HomeMy WebLinkAboutWrangell EV study REF4GrantApplication 15Sept2010
Renewable Energy Fund Round IV
Grant Application
AEA 11-005 Application Page 1 of 15 7/21/2010
Application Forms and Instructions
The following forms and instructions are provided to assist you in preparing your application for
a Renewable Energy Fund Grant. An electronic version of the Request for Applications (RFA)
and the forms are available online at: http://www.akenergyauthority.org/RE_Fund-IV.html
Grant Application
Form
GrantApp4.doc Application form in MS Word that includes an outline
of information required to submit a complete
application. Applicants should use the form to assure
all information is provided and attach additional
information as required.
Application Cost
Worksheet
Costworksheet4.doc Summary of Cost information that should be
addressed by applicants in preparing their application.
Grant Budget Form GrantBudget4.doc A detailed grant budget that includes a breakdown of
costs by milestone and a summary of funds available
and requested to complete the work for which funds
are being requested.
Grant Budget Form
Instructions
GrantBudgetInstructions4.pdf Instructions for completing the above grant budget
form.
If you are applying for grants for more than one project, provide separate application
forms for each project.
Multiple phases for the same project may be submitted as one application.
If you are applying for grant funding for more than one phase of a project, provide
milestones and grant budget for completion of each phase.
If some work has already been completed on your project and you are requesting
funding for an advanced phase, submit information sufficient to demonstrate that the
preceding phases are satisfied and funding for an advanced phase is warranted.
If you have additional information or reports you would like the Authority to consider in
reviewing your application, either provide an electronic version of the document with
your submission or reference a web link where it can be downloaded or reviewed.
REMINDER:
Alaska Energy Authority is subject to the Public Records Act AS 40.25, and materials
submitted to the Authority may be subject to disclosure requirements under the act if no
statutory exemptions apply.
All applications received will be posted on the Authority web site after final
recommendations are made to the legislature.
In accordance with 3 AAC 107.630 (b) Applicants may request trade secrets or
proprietary company data be kept confidential subject to review and approval by the
Authority. If you want information is to be kept confidential the applicant must:
o Request the information be kept confidential.
o Clearly identify the information that is the trade secret or proprietary in their
application.
o Receive concurrence from the Authority that the information will be kept
confidential. If the Authority determines it is not confidential it will be treated as a
public record in accordance with AS 40.25 or returned to the applicant upon
request.
Renewable Energy Fund
Grant Application Round IV
AEA11-005 Grant Application Page 2 of 15 7/21/2010
SECTION 1 – APPLICANT INFORMATION
Name (Name of utility, IPP, or government entity submitting proposal)
City and Borough of Wrangell
Type of Entity:
Local Municipal Entity
Mailing Address
City and Borough of Wrangell
P.O. Box 531
Wrangell, AK 99929
Physical Address
City and Borough of Wrangell
205 Brueger Street
Wrangell, AK 99929
Telephone
Fax
Email
1.1 APPLICANT POINT OF CONTACT / GRANTS MANAGER
Name
Timothy Rooney
Title
Borough Manager
Mailing Address
PO Box 531, Wrangell, AK 99929
Telephone
907-874-2381
-
Fax
907-874-3952
Email
tdrooney@wrangell.com
1.2 APPLICANT MINIMUM REQUIREMENTS
Please check as appropriate. If you do not to meet the minimum applicant requirements, your
application will be rejected.
1.2.1 As an Applicant, we are: (put an X in the appropriate box)
An electric utility holding a certificate of public convenience and necessity under AS
42.05, or
An independent power producer in accordance with 3 AAC 107.695 (a) (1), or
X A local government, or
A governmental entity (which includes tribal councils and housing authorities);
Yes
1.2.2. Attached to this application is formal approval and endorsement for its project by
its board of directors, executive management, or other governing authority. If the
applicant is a collaborative grouping, a formal approval from each participant’s
governing authority is necessary. (Indicate Yes or No in the box )
Yes
1.2.3. As an applicant, we have administrative and financial management systems and
follow procurement standards that comply with the standards set forth in the grant
agreement.
Yes
1.2.4. If awarded the grant, we can comply with all terms and conditions of the attached
grant form. (Any exceptions should be clearly noted and submitted with the
application.)
Yes
1.2.5 We intend to own and operate any project that may be constructed with grant
funds for the benefit of the general public.
Renewable Energy Fund
Grant Application Round IV
AEA11-005 Grant Application Page 3 of 15 7/21/2010
SECTION 2 – PROJECT SUMMARY
This is intended to be no more than a 1-2 page overview of your project.
2.1 Project Title – (Provide a 4 to 5 word title for your project)
Wrangell Electric Vehicle Feasibility Study
2.2 Project Location –
Include the physical location of your project and name(s) of the community or communities that will
benefit from your project.
