Loading...
HomeMy WebLinkAboutHaines Boro Excursion Inlet Hydro APP FinalRenewable Energy Fund Round IV Grant Application AEA 11-005 Haines Borough Excursion Inlet Hydro Project Reconnaissance and Feasibility Renewable Energy Fund Grant Application Round IV AEA11-005 Grant Application Page 2 of 26 7/21/2010 SECTION 1 – APPLICANT INFORMATION Name (Name of utility, IPP, or government entity submitting proposal) Haines Borough Type of Entity: home rule borough (municipality) Mailing Address PO Box 1209 Haines, AK 99827 Physical Address 103 Third Avenue South Telephone 907-766-2231 Fax 907-766-2716 Email bmaynard@haines.ak.us 1.1 APPLICANT POINT OF CONTACT / GRANTS MANAGER Name Brad A. Maynard Title Director of Public Facilities Mailing Address PO Box 1209 Haines, AK 99827 Telephone 907-766-2257 Fax 907-766-2716 Email bmaynard@haines.ak.us 1.2 APPLICANT MINIMUM REQUIREMENTS Please check as appropriate. If you do not to meet the minimum applicant requirements, your application will be rejected. 1.2.1 As an Applicant, we are: (put an X in the appropriate box) An electric utility holding a certificate of public convenience and necessity under AS 42.05, or An independent power producer in accordance with 3 AAC 107.695 (a) (1), or X A local government, or A governmental entity (which includes tribal councils and housing authorities); Yes 1.2.2. Attached to this a pplication is formal approval and endorsement for its project by its board of directors, executive managem ent, or other governing authority. If the applicant is a collaborative grouping, a fo rmal approval from each part icipant’s governing authority is necessary. (Indicate Yes or No in the box ) Yes 1.2.3. As an applicant, we have administrative and financial management systems and follow procurement standards that comply with the standards set forth in the grant agreement. Yes 1.2.4. If awarded the grant, we can comply with all terms and conditions of the attached grant form. (Any exce ptions shou ld be clearly noted an d submitted with the application.) Yes 1.2.5 We i ntend to own and operate any proj ect that ma y be constructed with grant funds for the benefit of the general public. Renewable Energy Fund Grant Application Round IV AEA11-005 Grant Application Page 3 of 26 7/21/2010 SECTION 2 – PROJECT SUMMARY Overview The Haines Borough encompasses an area of approximately 2,620 square miles, or almost 1.7 million acres. It is bounded on the North and East by Canada and the Skagway Borough, to the South by the City and Borough of Juneau and Icy Straits, and to the West by Glacier Bay National Park and Preserve. Nearly 120 miles long and 80 miles at its widest, the Borough is the northern boundary of the Southeast Alaska region (see Figure 1). Figure 1. Haines Borough Location In 2002 Borough residents voted to consolidate the first-class City of Haines and the third- class Haines Borough into a home rule borough, adding area wide planning, platting, and land use regulation to the responsibilities of the local government. Excursion Inlet (see Figure 2) is a community located in the extreme SW region of the borough. It is not an organized community, but has been home to a significant fish processing industry for many years. Excursion Inlet Renewable Energy Fund Grant Application Round IV AEA11-005 Grant Application Page 4 of 26 7/21/2010 A large part of the economic base of the Haines Borough is the fishery in the region, valued in the round at $60,000,000 annually. The bulk of the Haines gillnetting fleet -62 permits- sells to Ocean Beauty Seafoods. The facility is currently operating under the license of Ocean Beauty Seafoods, Inc. In FY10 the Haines Borough received $278,700 in raw fish tax, an estimated 95% of that generated in Excursion Inlet. Over the previous decade, FY00-09, the borough received $1,640,000 in raw fish tax. In addition to the seafood industry, the community of Excursion Inlet includes 119 parcels of land owned by 84 unique owners. Figure 2 – Excursion Inlet (photo courtesy of Ocean Beauty Seafoods) Like most of Alaska’s remote communities, Excursion Inlet, including Ocean Beauty Seafood’s plant, is entirely dependent on diesel fuel imported into the area for heat and power. The steady rise of fuel costs, in logistics, transportation, and power generation, and the cost of maintaining diesel generators in Excursion Inlet make the development of renewable energy resources a sound investment for the Haines Borough. This project would support the study of conditions that might encourage the further development of hydropower generation infrastructure in Excursion Inlet. Project Background Since the 1970’s AEA and SE Conference have explored the potential for hydroelectric development in the southeastern region of Alaska. Studies include: • Regional Inventory and Reconnaissance Study for Small Hydropower Sites in Southeast Alaska, October 1979, Department of the Army, Alaska District, Corps of Engineers • Southeast Alaska Hydropower, Robert Rutherford Associates, 1977 • Southeast Alaska Electrical Intertie Plan, ACRES International for SE Conference, 1988 • Southeast Alaska Intertie Study, Phase 2 , D Hittle & Associates for SE Conference, 2005  The AEA studies identified two creeks at Excursion Inlet as potentially feasible hydroelectric sites. These creeks are North Excursion Inlet Creek and South Excursion Inlet Creek. Renewable Energy Fund Grant Application Round IV AEA11-005 Grant Application Page 5 of 26 7/21/2010 According to the reports, the two projects would have installed capacities of 2.0 MW and 1.1 MW, respectively, and generate a total of 4,180 MWh annually. Project Description AEA Renewable Energy Fund grant guidelines require a multi-phase approach to project development. The Borough is requesting funds for the first two phases in this application: Reconnaissance and Feasibility/Conceptual Design Studies. The tasks for this project are described in Section 2.4 of the grant application instructions. Project Team The Borough has identified a project team composed of two engineering firms, Electric Power Systems, Inc. and EES Consulting, as qualified and capable of performing the tasks outlined in the grant requirements (Section 2.4 of the grant application instructions). These companies will be the Project Team and have prepared task lists, cost estimates and background materials in support of this grant application. 2.1 Project Title – (Provide a 4 to 5 word title for your project) Excursion Inlet Hydro Project - Phases I & II 2.2 Project Location – Include the physical location of your project and name(s) of the community or communities that will benefit from your project. The Excursion Inlet Hydro Project is located on Excursion Inlet in the community of the same name in southeastern Alaska (See Figure 3). Excursion Inlet is strategically located in Icy Straits, the water body at the extreme southwest of the Haines Borough. The community is composed of 84 land owners including Wards Cove Packing Company, dba Ocean Beauty Seafoods, and several commercial sport fishing lodges. The industry and most residences are seasonal. The valuation of the community in FY10 was $12,300,000. Figure 3. Excursion Inlet Hydro Project Location Renewable Energy Fund Grant Application Round IV AEA11-005 Grant Application Page 6 of 26 7/21/2010 2.3 PROJ ECT TYPE Put X in boxes as appropriate 2.3.1 Renew able Resource Type Wind Biomass or Biofuels X Hydro, including run of river Transmission of Renewable Energy Geothermal, including Heat Pumps Small Natural Gas Heat Recovery from existing sources Hydrokinetic Solar Storage of Renewable Other (Describe) 2.3.2 Proposed Grant Funded Phase(s) for this Request (Check all that apply) X Reconnaissance Design and Permitting X Feasibility Construction and Commissioning Conceptual Design 2.4 PROJ ECT DESCRIPTION Provide a brief one paragraph description of your proposed project. The application requests funding for the following studies to be performed on the proposed hydroelectric projects at Excursion Inlet: Phase I Reconnaissance Study, including the following tasks • Project scoping • Resource identification and analysis • Land use, permitting and environmental analysis • Preliminary design analysis and cost estimates • Cost of energy and market analysis • Simple economic analysis • Final report and recommendations Assuming the Reconnaissance Study is favorable, a Phase II Feasibility Study would be carried out, including the following tasks • Project scoping • Detailed energy resource analysis • Identification of land and regulatory issues • Permitting and environmental analysis • Detail analysis of existing and future energy costs and markets • Assessment of alternatives • Conceptual design analysis and cost estimate • Conceptual business and operations plan • Final report and recommendations Renewable Energy Fund Grant Application Round IV AEA11-005 Grant Application Page 7 of 26 9/14/2010 2.5 PROJECT BENEFIT Briefly discuss the financial and public benefits that