An independent power producer in accordance with 3 MC 107.695 (a) (1), or
X A local government, or
A governmental entity (which includes tribal councils and housing authorities);
Yes 1.2.2 Attached to this application is formal approval and endorsement for its project by
or its board of directors, executive management, or other governing authority. If the
No applicant is a collaborative grouping, a formal approval from each participant's
governing authority is necessary. (Indicate Yes or No in the box )
Yes 1.2.3 As an applicant, we have administrative and financial management systems and
or follow procurement standards that comply with the standards set forth in the grant
No agreement.
Yes 1.2.4 If awarded the grant, we can comply with all terms and conditions of the attached
or grant form. (Any exceptions should be clearly noted and submitted with the
No application.)
Yes 1.2.5 We intend to own and operate any project that may be constructed with grant
or funds for the benefit of the general public. If no please describe the nature of the
No project and who will be the primary beneficiaries.
AEA 13-006 Grant Application Page 2 of20 7/3//2012
Renewable Energy Fund Round 6
Grant Application
SECTION 2 -PROJECT SUMMARY
-:' ..::·
-ENERGY AUTHORITY
This is intended to be no more than a 1-2 page overview of your project.
2.1 Project Title-(Provide a 4 to 5 word title for your project)
Egegik Wind Feasibility Study
2.2 Project Location -
Include the physical location of your project and name( s) of the community or communities that will
benefit from your project in the subsections below.
2.2.1 Location of Project -Latitude and longitude, street address, or community name.
Latitude and longitude coordinates may be obtained from Google Maps by finding you project's location on the map
and then right clicking with the mouse and selecting 'What is here? The coordinates will be displayed in the Google
search window above the map in a format as follows: 61. 195676.-149.898663. If you would like assistance obtaining
this information please contact AEA at 907-771-3031.
City of Egegik located on the King Salmon River approximately 330 miles SW of Anchorage
2.2.2 Community benefiting-Name(s) of the community or communities that will be the
beneficiaries of the project.
City of Egegik
2.3 PROJECT TYPE
Put X in boxes as appropriate
2.3.1 Renewable Resource Type
X Wind Biomass or Biofuels
Hydro, including run of river Transmission of Renewable Energy
Geothermal, including Heat Pumps Small Natural Gas
Heat Recovery from existing sources Hydrokinetic
Solar Storage of Renewable
Other (Describe)
2.3.2 Proposed Grant Funded Phase(s) for this Request (Check all that apply)
Pre-Construction Construction
X Reconnaissance Design and Permitting
Feasibility Construction and Commissioning
Conceptual Design
2.4 PROJECT DESCRIPTION
Provide a brief one paragraph description of your proposed project.
AEA 13-006 Grant Application Page 3 of 20 713//2012
Renewable Energy Fund Round 6
Grant Application
The Lake and Peninsula Borough seeks funding to conduct a wind reconnaissance study on the
behalf of the City of Egegik. The project will consist of the installation of a needed 1 0-meter or
30-meter, whichever is appropriate, wind tower within the city to gather one year of wind data.
The wind data will be analyzed by a professional firm that specializes in the interpretation of
wind data. Following the completion of the data gathering, the firm will prepare a report that will
give the LPB and Egegik an indication on whether or not the wind resources merit a feasibility
study on the eventual construction of a wind turbine.
AEA 13-006 Grant Application Page 4 of20 7/3//2012
Renewable Energy Fund Round 6
Grant Application
2.5 PROJECT BENEFIT
ENERGY AUTHORITY
Briefly discuss the financial and public benefits that will result from this project, (such as reduced fuel
costs, lower energy costs, etc.)
Egegik currently pays $.90/kWh before PCE and .60/kWh with PCE. These costs are a
tremendous burden on residential, governmental and other users. The development of any
commercial or industrial activity is cost-prohibitive at these levels. The project will allow the LPB
and Egegik to decide if pursing a wind feasibility study is cost-effective. The LPB and Egegik are
both willing to contribute funds to further study if the results are positive.