Wrangell, Alaska
2.3 PROJECT TYPE
Put X in boxes as appropriate
2.3.1 Renewable Resource Type
Wind Biomass or Biofuels
Hydro, including run of river Transmission of Renewable Energy
Geothermal, including Heat Pumps Small Natural Gas
Heat Recovery from existing sources Hydrokinetic
Solar Storage of Renewable
Other (Describe)
2.3.2 Proposed Grant Funded Phase(s) for this Request (Check all that apply)
X Reconnaissance Design and Permitting
X Feasibility Construction and Commissioning
X Conceptual Design
2.4 PROJECT DESCRIPTION
Provide a brief one paragraph description of your proposed project.
This project is a conceptual design/feasibility study of localized testing and evaluation of electric
vehicles and related infrastructure in an Alaska community, using locally-generated renewable
electricity to displace the use of gasoline and diesel vehicle fuel. The community served by this
project is Wrangell, Alaska. Directly involved in this project is the City and Borough of
Wrangell (City), through Wrangell Municipal Light and Power (WMLP), and the Southeast
Alaska Power Agency (SEAPA). The City is requesting grant funds for a feasibility/design
study/cost estimate of an electric vehicle charging station in Wrangell, presumably to be located
at City-owned buildings such as the WMLP/public works, well as a feasibility/market study of
the types of electric vehicles most appropriate for use in Wrangell. Different business models,
including an EV rental car pool, would be explored. Cost estimates for partially converting the
city‟s vehicle fleet to EVs could also be prepared.
Renewable Energy Fund
Grant Application Round IV
AEA11-005 Grant Application Page 4 of 15 7/21/2010
2.5 PROJECT BENEFIT
Briefly discuss the financial and public benefits that will result from this project, (such as reduced fuel
costs, lower energy costs, etc.)
The main public benefit of using electric vehicles would be reduced fuel costs for Wrangell
drivers, and for the City & Borough of Wrangell‟s municipal vehicle fleet. Another benefit is
reduced local air pollution from automobiles.
Assuming a rate of $0.08/kWh for electricity used for vehicle battery charging, and a vehicle
efficiency of 4 miles/kWh, the cost of using WMLP energy for an electric vehicle is estimated to
be $0.02/mile.
Assuming that the equivalent gasoline-powered vehicle has an average fuel economy of 30
miles/gallon, the gasoline/diesel fuel equivalent cost of $0.02/mile would be $0.60/gallon.
Assuming an average gasoline/diesel fuel retail price in Wrangell of $4.00/gallon, electric
vehicles would cut vehicle fuel equivalent cost by nearly 85% (from $0.13/mile to $0.02/mile),
or a savings of $0.11/mile driven.
The estimated fuel displacement is 40 gallons of gasoline per 1000 vehicle-miles driven, or 80
gallons per year if the vehicle is driven in Wrangell 2,000 miles annually (assumption used in
section above).
2.6 PROJECT BUDGET OVERVIEW
Briefly discuss the amount of funds needed, the anticipated sources of funds, and the nature and source
of other contributions to the project.
A grant in the amount of $112,500 is being requested (Total Project of $125,000). This amount
is broken down as follows:
Reconnaissance, Feasibility, Design and Permitting Phases - $49,500
Construction Phase- $75,500 (including $40,000 for a purchase of an electric vehicle)
2.7 COST AND BENEFIT SUMARY
Include a summary of grant request and your project’s total costs and benefits below.
Grant Costs
(Summary of funds requested)
2.7.1 Grant Funds Requested in this application. $ 112,500
2.7.2 Other Funds to be provided (Project match) $ 12,500
2.7.3 Total Grant Costs (sum of 2.7.1 and 2.7.2) $ 125,000
Project Costs & Benefits
(Summary of total project costs including work to date and future cost estimates to get to a fully
operational project)
2.7.4 Total Project Cost (Summary from Cost Worksheet
including estimates through construction)
$125,000
2.7.5 Estimated Direct Financial Benefit (Savings) $0.11/mile driven
Renewable Energy Fund
Grant Application Round IV
AEA11-005 Grant Application Page 5 of 15 7/21/2010
SECTION 3 – PROJECT MANAGEMENT PLAN
Describe who will be responsible for managing the project and provide a plan for successfully
completing the project within the scope, schedule and budget proposed in the application.
3.1 Project Manager
Tell us who will be managing the project for the Grantee and include contact information, a
resume and references for the manager(s). If the applicant does not have a project manager
indicate how you intend to solicit project management support. If the applicant expects project
management assistance from AEA or another government entity, state that in this section.