will result from this project, (such as reduced fuel costs, lower energy costs, etc.) This project has multiple benefits, most tied to Ocean Beauty Seafood’s (OB) ability to operate successfully during an extended season at Excursion Inlet. The financial benefits are the result of lower operating costs and increased capacity. During the shoulder seasons - March to April and September - the plant cannot operate at full capacity and the diesel power generators operate inefficiently. OB cannot operate profitably; this year OB closed Excursion Inlet on September 1, despite the fact that there was an ongoing coho fishery. The shoulder seasons present opportunity for new markets. With lower power generation costs, OB could expand into the herring and crab markets, and increase its halibut poundage. The fall season presents black cod in addition to coho; value- added repackaging of salmon frozen during the peak season is also a shoulder season activity. Lower power generation costs would result in a longer profitable operating season, which would benefit the fishing fleet by providing a buyer in new markets, would benefit employees by providing income, would benefit the municipality and benefit the state with increased raw fish tax. OB currently buys from 27 trollers, 38 seiners and 62 gillnetters, the majority residing in the region. Historically, when the plant is stressed from operating at peak capacity, OB will limit the amount of product it can purchase, and the fleet has no market. The net total increase in available power by the use of hydropower with diesel backup will increase plant capacity. This has potential to increase the OB fleet by providing additional markets. Increased fish product landed at Ocean Beauty Seafoods translates into increased raw fish tax revenue for the Haines Borough. Providing this clean power would lower overall pollution and CO2 levels, further allowing OB to increase capacity. An indirect benefit is increased community service to the borough. OB’s plant provides garbage, fuel, freight, and airport maintenance to the region, but they can do so only when processing at a high level of output. The longer they operate in a season, the greater their ability is to provide these services to the community. Additionally, the availability of hydropower in Excursion Inlet will improve the quality of life for residents by alleviating the need to purchase, operate and maintain stand-alone diesel or alternative energy generators. There are 119 parcels and 84 distinct land owners in Excursion Inlet. The Haines Borough has selected additional lands in Excursion Inlet, and when titled, intends to sell them. The possibility that the Excursion Inlet community will grow is real; low cost energy encourages development and growth. 2.6 PROJECT BUDGET OVERVIEW Briefly discuss the amount of funds needed, the anticipated sources of funds, and the nature and source of other contributions to the project. The Haines Borough requests funding for the two phases of study proposed in this Grant Application. For Phase I Reconnaissance Study a total of $103,593 is budgeted. The Haines Borough intends to provide $10,000 matching funds in Phase I of the project and requests that this grant cover the remaining amount of $93,593. The Phase I study will make an initial determination practicality of developing one or both of the hydroelectric projects. Assuming that the outcome of Phase I is positive, then more detailed studies of the project will be performed in Phase II Feasibility Study. For Phase II, a total of $223,536 is required. The Borough requests that the Grant cover all of the Phase II costs. Renewable Energy Fund Grant Application Round IV AEA11-005 Grant Application Page 8 of 26 9/14/2010 2.7 COST AND BENEFIT SUMARY Include a summary of grant request and your project’s total costs and benefits below. Grant Costs (Summary of funds requested) 2.7.1 Grant Funds Requested in this application. $317,130.00 2.7.2 Other Funds to be provided (Project match) $10,000.00 2.7.3 Total Grant Costs (sum of 2.7.1 and 2.7.2) $327,130.00 Project Costs & Benefits (Summary of total project costs including work to date and future cost estimates to get to a fully operational project) 2.7.4 Total Project Cost (Summary from Cost Worksheet including estimates through construction) $15,500,000 2.7.5 Estimated Direct Financial Benefit (Savings) $17,500,000 (NPV) 2.7.6 Other Public Benefit (If you can calculate the benefit in terms of dollars please provide that number here and explain how you calculated that number in your application (Section 5.) $ Renewable Energy Fund Grant Application Round IV AEA11-005 Grant Application Page 9 of 26 7/21/2010 SECTION 3 – PROJECT MANAGEMENT PLAN Describe who will be responsible for managing the project and provide a plan for successfully completing the project within the scope, schedule and budget proposed in the application. 3.1 Project Manager Tell us who will be managing the project for the Grantee and include contact information, a resume and references for the man ager(s). If the applicant does n ot have a proje ct manager indicate how you intend to solicit project management support. If the applicant expects project management assistance from AEA or another government entity, state that in this section. Mr. Brad Maynard, Haines Borough Director of Public Facilities, will be the Program Manager and responsible for managing the project for the Grantee. Mr. Maynard’s contact information is provided in Section 1, above. The Borough has engaged a project team to assist the borough in preparing this application and support the development and implementation of the studies identified. This project team is composed of Electric Power Systems, Inc. and EES Consulting, With the approval of this grant request, the Borough will be responsible for successful completion of the projects within the scope, schedule, and budgets defined in the grant agreements. It is envisioned that the Borough will retain the EPS/EES team to provide the engineering and professional services necessary to complete the project phases identified in this application. This team will work closely with the Haines Borough and AEA to develop the detailed scoping documents, project plans, schedules and specifications for procurement of the resources needed. EPS is an Alaska Company specializing in electric power planning and implementation of infrastructure projects related to utilities. EPS staff offers a wide range of experience and education in the area of power system operation, engineering, and administration. Unlike many in our field of expertise, EPS provides a full range of services, from planning studies, design, construction, and start-up/commissioning to periodic testing and maintenance. EES Consulting is a professional services corporation headquartered in Kirkland, WA. EES has professional engineers registered in the State of Alaska with extensive experience in designing, licensing and permitting, and managing the construction of hydropower projects as well as scoping and implementing environmental resource studies and conducting agency consultation. . 3.2 Project Schedule Include a schedule for the proposed work that will be funded by this grant. (You may include a chart or table attachment with a summary of dates below.) The proposed schedule for both phases is shown below in Figure 4. Renewable Energy Fund Round IV Grant Application AEA 11-005 Application Page 10 of 26 7/21/2010 Figure 4. Schedule for Excursion Inlet Hydro Project Phases I and II Renewable Energy Fund Round IV Grant Application AEA 11-005 Application Page 11 of 26 7/21/2010 3.3 Project Milestones Define key t asks and decision points in your p roject and a schedule for achieving them. The Milestones must also be included on your budget worksheet to demonstrate how you propose to manage the project cash flow. (See Section 2 of the RFA or the Budget Form.) Project milestones for Phase I Reconnaissance Study will require a combination of field work and office work. Key tasks and deliverables are defined as milestones for project completion: • Project scoping and contractual matters – This task will include formalizing contracts with EPS and EES to perform the required studies. Once under contract the project team will review all prior studies, collect other available data needed and finalize schedules. • Resource identification and analysis – This task will include review of existing mapping and topography of the two watersheds. A preliminary review of the hydrology of North and South Excursion Inlet Creeks will be performed. Recommendations for additional topographic and hydrologic work will be developed. • Land ownership, land use, permitting and environmental analysis – This task will include establishing certainty in site ownership and potential ROW issues, review of present and future land uses of the project watersheds. A high-level review of permits that would be required for the construction of a hydroelectric