Loading...
HomeMy WebLinkAboutKoliganek Cost Benefit Worksheet Renewable Energy Fund Round 4 Project Cost/Benefit Worksheet RFA AEA11-005 Application Cost Worksheet Page 1 7-21-10 Please note that some fields might not be applicable for all technologies or all project phases. The level of information detail varies according to phase requirements. 1. Renewable Energy Source The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Annual average resource availability. Wind Speed: 5.72 m/s Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel) 2. Existing Energy Generation and Usage a) Basic configuration (if system is part of the Railbelt1 grid, leave this section blank) i. Number of generators/boilers/other 2 ii. Rated capacity of generators/boilers/other 180 kW & 200 kW iii. Generator/boilers/other type Diesel Gensets iv. Age of generators/boilers/other 5 years & 2 years v. Efficiency of generators/boilers/other b) Annual O&M cost (if system is part of the Railbelt grid, leave this section blank) i. Annual O&M cost for labor ii. Annual O&M cost for non-labor c) Annual electricity production and fuel usage (fill in as applicable) (if system is part of the Railbelt grid, leave this section blank) i. Electricity [kWh] 503,520 kWh/year ii. Fuel usage Diesel [gal] 50,000 gal/year Other iii. Peak Load 132 kW iv. Average Load 59 kW v. Minimum Load vi. Efficiency vii. Future trends d) Annual heating fuel usage (fill in as applicable) i. Diesel [gal or MMBtu] ii. Electricity [kWh] iii. Propane [gal or MMBtu] iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] vi. Other 1 The Railbelt grid connects all customers of Chugach Electric Association, Homer Electric Association, Golden Valley Electric Association, the City of Seward Electric Department, Matanuska Electric Association and Anchorage Municipal Light and Power. Renewable Energy Fund Round 4 Project Cost/Benefit Worksheet RFA AEA11-005 Application Cost Worksheet Page 2 7-21-10 3. Proposed System Design Capacity and Fuel Usage Reference Section 5 - (Include any projections for continued use of non-renewable fuels) Cost-Benefit of the application for clarification a) Proposed renewable capacity (Wind, Hydro, Biomass, other) [kW or MMBtu/hr] Wind – 55 kW b) Proposed annual electricity or heat production (fill in as applicable) i. Electricity [kWh] 97,100 kWh ii. Heat [MMBtu] c) Proposed annual fuel usage (fill in as applicable) i. Propane [gal or MMBtu] ii. Coal [tons or MMBtu] iii. Wood [cords, green tons, dry tons] iv. Other 4. Project Cost a) Total capital cost of new system $275,000 - $550,000 b) Development cost c) Annual O&M cost of new system d) Annual fuel cost 5. Project Benefits a) Amount of fuel displaced for i. Electricity 7,768 gal/year ii. Heat iii. Transportation b) Current price of displaced fuel $42,724/year c) Other economic benefits d) Alaska public benefits 6. Power Purchase/Sales Price a) Price for power purchase/sale 7. Project Analysis a) Basic Economic Analysis Project benefit/cost ratio 3.10 - 1.55 Payback (years) 6.44 - 12.9 Renewable Energy Fund Round 4 Project Cost/Benefit Worksheet RFA AEA11-005 Application Cost Worksheet Page 3 7-21-10