Loading...
HomeMy WebLinkAboutRound_IV_Costworksheet for False Pass Renewable Energy Fund Round 4 Project Cost/Benefit Worksheet RFA AEA11-005 Application Cost Worksheet Page 1 7-21-10 Please note that some fields might not be applicable for all technologies or all project phases. The level of information detail varies according to phase requirements. 1. Renewable Energy Source The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Annual average resource availability. Estimated to be Class 5 Wind Resource Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel) 2. Existing Energy Generation and Usage a) Basic configuration (if system is part of the Railbelt1 grid, leave this section blank) i. Number of generators/boilers/other 3 Diesel Generators ii. Rated capacity of generators/boilers/other #1 90 kW #2 125 kW #3 150 kW iii. Generator/boilers/other type None iv. Age of generators/boilers/other Not available v. Efficiency of generators/boilers/other 11.43 kWh/gal. b) Annual O&M cost (if system is part of the Railbelt grid, leave this section blank) i. Annual O&M cost for labor $10,244 ii. Annual O&M cost for non-labor $4,506 c) Annual electricity production and fuel usage (fill in as applicable) (if system is part of the Railbelt grid, leave this section blank) i. Electricity [kWh] 225,287 ii. Fuel usage Diesel [gal] 47,000 Other iii. Peak Load 75 kW iv. Average Load 49 kW v. Minimum Load vi. Efficiency vii. Future trends d) Annual heating fuel usage (fill in as applicable) i. Diesel [gal or MMBtu] Est. 48,433 gallons/year ii. Electricity [kWh] iii. Propane [gal or MMBtu] iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] 1 The Railbelt grid connects all customers of Chugach Electric Association, Homer Electric Association, Golden Valley Electric Association, the City of Seward Electric Department, Matanuska Electric Association and Anchorage Municipal Light and Power. Renewable Energy Fund Round 4 Project Cost/Benefit Worksheet RFA AEA11-005 Application Cost Worksheet Page 2 7-21-10 vi. Other 3. Proposed System Design Capacity and Fuel Usage (Include any projections for continued use of non-renewable fuels) a) Proposed renewable capacity (Wind, Hydro, Biomass, other) [kW or MMBtu/hr] NA Reconnaissance and Feasibility Study b) Proposed annual electricity or heat production (fill in as applicable) i. Electricity [kWh] ii. Heat [MMBtu] c) Proposed annual fuel usage (fill in as applicable) i. Propane [gal or MMBtu] ii. Coal [tons or MMBtu] iii. Wood [cords, green tons, dry tons] iv. Other 4. Project Cost a) Total capital cost of new system NA Reconnaissance and Feasibility Study b) Development cost c) Annual O&M cost of new system d) Annual fuel cost 5. Project Benefits a) Amount of fuel displaced for i. Electricity NA Reconnaissance and Feasibility Study ii. Heat iii. Transportation b) Current price of displaced fuel c) Other economic benefits Sale of green tags if project is constructed. d) Alaska public benefits 6. Power Purchase/Sales Price a) Price for power purchase/sale NA Reconnaissance and Feasibility Study 7. Project Analysis a) Basic Economic Analysis Project benefit/cost ratio NA Reconnaissance and Feasibility Study Renewable Energy Fund Round 4 Project Cost/Benefit Worksheet RFA AEA11-005 Application Cost Worksheet Page 3 7-21-10 Payback (years)