project will be prepared. A preliminary review of potential environmental issues will be performed (included threatened and endangered species). • Preliminary Design analysis and Cost – This task will include a preliminary arrangement of the two hydroelectric projects. It is envisioned that a site visit will be made to understand site constraints, and topography and refine project features (diversion dam, penstock and powerhouse locations). Project arrangement plans and profile drawings will be developed. A preliminary cost estimate for project development and construction will be prepared. As a part of this work average annual energy will be estimated. • Cost of energy and market analysis – Based on the estimated project development cost, the cost of power will be developed. Discussions will be held with OB, residents and commercial users concerning the cost of power to confirm their interest in power purchase. • Simple economic analysis – A simple payback period will be calculated based on the amount of and value of diesel fuel displaced and the estimated project development cost. • Final report and recommendations – A report that documents the above tasks will be prepared. A list of recommendations will be included in the report, based on the results of the study. Project milestones for Phase II Feasibility Study will require a combination of field work and office work. It is envisioned that this work will only proceed if the results of the Phase I reconnaissance study are favorable. Key tasks and deliverables are defined as milestones for project completion: • Project scoping – This will be the kickoff for this phase of work. • Detailed energy resource analysis – Based on the project configuration and hydrology of the applicable stream(s), average annual energy production will be estimated. For the feasibility phase analysis it is expected that a hydrologic record for a similar stream in Alaska will be selected and corrected by drainage area. The monthly energy production Renewable Energy Fund Grant Application Round IV AEA11-005 Grant Application Page 12 of 26 7/21/2010 for the hydroelectric projects will be compared to the Excursion Inlet community needs. As a part of the work, stream gauges will be installed at the two streams to begin collecting flow data. • Identification of land and regulatory issues – Issues regarding land use, and regulatory issues will be further developed in this phase of study. Land acquisition for the projects will be identified and acquisition costs estimated. Regulatory issues associated with operation of an electric utility will be identified and costs estimated. • Permitting and environmental analysis – Cost estimates will be prepared for acquisition of necessary permits to allow the construction and operation of hydroelectric project(s). Initial scoping of environmental issues (expected to be primarily aquatic resources, but terrestrial resources will also be reviewed) will be made with the involved regulatory agencies. It is expected that the major issues will be associated with aquatic resources and will be related to minimum flows and fish passage requirements. Terrestrial issues associated with project impacts will also be investigated. A site visit to assess these issues will be budgeted for this phase of work. • Detailed analysis of existing and future energy costs and markets – Existing energy uses and energy production from the proposed projects will be reviewed to determine how well the proposed projects can meet the needs of the fishing fleet, commercial interests and residents in the community. Possibilities for growth of the community and Ocean Beauty Seafood’s facility will be made to determine what role the projects can play in meeting those needs. • Assessment of alternatives – Alternatives to construction of hydroelectric projects will be reviewed. Alternatives may include wind power, tidal power, or interconnection to a regional grid (SE Intertie). • Conceptual design analysis and cost estimate – A conceptual design for each hydroelectric project will be developed. A project plan; profile along the water conveyance system; a plan of the diversion dam and intake; a powerhouse plan and a single-line diagram will be developed. As a part of the design analysis it is expected that a site visit will be required, and the site plan topographic information will be refined. A cost estimate for each project will be developed. • Detailed economic and financial analysis – Based on the project development cost estimated energy sales will be estimated and projected over time. An estimate of the operating costs for the projects will be made. Sources of funding for project development will be reviewed and cost of capital estimated. A financial model will be developed to determine the projects’ ability to cover operating costs and service debt. • Conceptual business and operations plan – A business plan will be developed to address the structure for developing the projects and the plan for project operations. This task will require specialized consultation due to political and regulatory realities, given that Excursion Inlet is not within an ARC service area; the Haines Borough, as a home rule borough, has options for delivering services within service areas. • Final report and recommendations – A final report will be developed to document the results of the study. Included in the report will be recommendations for further project development if merited. Renewable Energy Fund Grant Application Round IV AEA11-005 Grant Application Page 13 of 26 7/21/2010 3.4 Project Resources Describe the personnel , contractors, equipment, and services you will use to accomplish the project. Include any partnerships or commitments with other entities you have or anticipate will be needed to complete your project. Describe a ny existing contracts and the selection process you may use for major equipment purchases or contracts. Include brief resumes and references for known, key personnel, contractors, and suppliers as an attachment to your application. A team approach will be employed to implement and manage this project. The team will consist of The Haines Borough , Electric Power Systems, Inc., EES Consulting and the AEA grant manager. Each of the tasks described in this application requires specialized knowledge and skills that must be obtained from private sector consultants and service providers engaged in or highly familiar with hydropower resource development. Electric Power Systems (EPS) and EES Consulting (EES) are highly qualified to perform the work described in this grant application. Both companies are familiar with hydroelectric and utility power systems, and both have performed work on AEA grant-funded projects. EES will be the prime contractor for this project; EPS will be sub-contracted to perform the tasks related to the powerhouse, control systems, and transmission lines. EES Consulting will perform the other tasks related to the studies, including hydroelectric project design, construction cost estimates, energy production studies, economic and financial analysis, regulatory consultation, permitting and environmental studies and analysis. 3.5 Project Communications Discuss how you plan to monitor the project and keep the Authority informed of the status. Mr. Maynard will be the project manager and primary point of contact for communications with AEA and the grant manager. This will ensure an effective, continuous flow of communication throughout the project. The project team will use a suite of project management tools including web-based communications and reporting, task and milestone tracking, work breakdown structure, scheduling, document control, budget control and risk management. The project manager will coordinate with the AEA grant manager to develop a schedule of reports. At a minimum, the borough will conduct monthly status tele- conferences and web-based distribution of reports on scope, schedule, budget and unresolved issues. Troubleshooting reports and teleconferences will be scheduled on an as-needed basis. 3.6 Project Risk Discuss potential problems and how you would address them. Potential risk for this project centers on site conditions. Field work is required for project development and investigation, stream gauging, environmental review and permitting requirements. Some of these activities can be impeded or delayed by weather conditions. The project team is familiar with contingency requirements for site work in remote locations and will effectively manage the project schedule to avoid disruptions or delays. Potential risks associated with development of the hydroelectric projects will be identified as a result of the studies. Renewable Energy Fund Grant Application Round IV AEA11-005 Grant Application Page 14 of 26 7/21/2010 SECTION 4 – PROJECT DESCRIPTION AND TASKS • Tell us what the project is and how you will meet the requirements outlined in Section 2 of the RFA. • The level of informatio n will vary according to phase(s) of the project you propose to undertake with grant funds. • If you are applying for grant funding for more than one phase o f a project provide a plan and grant budget form for completion of each phase. • If some work has already been completed on your project and you are requesting funding for an advanced phase, submit information sufficient to demonstrate that the preceding phases are satisfied and funding for an advanced phase is warranted. 