HomeMy WebLinkAboutDP Library GSHP Cost Estimate - FinalDimond Park Library Geothermal Concept Design and Cost Estimate AIRPORT & DPAC GSHP COST INFORMATION DPAC Horizontal Piping 7272 DPAC Horizontal Piping Bid Cost 265,517$ DPAC Horizontal Piping Bid Cost/LF 36.51$ Airport Bid Cost/LF of borehole 7.50$ DIMOND PARK LIBRARY GEOTHERMAL LOOPFIELD DESIGN ASSUMPTIONS Dimond Park Library SF 20,600 Peak BTUH per SF 25 Total BTUH Peak Heat Load 515,000 LF Borehole Piping per BTUH 0.02292 LF Boreholes required at Dimond Park Library1 11,802 Number of 330' boreholes 36 Estimated length of Horizontal Piping 2,615 DIMOND PARK LIBRARY GSHP SYSTEM CONSTRUCTION COST ESTIMATE Boreholes2 $88,516 --escalation 17.50% $15,490 Driller Mobilization2 $170,000 --escalation 17.50% $29,750 Horizontal Piping2 $95,480 --escalation 17.50% $16,709 Site Demolition & Earthwork $80,000 Heat Pump Infrastructure in Boiler Room $140,000 Construction Contingency $64,056 Estimated Construction Cost of Gastineau GSHP System $700,000 DIMOND PARK LIBRARY GSHP SYSTEM PROJECT COST Construction Cost of DP Library GSHP System $700,000 Design $55,000 Test Wells - Use DPAC well performance for design1 $0 Conductance Tests - Use DPAC well performance for design1 $0 Permits $5,000 CBJ Bidding Services $5,000 Consultant Construction Inspection Services 2% $14,000 CBJ Project Management Services 4% $28,000 Commissioning $10,500 Annual O&M Reporting to AEA $10,500 Project Contingency $47,000 Total Project Cost $875,000 Project Capital Cost $725,000 Project Development Cost $150,000 1 Assumes similar heat transfer conductance in soil as Dimond Park Aquatic Center 2 Cost based on Spring 2009 bid results for DPAC and Airport Loop Fields Printed: 9/13/2012 Page 1 of 1