HomeMy WebLinkAboutThayer Lake Round V Grant Application Generation/GoVD ALASKA Renewable Energy Fund Round 5
40= ENERGY AUTHORITY Grant Application
Application Forms and Instructions
The following forms and instructions are provided to assist you in preparing your application for
a Renewable Energy Fund Grant. An electronic version of the Request for Applications (RFA)
and the forms are available online at: http://www.akenergyauthority.org
Grant Application
GrantApp5.doc
Application form in MS Word that includes an outline of
Form
information required to submit a complete application.
Applicants should use the form to assure all information is
provided and attach additional information as required.
Application Cost
Costworksheet
Summary of Cost information that should be addressed by
Worksheet
5.doc
applicants in preparing their application.
Grant Budget
GrantBudget5.
A detailed grant budget that includes a breakdown of costs by
Form
doc
milestone and a summary of funds available and requested to
complete the work for which funds are being requested.
Grant Budget
GrantBudgetln
Instructions for completing the above grant budget form.
Form Instructions
structions5.doc
Authorized
Authorized
Form indicating who is authorized to sign the grant, finance
Signers Form
signers
reports and progress reports and provides grantee information.
form5.doc
• If you are applying for grants for more than one project, provide separate application
forms for each project.
• Multiple phases for the same project may be submitted as one application.
• If you are applying for grant funding for more than one phase of a project, provide
milestones and grant budget for completion of each phase.
• If some work has already been completed on your project and you are requesting
funding for an advanced phase, submit information sufficient to demonstrate that the
preceding phases are satisfied and funding for an advanced phase is warranted.
• If you have additional information or reports you would like the Authority to consider in
reviewing your application, either provide an electronic version of the document with
your submission or reference a web link where it can be downloaded or reviewed.
REMINDER:
• Alaska Energy Authority is subject to the Public Records Act AS 40.25, and materials
submitted to the Authority may be subject to disclosure requirements under the act if no
statutory exemptions apply.
• All applications received will be posted on the Authority web site after final
recommendations are made to the legislature.
• In accordance with 3 AAC 107.630 (b) Applicants may request trade secrets or
proprietary company data be kept confidential subject to review and approval by the
Authority. If you want information is to be kept confidential the applicant must:
o Request the information be kept confidential.
o Clearly identify the information that is the trade secret or proprietary in their
application.
o Receive concurrence from the Authority that the information will be kept
confidential. If the Authority determines it is not confidential it will be treated as a
public record in accordance with AS 40.25 or returned to the applicant upon
request.
AEA 12-001 Application Page 1 of 28 7/1/2011
ALAHSKA
Renewable Energy Fund
Grant Application Round 5
SECTION 1 — APPLICANT INFORMATION �77
Name (Name of utility, IPP, or government entity submitting proposal)
Kootznoowoo Incorporated
Type of Entity: Fiscal Year End opezcmeeyl-
Independent Power Producer (�
-
Tax ID # % Tax Status: x For -profit or non-profit check one)
Mailing Address
Physical Address
8585 Old Dairy Road, Suite 104
8585 Old Dairy Road, Suite 104
Juneau, AK 99801
Juneau, AK 99801
Telephone Fax Email
907-790-2992 907-790-2995 peterCcbkootznoowoo.com
1.1 APPLICANT POINT OF CONTACT / GRANTS MANAGER
Name
Title
Peter Naoroz
General Manager and President
Mailing Address
8585 Old Dairy Road, Suite 104
Juneau, AK 99801
Telephone
Fax
Email
907-790-2992
907-790-2995
peter kootznoowoo.com
1.2 APPLICANT MINIMUM REQUIREMENTS
Please check as appropriate. If you do not to meet the minimum applicant requirements, your
application will be rejected.
1.2.1 As an Applicant, we are: (put an X in the appropriate box)
An electric utility holding a certificate of public convenience and necessity under AS
42.05, or
X
An independent power producer in accordance with 3 AAC 107.695 (a) (1), or
A local government, or
A governmental entity (which includes tribal councils and housing authorities);
Yes
1.2.2. Attached to this application is formal approval and endorsement for its project by
its board of directors, executive management, or other governing authority. If the
applicant is a collaborative grouping, a formal approval from each participant's
governing authority is necessary. (Indicate Yes or No in the box )
Yes
1.2.3. As an applicant, we have administrative and financial management systems and
follow procurement standards that comply with the standards set forth in the grant
agreement.
Yes
1.2.4. If awarded the grant, we can comply with all terms and conditions of the attached
grant form. (Any exceptions should be clearly noted and submitted with the
application.)
Yes
1.2.5 We intend to own and operate any project that may be constructed with grant
funds for the benefit of the general public.
AEA12-001 Grant Application Page 2 of 28 7/1//2011
/4KIF' ALASKA Renewable Energy Fund
ENERGY AUTHORITY Grant Application Round 5
SECTION 2 — PROJECT SUMMARY
This is intended to be no more than a 1-2 page overview of your project.
2.1 Project Title — (Provide a 4 to 5 word title for your project)
Type in your answer here and follow same_format for rest of the application.
Thayer Lake Hydropower Development (TLHD) Generation Project
2.2 Project Location —
Include the physical location of your project and name(s) of the community or communities that will
benefit from your project.
The Project location is located on the west shoreline of Admiralty Island National Monument
approximately six miles north of Angoon, Alaska in the middle of the Kootznoowoo
Wilderness. The City of Angoon, the Southeast Region and the State of Alaska will benefit
from this project.
2.3 PROJECT TYPE
Put X in boxes as appropriate
2.3.1 Renewable Resource Type
Wind
Biomass or Biofuels
X
Hydro, including run of river
X
Transmission of Renewable Energy
Geothermal, including Heat Pumps
Small Natural Gas
Heat Recovery from existing sources
Hydrokinetic
Solar
Storage of Renewable
Other (Describe)
2.3.2 Proposed Grant Funded Phase(s) for this Request (Check all that apply)
Reconnaissance
Design and Permitting
Feasibility
X
Construction and Commissioning
Conceptual Design
2.4 PROJECT DESCRIPTION
Provide a brief one paragraph description of your proposed project.
Thayer Lake Hydropower Development consists of a 1+MW run of the river hydropower project
located in the Tongass Forest within the Admiralty Island National Monument based on a
proposal that Kootznoowoo submitted in March 2000 which is described more full in the
Angoon Hydrologic Project Feasibility Evaluation Report currently on file with the AEA (Project).
The development would be located on Thayer Creek approximately 6 miles north of Angoon.
Thayer Creek flows out of Thayer Lake (64 square mile reservoir) at a gentle grade through a
broad forested valley then steepens for 6,800 feet through a narrow forested canyon and finally
flattens again for 2000 feet before flowing into Chatham Strait. The development will tap the
energy potential in the steep section of the stream and will avoid any impact on anadromous
fish that use the lower portion of the creek. The average flow of Thayer Creek is approximately
370 cfs and can vary from 25 cfs during the coldest periods of the winter to over 2000 cfs during
storms in the fall and winter. The generating facility has a head of 250 feet which is
AEA12-001 Grant Application Page 3 of 28 7/1//2011
&ALASKAENERGH
Renewable Energy Fund
Grant Application Round 5
approximate because of the wording of the Forest Service Record of Decision (ROD) requiring
maintenance of fish habitat. An additional restriction set forth in the ROD which is not
considered in the HDR proposal requires the overland transmission line be buried where
feasible along the access road to the community of Angoon. The transmission line funding will
be submitted in a separate companion application for Round V funds.
2.5 PROJECT BENEFIT
Briefly discuss the financial and public benefits that will result from this project, (such as reduced fuel
costs, lower energy costs, etc.)
Kootznoowoo's goal in applying for these funds, which will augment other sources, is to
construct the generating portion of an energy generating and transmitting project that
meets the congressional requirements of the Secretary of Agriculture for the cultural
and economic benefits for the community of Angoon and as such is mindful of the
increased health risks and costs associated with the current diesel based generating
capacity of Angoon, Alaska. While not quantified in terms of health care costs savings
over time and impacts on the global economy Kootznoowoo goal is to decrease and
ultimately eliminating the hydrocarbon emissions attributable to current diesel
generating facilities in the community and replacing it with clean generating capacity
and backup.
An additional public benefit is eliminating relatively risky shipments of diesel fuel in a
very important state fisheries area surrounding the community of Angoon and the
concomitant costs associated with stand by and actual clean up efforts which must be
borne by the utility rate payers and both the State of Alaska and the federal
government.
Reduced fuel costs and lower energy costs, particularly to businesses and government
sector users, provide significant public benefit and an opportunity for economic growth
in an otherwise stagnant and declining economy.