Overall project management of the project will be performed by Steve Henson, Electric
Superintendent for WMLP. Mr. Henson has over 39 years of experience in the electrical, oil and
gas, mining, and construction industry. He has been the project manager for numerous projects
in excess of $10 million dollars. His experience includes 10 years as the Maintenance
Electrician/Operator for the Tyee Hydroelectric Facility and for the past three years, he has been
Electrical Superintendent for Wrangell Municipal Light and Power. Mr. Henson‟s full resume
has been attached. The following are references for Mr. Henson:
Mr. Dave Carlson, CEO
SEAPA
1900 First Avenue, Suite 318
Ketchikan, AK 99901
(907) 228-2281
Email: dcarlson@seapahydro.org
Mr. Joe Nelson
Electrical Superintendent
City of Petersburg
(907) 772-4621
Email: pmpl@ci.petersburg.ak.us
Mr. Tim Rooney
Manager, City and Borough of Wrangell
PO Box 531, Wrangell, AK 99929
(907) 874-2381
Email: tdrooney@wrangell.com
3.2 Project Schedule
Include a schedule for the proposed work that will be funded by this grant. (You may include a
chart or table attachment with a summary of dates below.)
It is anticipated that the project would begin in July 2011, and completed by the end of 2012.
Renewable Energy Fund
Grant Application Round IV
AEA11-005 Grant Application Page 6 of 15 7/21/2010
3.3 Project Milestones
Define key tasks and decision points in your project and a schedule for achieving them. The
Milestones must also be included on your budget worksheet to demonstrate how you propose to
manage the project cash flow. (See Section 2 of the RFA or the Budget Form.)
Reconnaissance, Feasibility, Design and Permitting Phases -
1. Project scoping and contractor solicitation- 10/1/2011
2. Detailed energy resource analysis- 12/1/2011
3. Identification of land and regulatory issues- 12/1/2011
4. Permitting and environmental analysis- 12/1/2011
5. Detailed analysis of existing and future energy costs and markets- 12/1/2011
6. Assessment of alternatives- 12/1/2011
7. Conceptual design analysis and cost estimate- 3/1/2012
8. Detailed economic and financial analysis- 3/1/2012
9. Conceptual business and operations plans- 3/1/2012
10. Final report and recommendations- 3/1/2012
Construction Phase-
1. Confirmation that all design and feasibility requirements are complete- 4/1/2012
2. Completion of bid documents- 5/1/2012
3. Contractor/vendor selection and award- 6/1/2012
4. Construction of charging station- 8/31/2012
5. Integration and testing- 9/30/2012
6. Electric vehicle procurement- 8/31/2012
7. Final acceptance, commissioning and start-up- 10/31/2012
8. Operations Reporting- 12/31/2012
3.4 Project Resources
Describe the personnel, contractors, equipment, and services you will use to accomplish the
project. Include any partnerships or commitments with other entities you have or anticipate will
be needed to complete your project. Describe any existing contracts and the selection process
you may use for major equipment purchases or contracts. Include brief resumes and references
for known, key personnel, contractors, and suppliers as an attachment to your application.
WHPacific, Inc., Anchorage, Alaska-
WHPacific is the largest 100% Native American-owned engineering and architectural firm in the
United States, provide its clients with a broad range of high-quality land development,
engineering, surveying, and planning services. For the Wrangell electric vehicle conceptual
design/feasibility study, WHPacific will provide:
Conceptual designs and preliminary cost estimates of electric vehicle charging
infrastructure, and comparison of different types of charging stations and related
infrastructure. This will include a review of the existing electrical system at
buildings/locations where charging stations could be installed, a review of
codes/standards and permit requirements for the charging station(s), and a study of
impacts that electric vehicle charging to the local WMLP distribution grid system.
Renewable Energy Fund
Grant Application Round IV
AEA11-005 Grant Application Page 7 of 15 7/21/2010
Feasibility/market study of different electric vehicle types that could be practical in
Wrangell.
Study of „smart grid‟ and demand-side management applications associated with electric
vehicle battery charging in Wrangell, including interruptible loads for peak shaving and
utilization of vehicle battery storage capacity for local grid stability.
Brian Yanity, EIT
WHPacific’s Renewable Energy Specialist
Mr. Yanity is a recognized leader and has experience with micro-hydro sites in Alaska. He is
currently the project leader on several micro-hydro feasibility projects in the Girdwood area. Mr.
Yanity also has experience with HOMER Modeling, wind resource assessment and electric
power systems planning for rural Alaskan communities. Brian recently had a feature article
published in the magazine International Water Power and Dam Construction, titled
“Transmitting development strategies”, about hydropower and transmission line developments in
Southeast Alaska.
Ed Carlson, PE
WHPacific’s Sr. Electrical Engineer
Ed has designed electrical systems for a variety of public structures ranging from schools and
military facilities, to courthouses and scientific centers. He is skilled in programming specialty
spaces such as critical care units that includes remodel and new designs schematics. He
thoroughly inspects systems to verify they are installed and working correctly. Ed‟s lighting
projects have received national recognition and prestigious awards. The Homer Library project
on which Ed was lead electrical engineer is registered with the USGBC as a LEED Silver
project, which required meticulous design, emphasis on energy conservation through product
selection, lighting controls, and day-light harvesting.
