Loading...
HomeMy WebLinkAboutBBAHC SupportLetter2011-ra,L\-u/ Bristol Bay Area Health Corporation 6000 Kanakanak Road P.O. Box 130 Dillingham, AK 99576 (907) 842-5201aooaza-szor September 2,2011 FAX (907) a42-s354 Bristol Bay Area Health Corporation is a tribal organization representing 34 villages in Southwest Alaska: Aleknagik Chignik Bay Chignik Lagoon Chignik Lake Clark's Point Dillinqham Egegik Eku k Ekwok Goodnews Bay lgiugig I liam na lvanoJ Bay Kanata k King Salmon Knugank Kokhanok Koliganek Levelock Manokotak Naknek New Stuyahok N ewha le n Chignik Lagoon Village Council P.O. Box 9 Chignik Lagoon, AK 99565 Subject: Packer's Creek Hydroelectric Project Letter of Recommendation Dear Chignik Lagoon Village Council: This letter shows BBAHC's full support for the Packer's Creek Hydroelectric Project, which we understand is in the final stages of permitting and design. The project will meet an estimated94% of Chignik Lagoon's existing electrical demand and offset use of an estimated 44,000 gallons of diesel generation fuel; with savings of approximately $188,000 ayear. Additional public benefits would include fewer pollutants discharged in the air and less risk for environmental liability. The projected savings of having this hydro project will have a positive impact on the community of Chignik Lagoon. Any decrease in cost of basic life needs helps people to decide on staying in their community and may also help with the community's growth. The project will also have a savings in the operation of the Chignik Lagoon village clinic by reducing fuel and electrical costs. In closing, we encourage the funders to continue to move the project forward. Sincerely, Nondalton ,rl PedroBay ' r) -/ ) ,', -' ',-., a_d_:\. u-*--L-G-- Perryvi I le Pilot Point ROSe LOefapratinum Community Health Services Director Port Heiden Portage Creek South Naknek Togiak Twin Hills Uqashik 'l'o prontote heultlt u,,itlt totnpetence, o carrnq ottitude & cuIturul -se,i.sil iyil ji THE LAKE AND PENINSULA SCHOOL DISTRICT 101 Jensen Drive P.O. Box 498 King Salmon, Alaska 99613 Phone (907) 246-4280 / Fax (907) 246-4473 August 23,20II Mr. Grunert: The Lake and Peninsula School District is in support of the community of the Chignik Lagoon's Packer's Creek Hydroelectric Project. LPSD believes the development of the hydroelectric project benefit the community of Chignik Lagoon and the environment in many ways. Reduced reliance on fossil fuels resulting in less waste to the environment is desirable. LPSD will benefit from reduced cost of electricity and is interested in the potential availability of interruptible electric space heat. Please keep us informed as your project progresses. If there is opportunity for collaboration on design and/or installation of electric boilers to utilize excess power generation by the project similar to the recent Tazimina collaboration we are open to all possibilities. Sincerely, Ty Mase Superintendent ChignikBaycChignikLagoonoChignikLakeoEgegikolgiugigolvanofBayoKokhanokoLevelockNewhalen o Nondalton o Pedro Bay o Perryuille o Pilot Point o Port Alsworth o Port Heiden