Finally, the replacement of volatile priced fuels that must be transported at significant
additional expense will be replace by clean and stable priced renewable fuel which is
locally produced.
2.6 PROJECT BUDGET OVERVIEW
Briefly discuss the amount of funds needed, the anticipated sources of funds, and the nature and source
of other contributions to the project.
Kootznoowoo has expended significant funds, time and effort to date on this project. The State
of Alaska and the federal government have also contributed funds in identifying this project and
preparing a Record of Decision and a Final Environmental Impact Statement. Based on the HDR
feasibility and evaluation report reference herein and submitted to AEA as part of Round IV
application updated for inflation and additional known charges, the following is the current
budget for completion of the overall project:
Reconnaissance, Feasibility, Environmental $ 2,200,000
Preconstruction Engineering, Permitting, Design & Construction $ 2,221,000
Construction Costs Generating Facility Only $ 4,372,402
AEA12-001 Grant Application Page 4 of 28 7/1//2011
A L A S K A
4NE—) ENERGY AUTHORITY
Renewable Energy Fund
Grant Application Round 5
Construction Costs Transmission Facility
Contingency
Total Project Cost with Contingency
$ 4,784,000
$ 1,623,706
$15,201,108
Kootznoowoo is not seeking recovery of previously expended funds through this application.
Kootznoowoo's request for funds under this application is for $3,500,000, which includes
construction activities associated with the construction of the generating facility, road, diversion
structure, and penstock and power house shown in the HDR, Alaska Project documents.
In a separate application filed in conjunction with this application Kootznoowoo is requesting
funds in the amount of an additional $3,500,000 for the transmission line construction (including
construction of maintenance road and burying transmission lines where feasible as well as
tunneling under Kootznoowoo Inlet to complete the transmission connection to the community).
The intent of the separate application is to seek maximum State funds for both portions of the
overall TLHD Project and begin construction of the transmission components in the Summer of
2012.
Kootznoowoo will contribute and endeavor to secure the additional funds necessary to complete
the final project. It will seek additional funds from sources including but not limited to direct
federal funds, tribal authorized funds and funds available from the community or the State of
Alaska.
2.7 COST AND BENEFIT SUMARY
Include a summary of grant request and your project's total costs and benefits below.
Grant Costs
(Summary of funds requested)
2.7.1 Grant Funds Requested in this application.
$3,500,000
2.7.2 Other Funds to be provided (Project match)
$872,402
2.7.3 Total Grant Costs (sum of 2.7.1 and 2.7.2)
$4,372,402
Project Costs & Benefits
(Summary of total project costs including work to date and future cost estimates to get to a fully
operational project)
2.7.4 Total Project Cost (Summary from Cost Worksheet
$15,201,108
including estimates through construction)
2.7.5 Estimated Direct Financial Benefit (Savings)
$20.7 million
2.7.6 Other Public Benefit (If you can calculate the benefit in
$14.4 million conversion
terms of dollars please provide that number here and
of diesel home heating
explain how you calculated that number in your application
from diesel
(Section 5.)
SECTION 3 — PROJECT MANAGEMENT PLAN
Describe who will be responsible for managing the project and provide a plan for successfully
completing the project within the scope, schedule and budget proposed in the application.
3.1 Project Manager
Tell us who will be managing the project for the Grantee and include contact information, a
resume and references for the manager(s). If the applicant does not have a project manager
AEA12-001 Grant Application Page 5 of 28 7/1//2011
A L A S K A Renewable Energy Fund
/ME:) ENERGY AUTHORITY Grant Application Round 5
indicate how you intend to solicit project management support. If the applicant expects project
management assistance from AEA or another government entity, state that in this section.
The project manager will be Peter Naoroz the General Manager and President of
Grantee. Mr. Naoroz' resume is attached. Mr. Naoroz intends to hire an assistant
project manager who will be retained by a firm with significant qualifications in
completing run of river hydroelectric projects. Because of the unique nature of this
project's location and permitting requirements, Mr. Naoroz will maintain full
responsibilities for permitting, will directly oversee the Assistant Project Manager,
project funding including power sales agreement, and project implementation including
but not limited to procuring project construction management services and retaining
qualified general contractors who meet requirements of the USDA Forest Service.
Firms which have expressed an interest in providing project management services
include Chatham Electric, AP&T, and Cascade Creek, LLC, and other companies
identified during the final design work being conducted in FY ending June 2012. We will
be continuing our search for qualified firms and select one based on a proven capability
to perform work on time and on budget, experience in building hydropower in Southeast
Alaska; proven experience in building Low Impact Hydropower Institute approved
hydropower generation facilities.
Kootznoowoo will coordinate with and solicit input from AEA, the City of Angoon, the
Angoon Community Association and the certificated public utility, IPEC during each
phase of the Project.
3.2 Project Schedule
Include a schedule for the proposed work that will be funded by this grant. (You may include a
chart or table attachment with a summary of dates below.)
Many phases of the development project have successfully been completed. The
reconnaissance and preliminary feasibility and environmental work necessary for
proceeding to preconstruction activities have been completed and fully funded by either
Kootznoowoo or the federal government. The schedule of proposed work that will be
funded by this phase of this grant includes the following major tasks:
• Any finalization of Special Use Permits
• Additional fundraising
• Bidding of Construction activities under Final Plan
• Construction Commencement, Substantial Completion, Testing and Final Signoff
under provisions of Power Sale Agreement and Commencement of Operations
3.3 Project Milestones
Define key tasks and decision points in your project and a schedule for achieving them. The
Milestones must also be included on your budget worksheet to demonstrate how you propose to
manage the project cash flow. (See Section 2 of the RFA or the Budget Form.)
Construction Phase
Confirmation that all design and feasibility requirements are complete. Sept. 2012
Completion of bid documents October 2012
AEA12-001 Grant Application Page 6 of 28 7/1//2011
/44sk'S ALASKA Renewable Energy Fund
GEL-) ENERGY AUTHORITY Grant Application Round 5
Bidding, Feedback and Bid Awards
January 2013
Road Construction — Generation Facility
Spring Summer
2013
Road Construction — Power Line and Transmission
Spring Summer
2013
Power House Construction
Spring Summer
2013
Transmission Line Construction
Spring Summer
2013
Integration and testing
Fall 2013
Decommissioning old systems or System Integration
Winter 2013
Final Acceptance, Commissioning and Start-up
Spring 2014
Operations Reporting
Spring 2014
3.4 Project Resources
Describe the personnel, contractors, equipment, and services you will use to accomplish the
project. Include any partnerships or commitments with other entities you have or anticipate will
be needed to complete your project. Describe any existing contracts and the selection process
you may use for major equipment purchases or contracts. Include brief resumes and references
for known, key personnel, contractors, and suppliers as an attachment to your application.
No formal partnerships or commitments with other entities other the U.S. Department of
Energy have been entered into. Kootznoowoo has entered into a Memorandum or
Understanding with the local federally recognized tribe, Angoon Community Association
as well as the City of Angoon. We also have the support and cooperation of the City of
Angoon and the Angoon Community Association as can be evidenced by previously
submitted Energy Resolution which remains in effect, as well as the Resolutions of
Support from each organization. This critical group of entities will work collaboratively
on supporting the development of the Project and utilize their influence to move the
project to completion. In exchange for this support Kootznoowoo will endeavor to make
the project a success by completing tasks on time and on budget, and by keeping these
entities informed on progress; utilizing open and competitive bidding on project
components; and providing for and requiring a local hiring preference for labor and
contracting. Kootznoowoo selection processes include a preference for shareholders
and their spouses during competitive bidding. Kootznoowoo also commits to the
procurement requirements of the federal government, its agencies and including those
requirements of the Recovery Act (Stimulus) as required by funders. The AEA will have
access to all final bid documents and criteria prior to bid awards. Kootznoowoo Project
Manager retains all contract decision authority.
IPEC, the community of Angoon's electric utility, has prepared a strategic plan which
has been adopted by its Board of Directors identifying the Project as its renewable
solution for the Community. The plan states that TLHD will displace 90% of the diesel
requirement it uses to generate electricity. On June 1st 2009 representatives of IPEC
and the AEA described Thayer Lake as Angoon's perfect solution to decrease local
diesel generation. The purpose of the meeting was to seek common ground to building
the project. Subsequent to this meeting Kootznoowoo has received a bid from a highly
regarded law firm to assist Kootznoowoo in entering into a power sales agreement once
AEA12-001 Grant Application Page 7 of 28 7/1//2011
ALA
Renewable Energy Fund
Grant Application Round 5
we are in a position to determine the final economics and as a condition to funding
construction of the project. Kootznoowoo expects significant public benefits to ensue
from the project which will be memorialized in the final power sales agreement.