2.6 PROJECT BUDGET OVERVIEW
Briefly discuss the amount of funds needed, the anticipated sources of funds, and the nature and source
of other contributions to the project.
The project budget for the wind reconnaissance study is $90,000 and the LPB will supply an in-
kind contribution of $10,000 in managerial and financial oversight.
2.7 COST AND BENEFIT SUMARY
Include a summary of grant request and your project's total costs and benefits below.
Grant Costs
(Summary of funds requested)
2.7.1 Grant Funds Requested in this application. $80,000
2.7.2 Cash match to be provided $0
2.7.3 In-kind match to be provided $10,000
2.7.4 Other grant applications not yet approved $
2.7.5 Total Grant Costs (sum of 2.7.1 through 2.7.3) $90,000
Project Costs & Benefits
(Summary of total project costs including work to date and future cost estimates to get to a fully
operational project)
2.7.6 Total Project Cost (Summary from Cost Worksheet $90,000
including estimates through construction)
2.7.7 Estimated Direct Financial Benefit (Savings) $0
2.7.8 Other Public Benefit (If you can calculate the benefit in $0
terms of dollars please provide that number here and
explain how you calculated that number in your application
AEA 13-006 Grant Application Page 5 of 20 7/3//2012
Renewable Energy Fund Round 6
Grant Application
(Section 5.)
AEA 13-006 Grant Application Page 6 of20
~
~ >ENERGY AUTHORITY
7/3//2012
Renewable Energy Fund Round 6
Grant Application
SECTION 3 -PROJECT MANAGEMENT PLAN
>ENERGY AUTHORITY
Describe who will be responsible for managing the project and provide a plan for successfully
completing the project within the scope, schedule and budget proposed in the application.
3.1 Project Manager
Tell us who will be managing the project for the Grantee and include contact information, a
resume and references for the manager(s). If the applicant does not have a project manager
indicate how you intend to solicit project management support. If the applicant expects project
management assistance from AEA or another government entity, state that in this section.
Project management will be the responsibility of the Lake and Peninsula Borough. Borough
Manager Lamar Cotten will be the project manager. His resume is attached with this application.
Please fill out form provided below. You may add additional rows as needed.
Start End
Milestones Tasks Date Date
Project Start Sign paperwork with AEA 6/2013 6/2013
Contractor Selection Develop and submit RFP for bids 6/2013 6/2013
Tower construction Installation of wind monitor in Egegik 7/2013 7/2013
Data collection Monitor wind data in Egegik 7/2013 7/2014
Final Report Produce pre-feasibility report 7/2014 8/2014
Project Completion Submit report and final paperwork to AEA 8/2014 8/2014
AEA 13-006 Grant Application Page 7 of20 7/3//2012
Renewable Energy Fund Round 6
Grant Application
3.3 Project Resources
. illlllir
~··· ~c ; ENERGY AUTHORITY
Describe the personnel, contractors, accounting or bookkeeping personnel or firms, equipment,
and services you will use to accomplish the project. Include any partnerships or commitments
with other entities you have or anticipate will be needed to complete your project. Describe any
existing contracts and the selection process you may use for major equipment purchases or
contracts. Include brief resumes and references for known, key personnel, contractors, and
suppliers as an attachment to your application.
Project will be accomplished using a contractor selected by RFP. Thus, the expertise will be
determined in response to the RFP. Key members of Borough staff and Borough contractors will
review the bids and monitor the progress of any contractor.
3.4 Project Communications
Discuss how you plan to monitor the project and keep the Authority informed of the status.
Please provide an alternative contact person and their contact information.
The contractor will be required to submit monthly reports to the LPB. Monthly reports will be
included in the quarterly reports.
3.5 Project Risk
Discuss potential problems and how you would address them.
There is a low potential for risks in this project. The AEA 's maps indicate a Class V wind regime in the
area of Egegik and wind reconnaissance studies are a common practice across the state.
