Loading...
HomeMy WebLinkAboutFPTidalCostwkshtBudgetforms5 Renewable Energy Fund Round 5 Project Cost/Benefit Worksheet RFA AEA12-001 Application Cost Worksheet Page 1 7-1-11 Please note that some fields might not be applicable for all technologies or all project phases. The level of information detail varies according to phase requirements. 1. Renewable Energy Source The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Annual average resource availability. Anticipated current velocity within 3 to 7 knots Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel) 2. Existing Energy Generation and Usage a) Basic configuration (if system is part of the Railbelt1 grid, leave this section blank) i. Number of generators/boilers/other 3 Diesel generators ii. Rated capacity of generators/boilers/other #1 90 kW (not operational) #2 125 kW #3 150 kW iii. Generator/boilers/other type none iv. Age of generators/boilers/other Not available v. Efficiency of generators/boilers/other 11.43 kWh/gal b) Annual O&M cost (if system is part of the Railbelt grid, leave this section blank) i. Annual O&M cost for labor $10,244.00 ii. Annual O&M cost for non-labor $4,506.00 c) Annual electricity production and fuel usage (fill in as applicable) (if system is part of the Railbelt grid, leave this section blank) i. Electricity [kWh] 368,868 ii. Fuel usage Diesel [gal] 47,000 Other iii. Peak Load 75 kW iv. Average Load 47 kW v. Minimum Load vi. Efficiency vii. Future trends d) Annual heating fuel usage (fill in as applicable) i. Diesel [gal or MMBtu] Est. 47,000 gallons/year ii. Electricity [kWh] iii. Propane [gal or MMBtu] iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] 1 The Railbelt grid connects all customers of Chugach Electric Association, Homer Electric Association, Golden Valley Electric Association, the City of Seward Electric Department, Matanuska Electric Association and Anchorage Municipal Light and Power. Renewable Energy Fund Round 5 Project Cost/Benefit Worksheet RFA AEA12-001 Application Cost Worksheet Page 2 7-1-11 vi. Other 3. Proposed System Design Capacity and Fuel Usage (Include any projections for continued use of non-renewable fuels) a) Proposed renewable capacity (Wind, Hydro, Biomass, other) [kW or MMBtu/hr] NA Reconnaissance and Feasibility Study b) Proposed annual electricity or heat production (fill in as applicable) i. Electricity [kWh] ii. Heat [MMBtu] c) Proposed annual fuel usage (fill in as applicable) i. Propane [gal or MMBtu] ii. Coal [tons or MMBtu] iii. Wood [cords, green tons, dry tons] iv. Other 4. Project Cost a) Total capital cost of new system NA Reconnaissance and Feasibility Study b) Development cost c) Annual O&M cost of new system d) Annual fuel cost 5. Project Benefits a) Amount of fuel displaced for i. Electricity NA Reconnaissance and Feasibility Study ii. Heat iii. Transportation b) Current price of displaced fuel c) Other economic benefits Sale of green tags if project is constructed d) Alaska public benefits 6. Power Purchase/Sales Price a) Price for power purchase/sale NA Reconnaissance and Feasibility Study 7. Project Analysis a) Basic Economic Analysis Project benefit/cost ratio NA Reconnaissance and Feasibility Study Renewable Energy Fund Round 5 Project Cost/Benefit Worksheet RFA AEA12-001 Application Cost Worksheet Page 3 7-1-11 Payback (years) Renewable Energy Fund Grant Round V Grant Budget Form Phase I Reconnaissance 7-1-11 Milestone or Task Anticipated Completion Date RE- Fund Grant Funds Grantee Matching Funds Source of Matching Funds: Cash/In-kind/Federal Grants/Other State Grants/Other TOTALS Project Scoping and Contractor Solicitation 10/31/12 $3,900 $2,000 In-kind $5,900 Resource Identification and Analysis 12/1/12 $38000 $22,000 In-kind $60,000 Land Use, Permitting, and Environmental Analysis 12/1/12 $19,500 $10,000 In-kind $29,500 Preliminary Design Analysis and Cost 11/30/13 $13,700 $1,000 In-kind $14,700 Cost of Energy and Market Analysis 11/30/13 $7,800 $1,000 In-kind $8,800 Simple Economic Analysis 11/30/13 $6000 $ $6,000 Final Report and Recommendations 12/31/13 $14,800 $ $14,800 $ $ $ $ $ $ $ $ TOTALS $103,700 $36,000 $139,700 Budget Categories: Direct Labor & Benefits $ $6,000 $6,000 Travel & Per Diem $ $3,000 $3,000 Equipment $ $ $ Materials & Supplies $ $27,000 $27,000 Contractual Services $103,700 $ $103,700 Construction Services $ $ $ Other $ $ $ TOTALS $103,700 $36,000 $139,700 Applications should include a separate worksheet for each project phase (Reconnaissance, Feasibility, Design and Permitting, and Construction)- Add additional pages as needed Renewable Energy Fund Grant Round V Grant Budget Form Phase I Reconnaissance 7-1-11 Project Milestones that should be addressed in Budget Proposal Reconnaissance Feasibility Design and Permitting Construction 1. Project scoping and contractor solicitation. 