Dennis Sharp, EIT
WHPacific’s Project Electrical Engineer
Dennis Sharp is an energetic and talented Electrical Designer who, prior to joining WHPacific,
spent more than 20 years in systems development. His experience includes providing electrical
and mechanical design, materials specification, and the integration of special test equipment
panels. He was a hands-on field engineer, assisting US Air Force technicians in troubleshooting
problems and was responsible for technical decisions and oversight of technicians and other
engineers to ensure all tasks were accomplished.
3.5 Project Communications
Discuss how you plan to monitor the project and keep the Authority informed of the status.
Throughout the life of the project, the Project Manager will provide written monthly updates to
AEA which will include at minimum:
Expenditures to date
Percent complete; and
Narrative on progress including any schedule changes.
Renewable Energy Fund
Grant Application Round IV
AEA11-005 Grant Application Page 8 of 15 7/21/2010
In addition to the monthly progress reports, communication on project status will also be
provided verbally with the AEA Project/Program Manager on an informal basis through emails
and phone conversations.
3.6 Project Risk
Discuss potential problems and how you would address them.
The standard project risk of the possibility of cost overruns is mitigated on this project by
providing a 20% contingency cost in our projected project cost. Cost overruns will also be
mitigated by effectively managing the project.
Risks and impacts to WMLP‟s existing power distribution system by electric vehicle charging
will be analyzed in the feasibility study.
SECTION 4 – PROJECT DESCRIPTION AND TASKS
Tell us what the project is and how you will meet the requirements outlined in Section 2 of
the RFA.
The level of information will vary according to phase(s) of the project you propose to
undertake with grant funds.
If you are applying for grant funding for more than one phase of a project provide a
plan and grant budget form for completion of each phase.
If some work has already been completed on your project and you are requesting funding for
an advanced phase, submit information sufficient to demonstrate that the preceding phases
are satisfied and funding for an advanced phase is warranted.
4.1 Proposed Energy Resource
Describe the potential extent/amount of the energy resource that is available.
Discuss the pros and cons of your proposed energy resource vs. other alternatives that may be
available for the market to be served by your project.
The vast majority of WMLP‟s electrical power is provided by SEAPA‟s hydroelectric facilities of
Tyee Lake and Swan Lake, each of which currently have a generating capacity of 22.5 MW each.
In addition, the SEAPA interconnected system (including Wrangell, Petersburg and Ketchikan)
has an additional 19.2 MW of hydroelectric and 33.2 MW of diesel generation capacity, as
described in section 4.2.1 below.
There is approximately 13 MW of excess during the summer months and an excess of 9 MW
during the winter.
There is no other economically feasible alternative for this project since the hydroelectric power
produced by the existing SEAPA system is the most cost effective form of energy available, in
comparison to diesel and other petroleum fuels.
Renewable Energy Fund
Grant Application Round IV
AEA11-005 Grant Application Page 9 of 15 7/21/2010
4.2 Existing Energy System
4.2.1 Basic configuration of Existing Energy System
Briefly discuss the basic configuration of the existing energy system. Include information about
the number, size, age, efficiency, and type of generation.
The existing SEAPA energy system (AK-BC Intertie Feasibility Study, Hatch Acres, 2007)
Existing
generation site
Diesel capacity
(MW)
Hydro capacity
(MW)
Average annual hydro
energy generated
(MWh)
Ketchikan 15.0 12.3 69,600
Swan Tyee - 22.5 78,275
Tyee Lake - 22.5 116,800
Wrangell 8.1 - -
Petersburg 10.1 2.0 10,400
Total 33.2 59.3 275,075
The 138 kV Swan-Tyee Intertie, which connected the previously isolated Tyee-Wrangell-
Petersburg and Swan-Ketchikan systems, was completed in late 2009.
4.2.2 Existing Energy Resources Used
Briefly discuss your understanding of the existing energy resources. Include a brief discussion of
any impact the project may have on existing energy infrastructure and resources.
Automobiles currently used in Wrangell, both private and City-owned vehicles, use gasoline or
diesel fuel.
4.2.3 Existing Energy Market
Discuss existing energy use and its market. Discuss impacts your project may have on energy
customers.
The maximum estimated average annual electric load resulting from electric vehicles in Wrangell,
with population of 2,000 people, is about 100 kW based on the following assumptions:
On average, that 80% of Wrangell‟s population (1,600 people) each drives an average of
2,000 miles per year (or 5.5 miles per day) in personal vehicles on the road system of
Wrangell Island. These assumptions result in a total of 3,200,000 vehicle-miles driven per
year that could be potentially be a market for electric vehicles.
Based on an average electric vehicle efficiency of 4 miles/kWh, powering 3,200,000
electric vehicle miles would require 800,000 kWh of electricity (not including battery
charging losses).
The 800,000 kWh for electric vehicle battery charging would result in an average annual
load increase of 90 kW for WMLP (dividing 800,000 kWh by 8760 hours/year).
However, the instantaneous load of charging a large number of electric vehicles
simultaneously could be as high as several hundred kW.
