HomeMy WebLinkAboutSigned Cover Letter AEA Transmission1UB FW_"Ar WTRING ALWAYS FUTURE September 14, 2 010 Butch White, Grant Administrator Alaska Energy Authority 913 West Northern Lights Blvd. Anchorage, Aid 99503 lie: AEA 11-005 — RE Fund Grant Application Mound [ Dear Mr. White: Enclosed you will find Chugach Electric Association's ( hugach's) renewable energy grant application for funding to begin the process of routing and designing a transmission line to deliver geothermal energy from Mt. Spurr, and possibly hydroelectric energy from Lake Chakachantna, to the Railbelt. If one or both of these projects prove viable, the line would connect these renewable energy resources on the wept side of Cook Inlet to Chugach's existing facilities at the Beluga power Plant. The package includes: ■ The grant application Grant/budget worksheets for each phase of the project A project cost/benefit worksheet ■ Letters of support • A map of the, area where the project would be Iocated * Professional bias for the project manager and other key staff IF An organizational chart ofhugach's Power Delivery Division * A signed resolution from hugach's Board of Directors hugach's point of contact for this grant application is Ron Vecera, Director of Project Development. 13e can be reached directly at 762-4759. &in=cly, Bradley W. E s Chief Executive Officer Chugach EleClFiC As50ciC110n, Inc, S601 E40aF brava PC. Boa f*6300. Arnchwoge Ata3�n 993I4-6300 • 190.7J 563-741.1 Far t9071 542�0027 • (UNI 478-7j4,i www Tom