Loading...
HomeMy WebLinkAboutRound_IV_Costworksheet Renewable Energy Fund Round 4 Project Cost/Benefit Worksheet RFA AEA11-005 Application Cost Worksheet Page 1 7-21-10 dPlease note that some fields might not be applicable for all technologies or all project phases. The level of information detail varies according to phase requirements. 1. Renewable Energy Source The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Annual average resource availability. To be determined by feasibility analysis Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel) 2. Existing Energy Generation and Usage a) Basic configuration (if system is part of the Railbelt1 grid, leave this section blank) i. Number of generators/boilers/other 2 ii. Rated capacity of generators/boilers/other 300kW iii. Generator/boilers/other type iv. Age of generators/boilers/other Updated 2009 v. Efficiency of generators/boilers/other 13-14% b) Annual O&M cost (if system is part of the Railbelt grid, leave this section blank) i. Annual O&M cost for labor TBD ii. Annual O&M cost for non-labor TBD c) Annual electricity production and fuel usage (fill in as applicable) (if system is part of the Railbelt grid, leave this section blank) i. Electricity [kWh] 1,176,493 ii. Fuel usage Diesel [gal] 107,188 Other iii. Peak Load iv. Average Load 300kW v. Minimum Load vi. Efficiency 13-14% vii. Future trends d) Annual heating fuel usage (fill in as applicable) i. Diesel [gal or MMBtu] 197,388 ii. Electricity [kWh] N/A iii. Propane [gal or MMBtu] N/A iv. Coal [tons or MMBtu] N/A v. Wood [cords, green tons, dry tons] unknown vi. Other 1 The Railbelt grid connects all customers of Chugach Electric Association, Homer Electric Association, Golden Valley Electric Association, the City of Seward Electric Department, Matanuska Electric Association and Anchorage Municipal Light and Pow er. Renewable Energy Fund Round 4 Project Cost/Benefit Worksheet RFA AEA11-005 Application Cost Worksheet Page 2 7-21-10 3. Proposed System Design Capacity and Fuel Usage (Include any projections for continued use of non-renewable fuels) a) Proposed renewable capacity (Wind, Hydro, Biomass, other) [kW or MMBtu/hr] Wind kWh capacity TBD b) Proposed annual electricity or heat production (fill in as applicable) i. Electricity [kWh] TBD by feasibility analysis ii. Heat [MMBtu] c) Proposed annual fuel usage (fill in as applicable) i. Propane [gal or MMBtu] N/A ii. Coal [tons or MMBtu] N/A iii. Wood [cords, green tons, dry tons] TBD iv. Other 4. Project Cost a) Total capital cost of new system TBD, AEA estimated $1.3 million b) Development cost TBD c) Annual O&M cost of new system d) Annual fuel cost 5. Project Benefits a) Amount of fuel displaced for i. Electricity TBD ii. Heat TBD iii. Transportation N/A b) Current price of displaced fuel c) Other economic benefits Lower percentage of income spent on power costs d) Alaska public benefits More viable bush lifestyles, Lower PCE. 6. Power Purchase/Sales Price a) Price for power purchase/sale TBD by feasibility study 7. Project Analysis a) Basic Economic Analysis Project benefit/cost ratio TBD by feasibility study Payback (years) TBD