IPEC has reported to the Southeast Conference in its Status Report on Quest for Diesel
Independence dated September 14, 2009 that "it is conceived that IPEC will buy power
from Kootznoowoo when the project is built as long as it is cheaper than diesel -
generated power." Kootznoowoo will not proceed with this project unless this is the
case and it will not proceed unless TLHD can significantly reduce the overall cost of
power to Angoon ratepayers. IPEC's letter dated November 7, 2009 has previously
been provided to the AEA. On August 19, 2011 IPEC wrote to all of its customers a
letter that stated in part "IPEC believes that Thayer Creek project is the best and most
promising renewable energy project that could lead to reduced rates in Angoon, and we
stand ready to do whatever we can to advance this project." Letter attached.
3.5 Project Communications
Discuss how you plan to monitor the project and keep the Authority informed of the status.
During finalization of Project Design and Permitting, the Project Manager will initiate a bidding process
with the advice and guidance of the Kootznoowoo Advisory Committee which has been constituted and
includes the following organizations and interests which has been authorized by the Kootznoowoo Board
of Directors:
Kootznoowoo, Inc. — Peter Naoroz, General Manager and Chair of Committee
Local Utility — Peter Bibb, COO, IPEC has been invited
State of Alaska — Lawrence Blood, Rural Utilities Business Staff, DCRA, State of Alaska has accepted
Representative of the USDA Forest Service — Chad Van Ormer Admiralty District Ranger
Representative of the City of Angoon — Mayor Albert Howard or designee
Representative of the Angoon Community Association -- President Wally Frank or designee
Natural Currents LLC — Mr. Roger Bason, President and CEO
Kootznoowoo will plan to monitor phases of the project and keep AEA informed on the status by
communicating internally and externally as follows:
Weekly conference calls among the Project Manager and potential contractors and consultants with a
report of findings to the Advisory Committee via email.
Scheduling of initial meeting with AEA.
Monthly Scheduled meeting of Kootznoowoo Advisory Committee with written progress reports to AEA
and U.S. DOE Golden.
Selection of General Contractor Qualifications and recommendation from Advisory Committee and
Project Manager to Kootznoowoo Board of Directors with copy to AEA and any other Grant fonder for
informational purposes.
Submittal of updated Schedule and Cost Estimates to all interested parties including AEA.
During Project construction, communications within the team will consist of:
Weekly conference calls among the Project Manager, Construction Manager, Construction
Superintendents, Design Engineer, and representatives of the Forest Service with written report to
AEA12-001 Grant Application Page 8 of 28 7/1//2011
/4wmF-2—') ALASKA
4W7 ENERGY AUTHORITY
Kootznoowoo Advisory Committee.
Renewable Energy Fund
Grant Application Round 5
Weekly regarding compliance with environmental requirements
Bi-weekly written reports from the Construction Manager and Design Engineer detailing work completed,
work to be completed in the next two weeks, and potential problems identified.
Periodic site visits by the Project Manager, Construction Manager, Design Engineer, with a detailed
report on findings provided to the members of the Kootznoowoo Advisory Committee
These internal discussions and reports will form the basis of monthly reports and quarterly reports to the
AEA and others.
The reports will show in a clear and concise manner progress made on the various tasks and milestones,
the work to be accomplished in the ensuing month, and potential problems and corrective actions to be
considered or implemented. Cost data as described above will also be provided on a monthly basis.
Microsoft Project or similar software will be used to develop and maintain schedule and budget
information; updating of the management files will be on a bi-weekly basis.
3.6 Project Risk
Discuss potential problems and how you would address them.
Resource construction always carry certain amounts of uncertainty be it technical or
financial. Construction of a run of river project such as TLHD carries significantly less
risks than say a lake tap project with significant underground work. Additionally the
technology is proven and risks are further mitigated by complete and thorough Forest
Service oversight; particularly, when the standards are established and applied by the
USDA Forest Service under their standard field manual and a ROD which has been
thoroughly vetted by stakeholders through a full blown Environmental Impact Statement
and a to be established Special Use Permit. This high level of scrutiny was established
by the U.S. Congress under ANILCA. However risks do exist and some of the potential
risks and mitigating actions being taken by Kootznoowoo Incorporated for TLHD
includes the following.
Permitting — Will be substantially complete prior to use of construction funds.
Final Design — Will be completed and Construction documents prepared in a manner
that is consistent with the Record of Decision by the Forest and the Final EIS
Seismic — Project components will be designed appropriately for seismic activity, and it
is noted that the Eastern Denali- Chatham fault line runs through Chatham Straits where
Thayer Creek outfalls. The ROD requires that the diversion dam be constructed to
meet the guidelines for low hazard dams established by the Alaska Department of
Natural Resources. (ROD page 11)
Underground Construction — The current design for the project does not include
significant underground construction. Appropriate Geotechnical work will be done as
part of the preconstruction activities and finalized prior to construction activities at the
diversion structure and power house foundation and Penstock placement to assure
sound construction. It is anticipated that a routine boring and tunneling will occur to
cross Kootznahoo Inlet.
AEA12-001 Grant Application Page 9 of 28 7/1//2011
/4G1LF_2'ALASKA
Renewable Energy Fund
Grant Application Round 5
Construction Pricing and Performance — Only qualified contractors will be given a bid
package and they will be required to make appropriate site visits to assure the quality of
their bids as part of the bidding process.
Cost Overruns — The Project budget includes an appropriate level of contingency.
Operations — All major elements of the Project will carry standard warranties as
appropriate.
Operations and maintenance of the Project will be performed by qualified contractors in
accordance with Forest Service and Kootznoowoo hiring and employment policies.
SECTION 4 — PROJECT DESCRIPTION AND TASKS
• Tell us what the project is and how you will meet the requirements outlined in Section 2 of
the RFA.
• The level of information will vary according to phase(s) of the project you propose to
undertake with grant funds.
• If you are applying for grant funding for more than one phase of a project provide a
plan and grant budget form for completion of each phase.
• If some work has already been completed on your project and you are requesting funding for
an advanced phase, submit information sufficient to demonstrate that the preceding phases
are satisfied and funding for an advanced phase is warranted.
4.1 Proposed Energy Resource
Describe the potential extent/amount of the energy resource that is available.
Discuss the pros and cons of your proposed energy resource vs. other alternatives that may be
available for the market to be served by your project.
The TLHD as envisioned will be a 1+ megawatt hydroelectric resource located
approximately 6 miles north of Angoon Alaska. Annual energy production during an
average water year is estimated to be 8 million kilowatt-hours. The community load
factor will be confirmed during the upcoming year with the final design and confirmed
based on the passage of time, new telecommunication, entertainment and broadband
services and the conversion of diesel heat to electric heat as well as projected load
factors.
During final design the Project will be evaluated to accommodate increased storage in
the future and new technology to deal with freeze that will allow for better matching
generation with load requirements. These features are not felt to be warranted at this
time but as loads increase will be reconsidered.
Advantages: As will be discussed in the next subsection, diesel generation must be used
to provide electric generation in Angoon. The TLHD project will eliminate the need for
approximately 95% of the diesel generation until alternative reliable backup can be
provided that is capable of generations during low water according to estimates provided
by IPEC, the certificated community utility.
While other small hydroelectric resources are available in the area, none are as
accessible and proximate to Angoon, nor are they ready for immediate construction.
The project is located in a hydro reserve envisioned by Congress to provide power to
AEA12-001 Grant Application Page 10 of 28 7/1//2011
A L A S K A
dff---) ENERGY AUTHORITY
Renewable Energy Fund
Grant Application Round 5
Angoon. Tidal energy has promising potential in and near Angoon but the technology
will need to be proven and deployment cannot be deemed feasible nor reliable at this
time.
Geothermal, biofuel, wind and other alternative energy production is all of limited
application to Angoon at this time because of the lack of development of the regional
intertie. Until this is accomplished the best source of power necessary to displace diesel
in Angoon is this Project.
4.2 Existing Energy System
4.2.1 Basic configuration of Existing Energy System
Briefly discuss the basic configuration of the existing energy system. Include information about
the number, size, age, efficiency, and type of generation.
Inside Passage Electrical Cooperative (IPEC) until recently operated (3) 500 kva diesel
fired generators at a diesel cost of over $4.25 a gallon (and increasing) resulting in a
power cost to consumers and businesses that are approximately $.54 per KWh currently
and as high as $0.62 per kWh recently. Significant upgrades have occurred under the
supervision and by the AEA. The Grantee is aware of the upgrade to the system and
the addition of a new control system which currently is presently having "bugs worked
out". It is assumed that the efficiency of the system will be slightly better. Until the
system reliability is confirmed by IPEC and AEA we assume that the historic numbers
mentioned elsewhere are accurate for this grant proposal. Feedback from AEA and
IPEC would be helpful in other grant request the Grantee will be making however IPEC
feels that it may be premature to engage in depth discussion because of limited
resources and manpower at their end.
