Loading...
HomeMy WebLinkAboutAEA_2011_Scammon_Bay_Complete_ApplicationAEA 12-001 Application 7/1/2011 Attachment A Contact Information/Resumes Attachment B Cost Worksheet   Renewable Energy Fund Round 5 Project Cost/Benefit Worksheet   RFA AEA12-001 Application Cost Worksheet Page 1 7-1-11 Please note that some fields might not be applicable for all technologies or all project phases. The level of information detail varies according to phase requirements. 1. Renewable Energy Source The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Annual average resource availability. 2,481,473 kWh - hydropower output Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel) 2. Existing Energy Generation and Usage a) Basic configuration (if system is part of the Railbelt1 grid, leave this section blank) i. Number of generators/boilers/other 3 generators ii. Rated capacity of generators/boilers/other Diesel electric generation iii. Generator/boilers/other type 363 kW DD; 350 kW CMS; 499 kW CMS iv. Age of generators/boilers/other 4 years; 7 years; 1 year v. Efficiency of generators/boilers/other Total efficiency: 13.33 kW/gal b) Annual O&M cost (if system is part of the Railbelt grid, leave this section blank) i. Annual O&M cost for labor ii. Annual O&M cost for non-labor $170,000 Total labor and non-labor c) Annual electricity production and fuel usage (fill in as applicable) (if system is part of the Railbelt grid, leave this section blank) i. Electricity [kWh] 1,651,855 kW ii. Fuel usage Diesel [gal] 127,463 gal Other iii. Peak Load 352 kW iv. Average Load 194 kW v. Minimum Load vi. Efficiency 13.33 kW/gal vii. Future trends d) Annual heating fuel usage (fill in as applicable) i. Diesel [gal or MMBtu] ii. Electricity [kWh] iii. Propane [gal or MMBtu] iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] vi. Other                                                              1 The Railbelt grid connects all customers of Chugach Electric Association, Homer Electric Association, Golden Valley Electric  Association, the City of Seward Electric Department, Matanuska Electric Association and Anchorage Municipal Light and Power.      Renewable Energy Fund Round 5 Project Cost/Benefit Worksheet   RFA AEA12-001 Application Cost Worksheet Page 2 7-1-11 3. Proposed System Design Capacity and Fuel Usage (Include any projections for continued use of non-renewable fuels) a) Proposed renewable capacity (Wind, Hydro, Biomass, other) [kW or MMBtu/hr] Hydro – 350 kW b) Proposed annual electricity or heat production (fill in as applicable) i. Electricity [kWh] 1,065,852 ii. Heat [MMBtu] c) Proposed annual fuel usage (fill in as applicable) i. Propane [gal or MMBtu] ii. Coal [tons or MMBtu] iii. Wood [cords, green tons, dry tons] iv. Other 4. Project Cost a) Total capital cost of new system Estimated: $4,982,951 b) Development cost Estimated: $413,619 c) Annual O&M cost of new system $170,000 Total labor and non-labor d) Annual fuel cost 5. Project Benefits a) Amount of fuel displaced for i. Electricity 85,268 gal ii. Heat iii. Transportation b) Current price of displaced fuel Analyzed at AEA’s $4.59/gal (Retail price of $7.31/gal) c) Other economic benefits d) Alaska public benefits 6. Power Purchase/Sales Price a) Price for power purchase/sale 7. Project Analysis a) Basic Economic Analysis Project benefit/cost ratio 2.06 Payback (years) 10 years Attachment C Grant Budget Form Renewable Energy Fund Grant Round V Grant Budget Form 7-1-11 Milestone or Task Anticipated Completion Date RE- Fund Grant Funds Grantee Matching Funds Source of Matching Funds: Cash/In-kind/Federal Grants/Other State Grants/Other TOTALS Project Work Plan 10/1/2012  $    4,577    $         158  In‐Kind  $        4,735  Project scoping and contractor solicitation for planning