AEA 13-006 Grant Application Page 8 of20 7/3//2012
Renewable Energy Fund Round 6
Grant Application
SECTION 4-PROJECT DESCRIPTION AND TASKS
··-=·· -~·
• The level of information will vary according to phase(s) of the project you propose to
undertake with grant funds.
• If some work has already been completed on your project and you are requesting funding for
an advanced phase, submit information sufficient to demonstrate that the preceding phases
are satisfied and funding for an advanced phase is warranted.
4.1 Proposed Energy Resource
Describe the potential extent/amount of the energy resource that is available.
Discuss the pros and cons of your proposed energy resource vs. other alternatives that may be
available for the market to be served by your project. For pre-construction applications, describe
the resource to the extent known. For design and permitting or construction projects, please
provide feasibility documents, design documents, and permitting documents (if applicable) as
attachments to this application.
Wind is the sole alternative energy source for Egegik and AEA maps indicate it is located in a
Class V wind regime. Communities in the region, Port Heiden and Pilot Point, have
demonstrated wind regimes that make wind power economical. Biomass, solar, and hydro are
not present in quantities that approach wind.
4.2 Existing Energy System
4.2.1 Basic configuration of Existing Energy System
Briefly discuss the basic configuration of the existing energy system. Include information about
the number, size, age, efficiency, and type of generation.
·The current power plant for the city-owned utility includes two, 90kW diesel generators both
under three years old. They meet the AEA standard for PCE-efficiency and produces
approximately 605,000 kWh per year.
4.2.2 Existing Energy Resources Used
Briefly discuss your understanding of the existing energy resources. Include a brief discussion of
any impact the project may have on existing energy infrastructure and resources.
The current infrastructure is two, 90kW generators that serves approximately 110 people for the
majority of the year and the city has approximately 1000-2000 seasonal workers in the Bristol
Bay sockeye fishery. If the reconnaissance indicates further study merits pursing, an eventual
wind tower could offset a significant amount of diesel usage and open up the possibility of
economical processing for value-added processors
4.2.3 Existing Energy Market
Discuss existing energy use and its market. Discuss impacts your project may have on energy
customers.
AEA 13-006 Grant Application Page 9 of20 7/3//2012
Renewable Energy Fund Round 6
Grant Application ~
ENERGY AUTHORITY
The current 110 year-round and 1000-2000 summer market buy 605,000 kWh per year of diesel
generated power. The project would not have any immediate impact on existing energy use.
4.3 Proposed System
Include information necessary to describe the system you are intending to develop and address
potential system design, land ownership, permits, and environmental issues.
4.3.1 System Design
Provide the following information for the proposed renewable energy system:
• A description of renewable energy technology specific to project location
• Optimum installed capacity
• Anticipated capacity factor
• Anticipated annual generation
• Anticipated barriers
• Basic integration concept
• Delivery methods
The project calls for a wind monitor tower and data collection unit. Siting will be away from the
city-owned airport and closer to town to avoid any avigation conflicts.
4.3.2 Land Ownership
Identify potential land ownership issues, including whether site owners have agreed to the
project or how you intend to approach land ownership and access issues.
Egegik has completed its 14c3 land conveyances and has offered to allow its use for the study.
4.3.3 Permits
Provide the following information as it may relate to permitting and how you intend to address
outstanding permit issues.
• List of applicable permits
• Anticipated permitting timeline
• Identify and discussion of potential barriers
The only permit anticipated is approval from the FAA as any cite chosen will be within 5 miles of
the city airport. Obtaining a permit for this project is not expected to be a problem.
4.3.4 Environmental
Address whether the following environmental and land use issues apply, and if so how they will
be addressed:
• Threatened or Endangered species
• Habitat issues
• Wetlands and other protected areas
• Archaeological and historical resources
• Land development constraints
AEA 13-006 Grant Application Page 10 of 20 7/3//2012
Renewable Energy Fund Round 6
Grant Application
• Telecommunications interference
• Aviation considerations
• Visual, aesthetics impacts
• Identify and discuss other potential barriers
Aside from the previously mentioned FAA approval, there are no environmental considerations
for the installation of a wind monitor.
