Loading...
HomeMy WebLinkAboutRound_IV_Costworksheet Renewable Energy Fund Round 4 Project Cost/Benefit Worksheet RFA AEA11-005 Application Cost Worksheet Page 1 7-21-10 Please note that some fields might not be applicable for all technologies or all project phases. The level of information detail varies according to phase requirements. 1. Renewable Energy Source The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Annual average resource availability. Cannot forecast at this time Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel) 2. Existing Energy Generation and Usage a) Basic configuration (if system is part of the Railbelt1 grid, leave this section blank) i. Number of generators/boilers/other 3 ii. Rated capacity of generators/boilers/other 1) 128 kw 2) 138 kw 3) 200 kw iii. Generator/boilers/other type iv. Age of generators/boilers/other 1) 19years 2) 10 years 3) 2 year since major overhaul v. Efficiency of generators/boilers/other 10 8gph 2) 10-12 gph 3) 9-14 gph b) Annual O&M cost (if system is part of the Railbelt grid, leave this section blank) i. Annual O&M cost for labor ii. Annual O&M cost for non-labor c) Annual electricity production and fuel usage (fill in as applicable) (if system is part of the Railbelt grid, leave this section blank) i. Electricity [kWh] Annual usage 1,390,344 Kwh ii. Fuel usage Diesel [gal] 94,393 gallons Other iii. Peak Load 235 kw iv. Average Load 160 kw v. Minimum Load 147 kw vi. Efficiency 80% vii. Future trends Use hydrogen to help fuel efficiency d) Annual heating fuel usage (fill in as applicable) i. Diesel [gal or MMBtu] 48,000 gallons ii. Electricity [kWh] unknown iii. Propane [gal or MMBtu] none iv. Coal [tons or MMBtu] none v. Wood [cords, green tons, dry tons] 200 cords during winter vi. Other 1 The Railbelt grid connects all customers of Chugach Electric Association, Homer Electric Association, Golden Valley Electric Association, the City of Seward Electric Department, Matanuska Electric Association and Anchorage Municipal Light and Power. Renewable Energy Fund Round 4 Project Cost/Benefit Worksheet RFA AEA11-005 Application Cost Worksheet Page 2 7-21-10 3. Proposed System Design Capacity and Fuel Usage (Include any projections for continued use of non-renewable fuels) a) Proposed renewable capacity (Wind, Hydro, Biomass, other) [kW or MMBtu/hr] Hydro capacity unknown at this time b) Proposed annual electricity or heat production (fill in as applicable) i. Electricity [kWh] Not known at this time ii. Heat [MMBtu] Not known at this time c) Proposed annual fuel usage (fill in as applicable) i. Propane [gal or MMBtu] none ii. Coal [tons or MMBtu] none iii. Wood [cords, green tons, dry tons] none iv. Other none 4. Project Cost a) Total capital cost of new system Project Cost not applicable at this time b) Development cost c) Annual O&M cost of new system d) Annual fuel cost 5. Project Benefits a) Amount of fuel displaced for i. Electricity Accurate amount of fuel displaced not known at this time ii. Heat iii. Transportation b) Current price of displaced fuel c) Other economic benefits Up to 20 temporary jobs created d) Alaska public benefits 6. Power Purchase/Sales Price a) Price for power purchase/sale Not known at this time 7. Project Analysis a) Basic Economic Analysis Project benefit/cost ratio Not known at this time Payback (years)