HomeMy WebLinkAboutGrantApplication6 - Karluk Wind Feasibility Study and Design 081712Renewable Energy Fund Round 6 Grant Application AEA 13-006 Application Page 1 of 24 7/3/2011 SECTION 1 – APPLICANT INFORMATION Name (Name of utility, IPP, or government entity submitting proposal) Karluk Tribal Council Type of Entity: Government - Tribal Council Fiscal Year End June 30 2013 Tax ID # 92-0071173 Tax Status: X For-profit or non-profit ( check one) Mailing Address Karluk Tribal Council P.O. Box 22 AK 99608 Physical Address Karluk Tribal Council P.O. Box 22 AK 99608 Telephone (907) 241 2218 Fax (907) 241 2208 Email A96lynn@aol.com 1.1 APPLICANT POINT OF CONTACT / GRANTS MANAGER Name Alicia Andrew Title President Mailing Address Karluk Tribal Council P.O. Box 22 AK 99608 Telephone (907) 241 2218 Fax 907) 241 2208 Email A96lynn@aol.com 1.2 APPLICANT MINIMUM REQUIREMENTS Please check as appropriate. If you do not to meet the minimum applicant requirements, your application will be rejected. 1.2.1 As an Applicant, we are: (put an X in the appropriate box) An electric utility holding a certificate of public convenience and necessity under AS 42.05, or An independent power producer in accordance with 3 AAC 107.695 (a) (1), or A local government, or X A governmental entity (which includes tribal councils and housing authorities); Yes 1.2.2 Attached to this application is formal approval and endorsement for its project by its board of directors, executive management, or other governing authority. If the applicant is a collaborative grouping, a formal approval from each participant’s governing authority is necessary. (Indicate Yes or No in the box ) Yes 1.2.3 As an applicant, we have administrative and financial management systems and follow procurement standards that comply with the standards set forth in the grant agreement. Yes 1.2.4 If awarded the grant, we can comply with all terms and conditions of the attached grant form. (Any exceptions should be clearly noted and submitted with the application.) Yes 1.2.5 We intend to own and operate any project that may be constructed with grant funds for the benefit of the general public. If no please describe the nature of the project and who will be the primary beneficiaries. Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 2 of 24 7/3//2012 SECTION 2 – PROJECT SUMMARY This is intended to be no more than a 1-2 page overview of your project. 2.1 Project Title – (Provide a 4 to 5 word title for your project) KARLUK TRIBAL COUNCIL – WIND ENERGY SYSTEM 2.2 Project Location – Include the physical location of your project and name(s) of the community or communities that will benefit from your project in the subsections below. Karluk, Alaska 99608 2.2.1 Location of Project – Latitude and longitude, street address, or community name. Latitude and longitude coordinates may be obtained from Google Maps by finding you project’s location on the map and then right clicking with the mouse and selecting “What is here? The coordinates will be displayed in the Google search window above the map in a format as follows: 61.195676.-149.898663. If you would like assistance obtaining this information please contact AEA at 907-771-3031. Latitude and longitude coordinates of proposed wind turbines: N57.33.22.9” W 154.26.51.5” 2.2.2 Community benefiting – Name(s) of the community or communities that will be the beneficiaries of the project. Karluk, Alaska 2.3 PROJECT TYPE Put X in boxes as appropriate 2.3.1 Renewable Resource Type x Wind Biomass or Biofuels Hydro, including run of river Transmission of Renewable Energy Geothermal, including Heat Pumps Small Natural Gas x Heat Recovery from existing sources Hydrokinetic Solar Storage of Renewable Other (Describe) 2.3.2 Proposed Grant Funded Phase(s) for this Request (Check all that apply) Pre-Construction Construction Reconnaissance x Design and Permitting x Feasibility Construction and Commissioning x Conceptual Design 2.4 PROJECT DESCRIPTION Provide a brief one paragraph description of your proposed project. Karluk is located on the west cost of Kodiak Island in Alaska. The village is cut-off from any road system. Fuel oil has to be shipped by barge to Karluk. Therefore, it is a high energy cost village with fuel oil at 4.92 $/gal. This project will perform a feasibility study and complete the design & permitting for a wind energy system and a heat recovery system to serve the existing power plant in Karluk, Alaska. For the wind energy system, wind data from a meteorological monitoring tower already installed at the proposed wind turbine location will be available for the analysis and design. The wind energy systems would consist of wind turbines installed on the mountain 0.7 miles south of the existing power plant, the transmission line to the power plant, and the electric boiler for excess energy uti lization. The heat recovery system would consist of upgrading the existing power plant generators with waste heat recovery units and installing a total length of up to 1000ft hydronic heating loop to connect the power plant with the community buildings. Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 3 of 24 7/3//2012 2.5 PROJECT BENEFIT Briefly discuss the financial and public benefits that will result from this project, (such as reduced fuel costs, lower energy costs, etc.) Renewable energy is more cost efficient than the existing diesel generating system. The price of hydrocarbons is likely to increase in the future, which would impact the cost of operating a diesel-based system. A strong wind resource is available in Karluk and should be pursued. The goals and objectives and performance measures of the proposed grades to the Karluk village energy distribution system will be as follows: • Upgrading the generators by installing a waste heat recovery system • Utilize the rich wind resources in the Karluk area to produce up to 50% of the tribe’s annual electricity consumption • New hydronic heating loop will connect the power plant with community buildings and utilize generator waste heat and wind excess heat • Decrease the tribe’s heating fuel oil consumption by up to 39% • Reduce the tribe’s total fuel oil consumption (for electricity and heating) by up to 48% • Solve Karluk’s power plant generator capacity issue by replacing some of the electric heaters in the community buildings with waste heat and integrating wind turbines • Making affordable heat available to the commercial and community buildings will reduce their dependence on the fuel oil, electric heaters and fire wood. • Less energy costs and the sustainable way of using renewable resources and waste heat will make Karluk more attractive as a place to live • Subsistence and sustainable energy infrastructure go hand in hand and students get to experience the benefits of wind power and waste heat recovery in their own village An overall payback of about 12 years is possible. 2.6 PROJECT BUDGET OVERVIEW Briefly discuss the amount of funds needed, the anticipated sources of funds, and the nature and source of other contributions to the project. Use of grant funds for this project will greatly reduce the village energy costs. Total cost of the project is estimated at $ 1,300,000. The grant application is for $ 1,000,000. The applicant proposes to contribute $300,000 towards project costs from a combination of land made available for this project as well as labor and material\equipment contributions in the administration, permitting, and construction phases. 