4.1 Proposed Energy Resource Describe the potential extent/amount of the energy resource that is available. Discuss the pros and cons of your p roposed energy resource vs. other alternatives that ma y be available for the market to be served by your project. The 1979 report “Regional Inventory and Reconnaissance Study of Small Hydropower Sites in Southeast Alaska” performed by CH2M Hill identified North and South Excursion Creek as potential hydroelectric project sites. The potential resource includes two streams near Excursion Inlet. Either one or both of these streams could be used for hydroelectric energy generation. Alternative generation resources include wind and interconnection to a regional grid. Based on available wind resource maps Excursion Inlet does not appear to have a wind resource that is economic. The SE Intertie has been under study for a long time. The cost to interconnect locations such as Excursion Inlet appears to be cost prohibitive. 4.2 Existing Energy System 4.2.1 Basic configuration of Existing Energy System Briefly discuss the basic configuration of the existing energy system. Include inform ation about the number, size, age, efficiency, and type of generation. Excursion Inlet is a remote community in the southwestern part of the Haines Borough. Ocean Beauty Seafood’s fish processing plant is the primary employer and only significant fish processor in the region. During the summer, the facility employs 400 people and supports a varied fleet of 127 boats that depend on the plant for maintenance, fuel delivery and ice. Ocean Beauty Seafood provides all power to the community. Their facility is presently operating strictly on diesel fuel for boilers and electricity generation. The electrical power system consists of five diesel generators: three 600KW D398, one 275KW D353, and one 1100KW 3516. These generators are over 20 years old, and are about half as efficient as the current generation of diesel generators. The minimum operating power needs are approximately 800 kW with average operating needs at around 1,600kw. The maximum demand is roughly 2,100 kW. Based on current generator capacities, other than during peak demands, the facility is not able to efficiently match power needs to its generator capacities. Residents and small businesses provide their own power with diesel or gas-fired generators up to 20kW. 4.2.2 Existing Energy Resources Used Briefly discuss your understanding of the existing energy resources. Include a brief discussion of any impact the project may have on existing energy infrastructure and resources. During an average year, Ocean Beauty Seafoods consumes approximately 300,000 gallons of diesel to produce 3,900,000 KWH/yr. During the larger seasons of the early 2000s these numbers were typically doubled. Currently, energy use in Excursion Inlet is highly seasonal, as Ocean Beauty Seafoods is operating its facility from June through September. The rest of the Renewable Energy Fund Grant Application Round IV AEA11-005 Grant Application Page 15 of 26 7/21/2010 year energy needs are limited to energy for their facility caretaker staff. As previously noted, it is expected that energy from a hydroelectric resource would have a substantially lower cost. Lower cost power would allow Ocean Beauty Seafoods to extend its operating season, thereby opening new markets in herring, crab, halibut, coho, black cod and value-added repackaged salmon products. The Excursion Inlet community consists of 119 parcels, with Ocean Beauty Seafoods having the single greatest impact on resource use. Three sport fish lodges and residents generate their own power with small generators. The project will address the needs and methods of distributing electrical service to the community, thereby reducing total community fossil fuel consumption and corresponding carbon footprint. 4.2.3 Existing Energy Market Discuss existing energy use and its market. Discuss impacts your project may have on energy customers. For 2010, Ocean Beauty Seafoods paid $2.75 per gallon for diesel, including transportation and storage. It is reasonable to assume that as the economy recovers that world demand will drive these prices higher over time. Ocean Beauty Seafoods’ variable O&M costs have been estimated at $0.02 per kWh. Most of the generators installed there are very old and inefficient. It is likely that in the next 5 years they will need to replace the older engine-generator sets. Given the estimated efficiency of the units (13 kWh/gal), and fuel cost in 2010, the estimated total cost of power produced in 2010 is on the order of $0.30 per kWh. Obviously, this will escalate over time with fuel price. Note that in 2003 the diesel fuel price in Excursion Inlet was $1.10 per gallon. While presently Ocean Beauty Seafood is the largest significant energy user, the Borough anticipates a market for energy to residential and light commercial interests developing over time. The proposed hydroelectric projects have the potential to displace significant amounts of diesel- fueled generation. 4.3 Proposed System Include information necessary to d escribe the system you are intending to devel op and add ress potential system design, land ownership, permits, and environmental issues. 4.3.1 System Design Provide the following information for the proposed renewable energy system: • A description of renewable energy technology specific to project location • Optimum installed capacity • Anticipated capacity factor • Anticipated annual generation • Anticipated barriers • Basic integration concept • Delivery methods Renewable Energy Fund Grant Application Round IV AEA11-005 Grant Application Page 16 of 26 7/21/2010 Table 1 summarizes the project information from the 1979 report. Table 1 Hydroelectric Sites for Excursion Inlet Site Name S. Excursion Inlet Creek N. Excursion Inlet Creek Drainage Area (Sq. Miles) 14.3 13.6 Mean Annual Flow (CFS) 118 117 2-year, 7-day low flow (CFS) 4.3 4.1 Net Head (feet) 200 110 Full Gate Flow (CFS) 140 140 Rated Capacity (kW) 2,020 1,110 Dam Type Rockfill Concrete Diversion Size 5’ high x 40’ long 5’ x 70’ Flume Length 5,300’ 6,000’ Diameter 5’ 5’ Penstock Length 1,650’ 700’ Diameter 4.5’ 4.5’ Transmission Length (mile) 1.5 1.5 Voltage (kV) 15 15 Costs Construction $6,000,0 00 $5,400,000 Annual Operations $65,000 $36,000 Renewable Energy Fund Grant Application Round IV AEA11-005 Grant Application Page 17 of 26 7/21/2010 Figure 5 is a project plan for the two projects, taken from the 1979 report. Figure 5 – Project Plan The report notes that both North and South Excursion Inlet Creek have anadromous fish present, including sockeye and coho salmon (S. Excursion Inlet Creek) and pink and chum salmon (N. Excursion Inlet Creek). According to the study the two projects could have a total installed capacity of approximately 3 MW and generate an annual average of 3,800,000 kWh. This represents a plant capacity factor of 15%. It is not known how this information was developed in the study, nor how the installed capacity was selected. A review of streamflow data from other streams in Southeast Alaska indicates that runoff is highly seasonal. Streamflow data from Montana Creek, Auke Bay (near Juneau) was reviewed. The USGS and USFS maintain this gage (15052800) and the drainage area (14.1 sq. miles) and average annual flow (100 cfs) is very similar to that reported for the two Excursion Inlet Renewable Energy Fund Grant Application Round IV AEA11-005 Grant Application Page 18 of 26 7/21/2010 Creeks. Figure 6 provides a graph of average monthly flows, a median year flows, a dry year and a wet year flows for Montana Creek. Figure 6 – Monthly Flows Montana Creek 0 50 100 150 200 250 January February March April May June July August September October November DecemberFlow (cfs)Month Montana Creek Monthly Flows Average Year 1985 2007 1971 Based the hydrology patterns seen from Montana Creek, the average monthly flows line up with the local needs at Excursion Inlet (peak demands from May through September. Average monthly flows suggest that energy production could displace the majority of diesel generation used by the community and its fish processing industry. The Phase I Reconnaissance Study will look in greater detail at the hydrology and review plant installed capacity. If economics appear reasonable for one or both of the projects, further hydrologic investigation will be carried out in the Phase II Feasibility Study. Barriers to project development will include anadromous fish concerns. Additional research will be performed in