2. Resource identification and analysis 3. Land use, permitting, and environmental analysis 4. Preliminary design analysis and cost 5. Cost of energy and market analysis 6. Simple economic analysis 7. Final report and recommendations 1. Project scoping and contractor solicitation. 2. Detailed energy resource analysis 3. Identification of land and regulatory issues, 4. Permitting and environmental analysis 5. Detailed analysis of existing and future energy costs and markets 6. Assessment of alternatives 7. Conceptual design analysis and cost estimate 8. Detailed economic and financial analysis 9, Conceptual business and operations plans 10. Final report and recommendations 1. Project scoping and contractor solicitation for planning and design 2. Permit applications (as needed) 3. Final environmental assessment and mitigation plans (as needed) 4. Resolution of land use, right of way issues 5. Permit approvals 6. Final system design 7. Engineers cost estimate 8. Updated economic and financial analysis 9. Negotiated power sales agreements with approved rates 10. Final business and operational plan 1. Confirmation that all design and feasibility requirements are complete. 2. Completion of bid documents 3. Contractor/vendor selection and award 4. Construction Phases – Each project will have unique construction phases, limitations, and schedule constraints which should be identified by the grantee 5. Integration and testing 6. Decommissioning old systems 7. Final Acceptance, Commissioning and Start-up 8. Operations Reporting Renewable Energy Fund Grant Round V Grant Budget Form Phase II Feasibility 7-1-11 Milestone or Task Anticipated Completion Date RE- Fund Grant Funds Grantee Matching Funds Source of Matching Funds: Cash/In-kind/Federal Grants/Other State Grants/Other TOTALS Project Scoping and Contractor Solicitation 10/30/12 $4,100 $2,000 In-kind $6,100 Detailed Energy Resource Analysis 12/31/13 $35,000 $24,000 In-kind $59,000 Identification of Land and Regulatory Issues 11/1/12 $11,000 $10,000 In-kind $21,000 Permitting and Environmental Analysis 12/31/13 $7,800 $1,000 In-kind $8,800 Detailed Analysis of Existing and Future Energy Costs and Markets 12/31/13 $14,000 $1,000 In-kind $15,000 Assessment of Alternatives 12/31/13 $5,000 $1,000 In-kind $6,000 Conceptual Design Analysis and Cost Estimate 12/31/13 $13,700 $1,000 In-kind $14,700 Detailed Economic and Financial Analysis 12/31/13 $4,900 $1,000 In-kind $5,900 Conceptual Business and Operations Plans 12/31/13 $4,900 $1,000 In-kind $5,900 Final Report and Recommendations 3/1/14 $14,800 $14,800 $ TOTALS $115,200 $42,000 $157,200 Budget Categories: Direct Labor & Benefits $ $7,000 $7,000 Travel & Per Diem $ $3,000 $3,000 Equipment $ $ $ Materials & Supplies $ $32,000 $32,000 Contractual Services $115,200 $ $115,200 Construction Services $ $ $ Other $ $ $ TOTALS $115,200 $42,000 $157,200 Applications should include a separate worksheet for each project phase (Reconnaissance, Feasibility, Design and Permitting, and Construction)- Add additional pages as needed Renewable Energy Fund Grant Round V Grant Budget Form Phase II Feasibility 7-1-11 Project Milestones that should be addressed in Budget Proposal Reconnaissance Feasibility Design and Permitting Construction 1. Project scoping and contractor solicitation. 2. Resource identification and analysis 3. Land use, permitting, and environmental analysis 4. Preliminary design analysis and cost 5. Cost of energy and market analysis 6. Simple economic analysis 7. Final report and recommendations 1. Project scoping and contractor solicitation. 2. Detailed energy resource analysis 3. Identification of land and regulatory issues, 4. Permitting and environmental analysis 5. Detailed analysis of existing and future energy costs and markets 6. Assessment of alternatives 7. Conceptual design analysis and cost estimate 8. Detailed economic and financial analysis 9, Conceptual business and operations plans 10. Final report and recommendations 1. Project scoping and contractor solicitation for planning and design 2. Permit applications (as needed) 3. Final environmental assessment and mitigation plans (as needed) 4. Resolution of land use, right of way issues 5. Permit approvals 6. Final system design 7. Engineers cost estimate 8. Updated economic and financial analysis 9. Negotiated power sales agreements with approved rates 10. Final business and operational plan 1. Confirmation that all design and feasibility requirements are complete. 2. Completion of bid documents 3. Contractor/vendor selection and award 4. Construction Phases – Each project will have unique construction phases, limitations, and schedule constraints which should be identified by the grantee 5. Integration and testing 6. Decommissioning old systems 7. Final Acceptance, Commissioning and Start-up 8. Operations Reporting