4.4 Proposed New System Costs and Projected Revenues
{Total Estimated Costs and Projected Revenues)
The level of cost information provided will vary according to the phase of funding requested and
any previous work the applicant may have done on the project. Applicants must reference the
source of their cost data. For example: Applicants records or analysis, industry standards,
consultant or manufacturer's estimates.
4.4.1 Project Development Cost
Provide detailed project cost information based on your current knowledge and understanding of
the project. Cost information should include the following:
• Total anticipated project cost, and cost for this phase
• Requested grant funding
• Applicant matching funds -loans, capital contributions, in-kind
• Identification of other funding sources
• Projected capital cost of proposed renewable energy system
• Projected development cost of proposed renewable energy system
The project total is estimated at $90,000 for all phases of the year-long project. The LPB will
contribute $10,000 in staff time for administrative and financial oversight.
4.4.2 Project Operating and Maintenance Costs
Include anticipated O&M costs for new facilities constructed and how these would be funded by
the applicant.
(Note: Operational costs are not eligible for grant funds however grantees are required to meet
ongoing reporting requirements for the purpose of reporting impacts of projects on the
communities they serve.)
O&M is not applicable to the year-long project.
4.4.3 Power Purchase/Sale
The power purchase/sale information should include the following:
• Identification of potential power buyer( s )/customer( s)
• Potential power purchase/sales price -at a minimum indicate a price range
• Proposed rate of return from grant-funded project
AEA 13-006 Grant Application Page 11 of 20 7/3//2012
Renewable Energy Fund Round 6
Grant Application
This is not applicable.
4.4.4 Project Cost Worksheet
ENERGY AUTHORITY
Complete the cost worksheet form which provides summary information that will be considered
in evaluating the project.
Please fill out the form provided below
Renewable Energy Source
The Applicant should demonstrate that the renewable energy resource is available on a
sustainable basis.
Annual average resource availability. Class V wind --------------------------------------Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel)
Existing Energy Generation and Usage
a) Basic configuration (if system is part of the Railbelt 1 grid, leave this section blank)
i. Number of generators/boilers/other 2 -----------------------------------
ii. Rated capacity of generators/boilers/other 90kW -----------------------------------
iii. Generator/boilers/other type n/a -----------------------------------iv. Age of generators/boilers/other n/a -----------------------------------
v. Efficiency of generators/boilers/other n/a -----------------------------------
b) Annual O&M cost (if system is part of the Rail belt grid, leave this section blank)
i. Annual O&M cost for labor 322,000 ------------------------------------------
ii. Annual O&M cost for non-labor 289,000 ------------------------------------------
c) Annual electricity production and fuel usage (fill in as applicable) (if system is part of the
Railbelt grid, leave this section blank)
i. Electricity [kWh] 605,000 kWh ----------------------------------------------------
ii. Fuel usage
Diesel [gal] 65,300
Other 0
iii. Peak Load 153 kW
iv. Average Load 69kW
v. Minimum Load 30kW
AEA 13-006 Grant Application Page 12 of20 7/3//2012
Renewable Energy Fund Round 6
Grant Application
·~·.·)~@r~
vi. Efficiency 11.3 kW per gallon
vii. Future trends Unknown
d) Annual heating fuel usage (fill in as applicable)
i. Diesel [gal or MMBtu]
ii. Electricity [kWh]
iii. Propane [gal or MMBtu]
iv. Coal [tons or MMBtu]
v. Wood [cords, green tons, dry tons]
vi. Other
_, ... : ENERGY AUTHORITY
Proposed System Design Capacity and Fuel Usage
(Include any projections for continued use of non-renewable fuels)
a} Proposed renewable capacity n/a
(Wind, Hydro, Biomass, other)
[kW or MMBtu/hr]
b) Proposed annual electricity or heat production (fill in as applicable)
i. Electricity [kWh]
ii. Heat [MMBtu]
c) Proposed annual fuel usage (fill in as applicable)
i. Propane [gal or MMBtu]
a)
b)
0
d)
ii. Coal [tons or MMBtu]