Historically and until the past couple of months the community of Angoon has been
serviced by IPEC with four diesel generators.
Generators (#2 diesel fuel engines)
Caterpillar 3456ATAAC 475 kW
Caterpillar 3508DI 550 kW (existing)
Angoon's electric generation facility consists of three diesel generator sets (genset) with
AEA12-001 Grant Application Page 11 of 28 7/1//2011
ALASM
Renewable Energy Fund
Grant Application Round 5
a total capacity of approximately 1,500 kw. The community's load is typically between
250kw and 400kw. Their voltage output is 480v 3-phase which feeds three -250kw
overhead transformers. These transformers boost to a 7,200v distribution voltage and a
majority of the community receives power by an overhead distribution system.
Kootznoowoo understands that these systems have been removed and replaced with
one 1 CAT 3456 genset with planned heat exchanger. We understand that this planned
unit is in testing mode and no reliable data on efficiency has been established. While
optimistic about savings, this application assumes similar efficiency going forward on the
basis of a stable load. AEA will have the best information available through its oversight
of the project.
4.2.2 Existing Energy Resources Used
Briefly discuss your understanding of the existing energy resources. Include a brief discussion of
any impact the project may have on existing energy infrastructure and resources.
Existing Energy Resources are entirely diesel generation by the local electric utility and a
combination of wood, diesel and propane for heating and cooking. Several other
residences and a large lodge utilize diesel generation for their electric production. As
detailed in the next section significant need and demand exists under a lower cost price
structure for electricity. The Project is designed to displace fossil fuel and replace with
local clean renewable energy.
In 2007, IPEC burned 147,157 gallons of diesel to produce 1,949,156 of sold kWh. The
average cost of diesel was $2.55 in 2007, but exceeds $4.25 in 2010. In 2011
Kootznoowoo paid a high of $4.70 per gallon and a low of $4.67 per gallon for number 1
diesel plus delivery or nearly $5.00 per gallon. With diesel rising $5.00 is a realistic
round figure for current home heating costs. Our hydropower development will stabilize
electrical costs to a low rate, reduce operating costs, reduce fuel spill issues and reduce
carbon emissions in our community. These ancillary benefits are in addition to
significantly increasing the standard of living of one of the lowest income per capita
communities $11,357 with 82% of the residents being Alaska Natives with an overall
community poverty rate of 27.9% (2000 US Census and Alaska Dept of Labor Workforce
and Development 2007) with 87% unemployment (TANF, Central Council of Tlingit and
Haida Indians of Alaska).
The average annual flow of Thayer Creek is estimated to be 369 cfs with peak flows
exceeding 2000 cfs (HDR 2000 and with 2003 update data included). Hydrodynamic
head at proposed power house site is 250 feet. The development has the capacity to
generate 8,500,000 kWh annually or four times the current consumption load of the
community. It is anticipated that economic forces of elasticity of demand in the
consumer, tribal and business markets will increase demand from the current usage.
Further, most homes, businesses and schools are heated with diesel fuel. It is
anticipated that with the advent of low cost hydropower that space heating energy usage
will begin substitution from oil heat to electrical heat once the project is completed.
Kootznoowoo expects the demand to expand as future local demand as sales
opportunities are created.
AEA12-001 Grant Application Page 12 of 28 7/1//2011
ld&2-ORITY
ALASHKA
Renewable Energy Fund
Grant Application Round 5
One demonstration solar energy site has been developed in the last year involving a
single residential home. No data is available has been available even though the project
has been in operation slightly over a year.
4.2.3 Existing Energy Market
Discuss existing energy use and its market. Discuss impacts your project may have on energy
customers.
The following table provides a historic summary of energy sales over the past six years
according to IPEC and as publish by AEA for the community of Angoon
FY 2003
1,755,719
kWh
FY 2004
1,765,541
kWh
FY 2005
1,746,764
kWh
FY 2006
1,658,402
kWh
FY 2007
1,677,750
kWh
FY 2008
1,934,201
kWh
FY 2009
1,893,727
kWh
FY 2010
1,739,139
kWh
The Thayer Lake Hydropower Development is the highest economic and energy priority
for the City of Angoon, the Angoon Community Association (traditional IRA tribe) and
Kootznoowoo Incorporated as evidenced our jointly developed Angoon Community
Energy Plan.
The economic benefits of this project are profound and will decrease the diesel
generated electrical expenses to the State of Alaska (through PCE program) community
residences, businesses and tribal members by over $900,000 a year (2012 expected
cost of $0.62 per kWh versus an expected hydropower development cost $0.15 per kWh
at a community usage of 2,000,000 kWh per year). This is a profound economic impact
since the community has a population of approximately 470. In addition, the advent of
low cost electricity will provide strong incentive for businesses, schools, municipal
buildings and homes of tribal members to convert from expensive diesel space heating
to cheaper and more economically reliable hydropower electricity. It is estimated that
this will provide an additional $1.5 million dollars in collective energy savings in
displacing another 500,000 gallons of diesel a year. Kootznoowoo through TLHD has
the goal to completely displace the use of fossil fuel use in Angoon with a goal of 100%
renewable energy driven Native community as a hallmark of the only community in the
Admiralty Island National Monument Wilderness. TLHD will allow Angoon to become
energy self sufficient in energy generation for current and future load growth. Converting
police, municipal, school, and fire vehicles (as well as personal vehicles) to plug in
electric and or electric hybrid vehicles will over time further decrease the use of fossil
fuels in Angoon.
In addition to the substantial increase in the standard of living and promotion of
economic benefits, TLHD will provide cultural and social benefits. Currently the Angoon
public schools have cut back on sports and extracurricular activities in order to pay
energy expenses. These lack of activities have spawned unwanted social behaviors that
would be eliminated if these programs could resume with lower energy costs. The gym
AEA12-001 Grant Application Page 13 of 28 7/1//2011
ALASM
Renewable Energy Fund
Grant Application Round 5
and other sports activities are unheated or not heated after hours which have further
reduced the recreational and social activities or our youth. In some cases, this has led
some of our tribal member families to move out of their traditional community so they can
provide resources to their children. TLHD will reverse this downward social spiral
impacting our youth and young adults.
Many of our elders are on fixed income and many residents live on a subsistence
lifestyle where fishing and hunting provide the majority of the protein consumed in many
households. Allowing fish and game to be readily and more cheaply frozen will allow
more sharing of resources with our elderly and at our social gatherings where
subsistence foods is a staple. Additionally, many of our citizens have curtailed their
transportation expenses to regional cultural events so that they can pay their energy
bills. This has led to a decrease in some of our most respected elders and leaders from
attending and contributing to important Native issues and forums. In some cases, our
elders have had to move out of their traditional community leaving a vacuum of tribal
knowledge and protocol with some clans.
Some of our traditional clan houses have become in disrepair because there are no
funds to heat the houses which has led to further degradation. Lower energy costs will
allow clans and their members to fix and maintain structures that are over 100 years old.
It is important to the community of Angoon to protect and allow these cultural structures
to be preserved. Furthermore, it is difficult for our community to host regional events that
Angoon has traditionally hosted due to the high cost of energy. Therefore, low cost
hydropower will revitalize our ability to host cultural and traditional events that we have
been forced to eliminate.
An ancillary benefit is that Thayer Creek has the opportunity to provide future clean
water source for the community of Angoon. The location of existing small dam and
water line along the planned transmission line provides the opportunity for additional
infrastructure along an existing grandfathered right of way for future water sourcing.
Although the current Angoon water source is acceptable, it has limitations and the
Thayer Creek could provide a better quality water source in the future. An underground
crossing alternative across Kootznoowoo Inlet provides significant opportunity to
enhance water supply and fire protection as part of the Project at no additional costs.
Angoon's largest employer, a destination lodge of national reputation, has until recently
provided its own diesel generated power and has become an IPEC customer. This
Lodge burns about 15 gallons per hour of diesel for 90 days a year or about 32,400
gallons. The national economic picture makes predictions about the future of the Lodge
uncertain however lower cost energy will certainly enhance operations.
The City of Angoon has expended funds on renovation of a cold storage facility and is
expected to be operational as soon as economic and less expensive power is available.
This facility was constructed in conjunction with the Angoon Community Association with
contributions from Kootznoowoo but cannot operate at the existing cost of power and
therefore it cannot support the fishing industry. When operating much of the operation
will be seasonal in nature. However, the facility will be open the entire year with some
basic maintenance load during the off-season months.
