Loading...
HomeMy WebLinkAbout2 - Kipnuk Cost Worksheet
 Renewable Energy Fund Round 4 Project Cost/Benefit Worksheet 
 RFA AEA11-005 Application Cost Worksheet Page 1 7-21-10 Please note that some fields might not be applicable for all technologies or all project phases. The level of information detail varies according to phase requirements. 1. Renewable Energy Source The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Annual average resource availability. 7.78 m/s average wind speed AEA Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel) 2. Existing Energy Generation and Usage a) Basic configuration (if system is part of the Railbelt1 grid, leave this section blank) i. Number of generators/boilers/other 3 Diesel Gensets ii. Rated capacity of generators/boilers/other 952 kW(Diesel 1@ 467kW, !@ 350.kW, !@135 kW,) iii. Generator/boilers/other type Diesel iv. Age of generators/boilers/other 250 kW 2008- 467kW Spring 2010, 135 kW 2000 v. Efficiency of generators/boilers/other 11.0 kWhr/gal now, 12.5 est 2010 b) Annual O&M cost (if system is part of the Railbelt grid, leave this section blank) i. Annual O&M cost for labor ii. Annual O&M cost for non-labor c) Annual electricity production and fuel usage (fill in as applicable) (if system is part of the Railbelt grid, leave this section blank) i. Electricity [kWh] 1,657,658 kWhrs (est 2015, 2,381,000 kWhrs) ii. Fuel usage Diesel [gal] 150,582 gallons (2015, 198,845 gallons) Other iii. Peak Load 300 kW iv. Average Load 220 kW v. Minimum Load 120 kW est vi. Efficiency vii. Future trends Growing 2% per year d) Annual heating fuel usage (fill in as applicable) i. Diesel [gal or MMBtu] Community wide 200,000 gallons ii. Electricity [kWh] iii. Propane [gal or MMBtu] iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] 




























































 1
The
Railbelt
grid
connects
all
customers
of
Chugach
Electric
Association,
Homer
Electric
Association,
Golden
Valley
Electric
 Association,
the
City
of
Seward
Electric
Department,
Matanuska
Electric
Association
and
Anchorage
Municipal
Light
and
Power.
 
 
 Renewable Energy Fund Round 4 Project Cost/Benefit Worksheet 
 RFA AEA11-005 Application Cost Worksheet Page 2 7-21-10 vi. Other 3. Proposed System Design Capacity and Fuel Usage (Include any projections for continued use of non-renewable fuels) a) Proposed renewable capacity (Wind, Hydro, Biomass, other) [kWh or MMBtu/hr] 675 kW Wind 500 kW Powerstore flywheel 520 kW thermal electric storage b) Proposed Annual electricity or heat production (fill in as applicable) i. Electricity [kWh] 3,280.433 kWhrs ii. Heat [MMBtu] c) Proposed Annual fuel Usage (fill in as applicable) i. Propane [gal or MMBtu] ii. Coal [tons or MMBtu] iii. Wood [cords, green tons, dry tons] iv. Other 4. Project Cost a) Total capital cost of new system $ 4,624,041 b) Development cost c) Annual O&M cost of new system $ 48,000 d) Annual fuel cost 5. Project Benefits a) Amount of fuel displaced for i. Electricity 90,990 $ gal (2015), x $ 5.00 = $ 454,950 ii. Heat 24,000 gal x $6.00/ gal= $144,000 iii. Transportation b) Price of displaced fuel $ 5.00 c) Other economic benefits Reduced diesel runtime and O&M = $154,439 d) Amount of Alaska public benefits Insure turbine production & improve power quail $ 753,389 (2015), increased locally produced energy sales 6. Power Purchase/Sales Price a) Price for power purchase/sale ½ cost of home heating fuel, approx $.15/kWhr, value of fuel is split between uitliy and home owner, 
 Renewable Energy Fund Round 4 Project Cost/Benefit Worksheet 
 RFA AEA11-005 Application Cost Worksheet Page 3 7-21-10 7. Project Analysis a) Basic Economic Analysis Project benefit/cost ratio Npv, 20 yr, 5%, $753,389- 48,000= $23,324,360, B/C = 4.4 Payback 7.65 years