Renewable Energy Fund
Grant Application Round IV
AEA11-005 Grant Application Page 10 of 15 7/21/2010
4.3 Proposed System
Include information necessary to describe the system you are intending to develop and address
potential system design, land ownership, permits, and environmental issues.
4.3.1 System Design
Provide the following information for the proposed renewable energy system:
A description of renewable energy technology specific to project location
Optimum installed capacity
Anticipated capacity factor
Anticipated annual generation
Anticipated barriers
Basic integration concept
Delivery methods
Reconnaissance, Feasibility, Design and Permitting Phases-
The Wrangell electric vehicle charging infrastructure has not yet been designed, but a design and
cost estimate of a charging station will be produced during this feasibility study, design and
permitting phase. The three main tasks of the this project, to be funded with grant funds, are:
A feasibility/design study/cost estimate of an electric vehicle charging station in Wrangell,
presumably to be located at City-owned buildings such as the WMLP/public works
building. Conceptual designs and preliminary cost estimates of electric vehicle charging
infrastructure, and comparison of different types of charging stations and related
infrastructure. This will include a review of the existing electrical system at
buildings/locations where charging stations could be installed, a review of codes/standards
and permit requirements for the charging station(s), and a study of impacts that electric
vehicle charging to the local WMLP distribution grid system
A feasibility/market study of the types of electric vehicles most appropriate for use in
Wrangell. Electric buses, trucks, regular-sized sedans, scooters, smaller golf-cart type
vehicles will all be evaluated. Different business models, including an EV rental car pool,
would be explored. Cost estimates for partially converting the city‟s vehicle fleet to EVs
could also be prepared.
Study of „smart grid‟ and demand-side management applications associated with electric
vehicle battery charging in Wrangell, including interruptible loads for peak shaving and
utilization of vehicle battery storage capacity for local grid stability.
Construction Phase-
After the pre-construction phases (described above) of the project are completed, the City & Borough of
Wrangell will install an electric vehicle charging station at one of its City-owned buildings, and purchase
one or more electric vehicles.
Renewable Energy Fund
Grant Application Round IV
AEA11-005 Grant Application Page 11 of 15 7/21/2010
4.3.2 Land Ownership
Identify potential land ownership issues, including whether site owners have agreed to the
project or how you intend to approach land ownership and access issues.
All of the land is owned by the City so there are no ownership or access issues.
4.3.3 Permits
Provide the following information as it may relate to permitting and how you intend to address
outstanding permit issues.
List of applicable permits
Anticipated permitting timeline
Identify and discussion of potential barriers
No permits are required for this feasibility study.
4.3.4 Environmental
Address whether the following environmental and land use issues apply, and if so how they will
be addressed:
Threatened or Endangered species
Habitat issues
Wetlands and other protected areas
Archaeological and historical resources
Land development constraints
Telecommunications interference
Aviation considerations
Visual, aesthetics impacts
Identify and discuss other potential barriers
There are no environmental issues that apply to this project, as it is purely a feasibility
study/conceptual design effort.
For the next phase, with actual construction of one or more charging stations and deployment of
electric vehicles from future disposal of used electric vehicle batteries. The only aesthetic impact
is the charging stations, which are visually low impact.
4.4 Proposed New System Costs and Projected Revenues
(Total Estimated Costs and Projected Revenues)
The level of cost information provided will vary according to the phase of funding requested and
any previous work the applicant may have done on the project. Applicants must reference the
source of their cost data. For example: Applicants Records or Analysis, Industry Standards,
Consultant or Manufacturer’s estimates.
4.4.1 Project Development Cost
Provide detailed project cost information based on your current knowledge and understanding of
the project. Cost information should include the following:
Total anticipated project cost, and cost for this phase
Renewable Energy Fund
Grant Application Round IV
AEA11-005 Grant Application Page 12 of 15 7/21/2010
Requested grant funding
Applicant matching funds – loans, capital contributions, in-kind
Identification of other funding sources
Projected capital cost of proposed renewable energy system
Projected development cost of proposed renewable energy system
A grant in the amount of $112,500 is being requested, with $12,500 provided as match by the
City and Borough of Wrangell (total project cost of $125,000). This amount is broken down as
follows:
Reconnaissance, Feasibility, Design and Permitting Phases - $49,500
Construction Phase- $75,500 (including $40,000 for a purchase of an electric vehicle)
4.4.2 Project Operating and Maintenance Costs
Include anticipated O&M costs for new facilities constructed and how these would be funded by
the applicant.
(Note: Operational costs are not eligible for grant funds however grantees are required to meet
ongoing reporting requirements for the purpose of reporting impacts of projects on the
communities they serve.)
No operation and maintenance costs are expected for this phased of the project, which is a
conceptual design/feasibility study. The operation and maintenance costs of an electric vehicle
charging station installed on municipal government property would be minimal and will be borne
by the City. Normal maintenance on the charging station is minimal and would be funded from
savings of using electricity vs. gasoline/diesel fuel for City-owned vehicles.