2.7 COST AND BENEFIT SUMARY Include a summary of grant request and your project’s total costs and benefits below. Grant Costs (Summary of funds requested) 2.7.1 Grant Funds Requested in this application. $81,000 2.7.2 Cash match to be provided $0 2.7.3 In-kind match to be provided $300 2.7.4 Other grant applications not yet approved $0 2.7.5 Total Grant Costs (sum of 2.7.1 through 2.7.3) $81,300 Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 4 of 24 7/3//2012 Project Costs & Benefits (Summary of total project costs including work to date and future cost estimates to get to a fully operational project) 2.7.6 Total Project Cost (Summary from Cost Worksheet including estimates through construction) $1,300,000 2.7.7 Estimated Direct Financial Benefit (Savings) $/90,000 year (fuel savings) 2.7.8 Other Public Benefit (If you can calculate the benefit in terms of dollars please provide that number here and explain how you calculated that number in your application (Section 5.) $ N/A SECTION 3 – PROJECT MANAGEMENT PLAN Describe who will be responsible for managing the project and provide a plan for successfully completing the project within the scope, schedule and budget proposed in the application. 3.1 Project Manager Tell us who will be managing the project for the Grantee and include contact information, a resume and references for the manager(s). If the applicant does not have a project manager indicate how you intend to solicit project management support. If the applicant expects project management assistance from AEA or another government entity, state that in this section. Michael Hauke with Renewable Energy Engineering, LLC will be the project manager. He is a professional mechanical engineer and holds a Master of Science in Engineering Management. Michael has long time experience managing construction projects. His resume is attached to the application. 3.2 Project Schedule and Milestones Please fill out the schedule below. Be sure to identify key tasks and decision points in in your project along with estimated start and end dates for each of the milestones and tasks. Please clearly identify the beginning and ending of all phases of your proposed project. Project implementation will start immediately upon execution of agreement. Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 5 of 24 7/3//2012 FEASIBILITY STUDY Milestones Tasks Start Date End Date 1.0 Project Scoping/contractor solicitation Project scoping, solicit consultants, gather resources July 2013 August 2013 2.0 Detailed energy resource analysis Site-specific assessment of available energy resource following industry standards usually based on field measurements, discussions with resource owners, and other onsite activities. Examples of assessment activities include collection and analysis of meteorological tower data at proposed wind turbine locations (meteorological tower was already installed by REE) August 2013 December 2013 3.0 Identification of land and regulatory issues Obtain authorizations from all applicable agencies for any use of land or resources for feasibility activities; Assessment of site control requirements for proposed project; Authorization from land owners for onsite feasibility activities as needed August 2013 October 2013 4.0 Permitting and environmental analysis Site-specific assessment of resources that may be significantly affected. Examples include wildlife habitat assessment, historical sites investigation, etc.; Plan for addressing potential environmental impacts September 2013 October 2013 5.0 Detailed analysis of existing & future energy costs/markets Preliminary energy purchase or sales agreement September 2013 November 2013 6.0 Assessment of alternatives Identification and analysis of system alternatives; Recommended alternative including discussion of impacts on existing system September 2013 November 2013 7.0 Conceptual design analysis and cost estimate Existing Energy System Annual load profile; Load growth projections; Transmission system layout and capacity; Retirement schedule Proposed Energy System Assessment of project site, including geotechnical characteristics as necessary; Annual energy production profile; Conceptual system design; Conceptual integration design; Identification of remaining technical barriers; Conceptual level cost estimates for final design and construction; Annual O&M and fuel costs September 2013 November 2013 8.0 Detailed economic and financial analysis Detailed analysis of revenue from energy sales, tax credits, green tags, and other incentives; Discussion of non- monetary benefits September 2013 November 2013 9.0 Conceptual business and operations plans Prepare conceptual business and operations plan October 2013 November 2013 10.0 Final report and recommendations Deliverable: Final Feasibility Study , comprehensive economic and financial analyses of alternatives, recommendations for project design and construction activities, and draft operational and business plan November 2013 December 2013 Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 6 of 24 7/3//2012 DESIGN & PERMITTING PHASE Milestones Tasks Start Date End Date 1.0 Project scoping and contractor solicitation for planning and design Project scoping, solicit consultants, gather resources October 2013 January 2014 2.0 Permit applications (as needed) Complete permit applications (as needed) December 2013 February 2014 3.0 Final environmental assessment and mitigation plans (as needed) Get all environmental issues resolved; Prepare environmental plan December 2013 February 2014 4.0 Resolution of land use, right of way issues (as needed) Obtain final land use authorizations if needed December 2013 February 2014 5.0 Permit approvals Complete all permitting, right of ways, site controls December 2013 February 2014 6.0 Final system design Renewable Energy Resource: Updated data to confirm that resource is still available Existing Energy System: Final engineered and approved energy system configuration including upgrades Proposed System Design: Final engineered and approved system design; Final engineered and approved integration design Interconnection study January 2014 April 2014 7.0 Engineers cost estimate Finalize engineer’s estimate of project cost February 2014 May 2014 8.0 Updated economic and financial analysis Detailed financial analysis based on chosen business structure and applicable costs, revenues, and incentives May 2014 June 2014 9.0 Negotiated power sales agreements with approved rates Get executed power purchase/sales agreement May 2014 July 2014 10.0 Final business and operational plan Finalize operational and business plan June 2014 July 2014 3.3 Project Resources Describe the personnel, contractors, accounting or bookkeeping personnel or firms, equipment, and services you will use to accomplish the project. Include any partnerships or commitments with other entities you have or anticipate will be needed to complete your project. Describe any existing contracts and the selection process you may use for major equipment purchases or contracts. Include brief resumes and references for known, key personnel, contractors, and suppliers as an attachment to your application. Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 7 of 24 7/3//2012 The Karluk Tribal Council will hire Renewable Energy Engineer, LLC (REE) to help with project management as well as mechanical and electrical engineering. REE’s engineering work will include: -Mechanical Engineering for Heat Recovery System and Wind Turbine Design -Electrical Engineering for Heat Recovery System and Wind Turbine Switchgear Design (Determine appropriate interconnection requirements and specify switchgear, communications, and system controls equipment required for an integrated wind-diesel hybrid power system) REE teamed up with Q Engineers for electrical engineering services in the the Pilot Point Wind-Diesel Hybrid Power System and many other projects requiring mechanical/electrical engineering services . Q Engineers has pledged to support the project with electrical engineering design work. Statement of Qualifications and key employee resumes are attached to this application. The Karluk Tribal Council and REE is committed to working with local stakeholders, including the Alutiiq Power Company, Kodiak Island Borough, and Koniak Corporation. 3.4 Project Communications Discuss how you plan to monitor the project and keep the Authority informed of the status. Please provide an alternative contact person and their contact information. Renewable Energy Engineering, LLC’s (REE) project manager will provide direct oversight of all aspects of the project and will provide monthly or quarterly status reports by email (or other methods allowed by the Authority, if email is not available) to the Authority’s project manager. The report will update the Authority on the project’s progress, regulatory and compliance issues, possible delays, and grant expenditures during the quarter. The progress reports will summarize in one or two pages the progress made on grant tasks during the previous period and identify any difficulties in completing tasks or meeting goals or deadlines. REE will also include with the report copies of any work products due to the Authority. A Project Plan will be developed at the conclusion of the Planning phase of the project. It is a detailed document comprising: 3.5 Project Risk Discuss potential problems and how you would address them. The project is low-risk, in terms of budget, timeline, and product. The potential problems and plans to address them are as follows: Project Delays: Minor projects delays due to procurement of required equipment to complete renovations might occur. This can be limited by coordinating with the contractors and by considering longer lead times in the construction phase schedule. Site Control/Access: Until today, there is no site access to the wind turbines. This will have to be provided. This can be done by installing a 4-wheeler trail. Weather: Weather could delay the installation of the wind turbines on the mountain. However, this can be limited by allowing enough time in the construction schedule, selecting the right construction season and choosing contractors that have long term experience i n Alaska weather conditions. Local stakeholders, the Alutic Power Company and the Karluk community support renewable energy development and will endeavor to create an atmosphere of success. If any unidentified conflicts arise, the REE project manager will immediately address all concerns and communicate possible resolutions with all stakeholders and the authority. Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 8 of 24 7/3//2012 SECTION 4 – PROJECT DESCRIPTION AND TASKS  The level of information will vary according to phase(s) of the project you propose to undertake with grant funds.  If some work has already been completed on your project and you are requesting funding for an advanced phase, submit information sufficient to demonstrate that the preceding phases are satisfied and funding for an advanced phase is warranted. 4.1 Proposed Energy Resource Describe the potential extent/amount of the energy resource that is available. Discuss the pros and cons of your proposed energy resource vs. other alternatives that may be available for the market to be served by your project. For pre-construction applications, describe the resource to the extent known. For design and permitting or construction projects, please provide feasibility documents, design documents, and permitting documents (if applicable) as attachments to this application. Wind Energy Renewable Energy Engineering, LLC (REE) has installed a monitoring tower on a 1000 ft high mountain south-west of the village center and power plant. This was to done to confirm the wind resource characteristic that was found in the AEA –Alaska Wind Speed Map. The Alaska Energy Authority (AEA) provided a wind map for the Karluk area. According this map, the mountain location selected should be in the Wind Speed Class 5 (Excellent) –7 (Superb). This equates to an average wind speed of 7.5-8.8 m/s. Based on the estimates, Karluk mountains are a great wind resource and offer optimal conditions for developing a wind turbine energy system. The first step is to complete a full year of wind data monitoring and analyze the wind data. It is assumed that more than 500kW of wind energy resource is available along the mountain range. At the moment only 44kW are assumed to be allowed to develop per AEA. Theoretically, up to 80% of the village heating requirements could be met by developing more than 44kW of this wind resource. If allowed, the applicant would like research this alternative in the feasibility study. Waste Heat Recovery There are two (2) Katolite 55kW generators in the Karluk power plant, one is used for backup. There are being alternated to allow for frequent generator overhaul on both engines. The current generator setup only uses the electric power produced with an efficiency of 36%. The remaining energy is wasted in engine cooling, exhaust gas and radiation. B y installing a waste heat recovery system most of the thermal loss (almost 49%) can be reused for building heating. By using the heat that the radiator ejects for cooling the engine and heat from the exhaust gas, the system efficiency can be increased and fuel savings of up to 35% are possible. Waste heat recovery systems on generators are readily available and are easy to install. The waste heat from the generators can be used to help heating the school, the tribal council office, the city hall, and the lodge. The waste heat can also be used to heat the water treatment plant, which is currently unheated. Its location is perpendicular to the power plant Renewable energy and waste heat are more cost effective than the existing diesel generation system. The price of hydrocarbons is likely to increase in the future, which would impact the cost of operating diesel-based power system. The following is a break down of the electricity and fuel oil saving opportunities: With the waste heat recovery system, up to 5000 gal of heating fuel can be saved per year. With the wind energy system, up to 11,000 gal of fuel oil can be saved annually in the power plant electricity production. In addition, up to 2050 gal of fuel oil can be saved by using the excess wind en ergy for heating. Thus, up to 13,050 gal of fuel oil can be saved with wind energy. All together, a fuel oil replacement of up to 18,000 gal is possible, which represents about 45% of the annual fuel usage. At a current fuel oil price of $4.92 per gal, the annually saved cost is up to $90,000. Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 9 of 24 7/3//2012 With a total project cost of $1.3 Mill a project payback of 12 years can be possible. (This doesn’t not included the land value that is already owned by the Karluk Tribal Council and is made available for this project) All predicted fuel oil savings were estimated using the Homer Energy Software, Windographer, and MS Excel. 