Kootznoowoo, in collaboration with Tlingit and Haida and Sealaska, had created the
AEA12-001 Grant Application Page 14 of 28 7/1 //2011
� AAUTHORITYLASK,ENERGY
Renewable Energy Fund
Grant Application Round 5
Angoon Business Center which limped through 2009/2010 but will be terminated from its
current location for lack of funds to support the operations going forward. This business
incubator while run as energy efficiently as possible supported 15 computer terminals
and a fledgling business which manufactured coats with a number of sewing machines.
The Angoon business center has found new sponsors but it replaces a load which was
part of the school district and the vacancy created has not be absorbed by an
economically viable entity.
Kootznoowoo and others have also considering establishing a tourist destination facility
that will include a large all electric commercial kitchen that was contributed to the
community as a gift from a local benefactor. This kitchen served a camp of 125 workers
daily and with significant power requirements that will likely be served by a standalone
generator. Community economics and high cost of electricity have prevented this project
from moving forward.
Kootznoowoo has been contacted by more than one small cruise operator and has
looked at the potential benefits of attracting small boutique boats to Angoon. The lack of
modern amenities and the cost of services with embedded costs of utilities make such a
proposition marginal in terms of economics. Being able to attract and charge berth fees
which include reliable shore power would change to economics to marginally attractive.
Perhaps the single most significant factor which must be considered as a potential
impact on the energy market is the possibility of bringing on significant new housing to
the market. Remarkably, at a time when most of Alaska is experience significant
migration to regional centers, Angoon continues to maintain a core population despite
the high cost of transportation and energy. The reasons are beyond the scope of this
application but importantly each and every original shareholder of Kootznoowoo was
deeded a residential lot of a minimum size of/2 acre and up to 1.5 acre depending on
location. In addition to this conveyance nearly 900 acres of prime real estate was
conveyed to the City of Angoon for future development. There is no other community in
Southeast Alaska with this inventory of platted residential lots and opportunities for
immediate growth. If the average usage is extrapolated over 4 times the number of
homes and business in Angoon it is reasonable to predict the load growth will quadruple
and the load growth would be faster than average due to pent up demand. Reasonable
scenarios exist that completely reverse the stable to declining economy of Angoon with
reduction of energy costs.
GCI has recently installed a cable landing station in Angoon that is a customer of IPEC.
This cable landing station also provides television, broadband and telephone service to
Angoon at the lowest rate in the State. Accordingly, it is reasonable to expect use of
these services to increase the average household demand for electricity in the future.
The historic TV cable provider (the City of Angoon) will be displaced with higher value
lower cost content provided by GCI.
Without TLHD any one of these loads would create significant need for diesel
generation. The Project will provide the long-term/low-cost power required for the
development of these and other potential loads. The Project will increase the value of
the public's private property and business in Angoon and increase the likelihood that
new businesses will begin and be able to maintain themselves and not fail due to the
high cost of electricity.
AEA12-001 Grant Application Page 15 of 28 7/1//2011
/4&_-2`1ALASKA Renewable Energy Fund
ENERGY AUTHORITY Grant Application Round 5
4.3 Proposed System
Include information necessary to describe the system you are intending to develop and address
potential system design, land ownership, permits, and environmental issues.
4.3.1 System Design
Provide the following information for the proposed renewable energy system:
• A description of renewable energy technology specific to project location
• Optimum installed capacity
• Anticipated capacity factor
• Anticipated annual generation
• Anticipated barriers
• Basic integration concept
• Delivery methods
The HDR feasibility and evaluation along with the Forest Service FEIS has been
provided under previous cover to the AEA and are incorporated herein by reference and
more fully describes in detail the system we propose. The final design will update the
systems utilizing the Grant Awarded to Kootznoowoo, Inc. this past fiscal year and those
positive changes will be incorporated in the system which will be constructed. Land
ownership, permits and environment issues are described at length and the proposed
system is suitable and well thought out and designed to meet the requirements of the
U. S. Congress in granting certain rights to Kootznoowoo to develop hydroelectric
resources for Angoon.
The specific technology is well established and proven and consists generally of a small
diversion dam, a pipeline and penstock which powers two Francis turbines which in turn
generate the renewable energy — these facilities are considered the generating facilities
and the subject of one grant application in Round V. From the powerhouse the power
will be transmitted to Angoon via an overland transmission line which will be buried
where feasible consistent with the ROD. A second grant application will cover the
transmission assets and service road
The proposed plan is to install two generators capable of producing 1 MW however the
next phase will review all assumptions related to potential load and stream flow with the
goal of optimizing capacity. Given Angoon's current average load and peak load this
configuration is optimum as it will allow Angoon's current load to be serviced reliably with
some room to grow.
As designed the anticipated annual generation is approximately 8,500,000 mWh per
year which is approximately 4 times the annual requirements. Please see the details in
Selected Arrangements in the HDR report.
Once the final design is completed the only barrier to completing is construction funding.
On the operational side, occasional, low water flows will require the current diesel genset
to serve in a back up capacity on average less than a week during the coldest days of
the year. The energy produced will be transmitted over a 6 mile transmission line which
AEA12-001 Grant Application Page 16 of 28 7/1//2011
ALASKA
Renewable Energy Fund
Grant Application Round 5
will be buried where feasible and which will ideally be run through a drilled conduit under
Kootznoowoo Inlet to the existing power grid operated by IPEC, the Angoon's utility.
The local utility will purchase power from Kootznoowoo as provided in a power sales
agreement and operation and maintenance responsibilities will be detailed in that
agreement.
4.3.2 Land Ownership
Identify potential land ownership issues, including whether site owners have agreed to the
project or how you intend to approach land ownership and access issues.
All the land and waters upon which the Project will be situated is either National Forest in
a highly restricted category of land status — "Wilderness Monument" or on land surface
estate owned by Kootznoowoo, Inc. The Alaska National Interest Lands Conservation
Act (ANILCA), Section 506(a)3(B) gives Kootznoowoo, Inc., the right to develop
hydroelectric resources on Admiralty Island at the Project locations, subject to such
conditions as the Secretary shall prescribe for the protection of water, fishery, wildlife,
recreational and scenic values of Admiralty Island. The Secretary through the USDA
Forest Service has prescribed these conditions in the ROD completed in July 2009. The
intertie connection across Kootznoowoo Inlet between Kootznoowoo's surface estate
and the City of Angoon will involve future negotiation for easements with private
landowners and these details are anticipated as part of finalizing the permitting and
several options are available and funds necessary are anticipated to be well within the
contingencies provided.
4.3.3 Permits
Provide the following information as it may relate to permitting and how you intend to address
outstanding permit issues.
• List of applicable permits
• Anticipated permitting timeline
• Identify and discussion of potential barriers
Please see the ROD which is attached for a complete list of applicable permits. Permit
timeline will ensue once sufficient funds are available to engage permitting professional
and pay necessary fees including mitigations impacts necessary after negotiations.
Anticipated Permitting Timeline: September 2012 for USDA special use permits, FERC
does not have jurisdiction. Water Permits if any will be substantially negotiated by
September 2012.
Identify and discussion of potential barriers to permitting: Kootznoowoo does not
anticipate barriers based on discussions to date with Forest Service officials who are
responsible for coordinating activities of permitting authorities. The only significant
barrier to permits is funding. In all likelihood Kootznoowoo will need to mitigate the
impacts of affecting wetlands as required by the requirement of the U.S. Army Corps of
Engineer's 404 permit and may require longer time frame than September 2012 and this
will be dictated by final design.
Importantly Thayer Lake Hydropower Development is the number one priority of the
combined Angoon Energy plan in which Kootznoowoo, Incorporated, the City of Angoon
AEA12-001 Grant Application Page 17 of 28 7/1//2011
ALASKA
41K--) ENERGY
Renewable Energy Fund
Grant Application Round 5
and the Angoon Community Association (traditional IRA) have signed off on. Please see
attached resolutions and letter to President Obama. In addition, IPEC submitted a
strong letter of support in Environmental Impact Study process and has demonstrated
their political and local support for the development. Additionally other communities and
important economic entities continue to support the Project and TLHD is blessed with
wide community support from within the community and tribal members that live outside
the community but would like to return once energy costs have been stabilized and an
economy can return. The development has a Final Environmental Impact study that is
culmination of years of environmental wrangling with the US Forest Service and
Environmental groups. We now enjoy the support of the US Forest Service along with
local and national Environmental groups. Our only barrier to development that we are
working on is securing funds for construction funds to build the development. With this
$3.5 million grant from the Renewable Energy Fund of the State of Alaska, the U.S.
