10 MECH CALCS-kenny lake
KENNY LAKE SCHOOL MECHANICAL HEAT LOAD CALCULATIONS Likely Peak System Output Load Peak MBH Factor MBH Boiler 1 2154 0.6 1292.4 Boiler 2 2154 0.6 1292.4 School Total 4308 2585 Likely Biomass System Biomass Boiler Peak Boiler Size MBH Factor MBH School Total 2585 0.6 1551 Heat Energy Produced Input Assumed Heat Energy Prod. Gals Btu/gal Btu Efficiency Btu 20000 138690 2.77E+09 0.8 2.22E+09 Maximum Potential Output - Existing Boilers Connected Max Output Weeks of Possible Capacity Btu/hr Operation Btu Factor 4308000 36 2.61E+10 0.09 Maximum Potential Output - Biomass Boiler Connected Max Output Weeks of Possible Capacity Btu/hr Operation Btu Factor 1550000 36 9.37E+09 0.24 Connected Boiler Load Summary Biomass Boiler Size School Heating System Capacity Factors