4.2 Existing Energy System 4.2.1 Basic configuration of Existing Energy System Briefly discuss the basic configuration of the existing energy system. Include information about the number, size, age, efficiency, and type of generation. The Karluk power plant is located in the center of the village about 0.6 miles from the landing strip. There are two (2) Katolite 55kW diesel generators in the Karluk power plant, one is used for backup. The efficiency of the 2005 replaced generator set is 12 kwh/ gal. There are being alternated to allow for frequent generator overhaul on both engines. The current generator setup only uses the electric power produced with an efficiency of 36%. The remaining energy is wasted in engine cooling, exhaust gas and radiation. The manually controlled generator switchgear includes Woodward governors. Fuel Injection is mechanical. The governors could be reused in a switchgear lineup, however, new equipment could also be installed. Village distribution wiring is mainly copper. Routing is partly buried and partly overhead. Currently, the power plant supplies the school, 2 lodges, tribal council office, city hall & clinic, fire house, water treatment plant and 14 residential homes. Heating and domestic hot water is provided via fuel oil furnaces, fuel oil space heaters and several electrical space heaters. Only the school has an air handling system. Karluk consumes up about 39,000 gal fuel oil annually. 21,000 gal of this amount is used by the power plant generators to produce electricity. 18,000 gal of this amount is used as heating oil by 13 residential homes, and 10 commercial buildings and 2 community facilit ies. The school, a commercial building used 6,000 gal of heating oil per year. The power plant produces about 252,000 kWh annually. 37,000 kWh of this amount is the electrical system & line loss. About 215,000 kWh are sold to costumers. 85,000 kWh is used by 14 residential homes. 130,000 kWh is consumed by 10 commercial buildings and 2 community facilities. 4.2.2 Existing Energy Resources Used Briefly discuss your understanding of the existing energy resources. Include a brief discussion of any impact the project may have on existing energy infrastructure and resources. Karluk is located directly at the west coast of the Kodiak Island. Karluk higher elevations are characterizes by strong winds from the ocean. A strong river hydroelectric source is theoretically available as well, however, it is a salmon carrying stream and therefore currently expelled from hydroelectric development. The integration of the renewable energy power systems into the existing infrastructure will be addressed in detail in order to properly control all generating assets. A new buried transmission line will need to be built between the wind turbines and power plant. The design will consider uncomplicated systems which will help with the system operation and maintenance over the long term. Operator training will still be necessary as the village maintenance personnel do not have the technical and material resources that urban developers are accustomed to. The Karluk Tribal Council is aware of this fact and will address it. Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 10 of 24 7/3//2012 4.2.3 Existing Energy Market Discuss existing energy use and its market. Discuss impacts your project may have on energy customers. There used to be more people living in Karluk. There was a large fish processing manufacturer right there the Karluk river enters the ocean. The area was overfished and the manufactures were closed and abandoned. The village used to be centered close the shore line. Most of the buildings were subject to destruction by storm and flooding. A new Karluk subdivision was built further away from the ocean. This is now the center of Karluk and home for less than 50 people. Currently, the power plant supplies the school, 2 lodges, tribal council office, city hall & clinic, and 14 residential homes. The electrical market is Karluk is regulated through the State of Alaska. The power plant in Karluk is owned and operated by the Alutiiq Power Company. The average electrical loads are between 32 and 40kW. Occasional peaks over 56kW caused by the extended us of space heater have led to generator shut downs. Karluk consumes up about 39,000 gal fuel oil annually. 21,000 gal of this amount is used by the power plant generators to produce electricity. 18,000 gal of this amount is used as heating oil by 13 residential homes, and 10 commercial buildings and 2 community facilities. The school, a commercial building used 6,000 gal of heating oil per year. The power plant produces about 252,000 kWh annually. 37,000 kWh of this amount is the electrical system & line loss. About 215,000 kWh are sold to costumers. 85,000 kWh is used by 14 residential homes. 130,000 kWh is consumed by 10 commercial buildings and 2 community facilities. The price of electricity is currently 0.71 cents, which is the base rate. This is the rat e all commercial customers pay. Residential customers do qualify go the State’s power cost equalization program (PCE), which subsides residential customers. The power plant is a good condition. The existing electrical infrastructure is functional. The Alutiiq Pow er Company fully supports the waste heat recovery system integration and the wind turbine system. 4.3 Proposed System Include information necessary to describe the system you are intending to develop and address potential system design, land ownership, permits, and environmental issues. 4.3.1 System Design Provide the following information for the proposed renewable energy system:  A description of renewable energy technology specific to project location  Optimum installed capacity  Anticipated capacity factor  Anticipated annual generation  Anticipated barriers  Basic integration concept  Delivery methods The project includes upgrading the existing power plant with waste heat recovery units and connecting the community buildings to the hydronic waste heating loop. Further, medium scale wind turbines will be installed on the nearby mountain. A buried power line will connect the turbines with the power plant. System Design/ Description of Renewable Energy Technology Specific to Project Location/ & Optimum Installed Capacity Wind power: An analysis of the wind resource information indicates that four (4) Gaia 11kW turbines, with 60ft galvanized monopole tilt-up tower, would have a potential cross annual energy production of 213,000 Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 11 of 24 7/3//2012 kWh. REE installed a monitoring tower on the 1000 ft mountain about 0.6 miles south-west of the village center and power plan. If the data proofs that this is a suitable location, the wind turbine towers would be installed where the monitoring tower is located now. For the electrical connection between power plant and wind turbines, less than 0.7 miles of buried transmission line will be installed. There will be controls and switch gear in the power plant bank to manage power balances due to fluctuations in wind power and electrical load. There will also be an electric boiler to absorb excess wind energy to be used in the hydronic heating loop. Waste Heat Recovery in Generator Building : There are two (2) Katolite 55kW generators in the Karluk power plant, one is used for backup. There are being alternated to allow for frequent generator overhaul on both engines. Waste heat recovery systems will be installed on both generators. The waste heat recovery system will utilize the heat from the stack gas and jacket water to generate up to 270 MBH heat at full load. The waste heat from