Loading...
HomeMy WebLinkAbout2011_YRITWCGrantBudget5_AEANenRenewable Energy Fund Grant Round V Grant Budget Form 7-1-11 Milestone or Task Anticipated Completion Date RE- Fund Grant Funds Grantee Matching Funds Source of Matching Funds: Cash/In-kind/Federal Grants/Other State Grants/Other TOTALS Conceptual Design PHASE 1 $ $ $ Field check estimated heat loss calculations to Determine most efficient solar collector system size 03/12 $ 2,000 $ $ 2,000 Analyze solar storage location and optimal size for the system and building 03/12 $ 3,750 $ 2,000 Donated time ABS Alaska $5,750 Determine detailed cost savings using future oil prices to develop an accurate payback estimate 03/12 $ 2,000 $ - $ 2,000 Work with Heliodyne Inc to redesign user-friendly dashboard to properly categorize fuel savings 03/12 $5,500 $ 3,000 Engineer time from Heliodyne $ 8,500 Determine most efficient solar array/orientation/placement to minimize heat loss and pipe runs 03/12 $2,500 $ 3,000 Donated time from ABS Alaska $ 5,500 Determine efficiency/method of integrating excess solar production into DHW and forced air preheat 03/12 $ 2,250 $ 3,000 Donated engineer time from Heliodyne $ 5,250 $ $ $ $ $ $ $ $ TOTALS 18,000 11,000 $29,000 Budget Categories: Direct Labor & Benefits $ 10,000 $ - $ 10,000 Travel & Per Diem $ 3,000 $ - $ 3,000 Equipment $ - $ - $ Materials & Supplies $ - $ - $ Contractual Services $ 5,000 $ 11,000 $ 16,000 Construction Services $ - $ $ Other $ - $ $ TOTALS $ 18,000 $ 11,000 $ 29,000 Applications should include a separate worksheet for each project phase (Reconnaissance, Feasibility, Design and Permitting, and Construction)- Renewable Energy Fund Grant Round V Grant Budget Form 7-1-11 Add additional pages as needed Milestone or Task Anticipated Completion Date RE- Fund Grant Funds Grantee Matching Funds Source of Matching Funds: Cash/In-kind/Federal Grants/Other State Grants/Other TOTALS Final Design and Permitting $ $ $ Select the array/system design to maximize efficiency and ensure deliverability and quality of components 06/12 $ 4,000 $ - $ 4,000 Finalize feasible solar collector/storage tank placement 06/12 $ 2,000 $ 2,000 Donated engineer time ABS/Heliodyne $ 4,000 Finalize long-term monitoring methods and test on Nenana Rec Center Array 06/12 $ 3,500 $ - $ 3,500 Ensure that heating controls/solar thermal storage will integrate well with existing Siemens heating control system 06/12 $ 1,000 $ - $ 1,000 Select size, type and integration method of integrating solar hot water into DHW system 06/12 $ 3,000 $ 2,000 Donated engineer time ABS/Heliodyne $ 5,000 Select method of integrating solar hot water into forced air preheat 06/12 $ 4,000 $ 2,000 Donated engineer time ABS/S.D./City Nenana $ 6,000 Redesign interior of Mechanical Room or Determine how to place solar storage tank 06/12 $ 3,000 $ 4,000 City/S.D. donated time $ 7,000 $ $ $ $ $ TOTALS $20,500 10,000 $ 30,500 Budget Categories: Direct Labor & Benefits $ 10,000 $ $ 10,000 Travel & Per Diem $ 4,000 $ $ 4,000 Equipment $ $ $ Materials & Supplies $ $ $ Contractual Services $ 6,500 $ 10,000 $ 16,500 Construction Services $ $ $ Other $ $ $ TOTALS $ 20,500 $ 10,000 $ 30,500 Renewable Energy Fund Grant Round V Grant Budget Form 7-1-11 Milestone or Task Anticipated Completion Date RE- Fund Grant Funds Grantee Matching Funds Source of Matching Funds: Cash/In-kind/Federal Grants/Other State Grants/Other TOTALS Construction and Commissioning $ $ $ Install solar hot water storage tank 07/12 $ 35,000 $ 3,000 Donated time Nenana S.D. facility engineers $ 38,000 Re-plumb and replace existing DHW tank with solar DHW tank 07/12 $ 40,000 $ $ 40,000 Purchase solar hot water collectors and equipment 07/12 $ 70,000 $ $ 70,000 Reroute air intake preheat 08/12 $ 25,000 $ 1,000 Donated time Nenana S.D. facility engineers $ 26,000 Install solar collectors 08/12 $ 40,000 $ 5,000 Donated time Nenana S.D. facility engineers $ 45,000 Integrate existing heating system into solar hot water tank 08/12 $ 27,500 $ $ 27,500 Install and test data collection system 08/12 $3,000 $ 3,000 Heliodyne $ 6,000 Commission solar hot water collector space heating system 08/12 $6,000 $ $ 6,000 Monitor solar production and heating fuel replacement and provide analysis 06/13 $10,000 $ 2,000 Donated project oversight time from ABS/heliodyne $ 12,000 Analyze and report on data from solar hot water system 06/13 $ 5,000 $ 5,000 Donated time from YRITWC Energy Dept $ 10,000 TOTALS 261,500 19,000 $280,500.00 Budget Categories: Direct Labor & Benefits $ 35,000 $ 5,000 $ 40,000 Travel & Per Diem $ 10,000 $ - $ 10,000 Equipment $ 85,000 $ 5,000 Donated equipment use from city/S.D. $ 95,000 Materials & Supplies $ 35,000 $ - $ 35,000 Contractual Services $ 56,500 $ 5,000 $ 61,500 Construction Services $ 40,000 $ 4,000 $ 44,000 Renewable Energy Fund Grant Round V Grant Budget Form 7-1-11 Other $ $ $ TOTALS $261,500 $ 19,000 $280,500 Project Milestones that should be addressed in Budget Proposal Reconnaissance Feasibility Design and Permitting Construction 1. Project scoping and contractor solicitation. 2. Resource identification and analysis 3. Land use, permitting, and environmental analysis 4. Preliminary design analysis and cost 5. Cost of energy and market analysis 6. Simple economic analysis 7. Final report and recommendations 1. Project scoping and contractor solicitation. 2. Detailed energy resource analysis 3. Identification of land and regulatory issues, 4. Permitting and environmental analysis 5. Detailed analysis of existing and future energy costs and markets 6. Assessment of alternatives 7. Conceptual design analysis and cost estimate 8. Detailed economic and financial analysis 9, Conceptual business and operations plans 10. Final report and recommendations 1. Project scoping and contractor solicitation for planning and design 2. Permit applications (as needed) 3. Final environmental assessment and mitigation plans (as needed) 4. Resolution of land use, right of way issues 5. Permit approvals 6. Final system design 7. Engineers cost estimate 8. Updated economic and financial analysis 9. Negotiated power sales agreements with approved rates 10. Final business and operational plan 1. Confirmation that all design and feasibility requirements are complete. 2. Completion of bid documents 3. Contractor/vendor selection and award 4. Construction Phases – Each project will have unique construction phases, limitations, and schedule constraints which should be identified by the grantee 5. Integration and testing 6. Decommissioning old systems 7. Final Acceptance, Commissioning and Start-up 8. Operations Reporting