iii. Wood [cords, green tons, dry tons]
iv. Other
Project Cost
Total capital cost of new system
Development cost
Annual fuel cost
Project Benefits
a) Amount of fuel displaced for
i. Electricity 0
$90,000
80,0000
0
0
----------------------------------------------------
ii. Heat 0 ----------------------------------------------------
iii. Transportation 0 ----------------------------------------------------
b) Current price of displaced fuel 0 ---------------------------------------
c) Other economic benefits 0 ---------------------------------------
d) Alaska public benefits 0 ---------------------------------------
AEA 13-006 Grant Application Page 13 of20 7/3//2012
Renewable Energy Fund Round 6
Grant Application
Power Purchase/Sales Price
a} Price for power purchase/sale 0
·~· tlllllt
-~ : ENERGY AUTHORITY
-----------------------------------------
Project Analysis
a) Basic Economic Analysis
Project benefit/cost ratio n/a ------------------------------------------------
Payback (years) n/a
4.4.5 Proposed Biomass System Information
Please address the following items, if know. (For Biomass Projects Only)
• What woody biomass technology will be installed (cord wood, pellets, chips, briquettes,
pucks).
• Efficiency of the biomass technology.
• Thermal or electric application.
• Boiler efficiency.
• Displaced fuel type and amount.
• Estimated tons of wood pellets or chips (specify) to be used per year, and average moisture
percentage.
• Estimated cords of wood to be used per year, specify whether dry or green and the moisture
percentage.
• Ownership/Accessibility. Who owns the land and are their limitations and restrictions to
accessing the biomass resource?
• Inventory data. How much biomass is available on an annual basis and what types (species)
are there, if known?
AEA13-006 Grant Application Page 14 of 20 7/3//2012
Renewable Energy Fund Round 6
Grant Application ... :~
-~· 'ENERGY AUTHORITY
SECTION 5-PROJECT BENEFIT
Explain the economic and public benefits of your project. Include direct cost savings,
and how the people of Alaska will benefit from the project.
The benefits information should include the following:
• Potential annual fuel displacement (gallons and dollars) over the lifetime of the evaluated
renewable energy project
• Anticipated annual revenue (based on i.e. a Proposed Power Purchase Agreement price,
RCA tariff, or cost based rate)
• Potential additional annual incentives (i.e. tax credits)
• Potential additional annual revenue streams (i.e. green tag sales or other renewable
energy subsidies or programs that might be available)
• Discuss the non-economic public benefits to Alaskans over the lifetime of the project
The above points will all be addressed at part of the scope of this reconnaissance study. The
reconnaissance study has several benefits to the people of Alaska, including a greater knowledge
ofthe wind resources on the Alaska Peninsula. The development of wind power at promising
sites in Alaska would provide stable, base load power which could spur economic development
in diversifying the local fishing industry. Energy costs would also be more stable for local
communities, and waste heat could be used in various ways such as in greenhouses to establish
greater local food security or reduce utility bills for public facilities. By offsetting diesel fuel
generation and the resulting emissions, wind power development would also lead to cleaner air
and reduced greenhouse gas emissions
SECTION 6-SUSTAINABILITY
Discuss your plan for operating the completed project so that it will be sustainable.
Include at a minimum:
• Proposed business structure(s) and concepts that may be considered.
• How you propose to finance the maintenance and operations for the life of the project
• Identification of operational issues that could arise.
• A description of operational costs including on-going support for any back-up or existing
systems that may be require to continue operation
• Commitment to reporting the savings and benefits
AEA 13-006 Grant Application Page 15 of 20 7/3//2012
Renewable Energy Fund Round 6
Grant Application
~·
~··~· ) ENERGY AUTHORITY
There will not be operation of the wind tower after the project is completed. However, the unit
could be shipped to other communities at a lower cost since it would already be in-region.