the generators can be used to help heating the school, the tribal council office, the city hall, and the lodge. The waste heat can also be used to heat the water treatment plant, which is currently unheated. Its location is perpendicular to the power plant. There will be a total length of up to 1000ft of buried hydronic heating loop connecting the waste heat consuming community buildings with the power plant. The hydronic heating loop consists of two i nsulated pipes for supply and return, which are buried a min of 4ft below the surface. A combination of wind energy and waste heat system makes sense. The waste recovery system on the generators makes sure that most of the generator rejected heat is used for heating the buildings connected to the hydronic heating loop. In order to serve several buildings on the hydronic heating loop, a greater heat source is needed. This gap can be filled with excess wind energy. Excess wind energy is the energy not used in the village grid. Generator and wind turbines feed into the power control unit. The switchgear and power control unit make sure that the grid is always balanced. Any excess energy from the wind turbines is routed to the electric boiler. The Karluk power plant generator is at times maxed out and occasional shut downs occur when the maximum capacity (55kW) is reached. Therefore, a power plant upgrade is recommended. However, instead of upsizing the generator, a solution can be found by integrating wind t urbines and a battery bank as well as replacing of some of the electric heaters in the community buildings with waste heat. Code Compliance All mechanical and electrical systems will be designed in accordance with the most current building codes and building safety standards and guidelines including international building code, international mechanical code, international fire code, national electric code, and Ashrae building standards. Anticipated Barriers No “show-stopper” issues were found in the initial phase of the village energy analysis and system integration. Anticipated Capacity Factor; Anticipated Annual Generation; Basic Integration Concept Annual Parameter Available Energy from Wind 234,000 kWh Annual Electricity Demand 252,000 kWh Fraction of Electricity Demand met by Wind Turbines (with battery) 134,000 kWh Wind Capacity Factor 50% Excess Energy from Available for Electric Boiler 84,880 kWh Annual Heat Demand of Buildings 18,000 gal Fraction of Heat Demand met by Waste Heat 4,980 gal Fraction of Heat Demand met by Excess Energy from Wind Turbine 2,584 gal Estimate Diesel Efficiency 12 kWh/gal Current Diesel Fuel Use for Power and Heat 39,000 gal Diesel Fuel Use with Wind and Waste Heat 20,000 gal Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 12 of 24 7/3//2012 Annual Fuel Oil Savings 19,000 gal Residential buildings and some community buildings are currently not planned to be connected to the waste heat hydronic loop. Theoretically, the wind resource available in Karluk allows for supplying heat to buildings in Karluk. This would require a higher wind capacity, a larger electric boiler and an extended hydronic loop. A higher amount of fuel would be saved. If AEA is open for this option the applicant will gladly research this opportunity in the feasibility study. Delivery Methods A buried transmission line will need to be installed to connect the wind turbines with the power plant. Power from the power plant is anticipated to be delivered through the existing distribution systems. Specific recommendation will be developed as part of this study. 4.3.2 Land Ownership Identify potential land ownership issues, including whether site owners have agreed to the project or how you intend to approach land ownership and access issues. All of the land and infrastructure required for the project are privately owned by either the Karluk Tribal Council or the Koniak Corporation, an Alaska Native regional corporation. Both entities support renewable energy development in Karluk. 4.3.3 Permits Provide the following information as it may relate to permitting and how you intend to address outstanding permit issues.  List of applicable permits  Anticipated permitting timeline  Identify and discussion of potential barriers The permitting for this project will be successful since there are no environm ental conflicts. There are no wetlands anywhere within or near the project area. The coastal zone management program is currently unenforceable. There no endangered species within the project area. There no historical resources anywhere within or close by the project area. The existing historical properties in Karluk are located outside the critical 1 mile radius. There are no brownfields in the project area. 4.3.4 Environmental Address whether the following environmental and land use issues apply, and if so how they will be addressed:  Threatened or Endangered species  Habitat issues  Wetlands and other protected areas  Archaeological and historical resources  Land development constraints  Telecommunications interference  Aviation considerations  Visual, aesthetics impacts  Identify and discuss other potential barriers  Threatened or Endangered species / Habitat issues According to the U.S Fish and Wildlife Service department there are no threatened and endangered species in Karluk or in the project area. T he U.S. Fish and Wildlife Service (Service), designate critical habitat for the Alaska-breeding population of the Steller’s eider (Polysticta stelleri), a threatened species Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 13 of 24 7/3//2012 listed pursuant to the Endangered Species Act of 1973, as mended (Act). Critical habitat for the Alaska- breeding population of the Steller’s eider includes breeding habitat on the Yukon-Kuskokwim Delta (Y–K Delta) and 4 units in the marine waters of southwest Alaska, including the Kuskokwim Shoals in northern Kuskokwim Bay, and Seal Islands, Nelson Lagoon, and Izembek Lagoon on the north side of the Alaska Peninsula. Another endangered bird species under the the Endangered Species Act of 1973 is the short - tailed albatross (Phoebastria albatrus). The species occurs in waters throughout the North Pacific, primarily along the east coast of Japan and Russia, in the Gulf of Alaska, along the Aleutian Islands and in the Gulf of Alaska south of 64° north latitude. At the time of our 2000 final listing rule, the short -tailed albatross population consisted of about 1,200 individuals known to breed on two islands: Torishima, an active volcanic island in Japan, and Minami-Kojima, an island whose ownership is under dispute by Japan, China, and Taiwan. The coastal zone management program is currently unenforceable.  Wetlands and other protected areas There are no wetlands anywhere within or near the project area. Small freshwater emergent and freshwater forest/shrub wetlands exist 0.5 miles south from the wind turbine location. The wind turbines however, will be located on 1000 ft high hill, whereas the wetlands are in a valley. The wetland data was taken from the U.S. Fish and Wildlife Service's National Wetland Inventory website (http://www.fws.gov/wetlands/).  Archaeological and historical resources There no historical resources anywhere within or close by the project area. The existing historical properties in Karluk are located outside the critical 1 mile radius. There are two historic properties in Karluk: The orthodox church built in 1888, the building was added to the National Register of Historic Places on June 6, 1980, and the Karluk sandspit with the remains of the late 1800s cannery and village. The project area including the existing power plant upgrade and new wind turbines as well as buried transmission line is outside of the one-mile radius.  