the Reconnaissance Phase to assess the magnitude of the issue. Major concerns with protection of these species include minimum flows below a diversion facility and the need for both upstream and downstream fish passage. Interconnection of the powerhouse(s) to the electrical distribution system will be reviewed as part of the study work. Both powerhouses are located a short distance (1.5 miles) from the community. It is expected that transmission will be relatively inexpensive. Interconnection will likely require consideration to coordinate diesel generation and hydroelectric generation. At a minimum, the diesel generation facilities will need to be maintained for backup power and to augment hydro production during low-flow periods. Renewable Energy Fund Grant Application Round IV AEA11-005 Grant Application Page 19 of 26 7/21/2010 4.3.2 Land Ownership Identify potential land ownership issues, includ ing whether site owners have agree d to the proj ect or how you intend to approach land ownership and access issues. Lounsbury & Associates, Inc. of Wasilla, AK is currently finalizing a major survey of state lands the borough selected under entitlement. We know that the penstock site on South Excursion Inlet Creek is on federal lands. Land records will be reviewed and the owner(s) of the project lands will be identified. If the project is located on land owned by others, then the Borough would need to either acquire the some or all of the necessary land, or to obtain easements or rights of way. If any part of the project is on USDA Forest Service land, then a Special Use Permit would be required, and they would have mandatory conditioning authority if a FERC license were required. 4.3.3 Permits Provide the following information as it may relate to permitting and how you intend to address outstanding permit issues. • List of applicable permits • Anticipated permitting timeline • Identify and discussion of potential barriers Applicable permits for the construction of a hydroelectric project or projects at the Excursion Inlet site(s) may include: 1. Water rights and/or Instream Flow certificate – Alaska Department of Natural Resources (DNR), Division of Mining, Land, and Water.(In Alaska, federal reserved water rights may be involved if the project water source is on federal land.) 2. Instream Flow reservation – may be required as protective measure for preservation of fish habitat 3. Land ownership, easements or rights of way, USFS Special Use Permit 4. FERC License, or Alaska DNR, Division of Mining, Land and Water, Dam Safety and Construction Unit (DSCU) Certificate of Approval to Construct A Dam and Certificate of Approval to Operate A Dam 5. Fish Habitat Permit – Alaska Department of Fish and Game (ADFG) 6. Water Quality certification – must meet state standards administered by the Department of Environmental Conservation (DEC), Division of Water 7. Coastal Management Program project consistency determination 8. Local construction permits, if applicable 9. Army Corps of Engineers Section 404 Permit for developments within ordinary high water of navigable rivers and/or wetlands of navigable rivers This list of permits will be reviewed and updated as part of the Reconnaissance and Feasibility Study tasks. Permitting Timeline FERC has primary jurisdiction over construction of most U.S. hydropower projects. However, FERC has agreed that some small projects in Alaska are non-jurisdictional. For example, the Nushagak Cooperative in Dillingham, Alaska was able to obtain a declaration of non-jurisdiction because its proposed project would not be connected to an inter-state grid; would not be located on federal lands, and is located on a non-navigable river. If a FERC license is required, for a small project may be possible to obtain a FERC license within a year after the formal initiation of the licensing process, if the environmental issues can be resolved expeditiously with the resource agencies as the process moves along. However, significant information needs are identified, and depending on the number and the nature of studies required, the permitting process could take much longer. Phase I work should clarify the likely timeframe for permitting. Renewable Energy Fund Grant Application Round IV AEA11-005 Grant Application Page 20 of 26 7/21/2010 If the project(s) were determined not to be within FERC’s jurisdiction, the State of Alaska would approve the construction and operation. The timeframe for state permitting would be explored with the agency in the initial phases of the project, but it is anticipated that timing would again depend upon the complexity of the resource issues that are identified. Potential Barriers Potential barriers to obtaining the permits needed to construct a project(s) at Excursion Inlet include: ƒ fish habitat/instream flows ƒ anadromous fish distribution in both creeks (for example, sockeye salmon spawn in Neva Lake, which connects to S. Excursion Inlet Creek via Neva Creek, about 0.6 miles upstream from its confluence with Excursion Inlet) ƒ sediment routing at the diversion structures ƒ water quantity and quality issues associated with the diverting of streamflow for the proposed projects ƒ other environmental issues not currently known The two streams identified for potential projects are known to have anadromous fish present. If low instream flows during summer months are likely to adversely affect the anadromous fish that use the streams, this may present a significant challenge for development of one or both sites. 4.3.4 Environmental Address whether the following environmental and land use issues apply, and if so how they will be addressed: • Threatened or Endangered species • Habitat issues • Wetlands and other protected areas • Archaeological and historical resources • Land development constraints • Telecommu nications interference • Aviation considerations • Visual, aesthetics impacts • Identify and discuss other potential barriers Anadromous fish are known to be present in the two streams identified for these project locations. The project(s) would involve diverting water from these streams, so clearly impacts on fish habitat would need to be assessed and a Fish Habitat Permit would be required. Threatened and endangered species lists will be reviewed to determine which, if any listed species are present. Further assessment of existing information regarding fish presence, wildlife, habitat, wetlands, archaeological and historical resources and other environmental issues and constraints will be gathered in the Phase I and II investigations. Archaeological and historical resources typically require consultation at the federal and/or state levels depending upon the licensing or permitting processes that are involved. Phase I will investigate the land development issues and determine if any constraints exist. Phase II will assess what, visual and aesthetic issues may be of concern and the level of study that will be required. Telecommunications and aviation issues will be given consideration in Phase I, although they are not believed to present concerns for this project. Renewable Energy Fund Grant Application Round IV AEA11-005 Grant Application Page 21 of 26 7/21/2010 4.4 Proposed New System Costs and Projected Revenues (Total Estimated Costs and Projected Revenues) The level of cost inform ation provided will vary according t o the phase of funding requested and any previous work the applicant may have do ne on the project. Applicants must reference the source of their cost data. For example: Appl icant’s Records or An alysis, Industry Standa rds, Consultant or Manufacturer’s estimates. 4.4.1 Project Development Cost Provide detailed proje ct cost information based on your cu rrent knowledge and un derstanding of the project. Cost information should include the following: • Total anticipated project cost, and cost for this phase • Requested grant funding • Applicant matching funds – loans, capital contributions, in-kind • Identification of other funding sources • Projected capital cost of proposed renewable energy system • Projected development cost of proposed renewable energy system Project construction cost estimates would be developed as part of the studies. Recent projects in Alaska have ranged in cost from $3,000 to $10,000 per kilowatt of installed capacity. Table 2 lists some recent projects and their statistics. The 1979 estimated cost for the two projects was $11,400,000 for a total installed capacity of 3,110 kW. This equates to $3,670 per kW. Table 2. Costs of Recently Developed Alaska Projects Project Capacity (kW) Generation (MWh) Cost (Millions) Cost per kW Falls Creek 800 2,160 $8.5 $10,625 Kasidaya Creek 3,000 11,900 $10 $3,333 Lake Dorothy 14,300 74,500 $60 $4,195 Excursion Inlet construction will benefit from its proximity to Juneau. Nonetheless, construction of two projects simultaneously is complicated, especially with a short construction season and the need for a construction camp. These projects will benefit from very short transmission lines and construction taking place at altitudes below 500 feet. It is reasonable to assume the two projects could be developed for approximately $15,500,000 (approximately $5000 per kW). It is likely that the Borough could finance some portion of the development cost of the project by grant funds and the balance could be obtained through Bonds or other municipal financing. 