Loading...
HomeMy WebLinkAboutAttachment - Budget NarrativeGULKANA VILLAGE COUNCIL PO Box 254  Gakona, AK 99586  Phone: 907-822-3746  Fax: 907-822-3976  Email: Admin@GulkanaCouncil.org G ULKANA V ILLAGE P ELLET P ROJECT BUDGET NARRATIVE Gulkana Village is located in the Copper River basin of south-central Alaska, 200 miles from Anchorage, the nearest “urban” area. The Village is road connected, but Alaska roads would be considered at best secondary two-lane roads elsewhere in the United States. At least half the road between the Village and Anchorage traverses mountainous terrain. Climatic conditions often make travel and transportation “iffy” and difficult, and occasionally impossible. These factors make the cost of housing, goods and services, and of doing business much higher than the national average, and occasionally not readily available. This combined with the isolation and sparse population of interior Alaska makes it very difficult to attract and retain qualified staff. Consequently, salaries must be competitive with other villages and businesses in the area, and other budget costs may seem higher than outside of Alaska. Please give weight to these facts as the proposed budget is considered. PERSONNEL $364,515 One full-time project assistant, one full-time project foreman, and six pellet plant workers positions are dedicated to accomplishing this program. Supervision is a responsibility of the tribe’s Project Coordinator, and the Accountant performs financial management and administrative functions. Project Manager - $23.48/hr x 40 hrs/week x 52 weeks = $48,839 This position is responsible for the project and will provide direct supervision to the pellet plant project and its staff. Project Assistant - $16.90/hr x 40 hrs/week x 52 weeks = $35,152 This position will assist the Project Manager in conducting research, performing pellet plant investigation, and other assigned duties. Project Foreman - $20.16/hr x 40 hrs/week x 52 weeks = $41,933 This position is responsible for completing the day-to-day tasks of this project, operating and maintaining the machines in the project description. Pellet Plant Workers - (6) $15.99/hr x 40 hrs/week x 52 weeks = $199,555 This position will assist the Project Foreman in fulfilling the objectives of the project, and will function the machines properly. Heavy Equipment Operator - $18/hr X 500 = $9,000 This position will provide assistant in any heavy equipment work done within the project. Tribal Administrator - $28.15/hr x 12 hrs/week x 52 weeks = $17,566 This position is responsible for overall project oversight and supervision. The Tribal Administrator is an existing and currently staffed position. It is estimated that 27% of the Administrator’s time is required to oversee this project. Accountant - $22.89/hr x 8 hrs/week x 52 weeks = $9,522 This position will provide financial management support for the program, including oversight of accounting and bookkeeping functions as may be necessary. R OY S. E WAN PRESIDENT EILEEN L. EWAN VICE PRESIDENT Administrative Assistant - $15.13/hr x 4 hrs/week x 52 weeks = $3,148 This position will provide administrative and clerical support for the program, including filing, copying, mail, phone, typing, and other services as may be necessary. The Administrative Secretary is an existing and currently staffed position. FRINGE BENEFITS $80,193 Includes personal leave, sick leave, retirement, FICA, workman’s comp insurance, unemploy- ment, etc. Because of liability factors related to the employees, workmen’s comp insurance, and perhaps any other legally mandated fringe benefit, will be higher than for the average tribal staff member. For all staff involved with this pellet project, average cost to the Village for fringe benefits is approximately 22% of salary costs. An annual amount of $45,265 is required to cover these expenses for Village staff dedicated solely or largely to this project. Costs of $2,700 for these expenses related to existing Village staff positions that will provide administration and support to the project will be covered from the general funds of the Tribe as an in-kind contribution. MACHINES $281,500 This category includes the main machines needed to operate. Therefore we need to purchase them to produce pellets with raw materials. 3 Pellet mill x $52,000 $156,000 Makes the final product. 3 hammer mill x $11,000 $33,000 Grinds the chips to the smaller material ready for process. 3 air filtration x $10,000 $30,000 Cyclone air filtration - collects the fines . 3 conveyors x $ 1,000 $3,000 Pellet delivery systems which brings pellet to the elevator. 3 augers x $2,500 $7,500 Deliver chips to the hammer mill and another from the hammer mill to the pellet mill. 2 lift elevators x $6,000 $12,000 Deliver the pellet to the holding bins suspended above the bagger. 2 belt dryers x $20,000 $40,000 Dries the chips before the hammer mill. TRAVEL $ 16,460 Travel is required to allow program staff to attend appropriate training (i.e. safe equipment operator refresher or similar for maintenance training, bookkeeping/accounting for Bookkeeper, etc.). For estimation purposes, it is assumed training will be available in Anchorage and will occur 2 times a year, once in summer and once in winter. Per Diem: 4 staff x 5 days @ $188/day = $3,760 (assumes winter per diem rates) 5 staff x 3 days @ $278/day = $4,170 (assumes summer per diem rates) Mileage: 6 trips x 410 (round trip) mi x $0.55/mi = $1,353 Local Mileage – 60 trips x 28 miles x .50/mi = $840 National Biomass Conference – Lower 48 (only two attendees) 2 roundtrip airline tickets – ($750.50/ticket x 2 tickets) $ 1,501 1 car rental – ($50/day x 5 days) $ 250 SUPPLIES $6,700 This category includes the expenses required to provide the project staff the tools and materials they will need to accomplish the objectives of the project. Office equipment such as a computer work station and software ($2,500), etc., are required. Also included in this category are office consumables such as paper, rewritable cd’s, pens, staples, etc. ($3,200). EQUIPMENT RENTAL/REPAIR/MAINTENANCE $100,050 Equipment and supplies to enable the operator to perform basic maintenance for machines. This includes tool, specialized tools, and replacement parts for machines/equipments. Rental or lease of heavy equipment, 4x4 work vehicle, atv, equipment to conduct the labor and , etc. OTHER $105,582 Office Rent ($504/month x 12 months) $6,048 Water/Sewer ($120/month x 12 months) $1,440 Utilities (heating fuel, electricity, internet, telephone @ $500/month) $50,160 Cell Phone $420 Registration Fees – trainings and conferences $12,000 Fuel for heavy equipment, work truck, etc. $16,294 Freight $18,500 Copying and Postage $720 TOTAL BUDGET: $ 955,000