Departments of Energy, Agriculture and Interior the cash flow from the project will more
than pay for the anticipated operating costs and under our scenarios make a return to
Kootznoowoo to provide resources for our tribal members.
4.3.4 Environmental
Address whether the following environmental and land use issues apply, and if so how they will
be addressed:
• Threatened or Endangered species
• Habitat issues
• Wetlands and other protected areas
• Archaeological and historical resources
• Land development constraints
• Telecommunications interference
• Aviation considerations
• Visual, aesthetics impacts
• Identify and discuss other potential barriers
Discussion
• Any threatened and endangered species have been fully disclosed in the Final
Environmental Impact study and do not pose a barrier to Project completion
• Habitat Issues are also disclosed in the same document and requirements for
mitigating the impacts on habitat are fully articulated.
• Wetlands and other protected areas are fully disclosed in the Final Environmental
Impact Statement (FEIS) and do not pose a significant barrier to Project
completion. The Army Corp of Engineers has physically been present on the site
with the Forest Service and Grantee and no barriers to construction are
anticipated with the current design.
• Archaeological and historical resources have been disclosed by the FEIS and
certain mitigation measures will be required which Kootznoowoo feels are
attainable and will require continued community participation and monitoring.
• Land development constraints have been fully analyzed by both HDR, Alaska and
the Forest Service based on their experts and significant experience. The original
road to the diversion dam was relocated based on recent experience in Gustavus
with roads that are proximate to streams and creeks. The relocation will add
slightly to the length but will protect critical habitat and reduce the chance of
AEA12-001 Grant Application Page 18 of 28 7/1//2011
ALASKA
Renewable Energy Fund
Grant Application Round 5
unstable soils and fill
Telecommunications interference — there is no anticipated telecommunication
interference.
• Aviation considerations — the crossing off Kootznoowoo Inlet is designed to be
under water to avoid impacting the seaplane approach that is currently utilized by
the community.
• Visual, aesthetics impacts have been addressed fully to the standards established
by ANILCA in the Forest Service Record of Decision (ROD) based on the
alternatives established in the Final Environmental Statement.
• Identify and discuss other potential barriers
Kootznoowoo does not anticipate barriers based on discussions to date with Forest
Service officials who are responsible for coordinating activities of permitting authorities.
4.4 Proposed New System Costs and Projected Revenues
(Total Estimated Costs and Projected Revenues)
The level of cost information provided will vary according to the phase of funding requested and
any previous work the applicant may have done on the project. Applicants must reference the
source of their cost data. For example: Applicants Records or Analysis, Industry Standards,
Consultant or Manufacturer's estimates.
4.4.1 Project Development Cost
Provide detailed project cost information based on your current knowledge and understanding of
the project. Cost information should include the following:
• Total anticipated project cost, and cost for this phase
• Requested grant funding
• Applicant matching funds — loans, capital contributions, in -kind
• Identification of other funding sources
• Projected capital cost of proposed renewable energy system
• Projected development cost of proposed renewable energy system
Proposed New System Costs and Projected Revenues
(Total Estimated Costs and Projected Revenues)
Attached is the detailed budget entitled "Thayer Lake Hydroelectric Budget" which has
previously been submitted to the AEA as part of Round IV. This information will be update with
the final design phase currently underway and it is anticipated that the costs will escalate over the
next 12 months at the current rate of inflation.
Also attached is a Schedule of HDR cost estimates which have been adjusted to 2011 dollars
using a 3% inflation rate. Updating to 2012 which we anticipate the start of construction will
escalate costs to approximately $8.8 million.
4.4.2 Project Operating and Maintenance Costs
Include anticipated O&M costs for new facilities constructed and how these would be funded by
the applicant.
(Note: Operational costs are not eligible for grant funds however grantees are required to meet
ongoing reporting requirements for the purpose of reporting impacts of projects on the
communities they serve.)
AEA12-001 Grant Application Page 19 of 28 7/1//2011
/®ALASM
Renewable Energy Fund
Grant Application Round 5
TABLE 4.4.2 Project Operating and Maintenance Costs
0&M Cost
Basis
Amount
Labor
1 half-time position
$25,000
Transportation
200 trips/year@$25/trip
$5 000
Misc. Expenses
$15,000
Administrative
35% of 0&M
$15,000
Insurance
0.1% of Total Construction Cost
$8,000
Replacements
0.2% of Total Construction Cost
$17,000
Total
"'
$85,000
Source: HDR Angoon Hydroelectric Project Feasibility Evaluation Report March 2000
Operating cost estimates from HDR's study assume coordination with the O&M of the existing
diesel plant so that a single new half time position is required. Kootznoowoo believes that in
order to retain qualified personnel to maintain both systems the position will need to pay more
than the estimated costs even if inflated for wage inflation over the past 10 years. Additionally
the transportation estimate of $25 per trip will need to inflate at the rate of inflation of gasoline
over the same period of time. These estimates will be updated with the updated feasibility
analysis completed with this phase of the project and negotiated in the Power Sales Agreement
and prior to construction funding.
4.4.3 Power Purchase/Sale
The power purchase/sale information should include the following:
• Identification of potential power buyer(s)/customer(s)
• Potential power purchase/sales price - at a minimum indicate a price range
• Proposed rate of return from grant -funded project
• Potential power buyers and customers include existing utility — IPEC is anticipated to be
the major customer. Depending on the utility rate structure — particularly for large interruptible
users at least one lodge has expressed an interest in purchasing power directly from
Kootznoowoo. Kootznoowoo also may start a business venture with a large user of energy on
lands on the North side of Kootznoowoo Inlet that would be serving after the communities power
needs were met in order to avoid spilling surplus power.
• Kootznoowoo has been, until this summer, been targeting a pro forma $0.15 kWh for
power sales which cuts power cost based on recent prices in half. In 2009-2010 fuel costs
averaged as much as $.30 per kWh, however until the current phase of the Project involving the
preconstruction activities can reveal the likely economics of the projects including available
federal grant funds this figure is only a target. A price range would be $0.13 to $0.18 depending
on other terms of the power sales agreement such as sharing of employees and creation of
operating efficiencies. By including the COO of IPEC in this critical final design phase we are
optimistic about reducing our operating costs by working collaboratively on reducing
maintenance and operation costs. For example a buried transmission line with an underground
cable through Kootznoowoo inlet should reduce O&M for the life of the project. Because of the
lack of economies of scale it is essential for the utility and Kootznoowoo to look for every
possible savings in order to keep the rate as low as possible.
In speaking to representatives of AEA during the summer months it is also possible that it will be
necessary to target a slightly higher price in order to enjoy a more full sponsorship by the State of
AEA12-001 Grant Application Page 20 of 28 7/1//2011
do ALASKA
4ME--) ENERGY AUTHORITY
Renewable Energy Fund
Grant Application Round 5
Alaska. A power purchase and sales price will be detennined ultimately by the negotiations that
lead up to a power sales agreement with IPEC but it is anticipated and we understand from these
discussion by targeting a price relatively close to the average "whole sale" cost of power in Prince
of Wales Island that this project can be constructed and operated at an overall residential price of
$0.22 to $0.25 utilizing a combination of grant funding and guaranteed or special loan
arrangement.
Kootznoowoo understand that the rate of return for grant funded projects are limited and that the
State of Alaska portion of funds are subject to regulations and covenants that insure the "public
benefit of those funds" so it is not anticipated that market rates are achievable.
• In any event, Kootznoowoo is endeavoring to snake the community cost of power as low
as possible. Given the significant current investment in the project it is unrealistic for
Kootznoowoo to expect to accomplish this without significant grant funds. A full recovery on the
basis of a risk adjusted fair market basis requires considerations aside from the power sale
revenues. As Kootznoowoo and its original shareholders and their heirs and assigns own
significant land in the service area it only makes sense to pursue public funds to best of our ability
while available and therefore avoid unnecessary expenses. Simply put, Kootznoowoo is not
looking for a direct market rate return from the State of Alaska's grant funded portion of the
project. By keeping energy prices as low as possible the return from grant funds can be seen
elsewhere in ways that are not traditionally measure — such as the health and sustainability of the
City of Angoon as well a business ventures Kootznoowoo can sponsor. On new funds,
Kootznoowoo would expect a normal market rate of return from its financial contributions.
Kootznoowoo believes it will be able to achieve significant public benefit as is described further
in Section 5 and elsewhere.
4.4.4 Project Cost Worksheet
Complete the cost worksheet form which provides summary information that will be considered
in evaluating the project.
Download the form, complete it, and submit it as an attachment. Document any conditions or
sources your numbers are based on here.
Cost worksheets are attached and a narrative is included as an additional attachment which
includes documentation
SECTION 5— PROJECT BENEFIT
Explain the economic and public benefits of your project. Include direct cost savings,
and how the people of Alaska will benefit from the project.