4.4.3 Power Purchase/Sale
The power purchase/sale information should include the following:
Identification of potential power buyer(s)/customer(s)
Potential power purchase/sales price - at a minimum indicate a price range
Proposed rate of return from grant-funded project
The City and Borough of Wrangell (City), through Wrangell Municipal Light and Power
(WMLP), has established a rate of $0.08/kWh for all electric heating and hot water applications,
and there is a possibility of an interruptible rate of $0.05/kWh from the Southeast Alaska Power
Agency (SEAPA). This special rate is due to the hydroelectric facilities of the SEAPA system
spilling excess water (water not used in power production).
4.4.4 Project Cost Worksheet
Complete the cost worksheet form which provides summary information that will be considered
in evaluating the project.
The cost worksheet is provided as Attachment F.
Renewable Energy Fund
Grant Application Round IV
AEA11-005 Grant Application Page 13 of 15 7/21/2010
SECTION 5– PROJECT BENEFIT
Explain the economic and public benefits of your project. Include direct cost savings,
and how the people of Alaska will benefit from the project.
The benefits information should include the following:
Potential annual fuel displacement (gal and $) over the lifetime of the evaluated
renewable energy project
Anticipated annual revenue (based on i.e. a Proposed Power Purchase Agreement price,
RCA tariff, or cost based rate)
Potential additional annual incentives (i.e. tax credits)
Potential additional annual revenue streams (i.e. green tag sales or other renewable
energy subsidies or programs that might be available)
Discuss the non-economic public benefits to Alaskans over the lifetime of the project
Southeast Alaska offers a prime opportunity for hydro-electricity to be used for electric vehicle
charging, as well as for testing, demonstration, and evaluation of demand-side management
strategies involving electric vehicle charging stations. Southeast Alaska utilities could test new
smart grid technology for handling interruptible loads, or discretionary loads, with the possibility
of discounted rates of electricity for consumers charging electric vehicles. This project would
initiate a program of localized testing and evaluation of electric vehicles in an Alaska community.
Wrangell is the perfect Alaska site for this testing due to the following attributes, because the
community has:
1. Clean, hydro-generated electricity that is relatively inexpensive
2. A short, „islanded‟ road network, with the maximum driving distance (about 30 miles)
well under the typical range of electric vehicle batteries
3. The community has recent experience with new installations of interruptible, „surplus‟
electric load applications of electric heating for public buildings
4. A relatively mild winter climate (better for battery performance)
5. Barge transportation costs to the lower 48 states and British Columbia are relatively
inexpensive.
Assuming a rate of $0.08/kWh for electricity used for vehicle battery charging, and a vehicle
efficiency of 4 miles/kWh, the cost of using WMLP energy for an electric vehicle is estimated to
be $0.02/mile.
Assuming that the equivalent gasoline-powered vehicle has an average fuel economy of 30
miles/gallon, the gasoline/diesel fuel equivalent cost of $0.02/mile would be $0.60/gallon.
Assuming an average gasoline/diesel fuel retail price in Wrangell of $4.00/gallon, electric
vehicles would cut vehicle fuel equivalent cost by nearly 85% (from $0.13/mile to $0.02/mile).
The estimated fuel displacement is 40 gallons of gasoline per 1000 vehicle-miles driven, or 80
gallons per year if the vehicle is driven in Wrangell 2,000 miles annually (assumption used in
section above).
The main public benefit of using electric vehicles would be reduced fuel costs for Wrangell
drivers, and for the City & Borough of Wrangell‟s municipal vehicle fleet. Another benefit is
reduced local air pollution from automobiles.
Renewable Energy Fund
Grant Application Round IV
AEA11-005 Grant Application Page 14 of 15 7/21/2010
The introduction of electric vehicles to the City‟s vehicle fleet would reduce vehicle fuel cost for
the City and WMLP, which would in turn lower the cost of government. By reducing the cost of
government, the benefits to the community of Wrangell include the possibility of a reduction in
sales taxes and an increase in funds available for increased infrastructure development.
The lessons learned from the demonstration of electric vehicles, and related charging
infrastructure, in Wrangell can be applicable to other communities in Southeast Alaska and other
parts of the state.
SECTION 6– SUSTAINABILITY
Discuss your plan for operating the completed project so that it will be sustainable.
Include at a minimum:
Proposed business structure(s) and concepts that may be considered.
How you propose to finance the maintenance and operations for the life of the project
Identification of operational issues that could arise.
A description of operational costs including on-going support for any back-up or existing
systems that may be require to continue operation
Commitment to reporting the savings and benefits
No operation and maintenance costs are expected for the first phases of the project, which is a
conceptual design/feasibility study. The operation and maintenance costs of an electric vehicle
charging station installed on municipal government property would be minimal and will be borne
by the City. Normal maintenance on the charging station is minimal and would be funded from
savings of using electricity vs. diesel fuel for City-owned vehicles.