SECTION 7-READINESS & COMPLIANCE WITH OTHER GRANTS
Discuss what you have done to prepare for this award and how quickly you intend to proceed
with work once your grant is approved.
Tell us what you may have already accomplished on the project to date and identify other grants
that may have been previously awarded for this project and the degree you have been able to
meet the requirements of previous grants.
Borough staff and consultants are able to begin immediately upon award with this project.
Permitting and field work planning activities and vendor solicitations could begin immediately,
and we anticipate mobilizing field crews within a month of approval, assuming approval is
granted in July of 2013. This is the first work to be done on this project, but the team members
have past experience meeting the requirements of other grants and projects.
SECTION 8-LOCAL SUPORT
Discuss what local support or possible opposition there may be regarding your project. Include
letters of support from the community that would benefit from this project.
The City of Egegik supports the project as does the Lake and Peninsula Borough Assembly. A
letter from the City of Egegik is attached.
AEA 13-006 Grant Application Page 16 of 20 7/3//2012
Renewable Energy Fund Round 6
Grant Application
SECTION 9 -GRANT BUDGET
Tell us how much you want in grant funds Include any investments to date and funding sources,
how much is being requested in grant funds, and add;tional investments you will make as an
applicant.
Provide a narrative summary regarding funding sources and your financial commitment to the
project.
Applications should include a separate worksheet for each project phase that was identified in
section 2.3.2 of this application, (Reconnaissance, Feasibility, Cot:~ceptual Design, Design and
Permitting, and Construction). Please use the tables provided below to detail your proposed
project's budget. Be sure to use one table for each phase of your project.
If you have any question regarding how to prepare these tables or if you need assistance preparing the
application please feel free to contact AEA at 907-771-3031 or by emailing the Grant Administrator,
Shawn Calfa, at scalfa@aidea.org.
Source of
Matching
Anticipated Grantee Funds:
RE-Fund Cash/In-Milestone or Task Completion Grant Funds Matching kindfFederal TOTALS
Date Funds Grants/Other
State
Grants/Other
(List milestones based on
phase and type of project. $ $ $
See Milestone list below. )
Project Seeping and 8/2013 $ 1000 $3000 $4000 Contractor Solicitation
Resource Analysis and 8/2013 $0 $ $4000 Identification
Land Use, Permitting, and 8/2013 $1000 $2000 $7000 environmental analysis
Preliminary design analysis 8/2013 $20000 $ $27000 and cost
AEA 13-006 Grant Application Page 17 of20 7/3//2012
Renewable Energy Fund Round 6
Grant Application ENERGY AUTHORITY
Cost of energy and market 8/2014 $45000 $ $72000 analysis
Simple economic analysis 8/2014 $6000 $ $78000
Final Report and 9/2014 $7000 $5000 $90000 recommendations
$ $ $
$ $ $
$ $ $
$ $ $
TOTALS $ $ $
Budget Categories:
Direct Labor & Benefits $10000 $ $10000
Travel & Per Diem $ $ $
Equipment $ $ $
Materials & Supplies $ $ $
Contractual Services $80000 $ $80000
Construction Services $ $ $
Other $ $ $
TOTALS $ $ $90000
p ro1ect M"l 1 estones th at s h ld b dd ou ea resse d. B d In u 1aet p roposa
Reconnaissance Feasibility Design and Construction Permitting
1. Project seeping and 1. Project seeping 1. Project seeping 1. Confirmation that all
contractor solicitation. and contractor and contractor design and feasibility
2. Resource solicitation. solicitation for requirements are
identification and 2. Detailed energy planning and complete.