4.4.2 Project Operating and Maintenance Costs Include anticipated O&M costs for new facilities constructed and how these would be funded by the applicant. (Note: Operational co sts are not eligible for grant funds h owever grantees are r equired to meet ongoing reporting requirements for the purpose of reporting impacts of projects on the communities they serve.) Hydroelectric operating and maintenance costs vary widely. These projects should be relatively inexpensive to operate. O&M costs will be likely on the order of $300,000 annually covering insurance, labor, management, supplies, etc. This O&M cost does not include debt service. It is expected that debt and O&M costs would be funded through the sales of electricity to the community and Ocean Beauty Seafood. Estimates of Operation and Maintenance costs will be developed during Task 2.8: Economic and financial analysis. Renewable Energy Fund Grant Application Round IV AEA11-005 Grant Application Page 22 of 26 7/21/2010 4.4.3 Power Purchase/Sale The power purchase/sale information should include the following: • Identification of potential power buyer(s)/customer(s) • Potential power purchase/sales price - at a minimum indicate a price range • Proposed rate of return from grant-funded project As noted above, it is expected that electricity would be sold to the community. Residential uses, while presently not significant, are expected to rise with the provision of services. The existing industrial user, Ocean Beauty Seafoods, would be the primary purchaser in the summer months. Simple cost of power produced would be in the range of $0.25 per kWh, based on 30-year financing and a total of $4,000,000 of grant funding. Of course once the project is paid off, cost of power would drop dramatically. The levelized cost of power (assumed 50 year life) would be on the order of $0.12 per kW. Based on the spreadsheet analysis of diesel displaced by hydroelectric production, there will be a respectable benefit/cost (B/C) ratio for the project. If the hydroelectric projects are able to generate 3,000,000 kWh annually, they would displace 250,000 gallons of diesel fuel annually. Based on the NPV of the value of the diesel displaced and the NPV of the development cost of the project, the B/C ratio will be 1.16. 4.4.4 Project Cost Worksheet Complete the cost worksheet form which provides summary information that will be consider ed in evaluating the project. Download the form, complete it, and submit it as an attachment. Document any conditions or sources your numbers are based on here. AEA form Project Cost Worksheet attached. SECTION 5– PROJECT BENEFIT Explain the economic and public benefits of your project. Include direct cost savings, and how the people of Alaska will benefit from the project. The benefits information should include the following: • Potential annual fuel displacement (gal and $) over the lifetime of the evaluated renewable energy project • Anticipated annual revenue (based on i.e. a Proposed Power Purchase Agreement price, RCA tariff, or cost based rate) • Potential additional annual incentives (i.e. tax credits) • Potential additional annual revenue streams (i.e. green tag sales or other renewable energy subsidies or programs that might be available) • Discuss the non-economic public benefits to Alaskans over the lifetime of the project The Excursion Inlet proposed hydroelectric projects will show a substantial benefit to the Haines Borough and the people of Alaska. Benefits include the following: • Reduced dependence on fossil fuel. Project can be expected to displace 250,000 gallons of fuel used by the existing diesel generators and 20,000 gallons of fuel used for heating each year. Over a fifty-year project life the proposed project would have a net present value benefit of $17.5 million and a net present value cost of $15 million. Renewable Energy Fund Grant Application Round IV AEA11-005 Grant Application Page 23 of 26 7/21/2010 • The hydroelectric project would reduce carbon emissions and pollution in the region. • The project would provide electrical service to community residents, commercial and industrial users at an attractive price. Affordable energy encourages community growth and economic development. • With stable electricity pricing, the industrial user may be able to expand its operations and provide an expanded market for the regional fleet and additional jobs. One hundred twenty- seven distinct permits currently produce in the area. With expanded and varied markets, currently inactive permits could be activated, and permits fishing other regions could be attracted to Excursion Inlet, thereby growing the industry and the economic benefits that accrue, including tax revenues to the State of Alaska and the Haines Borough. • The project is not being pursued to generate profit. Rates for electricity would be set to recover costs (debt and O&M). A levelized rate of $0.13 per kWh is expected, based on average production. An initial rate of $0.25 per kWh would likely be required to cover costs during debt service on the project. • The projects are small run-of-river hydroelectric facilities that would be designed to minimize any aquatic resource impacts and displace fossil fuel generation. They may qualify to sell green tags. Generally, for hydroelectric projects to sell green tags, they must be qualified as “low impact hydro.” We would expect to qualify through the Low Impact Hydropower Institute. • The hydroelectric project will reduce fossil fuel consumption and accompanying emissions pollution, thereby contributing to the reduction of Alaska’s overall carbon footprint. SECTION 6– SUSTAINABILITY Discuss your plan for operating the completed project so that it will be sustainable. Include at a minimum: • Proposed business structure(s) and concepts that may be considered. • How you propose to finance the maintenance and operations for the life of the project • Identification of operational issues that could arise. • A description of operational costs including on -going support for any back-up or existing systems that may be require to continue operation • Commitment to reporting the savings and benefits The business and operations plan will be developed as part of the feasibility study (See Task 2.9). Excursion Inlet is currently outside of a local utility ARC service area. To provide the best operations scenario, the Borough will be looking at several options. One intriguing option could be creation of a local energy service area governed by a local board. Other options include variations on an agreement with a certified utility for operations and maintenance, a cooperative agreement that includes Ocean Beauty Seafoods, or other viable option. Ocean Beauty Seafoods will need to maintain backup power and swing load capabilities for their operation. Backup power and infrastructure will be reviewed as part of the feasibility study. Maintenance and operations will be financed through user fees. The operating costs and ongoing support for existing systems will be considered during the development of an operations plan. The Haines Borough is committed to energy sustainability and reducing energy costs Borough wide. Currently the Borough tracks usage, savings and benefits of energy management. Renewable Energy Fund Grant Application Round IV AEA11-005 Grant Application Page 24 of 26 7/21/2010 SECTION 7 – READINESS & COMPLIANCE WITH OTHER GRANTS Discuss what you have done to pr epare for this award and how quickly you intend to procee d with work once your grant is approved. Tell us what you may have already accomplished on the project to date and identify other grants that may have been previously awarded for this project and the degree you ha ve been able to meet the requirements of previous grants. Recently the Haines Borough Assembly and Borough staff visited Excursion Inlet on a fact finding trip. In meetings with Ocean Beauty Seafoods and local residents, sustainable hydropower was discussed as a high priority need for the community. The Borough has contracted with two engineering firms to assist in preparing the grant application. Their project schedule identifies a start date that will begin in July of 2011, which would be shortly after grant award. We intend to complete both the reconnaissance and feasibility phase of the project within a two-year time period. SECTION 8– LOCAL SUPORT Discuss what local sup port or possible oppo sition there may be regarding your project. Include letters of support from the community that would benefit from this project. The Borough has provided two letters demonstrating local