Upon successful implementation, quarterly updates would be provided to the citizens of Wrangell,
as well as any other parties, through the Borough Manager‟s Report which is published online and
distributed every two weeks.
SECTION 7 – READINESS & COMPLIANCE WITH OTHER GRANTS
Discuss what you have done to prepare for this award and how quickly you intend to proceed
with work once your grant is approved.
Tell us what you may have already accomplished on the project to date and identify other grants
that may have been previously awarded for this project and the degree you have been able to
meet the requirements of previous grants.
It is intended that the grant would begin in January of 2011. Extensive background work with
WHPacific‟s renewable Energy Specialist, Mr. Brian Yanity, has been conducted at this point in
order to arrive at application stage. The Borough Assembly discussed the potential use of electric
vehicles as a portion of the city‟s fleet of vehicles and the potential benefits to the citizens of
Wrangell if electric vehicle charging stations were created. The Assembly directed the Borough
Manager to explore grant opportunities in this area.
Renewable Energy Fund
Grant Application Round IV
AEA11-005 Grant Application Page 15 of 15 7/21/2010
SECTION 8– LOCAL SUPORT
Discuss what local support or possible opposition there may be regarding your project. Include
letters of support from the community that would benefit from this project.
The Borough Assembly adopted a Resolution in support of this grant application on September
14, 2010.
SECTION 9 – GRANT BUDGET
Tell us how much you want in grant funds Include any investments to date and funding sources,
how much is being requested in grant funds, and additional investments you will make as an
applicant.
Include an estimate of budget costs by milestones using the form – GrantBudget3.doc
As referenced earlier, a total of $112,500 of grant funding is being requested for this project. If
successful, the grants funds will be combined with a local match of $12,500.
Alaska Energy Authority Renewable Energy Fund Round IV Application
Wrangell Electric Vehicle Study September 15, 2010
AEA Renewable Energy Fund Application Attachments
Attachment A: Resumes
Attachment B: Cost Worksheet
Attachment C: Grant Budget Forms
Attachment D: Letters of Support
Attachment F: Authorized Signers Form
Attachment G: Governing Body Resolution
Attachment H: Certification
Alaska Energy Authority Renewable Energy Fund Round IV Application
Wrangell Electric Vehicle Study September 15, 2010
Attachment A: Resumes
Alaska Energy Authority Renewable Energy Fund Round IV Application
Wrangell Electric Vehicle Study September 15, 2010
Attachment B: Cost Worksheet
Renewable Energy Fund Round 4
Project Cost/Benefit Worksheet
RFA AEA11-005 Application Cost Worksheet Page 1 7-21-10
1. Renewable Energy Source
The Applicant should demonstrate that the renewable energy resource is available on a
sustainable basis.
Annual average resource availability. Existing hydropower- excess capacity (13 MW summer,
9 MW winter)
Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel)
2. Existing Energy Generation and Usage
a) Basic configuration (if system is part of the Railbelt1 grid, leave this section blank)
i. Number of generators/boilers/other 4 diesel generators (3 = 2mw, 1= 2.5 mw)
ii. Rated capacity of generators/boilers/other See above
iii. Generator/boilers/other type No boilers at this time
iv. Age of generators/boilers/other Early 80’s for the 2 mw’s, late 70’s for 2.5 mw
v. Efficiency of generators/boilers/other N/A
b) Annual O&M cost (if system is part of the Railbelt grid, leave this section blank)
i. Annual O&M cost for labor 183,650
ii. Annual O&M cost for non-labor
c) Annual electricity production and fuel usage (fill in as applicable) (if system is part of the
Railbelt grid, leave this section blank)
i. Electricity [kWh] Only used during outages and shutdown
ii. Fuel usage
Diesel [gal] 52,921 gal
Other
iii. Peak Load 6.2 mw
iv. Average Load 4.0 mw
v. Minimum Load 1.8 mw
vi. Efficiency
vii. Future trends Expecting 1- to 2% load increase per year
d) Annual heating fuel usage (fill in as applicable)
i. Diesel [gal or MMBtu]
N/A
ii. Electricity [kWh]
iii. Propane [gal or MMBtu]
iv. Coal [tons or MMBtu]
v. Wood [cords, green tons, dry tons]
vi. Other
1 The Railbelt grid connects all customers of Chugach Electric Association, Homer Electric Association, Golden Valley Electric
Association, the City of Seward Electric Department, Matanuska Electric Association and Anchorage Municipal Light and Power.
