HomeMy WebLinkAboutRound_IV_Costworksheet_TKE Renewable Energy Fund Round 4 Project Cost/Benefit Worksheet RFA AEA11-005 Application Cost Worksheet Page 1 7-21-10 Please note that some fields might not be applicable for all technologies or all project phases. The level of information detail varies according to phase requirements. 1. Renewable Energy Source The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Annual average resource availability. 916,600 kWh (average water year) Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel) 2. Existing Energy Generation and Usage a) Basic configuration (if system is part of the Railbelt1 grid, leave this section blank) i. Number of generators/boilers/other 3 ii. Rated capacity of generators/boilers/other 88, 88, 66 kW (peak rating) iii. Generator/boilers/other type Diesel generators iv. Age of generators/boilers/other All are 3 years old v. Efficiency of generators/boilers/other Combined efficiency is 13 kWh/gal b) Annual O&M cost (if system is part of the Railbelt grid, leave this section blank) i. Annual O&M cost for labor $20,000 (estimated) ii. Annual O&M cost for non-labor $5,000 (estimated) c) Annual electricity production and fuel usage (fill in as applicable) (if system is part of the Railbelt grid, leave this section blank) i. Electricity [kWh] 430,000 kWh ii. Fuel usage Diesel [gal] 32,500 gal Other none iii. Peak Load 120 kW iv. Average Load 50 kW v. Minimum Load 19 kW vi. Efficiency 13 kWh per gallon (per PCE data, 2007-2009) vii. Future trends Future load growth without hydro is flat or declining. With hydro, will likely increase. d) Annual heating fuel usage (fill in as applicable) i. Diesel [gal or MMBtu] 60,000 (estimate) ii. Electricity [kWh] Unknown (any usage is include in # at c.i) iii. Propane [gal or MMBtu] Zero iv. Coal [tons or MMBtu] Zero v. Wood [cords, green tons, dry tons] 24 cords/year (estimate) vi. Other Unknown 1 The Railbelt grid connects all customers of Chugach Electric Association, Homer Electric Association, Golden Valley Electric Association, the City of Seward Electric Department, Matanuska Electric Association and Anchorage Municipal Light and Power. Renewable Energy Fund Round 4 Project Cost/Benefit Worksheet RFA AEA11-005 Application Cost Worksheet Page 2 7-21-10 3. Proposed System Design Capacity and Fuel Usage (Include any projections for continued use of non-renewable fuels) a) Proposed renewable capacity (Wind, Hydro, Biomass, other) [kW or MMBtu/hr] 120 kW installed capacity – run-of-river hydro 87% capacity factor b) Proposed annual electricity or heat production (fill in as applicable) i. Electricity [kWh] 916,600 kWh ii. Heat [MMBtu] - c) Proposed annual fuel usage (fill in as applicable) i. Propane [gal or MMBtu] 0 ii. Coal [tons or MMBtu] 0 iii. Wood [cords, green tons, dry tons] 0 iv. Other 0 4. Project Cost a) Total capital cost of new system $2,711,000 b) Development cost $329,000 (includes $100,000 already committed) c) Annual O&M cost of new system $22,200 d) Annual fuel cost zero 5. Project Benefits a) Amount of fuel displaced for i. Electricity 31,400 gal ii. Heat 13,000 gal iii. Transportation N/A b) Current price of displaced fuel $4.00 per gal $3.87 per gal (2010 AEA model price for heating fuel – used for benefits calculations) c) Other economic benefits Included in future fuel cost projections. d) Alaska public benefits Significant other benefits, but not quantifiable in economic terms. 6. Power Purchase/Sales Price a) Price for power purchase/sale Est. retail utility rate with the project is $0.20 to 0.30 per kWh. This includes revenue requirements for all utility costs. 7. Project Analysis a) Basic Economic Analysis Project benefit/cost ratio With 50=year life, $4,993,600 / $2,450,500 = 2.04 Payback (years) $2.711M / $162,435 = 14.3 years