The benefits information should include the following:
• Potential annual fuel displacement (gal and $) over the lifetime of the evaluated
renewable energy project
• Anticipated annual revenue (based on i.e. a Proposed Power Purchase Agreement price,
RCA tariff, or cost based rate)
• Potential additional annual incentives (i.e. tax credits)
• Potential additional annual revenue streams (i.e. green tag sales or other renewable
energy subsidies or programs that might be available)
• Discuss the non -economic public benefits to Alaskans over the lifetime of the project
AEA12-001 Grant Application Page 21 of 28 7/1//2011
/GaILE' ALASKA Renewable Energy Fund
ENERGY AUTHORITY Grant Application Round 5
Diesel generation pollutes Angoon's otherwise pristine environment and community. Per
a July 9, 2007 letter submitted the US Forest by the Inside Passage Electric Cooperative
(IPEC), the utility discharged 3,437,981 pounds of CO2 emissions in 2006. One key
benefit of our development would be to mitigate this discharge of CO2 emissions in our
community that impacts the health and safety of our shareholder, tribal and community
members — all of whom are residents of Alaska in Angoon. Kootznoowoo expects to
receive on behalf of its shareholders significant benefit from low cost power.
The least of these benefits is the annual revenue contemplated under the Power
Purchase Agreement. Targeting a sales price of $0.15 per kWh and adjusting for the
cost incurred (HDR, Alaska, 2000) net operating income in the range of $200,000 is
reasonable to expect initially.
Significant growth will cause this revenue to increase and the average cost to drop so it
is reasonable for revenues to grow faster than inflation. However, the real benefits to
Kootznoowoo's land holdings and the value of shareholder lots is immediate as the
community moves toward positive economic growth and expectations change to a more
positive economic future.
Tax credits, green tags and renewable energy subsidies may or may not be available
depending on the action of state and federal policy makers. This project is not
dependent on such incentives but if they are available they should inure to the benefit of
Kootznoowoo Shareholders and the community of Angoon.
Other benefits including the possibility of eliminating all diesel household heat.
Angoon's annual electric diesel generation produces approximately 2,000,000 kWh
(source AEA). There are other independent producers of diesel generated electricity and
these figures are unknown at this time. No known renewable energy produces electricity
in Angoon at this time. However, more disturbing, no use of electricity is used for space
heating in Angoon due to the high cost of electricity. Therefore over 95% of the energy
usage for space heating for homes and businesses is produced through diesel
generated heat. Approximately 5% of the homes use firewood or are supplemented with
firewood.
The CBJ Greenhouse Gas Emission study released in March 2009 reveals that Juneau
is 81 % dependent on diesel in its total non -transportation use of energy. Naturally,
Angoon does not have hydropower so it is 100% diesel dependent. Converting the
MMBTU requirements for Angoon using the CBJ 81 % figure, we find that Angoon would
convert to its diesel usage to electrical usage if the price of electricity provided the
economic incentive to convert to lower cost electrical heat. Theoretically, (based on
2,000,000 kWh figure) the community of Angoon would need 10,500,000 kWh
(2,000,000/19%) if it completely converted its home heating and diesel fuel usage to
electrical generation from low cost methods. Theoretically, the community of Angoon
currently needs the equivalent of 10,500,000 kWh for its current needs if their needs can
be compared "one to one" with Juneau's usage. Because of the high cost of fuel in
Angoon and current conservation efforts this estimate is very conservative but is a
straightforward extrapolation. We know that the PCE supplement creates a significant
AEA12-001 Grant Application Page 22 of 28 7/1//2011
/6"ALASKAORITY
AUTENERGYH
Renewable Energy Fund
Grant Application Round 5
barrier to realistically making this conversion. However a significant reduction in the
price of electricity would allow for conversion to occur. In other words low cost power
would drive conversion from diesel and other CO2 producing fuel sources in the
community of Angoon much as has recently occurred in Juneau, Petersburg, Sitka and
other communities.
IPEC will be able to completely idle their diesel generation capacity to a stand by status
and would be able to salvage unnecessary equipment further reducing cost of operating
existing infrastructure. IPEC would however need to build and expand its distribution
system in Angoon as demand will increase the number of homes, business and public
buildings which are operated as the economy moves forward. In a community planning
on building an airport in the next year or so and building a new ferry terminal and other
necessary infrastructure it is entirely reasonable to expect significant economic growth
particularly compared to recent years of decline. There exists the potential for many new
housing starts do to one of the highest level of vacant but "shovel ready" housing lots in
the Community directly the result of Kootznoowoo shareholders receiving lands from
Kootznoowoo. We expect Angoon to likely experience an unprecedented power
demand in converting home heat fuel from diesel to relatively inexpensive hydroelectric
power which, in turn would justify line upgrades and line expansion to new areas within
the community.
Currently, the community of Angoon has one of the highest unemployment rates at 87%
(source TANF program, Central Council of Tlingit and Haida Indians of Alaska) and
lowest per capita income in Southeast Alaska. The per capita income for Angoon was
$11, 357. Nearly a third of families and Angoon's overall population are below the
poverty line (source US Census Bureau Fact finder for Angoon, Alaska). Alaska ranks
number one in energy use per capita. According to the Cold Climate Housing Research
Center 2009 Alaska Housing Assessment, the average Sealaska household (of which
Angoon belongs) consumes $6,072 of energy per year.
Over half of the average household per capita income of Angoon residents is spent on
energy. The impact of this project to bring low cost hydropower to the community of
Angoon and energy customers is potentially profound. Energy customers are making
decisions to either heat their homes or feed their household. TLHD is ready to finalize its
design based on these facts and the enormous price increase in the cost of diesel since
the HDR feasibility analysis. An updated design and procurement of necessary permits
and funding is all that remains between continuing the decline associated with diesel
generation and the growth anticipated with economical and non volatile hydroelectric
power generation. The boost to the economy with the construction should be the
catalyst for this growth as families begin to return to Angoon once the see progress on
the horizon. An investment by the State of Alaska alongside the current award by the US
DOE in this project is needed now in order to save this community.
IPEC currently sells electricity in a non -subsidized rate at over $0.52 per kWh. TLHD
would dramatically reduce and stabilize the electrical rate, would provide for a
meaningful alternative to heating fuels such as diesel, propane and wood and would
allow the City of Angoon to prosper. It will result in direct out of pocket annual savings to
Angoon ratepayers of over $300,000 annually for electricity alone and increase
disposable income by nearly $600 per capita or $1800 for a household of three.
AEA12-001 Grant Application Page 23 of 28 7/1//2011
ALASKA
Renewable Energy Fund
Grant Application Round 5
As can be seen from the attached chart conversion to electric heat is entirely likely to
occur and the update to the existing feasibility will recalculate loads based on rational
economic behavior which can be shown graphically by the following chart. New homes
will also likely be constructed with electric heating as part of design. It is expected that
this conversion will be directly related to the price of electricity which in turn is based on
future demand predictions. Kootznoowoo would prefer to overestimate demand
estimates and encourages AEA to do the same for the factors mentioned above and for
the reasons we have seen other communities react to lower cost power.
Figure 3.2-1 Electricity Price Threshold for Conversion
Electricity Price Threshold for Conversion
lsg. at 50% oil ^eatng of taency and Oil Price or SZOD per US gal. e;sanoty price must be less than SO.1051AWh for c ,m ion)
0.25 �----
------------------------------------ ---------------------
--------------------------
-----------------------
0.20
--------- ---- - - —-
i --- -----------------------
.c
3
----------------- -----------
-----------------
---�
--------------------------------------
w 0.15
- - -
u
-- —----------------------
1------------
---- - --- ------- ------
a--------------------------
'---- ------ ------
0.10
--- ----
----
�'
-- —--------
-
------------------------------------
w
------ - ---- --- --- --
----------------------- -
----------------
0.05
----------------
-----
-----------------------
j - --- --- �
---- --- - - - - --
-------------------------------
0.00
------------ —
i
---------------
1.00 1.20 1.40 1.60 1.80 2.00 2.20 2.40 2.60 2.80 3.00 3.20 3.40 3.60 3.80 4.00 4.20 4.40 4.60 4.80 5.00
Oil Price (SiUSgal)
SECTION 6— SUSTAINABILITY
Discuss your plan for operating the completed project so that it will be sustainable.
Include at a minimum:
• Proposed business structure(s) and concepts that may be considered.
• How you propose to finance the maintenance and operations for the life of the project
• Identification of operational issues that could arise.
