September 14, 2 010
Butch White, Grant Administrator
Alaska Energy Authority
913 West Northern Lights Blvd.
Anchorage, Aid 99503
lie: AEA 11-005 — RE Fund Grant Application Mound [
Dear Mr. White:
Enclosed you will find Chugach Electric Association's ( hugach's) renewable energy
grant application for funding to begin the process of routing and designing a transmission
line to deliver geothermal energy from Mt. Spurr, and possibly hydroelectric energy from
Lake Chakachantna, to the Railbelt.
If one or both of these projects prove viable, the line would connect these renewable
energy resources on the wept side of Cook Inlet to Chugach's existing facilities at the
Beluga power Plant.
The package includes:
■ The grant application
Grant/budget worksheets for each phase of the project
A project cost/benefit worksheet
■ Letters of support
• A map of the, area where the project would be Iocated
* Professional bias for the project manager and other key staff
IF An organizational chart ofhugach's Power Delivery Division
* A signed resolution from hugach's Board of Directors
hugach's point of contact for this grant application is Ron Vecera, Director of Project
Development. 13e can be reached directly at 762-4759.
&in=cly,
Bradley W. E s
Chief Executive Officer
Chugach EleClFiC As50ciC110n, Inc,
S601 E40aF brava PC. Boa f*6300. Arnchwoge Ata3�n 993I4-6300 • 190.7J 563-741.1 Far t9071 542�0027 • (UNI 478-7j4,i