Land development constraints There are no brownfields in the project area. All of the land and infrastructure required for the project are privately owned by either the Karluk Tribal Council or the Koniak Corporation, an Alaska Native regional corporation. Both entities support renewable energy development in Karluk.  Telecommunications interference There are no telecommunication interferences anticipated in this project.  Aviation considerations The wind turbines are far enough from the airport. Thus, there would likely be no FAA permitting requirements associated with this project.  Visual, aesthetics impacts and other potential barriers Renewable energy systems are supported in the Karluk community. A general acceptance of the wind turbines up the mountain is expected. 4.4 Proposed New System Costs and Projected Revenues (Total Estimated Costs and Projected Revenues) The level of cost information provided will vary according to the phase of funding requested and Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 14 of 24 7/3//2012 any previous work the applicant may have done on the project. Applicants must reference the source of their cost data. For example: Applicants records or analysis, industry standards, consultant or manufacturer’s estimates. 4.4.1 Project Development Cost Provide detailed project cost information based on your current knowledge and understanding of the project. Cost information should include the following:  Total anticipated project cost, and cost for this phase  Requested grant funding  Applicant matching funds – loans, capital contributions, in-kind  Identification of other funding sources  Projected capital cost of proposed renewable energy system  Projected development cost of proposed renewable energy system The total anticipated project cost is $1.3 million – $1.7million ($1.7 million if more buildings are to be connected to the hydronic heating loop and more wind capacity is installed). The project costs includes approximately $81,300 in developing cost (feasibility, design, and permitting), and a construction cost of about$1.2 million to $1.6 million ($1.6 million if more buildings are to be connected to the hydronic heating loop and more wind capacity is installed). The applicant is requesting $81,300 to cover the entire feasibility study and design & permitting phase. For these initial phases, the applicant will provide about $10,000 as mixtures of cash and in-kind services. 4.4.2 Project Operating and Maintenance Costs Include anticipated O&M costs for new facilities constructed and how these would be funded by the applicant. (Note: Operational costs are not eligible for grant funds however grantees are required to meet ongoing reporting requirements for the purpose of reporting impacts of projects on the communities they serve.) This proposal is for engineering studies and design services only. There are no operating and maintenance cost associated with this project stages. 4.4.3 Power Purchase/Sale The power purchase/sale information should include the following:  Identification of potential power buyer(s)/customer(s)  Potential power purchase/sales price - at a minimum indicate a price range  Proposed rate of return from grant-funded project The Karluk power plant is operated by the Alutiiq Power Com pany, which is owned by the Karluk tribal council. The wind turbine power will be fed into this power plant. The potential buyer will be the Karluk village commercial and residential customers. The electrical rate will be determined during the completion of the resource analysis. The rate of return for this project will depend on the wind data collected. It is assumed to be about 8%. (This doesn’t include the land value since the land already owned by the Tribal Council and contributed to this project). A higher rate of return is possible if a larger wind capacity is installed and more buildings are connected to the hydronic loop. Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 15 of 24 7/3//2012 4.4.4 Project Cost Worksheet Complete the cost worksheet form which provides summary information that will be considered in evaluating the project. Please fill out the form provided below Renewable Energy Source The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Annual average resource availability. 500kW or greater (if more than 44kW is allowed to be developed the wind resource could also be used for a larger fraction of village heating load) Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel) Existing Energy Generation and Usage a) Basic configuration (if system is part of the Railbelt1 grid, leave this section blank) i. Number of generators/boilers/other 2 diesel generators ii. Rated capacity of generators/boilers/other 2 x 55kW (they at being alternated) iii. Generator/boilers/other type Diesel iv. Age of generators/boilers/other 6+ years v. Efficiency of generators/boilers/other 12 kWh / gal of fuel b) Annual O&M cost (if system is part of the Railbelt grid, leave this section blank) i. Annual O&M cost for labor $14,000 ii. Annual O&M cost for non-labor $110,000 (including $104,000 for fuel expenses) c) Annual electricity production and fuel usage (fill in as applicable) (if system is part of the Railbelt grid, leave this section blank) i. Electricity [kWh] 252,000 kWh ii. Fuel usage Diesel [gal] 21,000 gal Other N/A iii. Peak Load 63 kW iv. Average Load 34 kW v. Minimum Load 25 kW vi. Efficiency 12 kWh / gal of fuel vii. Future trends Upwards d) Annual heating fuel usage (fill in as applicable) 1 The Railbelt grid connects all customers of Chugach Electric Association, Homer Electric Association, Golden Valley Electric Association, the City of Seward Electric Department, Matanuska Electric Association and Anchorage Municipal Light and Power. Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 16 of 24 7/3//2012 i. Diesel [gal or MMBtu] 18,000 gal ii. Electricity [kWh] 45,000 kWh (estimated) iii. Propane [gal or MMBtu] N/A iv. Coal [tons or MMBtu] N/A v. Wood [cords, green tons, dry tons] N/A vi. Other N/A Proposed System Design Capacity and Fuel Usage (Include any projections for continued use of non-renewable fuels) a) Proposed renewable capacity (Wind, Hydro, Biomass, other) [kW or MMBtu/hr] 44 kW (if more than 44kW is allowed to be developed the wind resource could also be used for a larger fraction of village heating load) b) Proposed annual electricity or heat production (fill in as applicable) i. Electricity [kWh] 252,000 kWh ii. Heat [MMBtu] 2,631 MMBtu c) Proposed annual fuel usage (fill in as applicable) i. Propane [gal or MMBtu] N/A ii. Coal [tons or MMBtu] N/A iii. Wood [cords, green tons, dry tons] N/A iv. Other 21,000 gal of fuel oil Project Cost a) Total capital cost of new system $ 1.3 Million b) Development cost $ 81,300 (including feasibility study and design/permitting c) Annual O&M cost of new system $20,000 d) Annual fuel cost $103,320 Project Benefits a) Amount of fuel displaced for i. Electricity 11,750 gal ii. Heat 7,250 gal iii. Transportation 0 b) Current price of displaced fuel $4.92 c) Other economic benefits N/A d) Alaska public benefits Possible reduction in PCE payout Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 17 of 24 7/3//2012 Power Purchase/Sales Price a) Price for power purchase/sale 0.26 – 0.6 $/kWh Project Analysis a) Basic Economic Analysis Project benefit/cost ratio 2.0-2.5 Payback (years) 12 4.4.5 Proposed Biomass System Information Please address the following items, if know. (For Biomass Projects Only)  What woody biomass technology will be installed (cord wood, pellets, chips, briquettes, pucks).  