• A description of operational costs including on -going support for any back-up or existing
systems that may be require to continue operation
• Commitment to reporting the savings and benefits
• Kootznoowoo will operate the Project in a corporate entity. At present it has
reserved the name Natural Power for such a purpose. The likely entity will be an
LLC that will operate as an IPP. The LLC structure gives Kootznoowoo the
benefits of corporate protection of assets and is consistent with other entities
owned by Kootznoowoo, Inc., and it can be managed for little additional costs.
This form of business structure gives us the greatest opportunity to attract and
retain partners such as the local utility once the project is fully constructed and in
an operating mode. Other concepts may need to be considered as facts and
circumstances dictate.
• Kootznoowoo expects the project to finance the maintenance and operations for
the life of the project as run of river hydro projects while expensive are very well
understood and relatively simple to maintain and operate.
• Identification of operational issues that could arise.
AEA12-001 Grant Application Page 24 of 28 7/1//2011
/4" ALASORITY
IIIIIIIIIED ENERGYHKA
Renewable Energy Fund
Grant Application Round 5
• According to HDR the operational cost of the Project was calculated to be $85,000
per year in 1999 dollars. Costs identified were Labor, Transportation by boat,
Miscellaneous Expenses, Administrative, Insurance and Replacement Reserves.
Even after adjusting for inflation these figures appear too low and unrealistic given
reporting requirements for IPP's in Alaska. We believe that economies of scale
and operation can be achieved by working very closely and cooperatively with the
local utility and we will explore this thoroughly during the negotiations for a power
sales agreement. Because on -going back-up to the Project must be provided by
IPEC we expect to be able to achieve our mutual goals of the lowest cost power to
the community and at the same time look forward to increased economy as
demand and revenues grow.
• Kootznoowoo is committed to reporting the savings and benefits of this project as
part of its ongoing responsibilities under the grant and under its role of steward of
the lands and waters in and around Angoon. It will of course have a long-term
interest in Angoon and its largest landowner, and as its business interests grow
with economic and competitive energy becomes available.
SECTION 7 — READINESS & COMPLIANCE WITH OTHER GRANTS
Discuss what you have done to prepare for this award and how quickly you intend to proceed
with work once your grant is approved.
Tell us what you may have already accomplished on the project to date and identify other grants
that may have been previously awarded for this project and the degree you have been able to
meet the requirements of previous grants.
As stated elsewhere Kootznoowoo has methodically moved this project forward and anticipates
that the final design and permitting will be completed in the fall of 2012. Accordingly we intend
to proceed immediately to construction once funds are approved. This will require preparations
that include acceptance of final design, specifications and construction drawings, short listing one
or two acceptable project contractors and negotiating financing or finding all necessary funding.
Kootznoowoo has met the Forest Service requirements to date for designing TLHD as stated
elsewhere. We have completed all required environmental work with the assistance of the USDA
Forest Service. The Department of Energy has awarded Kootznoowoo preconstruction funds.
Kootznoowoo is in good standing given the snatch provided by the AEA. Kootznoowoo
anticipates completing the requirements of both grants.
AEA12-001 Grant Application Page 25 of 28 7/1//2011
/GZFE�l ALASKA Renewable Energy Fund
ENERGY AUTHORITY Grant Application Round 5
SECTION 8— LOCAL SUPORT
Discuss what local support or possible opposition there may be regarding your project. Include
letters of support from the community that would benefit from this project.
The City of Angoon, the Angoon Community Association (federally recognized tribe),
IPEC and relevant entities have made it clear that this project is uniformly considered the
number 1 community priority and project even though the Community has other projects,
earlier in the development phase, that are beneficial to the Regional Economy and the
Community. The priority is established, in part, because it was a dream of Angoon's
Elders, at the time of ANCSA, to build this project. The City of Angoon, the Angoon
Community Association (federally recognized tribe) and Kootznoowoo considers this
project the community's highest priority. This may be the only project in the Tongass
that enjoys support from both the conservation groups as well as the industry. According
to the Forest Supervisor of the Tongass, Forrest Cole and as reported to Kootznoowoo,
Inc. by the Monument Ranger in June 2010, it is the number 1 priority of the Tongass
National Forest. Kootznoowoo does not expect any opposition to the project. Letters of
support are on file with the AEA and included in Round III and Round IV applications.
Also, please review the Final EIS and the USDA Forest Service ROD for a complete list
of support letters from the region and the community.
Include letters of support
SECTION 9 — GRANT BUDGET
Tell us how much you want in grant funds Include any investments to date and funding sources,
how much is being requested in grant funds, and additional investments you will make as an
applicant.
Include an estimate of budget costs by milestones using the form — GrantBudget5. doc
Provide a narrative summary regarding.funding sources and your financial commitment to the
project.
As described in the Round IV application, the total cost of TLHD is estimated to be
approximately $14 million, including all costs spent to date. More than likely this will change
with the results of final design and preconstruction activities planned in 2011112. Initial
reconnaissance studies, preliminary design, and the necessary environmental work were funded
from internal equity and a small federal grant as well as support from the USDA Forest Service
who prepared the Record of Decision, the project scoping and environmental work necessary to
complete the FEIS.
Currently, internal equity totals slightly more than $2.2 million. For several years, internal
equity has been used to move the Project forward.
AEA12-001 Grant Application Page 26 of 28 7/1//2011
/® ALASKA Renewable Energy Fund
4111111111EDENERGY AUTHORITY Grant Application Round 5
A federal award was recently added to the project sources of funds and the Kootznoowoo Board
has accepted these funds and directed staff to seek sources of the match which was accomplished
this past year through our Round IV efforts and AEA's response and subsequent appropriation.
This application continues the effort to find equity dollars to construct the project.. Other efforts
include possibility of liquidating assets of Kootznoowoo to invest in the project. Given the
economics both to Kootznoowoo and the future ratepayers it essential to maximize efforts to find
grant funds from all possible sources. Significant funds, tribal funds for economic development
and healthy communities, tribal road funds and as well as funds designed for simply creating
sustainable communities continue to be available to the project.. The State of Alaska's
contribution would certainly improve the chances of completing this project at the earliest date
possible. We have discussed with the AEA utilizing a combination of General Funds and State
Loans or Loan assistance to complete project constructions. Future costs will be funded by a
combination of corporate equity, possible debt, federal grants, and proceeds from this grant.
Total equity will be targeted at 20 percent of total Project costs ($2.8 million). Kootznoowoo is
committed to the completion of Thayer Creek and we will continue to rely on the City ofAngoon
and the federally recognized tribe (the Angoon Community Association) for project support so
that benefits may flow to the ratepayers ofAngoon.
To date we have favorable response from the federal government and the State of Alaska — the
federal government on business case, feasibility and environmental analysis and the fed/state of
preconstruction and permitting. It is anticipated that a combination of fed/state support will be
needed to complete construction and enter into operation but the end product is designed to
create a self sustaining community based energy source for both electric and home heating
purposes. It is designed financially to move the community away from non renewable resources
to renewable and designed to eliminate an ongoing subsidy from the State of Alaska and replace
that with a productive economic base including lands and waters currently owned by
Kootznoowoo and its shareholders which is relatively unproductive.
AEA12-001 Grant Application Page 27 of 28 7/1//2011
/461EE--2') ALASKA
ENERGY AUTHORITY
Renewable Energy Fund
Grant Application Round 5
SECTION 10 — ADDITIONAL DOCUMENTATION AND CERTIFICATION
SUBMIT THE FOLLOWING DOCUMENTS WITH YOUR APPLICATION:
A. Contact information, resumes of Applicant's Project Manager, key staff, partners,
consultants, and suppliers per application form Section 3.1 and 3.4. Applicants
are asked to separate resumes submitted with applications, if the individuals do
not want their resumes posted.
B. Cost Worksheet per application form Section 4.4.4.
C. Grant Budget Form per application form Section 9.
D. Letters demonstrating local support per application form Section 8.
E. An electronic version of the entire application on CD per RFA Section 1.7.
F. Authorized Signers Form.
G. Governing Body Resolution or other formal action taken by the applicant's
governing body or management per RFA Section 1.4 that:
- Commits the organization to provide the matching resources for project at the
match amounts indicated in the application.
- Authorizes the individual who signs the application has the authority to
commit the organization to the obligations under the grant.
- Provides as point of contact to represent the applicant for purposes of this
application.
- Certifies the applicant is in compliance with applicable federal, state, and local,
laws including existing credit and federal tax obligations.
H. CERTIFICATION
The undersigned certifies that this application for a renewable energy grant is truthful
and correct, and that the applicant is in compliance with, and will continue to comply
with, all federal and state laws including existing credit and federal tax obligations and
that they can indeed commit the entity to these obligations.
Print Name
Peter M. Naoroz
//
Signature
Title
Preside t, General Manager and Project Manager
Date
August 25, 2011