support. Based on our contacts in the community to date, we do not believe there is any opposition to the projects should they prove feasible economically, and if environmental concerns are capable of satisfactory resolution. We intend to consult with the community on an ongoing basis as the process of studying and possibly developing these projects moves forward. SECTION 9 – GRANT BUDGET Tell us how much you want in grant funds Include any investments to date and funding sources, how much is being req uested in gr ant funds, a nd additional investments you will m ake as an applicant. Include an estimate of budget costs by milestones using the form – GrantBudget3.doc Renewable Energy Fund Grant Application Round IV AEA11-005 Grant Application Page 25 of 26 7/21/2010 Provide a n arrative summary regarding funding sources a nd your fina ncial commitment to the project. The Grant Budget Form by task is attached. The applicant requests 100% funding of the studies described in this application with the exception of $10,000 in matching funds that will be provided in Phase I by the Borough. Renewable Energy Fund Grant Round IV Excursion Inlet Hydro Projects Grant Budget Form: Phase 1 – Reconnaissance Grant Budget Form: Phase 2 – Feasibility Renewable Energy Fund Grant Round IV Grant Budget Form 9-14-10 Milestone or Task Anticipated Completion Date RE- Fund Grant Funds Grantee Matching Funds Source of Matching Funds: Cash/In-kind/Federal Grants/Other State Grants/Other TOTALS Excursion Inlet Hydro Project Phase I - Reconnaissance $ 1. Project scoping and contractor solicitation. 8/12/2011 $8,817 $0 $0 $8,817 2. Resource identification and analysis 9/12/2011 $0 $10,000 $0 $9,999 3. Land use, permitting, environmental analysis 9/12/2011 $14,265 $0 $0 $14,265 4. Preliminary design analysis/cost estimates 11/10/2011 $46,021 $0 $0 $46,021 5. Simple economic analysis 1/9/2012 $8,020 $0 $0 $8,020 6. Final report and recommendations 2/8/2012 $16,472 $0 $0 $16,472 $ $ $ $ TOTALS $93,593 $10,000 $103,593 Budget Categories: Direct Labor & Benefits $80,575 $0 $80,575 Travel & Per Diem $5,634 $0 $5,634 Equipment $0 $0 $0 Materials & Supplies $350 $0 $350 Contractual Services $7,034 $10,000 $17,034 Construction Services $0 $0 $0 Other $0 $0 $0 TOTALS $93,593 $10.000 $103,593 Applications should include a separate worksheet for each project phase (Reconnaissance, Feasibility, Design and Permitting, and Construction)- Add additional pages as needed Renewable Energy Fund Grant Round IV Grant Budget Form 9-14-10 Project Milestones that should be addressed in Budget Proposal Reconnaissance Feasibility Design and Permitting Construction 1. Project scoping and contractor solicitation. 2. Resource identification and analysis 3. Land use, permitting, and environmental analysis 5. Preliminary design analysis and cost 4. Cost of energy and market analysis 5. Simple economic analysis 6. Final report and recommendations 1. Project scoping and contractor solicitation. 2. Detailed energy resource analysis 3. Identification of land and regulatory issues, 4. Permitting and environmental analysis 5. Detailed analysis of existing and future energy costs and markets 6. Assessment of alternatives 7. Conceptual design analysis and cost estimate 8. Detailed economic and financial analysis 9, Conceptual business and operations plans 10. Final report and recommendations 1. Project scoping and contractor solicitation for planning and design 2. Permit applications (as needed) 3. Final environmental assessment and mitigation plans (as needed) 4. Resolution of land use, right of way issues 5. Permit approvals 6. Final system design 7. Engineers cost estimate 8. Updated economic and financial analysis 9. Negotiated power sales agreements with approved rates 10. Final business and operational plan 1. Confirmation that all design and feasibility requirements are complete. 2. Completion of bid documents 3. Contractor/vendor selection and award 4. Construction Phases – Each project will have unique construction phases, limitations, and schedule constraints which should be identified by the grantee 5. Integration and testing 6. Decommissioning old systems 7. Final Acceptance, Commissioning and Start-up 8. Operations Reporting Renewable Energy Fund Grant Round IV Grant Budget Form: Feasibility 9-14-10 Milestone or Task Anticipated Completion Date RE- Fund Grant Funds Grantee Matching Funds Source of Matching Funds: Cash/In-kind/Federal Grants/Other State Grants/Other TOTALS Excursion Inlet Hydro Project Phase II - Feasibility $ $ $ 1. Project scoping 03/15/12 $5,747 $ $5,747 2. Detailed energy resource analysis 03/15/13 $70,593 $ $70,593 3. Identification of land and regulatory issues 04/15/12 $7,762 $ $7,762 4. Permitting and environmental analysis 07/15/12 $34,996 $ $34,996 5. Detail analysis of existing and future energy costs and markets 05/15/13 $7,781 $ $7,781 6. Assessment of alternatives 04/15/12 $12,100 $ $12,100 7. Conceptual design analysis and cost estimate 10/15/12 $44,462 $ $44,462 8. Detailed economic and financial Analysis 05/15/13 $10,566 $ $10,566 9. Conceptual business and operations plan 06/15/13 $13,051 $ $13,051 10. Final report and recommendations 07/15/13 $16,479 $ $16,479 TOTALS $223,536 $223,536 Budget Categories: Direct Labor & Benefits $175,260 $ $175,260 Travel & Per Diem $15,337 $ $15,337 Equipment $14,729 $ $14,729 Materials & Supplies $515 $ $515 Contractual Services $17,695 $ $17,695 Construction Services $0 $ $ Other $ $ $ TOTALS $223,536 $ $223,536 Applications should include a separate worksheet for each project phase (Reconnaissance, Feasibility, Design and Permitting, and Construction)- Add additional pages as needed Renewable Energy Fund Grant Round IV Grant Budget Form: Feasibility 9-14-10 Project Milestones that should be addressed in Budget Proposal Reconnaissance Feasibility Design and Permitting Construction 1. Project scoping and contractor solicitation. 2. Resource identification and analysis 3. Land use, permitting, and environmental analysis 5. Preliminary design analysis and cost 4. Cost of energy and market analysis 5. Simple economic analysis 6. Final report and recommendations 1. Project scoping and contractor solicitation. 2. Detailed energy resource analysis 3. Identification of land and regulatory issues, 4. Permitting and environmental analysis 5. Detailed analysis of existing and future energy costs and markets 6. Assessment of alternatives 7. Conceptual design analysis and cost estimate 8. Detailed economic and financial analysis 9, Conceptual business and operations plans 10. Final report and recommendations 1. Project scoping and contractor solicitation for planning and design 2. Permit applications (as needed) 3. Final environmental assessment and mitigation plans (as needed) 4. Resolution of land use, right of way issues 5. Permit approvals 6. Final system design 7. Engineers cost estimate 8. Updated economic and financial analysis 9. Negotiated power sales agreements with approved rates 10. Final business and operational plan 1. Confirmation that all design and feasibility requirements are complete. 2. Completion of bid documents 3. Contractor/vendor selection and award 4. Construction Phases – Each project will have unique construction phases, limitations, and schedule constraints which should be identified by the grantee 5. Integration and testing 6. Decommissioning old systems 7. Final Acceptance, Commissioning and Start-up 8. Operations Reporting Renewable Energy Fund Grant Round IV Excursion Inlet Hydro Projects Project Cost/Benefit Worksheet   Renewable Energy Fund Round 4 Project Cost/Benefit Worksheet   RFA AEA11-005 Application Cost Worksheet Page 1 7-21-10 Please note that some fields might not be applicable for all technologies or all project phases. The level of information detail varies according to phase requirements. 1. Renewable Energy Source The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Annual average resource availability. Hydro projects minimum average 3,000,000 kWh Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel) 2. Existing Energy Generation and Usage a) Basic configuration (if system is part of the Railbelt1 grid, leave this section blank) i. Number of generators/boilers/other 5 diesel generators ii. Rated capacity of generators/boilers/other 3,175 kW iii. Generator/boilers/other type diesel iv. Age of generators/boilers/other 20 v. Efficiency of generators/boilers/other 13 kWh/gal b) Annual O&M cost (if system is part of the Railbelt grid, leave this section blank) i. Annual O&M cost for labor Not separately broken out ii. Annual O&M cost for non-labor Estimated at $0.02 per kWh c) Annual electricity production and fuel usage (fill in as applicable) (if system is part of the Railbelt grid, leave this section blank) i. Electricity [kWh] 3,900,000 ii. Fuel usage Diesel [gal] 280,000 gal Other iii. Peak Load 2,100 iv. Average Load 1,600 v. Minimum Load 800 vi. Efficiency 13 kWh/gal vii. Future trends d) Annual heating fuel usage (fill in as applicable) i. Diesel [gal or MMBtu] 20,000 gal ii. Electricity [kWh] iii. Propane [gal or MMBtu] iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] vi. Other                                                              1 The Railbelt grid connects all customers of Chugach Electric Association, Homer Electric Association, Golden Valley Electric  Association, the City of Seward Electric Department, Matanuska Electric Association and Anchorage Municipal Light and Power.      