and design 10/1/2012  $    5,692    $         197  In‐Kind  $        5,889  Conceptual Design Phase 12/1/2012  $  70,454    $     2,438  In‐Kind  $     72,892  35% Design Phase 3/1/2013  $  87,080    $     3,013  In‐Kind  $     90,093  Resolution of land use, right of way issues 5/1/2013  $    3,332    $         115  In‐Kind  $        3,447  Permit applications (as needed)  6/1/2013  $  22,637    $         783  In‐Kind  $     23,420  Final environmental assessment and mitigation plans (as needed) 6/1/2013  $    2,160    $           75  In‐Kind  $        2,235  Negotiated power or heat sales agreements with approved rates 5/1/2013  $  16,760    $         580  In‐Kind  $     17,340  Final business and operational plan 6/1/2013  $  14,615    $         506  In‐Kind  $     15,121  95% Design Phase 6/1/2013  $  85,004    $     2,941  In‐Kind  $     87,945  Permit approvals 7/1/2013  $    9,114    $         315  In‐Kind  $        9,430  Engineers cost estimate 7/1/2013  $  13,174    $         456  In‐Kind  $     13,630  Updated economic and financial analysis 7/1/2013  $    5,953  $         206 In‐Kind  $        6,159   TOTALS $  399,786 $   13,833   $   413,619  Budget Categories: Direct Labor & Benefits $283,436 $13,833 In-Kind $297,269 Travel & Per Diem $31,000 $ $31,000 Equipment $ $ $ Materials & Supplies $1,350 $ $1,350 Contractual Services $64,000 $ $64,000 Construction Services $ $ $ Other (permits) $20,000 $ $20,000 TOTALS $  399,786 $   13,833   $   413,619  Applications should include a separate worksheet for each project phase (Reconnaissance, Feasibility, Design and Permitting, and Construction)- Add additional pages as needed Attachment D Support Letters Attachment F Authorized Signers Form Attachment G City Resolution Attachment H Supplemental Documents Scammon Bay Hydroelectric Feasibility Study March 2003 AEA Cost Economic Calculation AEA B/C Model Project Description Community Nearest Fuel Community Comments: (Please assign comment ID and hyperlink next to applicable column/row) Region ID RE Technology Project ID Applicant Name Project Title Category Results NPV Benefits $8,611,792 NPV Capital Costs $4,173,143 B/C Ratio 2.06 NPV Net Benefit $4,438,649 Performance Unit Value Displaced Electricity kWh per year 1,065,852 Displaced Electricity total lifetime kWh 31,975,560 Displaced Petroleum Fuel gallons per year 85,268 Displaced Petroleum Fuel total lifetime gallons 2,558,045 Displaced Natural Gas mmBtu per year - Displaced Natural Gas total lifetime mmBtu - Avoided CO2 tonnes per year 865 Avoided CO2 total lifetime tonnes 25,964 Proposed System Unit Value Capital Costs $4,982,951$ Project Start year 2013 Project Life years 30 Displaced Electric kWh per year 1,065,852 Displaced Heat gallons displaced per year Displaced Transportation gallons displaced per year Renewable Generation O&M $ per kWh 0.16 Electric Capacity kW Electric Capacity Factor % Heating Capacity Btu/hr Heating Capacity Factor % Base System Unit Value Diesel Generator O&M $ per kWh 0.160$ Diesel Generation Efficiency kWh per gallon 12.50 Parameters Unit Value Heating Fuel Premium $ per gallon 1.00$ Transportation Fuel Premium $ per gallon 1.00$ Discount Rate % per year 3% Crude Oil $ per barrel EIA Mid Natural Gas $ per mmBtu ISER - Mid 1 2 3 45678961 Annual Savings (Costs)Units 2008 2009 2010 2011 2012 2013 2014 2015 2016 2068 PV Entered Value Project Capital Cost $ per year -$ -$ -$ -$ -$ 4,982,951$ -$ -$ -$ -$ $4,173,143 Electric Savings (Costs)$ per year $0 $0 $0 $0 $0 $404,258 $414,917 $423,589 $433,967 $0 $8,611,792 Heating Saving (Costs)$ per year $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Transportation Savings (Costs)$ per year $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total Savings (Costs)$ per year $0 $0 $0 $0 $0 $404,258 $414,917 $423,589 $433,967 $0 $8,611,792 Net Benefit $ per year $0 $0 $0 $0 $0 ($4,578,693)$414,917 $423,589 $433,967 $0 $4,438,649 Electric Units 2008 2009 2010 2011 2012 2013 2014 2015 2016 2068 PV Renewable Generation kWh per year - - - - - 1,065,852 1,065,852 1,065,852 1,065,852 - Entered Value Renewable Scheduled Repairs $ per year -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ $0 Renewable O&M $ per year -$ -$ -$ -$ -$ 170,536$ 170,536$ 170,536$ 170,536$ -$ $2,883,345 Entered Value Renewable Fuel Use Quantity (Biomass) green tons -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Entered Value Renewable Fuel Cost $ per unit -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Total Renewable Fuel Cost $ per year -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ $0 Proposed Generation Cost $ per year -$ -$ -$ -$ -$ 170,536$ 170,536$ 170,536$ 170,536$ -$ $2,883,345 Fossil Fuel Generation kWh per year - - - - - 1,065,852 1,065,852 1,065,852 1,065,852 - Fuel Cost $ per gallon 5.06$ 3.22$ 4.29$ 4.59$ 4.62$ 4.74$ 4.87$ 4.97$ 5.09$ 9.75$ Entered Value Generator Scheduled Repairs $ per year -$ -$ -$ -$ -$ -$ -$ -$ -$ $0 Fuel Use gallons per year - - - - - 85,268 85,268 85,268 85,268 - Fossil Fuel O&M $ per year -$ -$ -$ -$ -$ 170,536$ 170,536$ 170,536$ 170,536$ -$ $2,883,345 Fuel Cost $ per year -$ -$ -$ -$ -$ 404,258$ 414,917$ 423,589$ 433,967$ -$ $8,611,792 Base Generation Cost $ per year -$ -$ -$ -$ -$ 574,794$ 585,453$ 594,125$ 604,503$ -$ $11,495,137 Heating Units 2008 2009 2010 2011 2012 2013 2014 2015 2016 2068 PV Renewable Heat gallons displaced per year - - - - - - - - - - Entered Value Renewable Heat Scheduled Repairs $ per year -$ -$ -$ -$ -$ -$ -$ -$ -$ $0 Entered Value Renewable Heat O&M $ per year -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ $0 Entered Value Renewable Fuel Use Quantity (Biomass) green tons -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Entered Value Renewable Fuel Cost $ per unit -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Total Renewable Fuel Cost $ per year -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Proposed Heat Cost $ per year -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ $0 Fuel Use gallons per year - - - - - - - - - - Fuel Cost $ per gallon 4.80$ 3.77$ 4.47$ 4.64$ 4.66$ 4.73$ 4.80$ 4.86$ 4.94$ 7.98$ Entered Value Fuel Scheduled Repairs $ per year -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ $0 Entered Value Fuel O&M $ per year -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ $0 Fuel Cost $ per year -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ $0 Base Heating Cost $ per year -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ $0 Transportation Units 2008 2009 2010 2011 2012 2013 2014 2015 2016 2068 PV Renewable Transportation Use gallons displaced per year - - - - - - - - - - Entered Value Scheduled Repairs ($) $ per year -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ $0 Entered Value O&M $ per year -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ $0 Proposed Transportation Cost $ per year -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ $0 Transportation Fuel Use gallons per year - - - - - - - - - - Transportation Fuel Cost $ per gallon 4.80$ 3.77$ 4.47$ 4.64$ 4.66$ 4.73$ 4.80$ 4.86$ 4.94$ 7.98$ Entered Value Scheduled Repairs ($) $ per year -$ -$ -$ -$ -$ -$ -$ -$ -$ $0 Entered Value O&M $ per year -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ $0 Fuel Cost $ per year -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ $0 Base Transportation Cost $ per year -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ $0 Base Proposed Base Proposed Base Proposed The City of Scammon Bay Scammon Bay Hydroelectric Scammon Bay Scammon Bay Rural Description Hydro