Loading...
HomeMy WebLinkAboutAEA RE Geo T-line Signed Cover LetterPOWERING ALASKA'S FUTURE August 24, 2011 Butch White, Grant Administrator Alaska Energy Authority 813 West Northern Lights Blvd. Anchorage, AK 99503 Re: AEA 12-001— RE Fund Grant Application Round V Dear Mr. White: Enclosed you will find Chugach Electric Association's (Chugach's) renewable energy grant application for funding to continue the process of design and construction of a transmission line to deliver geothermal energy from Mt. Spurr to the Railbelt. The specific phase being planned for this Round V grant is the permitting and design of the substations at each end of the line. The proposed line, on the west side of Cook Inlet, will connect the renewable energy resource being developed by Ormat at Mt. Spurr to Chugach's existing facilities at the Beluga Power Plant. The package includes: • The grant application • A Grant/budget worksheet for design and permitting of substations • A project cost/benefit worksheet • Letters of support • A map of the area where the project will be located • Professional bios for the project manager and other key staff • An organizational chart of Chugach's Power Delivery Division • A signed resolution from Chugach's Board of Directors Chugach's point of contact for this grant application is Ron Vecera, Director of Project Development. He can be reached directly at 762-4759. Sincerely, Bradley W iQu Chief Executive Officer Chugach Electric Association, Inc. 5601 Electron Drive, P.C. Box 196300, Anchorage, Alosko 99519-6300 • 1907( 5637494 fox (907)562-0027 • 18001478-7494 w vchugochelectric.com •info@chugachelectr,c.com