Renewable Energy Fund Round 4 Project Cost/Benefit Worksheet   RFA AEA11-005 Application Cost Worksheet Page 2 7-21-10 3. Proposed System Design Capacity and Fuel Usage (Include any projections for continued use of non-renewable fuels) a) Proposed renewable capacity (Wind, Hydro, Biomass, other) [kW or MMBtu/hr] 3,110 kW Hydro b) Proposed annual electricity or heat production (fill in as applicable) i. Electricity [kWh] 3,000,000 ii. Heat [MMBtu] c) Proposed annual fuel usage (fill in as applicable) i. Propane [gal or MMBtu] ii. Coal [tons or MMBtu] iii. Wood [cords, green tons, dry tons] iv. Other hydro 4. Project Cost a) Total capital cost of new system $15,500,000 b) Developme nt cost Included above c) Annual O&M cost of new system $300,000 d) Annual fuel cost 5. Project Benefits a) Amount of fuel displaced for i. Electricity 280,000 gallons ii. Heat 20,000 gallons iii. Transportation b) Current price of displaced fuel $2.75 c) Other economic benefits Increased employment opportunity for the community d) Alaska public benefits Increased tax revenues 6. Power Purchase/Sales Price a) Price for power purchase/sale $0.15 to $0.25 per kWh range anticipated 7. Project Analysis a) Basic Economic Analysis Project benefit/cost ratio 1.15 Pay back (years) 30 years Renewable Energy Fund Grant Round IV Excursion Inlet Hydro Projects Cost Spreadsheet by Task Haines Borough - Excursion Inlet Hydro Updated 9/13/2010Task 1.1 Task 1.2 Task 1.3 Task 1.4 Task 1.5 Task 1.6 Task 2.1 Task 2.2 Task 2.3 Task 2.4 Task 2.5 Task 2.6 Task 2.7 Task 2.8 Task 2.9 Task 2.10LaborBilling Project Resource ID Land Use Prel Design Economic Final Project Energy Land & Permitting Energy Costs Alternatives Design Economic Business FinalTotalTotalNameRate Scoping and analysis & Enviro Cost est. Analysis Report Scoping Resources Regulatory & Enviro & Markets& Cost & Financial & Ops Plan ReportHoursCostDon Jarrett$175.00 8244 64 16 248244481660162424328 $57,400.00Scott Mahnken$175.00 840 64 0 16008004400016160 $28,000.00Eli Wilson$90.00 800 40 0 400000080004136 $12,240.00Lisa Fortney$120.00 8816 00 8001616000008 80$9,600.00Pete Rittmueller$140.00 88000 80182 00000008214$29,960.00Janet White$130.00 8816 00 1680162408002020144$18,720.00John Blum$175.00 0032 00 0800120000008168$29,400.00Anne Falcon$175.00 0000 24 808002424040248160 $28,000.00Rubin Jackson$120.00 000 40 0 0000000100000140 $16,800.00Nic Truscott$75.00 00000 00120 00000000120$9,000.00Stream gauging technician $50.00 00000 006000000000 60$3,000.00Dennis Shult$120.00 00000 000040000000 40$4,800.00Haines Project Management$70.004 2216142 18341114256 $3,920.00Haines Project Clerk$45.001 240641 10380018241 $1,845.00Lounsbury Surveying$175.0012618 $3,150.00$0.00Total Hours535686 224 47 9227396 5821044532815880 1001865Task Labor Cost$6,965$8,250$12,720$31,920$7,340$13,380$4,025$43,195$7,710$31,885$6,240$8,810$36,770$9,915$11,640$15,070$255,835.0Expenses:Computers $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Equipment purch/rent $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $14,300.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $14,300.00Postage/shipping $50.00 $0.00 $0.00 $0.00 $0.00 $40.00 $50.00 $500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $640.00Reproduction $50.00 $0.00 $0.00 $100.00 $0.00 $100.00 $50.00 $0.00 $50.00 $50.00 $50.00 $50.00 $50.00 $50.00 $50.00 $0.00 $650.00Travel $0.00 $0.00 $1,500.00 $3,000.00 $0.00 $0.00 $0.00 $9,800.00 $0.00 $2,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $16,300.00Film/misc/gage matl $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Excursion Inlet Travel $970.00 $1,670.00 $970.00$3,610.00Sub-Total Expenses: $100 $0 $1,500 $4,070 $0 $140 $100 $26,270 $50 $3,020 $50 $50 $50 $50 $50 $0$35,500.00Expense Mark-up 3% $3.00 $0.00 $45.00 $122.10 $0.00 $4.20 $3.00 $788.10 $1.50 $90.60 $1.50 $1.50 $1.50 $1.50 $1.50 $0.00$1,065.00Total Expenses $103 $0 $1,545 $4,192 $0 $144 $103 $27,058 $52 $3,111 $52 $52 $52 $52 $52 $0 $36,565.00Subcontracts:EPS:David Buss $165.00 8 8 0 40 4 12 8 2 0 0 8 16 32 2 8 6 154 $25,410.00Earl George $145.00 4 4 0 40 0 12 4 0 0 0 2 8 24 4 0 4 106 $15,370.00Admin $63.00 2 2 0 0 0 2 0 0 0 0002002 10$630.000 000000 000000000 0$0.00Expenses $1.00 0 0 0 500.00$ 0 0000000500.00$ 0001000 $1,000.00Sub-Total Subcontracts$1,698.00 $1,698.00 $0.00 $9,620.00 $660.00 $2,862.00 $1,572.00 $330.00 $0.00 $0.00 $1,446.00 $3,144.00 $7,418.00 $582.00 $1,320.00 $1,368.00$33,718Sub. Mark-up (3%)$50.94 $50.94 $0.00 $288.60 $19.80 $85.86 $47.16 $9.90 $0.00 $0.00 $43.38 $94.32 $222.54 $17.46 $39.60 $41.04$1,012Total Subcontracts$1,749 $1,749 $0 $9,909 $680 $2,948 $1,619 $340 $0$0 $1,489 $3,238 $7,641 $599 $1,360 $1,409$34,730Task Totals$8,817 $9,999 $14,265 $46,021 $8,020 $16,472 $5,747 $70,593 $7,762 $34,996 $7,781 $12,100 $44,462 $10,566 $13,051 $16,479Grand Totals TOTAL FEE $327,130Reconnaissance $103,593Notes Feasibility $223,536Assumes one site visit for Jarrett, Mahnken and Blum during Reconnaissance phaseGrand Total $327,130Assumes Blum makes one trip for Agency meeting in Anchorage during feasibility studyEPS will take care of all electrical activities, including cost estimates for controls, transmission and coordination with the BoroughBorough responsible for transport to/from Excursion Inlet and housing during site visits.Surveying for Excursion Inlet Hydro Projects not included. Studies will rely on existing topographic mapping and site work.Hydrology work for Excursion Inlet includes 3 trips (first trip plus 2 additional) for rating curve development and training of local labor for assistance with gage data downloading. Costs are for one year of gage work.Hydrology work includes purchase of bubbler type stream gauge which will be installed permanently on both Creek, including gauge monitor, enclosure and accessoriesPhase I ReconnaissancePhase II Feasibility & Conceptual Design Renewable Energy Fund Grant Round IV Excursion Inlet Hydro Projects Letters of Support Jan Hill, Mayor, & Borough Assembly Haines Borough P.O. Box 1209 Haines, Alaska 99827 This letter is in responce to an inquiry by Deborah Schnabel concerning local Rsident and Property Owner, responce to a Borough Proposed Grant Application, to study a possible Hydroelectric Generation Plant here at Excursion Inlet. I have talked to a number of folks here, and via phone & email, listed below, concerning the proposed Grant application, since receiving the inquiry. There have been no negative responces to such a Grant Application, and only one neutral responce. Most folks would welcome such a study to be done, to give the community an oppurtunity to see if such a project is feesable, and makes economic sense. There is one concern that was fairly common among the respondents, and that was, “If such a project was to be built, there should be a “Plan” for extending the Power produced to the local Borough Subdivisions, in Excursion Inlet, Ak, in the long term scheme of things.” Some responders would NOT support, a Cannery only, project that leaves the local residents, without infrastructure improvements, in the long term. With the Long Term, Southeastern Intertie Power Grid being proposed in the region, a connection to that Intertie, would make excess power generated here, available for sale to other Users on the Intertie, and revenue from such sales, used for maintainance of the project, and to extend the local electrical infurstucture to the Excursion Inlet, Ak subdivisions. We would like to be kept informed as to the progress of the Grant application, and any subsequent Study, when completed. Sincerely. BB rr uu cc ee ''ss TT rr aa dd ii nn gg PP oo ss tt Excursion Inlet South Excursion Inlet, Alaska 99850 FCC GROL #PG-13-10449 Naber CTRT #002984 FFL#9-92-110-01-3E-06797 Phone (907)771-4830 Internet bruce@btpost.net DATE: 99 //11 00 //11 00 for, and in behalf of: Chuck & Fay Elliott, Russel & Shelly Ables, Doug & Laura Vivian John & Anita Crabill, Tom & Betsy Bear, Bruce & Debora Gordon Adan & Haley DesRosiers, Jack Campbell, Matt Campbell, Wayne Lonn MacDonald Franklin & Sons, Clyde & Kathy Shafer, Paul Dillon Bob Newsome BB rr uu cc ee ''ss TT rr aa dd ii nn gg PP oo ss tt Excursion Inlet South Excursion Inlet, Alaska 99850 FCC GROL #PG-13-10449 Naber CTRT #002984 FFL#9-92-110-01-3E-06797 Phone (907)771-4830 Internet bruce@btpost.net DATE: 99 //11 00 //11 00 Renewable Energy Fund Grant Round IV Excursion Inlet Hydro Projects Project Staff Resumes                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                .