Renewable Energy Fund Round 4
Project Cost/Benefit Worksheet
RFA AEA11-005 Application Cost Worksheet Page 2 7-21-10
3. Proposed System Design Capacity and Fuel Usage
(Include any projections for continued use of non-renewable fuels)
a) Proposed renewable capacity
(Wind, Hydro, Biomass, other)
[kW or MMBtu/hr]
Existing hydropower from Southeast Alaska Power
Agency (SEAPA) system- excess capacity
(13 MW summer, 9 MW winter)
b) Proposed annual electricity or heat production (fill in as applicable)
i. Electricity [kWh]
ii. Heat [MMBtu]
c) Proposed annual fuel usage (fill in as applicable)
i. Propane [gal or MMBtu]
ii. Coal [tons or MMBtu]
iii. Wood [cords, green tons, dry tons]
iv. Other
4. Project Cost
a) Total capital cost of new system $75,500
b) Development cost $49,500
c) Annual O&M cost of new system
d) Annual fuel cost
5. Project Benefits
a) Amount of fuel displaced for
i. Electricity
ii. Heat
iii. Transportation Estimated 40 gallons of gasoline or diesel, per 1000 vehicle-miles driven
b) Current price of displaced fuel $4/gallon
c) Other economic benefits
d) Alaska public benefits Reduction in air pollution, fuel use
6. Power Purchase/Sales Price
a) Price for power purchase/sale $0.08/kWh (WMLP rate)
7. Project Analysis
a) Basic Economic Analysis
Project benefit/cost ratio unknown
Payback (years) unknown
Alaska Energy Authority Renewable Energy Fund Round IV Application
Wrangell Electric Vehicle Study September 15, 2010
Attachment C: Grant Budget Forms
Renewable Energy Fund Grant Round IV Grant Budget Form 9-13-2010
Wrangell Electric Vehicle and Charging Station Installation- Reconnaissance, Feasibility, Design and Permitting Phases
Milestone or Task Anticipated
Completion Date
RE- Fund
Grant Funds
Grantee Matching
Funds
Source of Matching
Funds:
Cash/In-kind/Federal
Grants/Other State
Grants/Other
TOTALS
Project scoping and contractor solicitation 10/1/2011 $1,000 $0 $1,000
Detailed energy resource analysis 12/1/2011 $2,000 $0 $2,000
Identification of land and regulatory issues 12/1/2011 $2,000 $0 $2,000
Permitting and environmental analysis 12/1/2011 $1,500 $0 $1,500
Detailed analysis of existing and future
energy costs and markets
12/1/2011 $5,000 $0 $5,000
Assessment of alternatives 12/1/2011 $10,000 $0 $10,000
Conceptual design analysis and cost
estimate
3/1/2012 $11,500 $0 $11,500
Detailed economic and financial analysis 3/1/2012 $10,000 $0 $10,000
Conceptual business and operations plans 3/1/2012 $1,500 $0 $1,500
Final report and recommendations 3/1/2012 $5,000 $0 $5,000
TOTALS $49,500 $0 $49,500
Budget Categories:
Direct Labor & Benefits $0 $0 $0
Travel & Per Diem $2,000 $0 $2,000
Equipment $0 $0 $0
Materials & Supplies $0 $0 $0
Contractual Services $47,500 $0 $47,500
Construction Services $0 $0 $0
Other $0 $0 $0
TOTALS $49,500 $0 $49,500
Renewable Energy Fund Grant Round IV Grant Budget Form 9-13-2010
Wrangell Electric Vehicle and Charging Station Installation- Construction Phase
Milestone or Task Anticipated
Completion Date
RE- Fund
Grant Funds
Grantee Matching
Funds
Source of Matching
Funds:
Cash/In-kind/Federal
Grants/Other State
Grants/Other
TOTALS
Confirmation that all design and feasibility
requirements are complete
4/1/2012 $1,000 $0 $1,000
Completion of bid documents 5/1/2012 $1,000 $1,000 $2,000
Contractor/vendor selection and award 6/1/2012 $1,000 $5,000 $6,000
Construction of charging station 8/31/2012 $15,000 $5,000 $20,000
Integration and testing 9/30/2012 $3,000 $0 $3,000
Electric vehicle procurement 8/31/2012 $40,000 $0 $40,000
Final Acceptance, Commissioning and
Start-up
10/31/2012 $1,000 $1,000 $2,000
Operations Reporting 12/31/2012 $1,000 $500 $1,500
TOTALS $63,000 $12,500 $75,500
Budget Categories:
Direct Labor & Benefits $0 $0 $0
Travel & Per Diem $5,000 $0 $5,000
Equipment $40,000 $5,000 $45,000
Materials & Supplies $5,000 $5,000 $10,000
Contractual Services $5,000 $1,000 $6,000
Construction Services $8,000 $1,500 $9,500
Other $0 $0 $0
TOTALS $63,000 $12,500 $75,500
Alaska Energy Authority Renewable Energy Fund Round IV Application
Wrangell Electric Vehicle Study September 15, 2010
Attachment F: Authorized Signers Form
Alaska Energy Authority Renewable Energy Fund Round IV Application
Wrangell Electric Vehicle Study September 15, 2010
Attachment G: Governing Body Resolution
Alaska Energy Authority Renewable Energy Fund Round IV Application
Wrangell Electric Vehicle Study September 15, 2010
Attachment H: Certification