Efficiency of the biomass technology.  Thermal or electric application.  Boiler efficiency.  Displaced fuel type and amount.  Estimated tons of wood pellets or chips (specify) to be used per year, and average moisture percentage.  Estimated cords of wood to be used per year, specify whether dry or green and the moisture percentage.  Ownership/Accessibility. Who owns the land and are their limitations and restrictions to accessing the biomass resource?  Inventory data. How much biomass is available on an annual basis and what types (species) are there, if known? Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 18 of 24 7/3//2012 SECTION 5– PROJECT BENEFIT Explain the economic and public benefits of your project. Include direct cost savings, and how the people of Alaska will benefit from the project. The benefits information should include the following:  Potential annual fuel displacement (gallons and dollars) over the lifetime of the evaluated renewable energy project  Anticipated annual revenue (based on i.e. a Proposed Power Purchase Agreement price, RCA tariff, or cost based rate)  Potential additional annual incentives (i.e. tax credits)  Potential additional annual revenue streams (i.e. green tag sales or other renewable energy subsidies or programs that might be available)  Discuss the non-economic public benefits to Alaskans over the lifetime of the project The following is a breakdown of the electricity and fuel oil & Dollar saving opportunities assuming the current fuel oil price of $4.92 per gal: With the waste heat recovery system, up to 5000 gal ($24,600) of heating fuel can be saved per year. With the wind energy system, up to 11,000 gal ($54,120) of fuel oil can be saved annually in the power plant electricity production. In addition, up to 2050 gal ($10,086) of fuel oil can be saved by using the excess wind energy for heating. Thus, up to 13,050 gal ($64,206) of fuel oil can be saved with wind energy. Altogether, a fuel oil replacement of up to 18,000 gal ($88,560) per year is possible, which represents about 45% of the annual fuel usage. Over a 30 year period with a discount rate of 3%, this equals a present value of about $1,700,000. With a total estimate project cost of $1.3 Mill a payback of 12 years is possible. All predicted fuel oil savings were calculated using the Homer Energy Software, Windographer, and MS Excel. Over the project life time, there will be non-economic public benefits to Alaskans such as:  The positive aspect of the renewable energy is a sense of ownership and pride in sustainable technology  Reduced generator operating hours means reduced exposure to NOX from the diesel generators, reduced noise pollution to the community and surrounding eco-system, reduced risks for diesel spills that impact land and water  Improved climate for business development in the community  Local hire  Training for local operators There are currently no additional incentives or additional annual revenue streams. SECTION 6– SUSTAINABILITY Discuss your plan for operating the completed project so that it will be sustainable. Include at a minimum:  Proposed business structure(s) and concepts that may be considered.  How you propose to finance the maintenance and operations for the life of the project  Identification of operational issues that could arise.  A description of operational costs including on-going support for any back-up or existing systems that may be require to continue operation  Commitment to reporting the savings and benefits Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 19 of 24 7/3//2012 The investments made in this project are expected to bring a large reduction in fuel oil demand for the village. Over the long term, the waste heat recovery and wind energy system will deliver affordable and sustainable energy to Karluk. The energy study and design will be provided by Renewable Energy Engineering, LLC (REE). REE has proven itself as energ y and engineering design, and project management consultant in Alaska, focused on maintaining top quality service at a reasonable price. The Alutiiq Power Company will operate and maintain the power plant generator waste heat recovery system and wind turbine system. This work will be supported financially by the operating revenues. The Alutiiq Power Company will seek power plant operator training to limit the risk of operating issue due to lack of technology expertise. The project operating and maintenance cost will include the salary of the operators and general administrative functions. Normal replacement of parts will be scheduled and budgeted into the annual budget to continue optimum operations. Savings and benefits will be reported to AEA through annual reports. SECTION 7 – READINESS & COMPLIANCE WITH OTHER GRANTS Discuss what you have done to prepare for this award and how quickly you intend to proceed with work once your grant is approved. Tell us what you may have already accomplished on the project to date and identify other grants that may have been previously awarded for this project and the degree you have been able to meet the requirements of previous grants. In 2012 Renewable Energy Engineering, LLC (REE) has performed several site visits to Karluk. The village utility usage information was collected including existing generator system model, fuel usage, electricity production, village electricity and heating oil consumption for commercial, community and residential buildings, etc. The area wind maps were studied to determine suitable locations for wind turbines. REE found the closet and most promising wind location on a 1000 ft high mountain south-west of the village center /power plant. REE installed a wind monitoring tower at this location, which will make wind data available for the feasibility study and design. As the detailed information listed in this application shows, REE heavily invested in a resource identification and analysis in Karluk. This includes land use, permitting, and environmental analysis, preliminary design analysis and cost, cost of energy and market analysis, and simple economic analysis. REE is ready to proof with a feasibility study and design/permitting phase that this project is worthwhile proceed ing. Once approved, REE can immediately start the work process. SECTION 8– LOCAL SUPORT Discuss what local support or possible opposition there may be regarding your project. Include letters of support from the community that would benefit from this project. The Karluk Tribal Council runs the Alutiiq Power Company, which operates the Karluk power plant. The Karluk village, the Tribal Council, Alutiiq Power Company, and the Kodiak Island Borough all fully support this renewable energy and energy efficiency project in Karluk. At this point there is no opposition to the project. Letters of support from the Karluk Tribal Council, the Alutiiq Power Company and the Kodiak Island Borough are attached. Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 20 of 24 7/3//2012 SECTION 9 – GRANT BUDGET Tell us how much you want in grant funds Include any investments to date and funding sources, how much is being requested in grant funds, and additional investments you will make as an applicant. Provide a narrative summary regarding funding sources and your financial commitment to the project. $ 81,300 is required to complete a feasibility study and the design/permitting for the waste heat recovery and wind turbine energy system. The applicant is requesting the total amount of funding from the Alaska Energy Authority. Other contributions to the investment in Karluk’s power system include:  REE has sponsored the wind monitoring tower installation and invested in the village energy study  Karluk Tribal Council will make the land available for the wind turbines, power line, and wa ste heat recovery hydronic heating loop.  Karluk Tribal Council will help with the installation of the wind turbine power line, and hydronic loop excavation/backfilling. Applications should include a separate worksheet for each project phase that was ident ified in section 2.3.2 of this application, (Reconnaissance, Feasibility, Conceptual Design, Design and Permitting, and Construction). Please use the tables provided below to detail your proposed project’s budget. Be sure to use one table for each phase of your project. Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 21 of 24 7/3//2012 FEASIBILITY STUDY Milestone or Task Anticipated Completion Date RE- Fund Grant Funds Grantee Matching Funds Source of Matching Funds: Cash/In- kind/Federal Grants/Other State Grants/Other TOTALS 1.0 Project Scoping/contractor solicitation 01 August 2013 $500 $300 Work provided by Grantee $ 2.0 Detailed energy resource analysis 01 December 2013 $11,500 N/A N/A $ 3.0 Identification of land and regulatory issues, 01 October 2013 $500 N/A N/A $ 4.0 Permitting and environmental analysis 01 October 2013 $500 N/A N/A $ 5.0 Detailed analysis of existing and future energy costs and markets 01 November 2013 $1,000 N/A N/A $ 6.0 Assessment of alternatives 01 November 2013 $2,000 N/A N/A $ 7.0 Conceptual design analysis and cost estimate 01 November 2013 $2,000 N/A N/A $ 8.0 Detailed economic and financial analysis 01 November 2013 $1,000 N/A N/A $ 9.0 Conceptual business and operations plans 01 November 2013 $1,000 N/A N/A $ 10.0 Final report and recommendations 01 December 2013 $1,000 N/A N/A $ TOTALS $21,000 $300 $21,300 Budget Categories: Direct Labor & Benefits $0 $300 Work provided by Grantee $300 Travel & Per Diem $0 N/A N/A $0 Equipment $0 N/A N/A $0 Materials & Supplies $0 N/A N/A $0 Contractual Services $21,000 N/A N/A $21,000 Construction Services $0 N/A N/A $0 Other $0 N/A N/A $0 TOTALS $21,000 N/A $21,300 Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 22 of 24 7/3//2012 DESIGN AND PERMITTING PHASE Milestone or Task Anticipated Completion Date RE- Fund Grant Funds Grantee Matching Funds Source of Matching Funds: Cash/In- kind/Federal Grants/Other State Grants/Other TOTALS 1.0 Project scoping and contractor solicitation for planning and design 01 January 2014 $2,000 $2,000 Work Provided by Grantee $4,000 2.0 Permit applications (as needed) 01 February 2014 $0 $3,000 Work & Fees Provided by Grantee $3,000 3.0 Final environmental assessment and mitigation plans (as needed) 01 February 2014 $0 $2,000 Cash provided by Grantee $2,000 4.0 Resolution of land use, right of way issues (as needed) 01 February 2014 $0 $1,000 Work Provided by Grantee $1,000 5.0 Permit approvals 01 February 2014 $0 $500 N/A $500 6.0 Final system design 01 April 2014 $47,000 $0 N/A $47,000 7.0 Engineers cost estimate 01 May 2014 $1,000 $0 N/A $1,000 8.0 Updated economic and financial analysis 01 June 2014 $500 $0 N/A $500 9.0 Negotiated power sales agreements with approved rates 01 July 2014 $0 $500 Work Provided by Grantee $500 10.0 Final business and operational plan 01 July 2014 $0 $500 Cash provided by Grantee $500 TOTALS $50,500 $9,500 $60,000 Budget Categories: Direct Labor & Benefits $0 $7,000 Work Provided by Grantee $7,000 Travel & Per Diem $0 N/A N/A $0 Equipment $0 N/A N/A $0 Materials & Supplies $0 N/A N/A $0 Contractual Services $50,500 $2,500 Cash provided by Grantee $53,000 Construction Services $0 N/A N/A $0 Other $0 N/A N/A $0 TOTALS $50,500 $9,500 $60,000 Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 23 of 24 7/3//2012 CONSTRUCTION – PHASE Milestone or Task Anticipated Completion Date RE- Fund Grant Funds Grantee Matching Funds Source of Matching Funds: Cash/In- kind/Federal Grants/Other State Grants/Other TOTALS 1.0 Confirmation that all design and feasibility requirements are complete. August 01, 2014 $0 $1,000 Work Provided by Grantee $1,000 2.0 Completion of bid documents September 01, 2014 $0 $3,000 Work Provided by Grantee $3,000 3.0 Contractor/vendor selection and award November 01, 2014 $0 $1,000 Work Provided by Grantee $1,000 4.0 Construction: 4.1 Installing power plant generators heat recovery system and electric boiler as well as hydronic loop to connected buildings August 01, 2015 $928,500 $278,700 Land made available by Grantee & Labor and Equipment provided by Grantee $1,167,200 4.2 Installing wind turbines and transmission line, to power plant. Integrate switch gear. August 01, 2015 5.0 Integration and testing September 01, 2015 6. 0 Decommissioning old systems N/A – no old systems to be demolished N/A N/A N/A 7.0 Final Acceptance, Commissioning and Start-up September 01, 2015 $0 $5,500 Cash Provided by Grantee $5,500 8.0 Operations Reporting October 01, 2015 $0 $500 $500 $ $ $ $ $ $ TOTALS $928,500 $279,700 $1,178,200 Budget Categories: Direct Labor & Benefits $0 $79,700 Labor and Equipment provided by Grantee $79,700 Travel & Per Diem (Admin) $0 $5,000 Cost covered by Grantee $5,000 Equipment $0 N/A N/A $0 Materials & Supplies $0 N/A N/A $0 Contractual Services $0 $5,500 Cash Provided by Grantee $5,500 Construction Services $928,500 N/A N/A $928,500 Other – Land Value $0 $200,000 Land made available by Grantee $200,000 TOTALS $928,500 $290,200 $1,218,700 Renewable Energy Fund Round 6 Grant Application AEA13-006 Grant Application Page 24 of 24 7/3//2012 Project Milestones that should be addressed in Budget Proposal Reconnaissance Feasibility Design and Permitting Construction 1. Project scoping and contractor solicitation. 2. Resource identification and analysis 3. Land use, permitting, and environmental analysis 4. Preliminary design analysis and cost 5. Cost of energy and market analysis 6. Simple economic analysis 7. Final report and recommendations 1. Project scoping and contractor solicitation. 2. Detailed energy resource analysis 3. Identification of land and regulatory issues, 4. Permitting and environmental analysis 5. Detailed analysis of existing and future energy costs and markets 6. Assessment of alternatives 7. Conceptual design analysis and cost estimate 8. Detailed economic and financial analysis 9, Conceptual business and operations plans 10. Final report and recommendations 1. Project scoping and contractor solicitation for planning and design 2. Permit applications (as needed) 3. Final environmental assessment and mitigation plans (as needed) 4. Resolution of land use, right of way issues 5. Permit approvals 6. Final system design 7. Engineers cost estimate 8. Updated economic and financial analysis 9. Negotiated power sales agreements with approved rates 10. Final business and operational plan 1. Confirmation that all design and feasibility requirements are complete. 2. Completion of bid documents 3. Contractor/vendor selection and award 4. Construction Phases – Each project will have unique construction phases, limitations, and schedule constraints which should be identified by the grantee 5. Integration and testing 6. Decommissioning old systems 7. Final Acceptance, Commissioning and Start-up 8. Operations Reporting