analysis resource analysis design 2. Completion of bid
3. Land use, permitting, 3. Identification of 2. Permit documents
applications (as and environmental land and regulatory needed) 3. Contractor/vendor
analysis issues, selection and award
4. Preliminary design 4. Permitting and 3. Final 4. Construction Phases environmental analysis and cost environmental assessment and -
5. Cost of energy and analysis mitigation plans Each project will have
market analysis 5. Detailed analysis of (as needed) unique construction
6. Simple economic existing and future 4. Resolution of phases, limitations,
analysis energy costs and land use, right of and schedule
markets constraints which
7. Final report and
way issues should be identified 6. Assessment of recommendations alternatives 5. Permit approvals by the grantee
7. Conceptual design 6. Final system 5. Integration and
analysis and cost design testing
estimate 7. Engineers cost 6. Decommissioning old
8. Detailed economic estimate systems
and financial 8. Updated 7. Final Acceptance,
analysis economic and Commissioning and
9, Conceptual financial analysis Start-up
business and 9. Negotiated 8. Operations Reporting
operations plans power sales
10. Final report and agreements with
recommendations approved rates
10. Final business
and operational
plan
AEA 13-006 Grant Application Page 18 of 20 7/3//2012
Renewable Energy Fund Round 6
Grant Application
ECTION 10-AUTHORIZED SIGNERS FORM
Community/Grantee Name: Lake and Peninsula Borough
Regular Election is held: October I Date: 9/20/2012
Authorized Grant Signer(s):
Printed Name Title Term
Lamar J. Cotten Borough Manager n/a
I authorize the above person( s) to sign Grant Documents:
(Highest ranking organization/community/municipal official)
Printed Name Title Term
Glen R. Alsworth Borough Mayor 8/2012
Grantee Contact Information:
Mailing Address:
Signature
Signature
PO Box 495 King Salmon, AK 99613
Phone Number: 907-246-3421
Fax Number: 907-246-6602
E-mail Address:
manaoer@lakeandoen.com
Federal Tax ID #:
Please submit an updated form whenever there is a change to the above information.
AEA 13-006 Grant Application Page 19 of 20 7/3//2012
Renewable Energy Fund Round 6
Grant Application
·~
~
-~ ; ENERGY AUTHORITY
SECTION 11-ADDITIONAL DOCUMENTATION AND CERTIFICATION
SUBMIT THE FOLLOWING DOCUMENTS WITH YOUR APPLICATION:
A. Contact information, resumes of Applicant's Project Manager, key staff, partners,
consultants, and suppliers per application form Section 3.1 and 3.4. Applicants
are asked to separate resumes submitted with applications, if the individuals do
not want their resumes posted.
B. letters demonstrating local support per application form Section 8.
C. An electronic version of the entire application on CD per RFA Section 1.7.
D. Governing Body Resolution or other formal action taken by the applicant's
governing body or management per RFA Section 1.4 that:
Commits the organization to provide the matching resources for project at the
match amounts indicated in the application.
Authorizes the individual who signs the application has the authority to
commit the organization to the obligations under the grant.
Provides as point of contact to represent the applicant for purposes of this
application.
Certifies the applicant is in compliance with applicable federal, state, and local,
laws including existing credit and federal tax obligations.
E. CERTIFICATION
The undersigned certifies that this application for a renewable energy grant is truthful
and correct, and that the applicant is in compliance with, and will continue to comply
with, all federal and state laws including existing credit and federal tax obligations and
that they can indeed commit the entity to these obligations.
Print Name Lamar J. Cotten
Signature
Title Borough Manager
Date
I
AEA 13-006 Grant Application Page 20 of20 7/3//2012
Alaska Energy Authority
813 West Northern Lights Blvd.
Anchorage, AK 99503
To whom it may concern:
City of Egegik
P.O. Box 189
Egegik, AK 99579
Phone (907) 233-2400
Fax (907) 233-2231
August 17, 2012
The City of Egegik supports the Lake and Peninsula Borough's efforts to obtain a preliminary
wind study for Egegik. This study will hopefully enable the community to benefit from lower
energy costs in the future with the addition of wind as an additional energy source. The City of
Egegik would be happy to assist the Alaska Energy Authority and/or the Lake and Peninsula
Borough to the extent possible in this endeavor.
Please feel free to contact me if I can provide any additional information.
Sincerely,
Don Strand
City Administrator