HomeMy WebLinkAboutCostworksheetSept13,2010 Renewable Energy Fund Round 4 Project Cost/Benefit Worksheet RFA AEA11-005 Application Cost Worksheet Page 1 7-21-10 Please note that some fields might not be applicable for all technologies or all project phases. The level of information detail varies according to phase requirements. 1. Renewable Energy Source The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Annual average resource availability. Estimated to be well in excess of the required 17,000 to 23,000 tons per year of sustainable biomass (tree chips) Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel) 2. Existing Energy Generation and Usage a) Basic configuration (if system is part of the Railbelt1 grid, leave this section blank) i. Number of generators/boilers/other Six generators in New Town, three boilers at former base ii. Rated capacity of generators/boilers/other Generators range from 350 kW to 1050 kW capacity. iii. Generator/boilers/other type Diesel generators and boilers iv. Age of generators/boilers/other Generators range from 20 to 2 years old. The boilers are estimated to be 30 years old, but were recently refurbished v. Efficiency of generators/boilers/other Generators are about 40% eff, boilers about 80% b) Annual O&M cost (if system is part of the Railbelt grid, leave this section blank) i. Annual O&M cost for labor $600,000 ii. Annual O&M cost for non-labor $466,000, estimated from the AEA Community Information Summary, Appendix 3 c) Annual electricity production and fuel usage (fill in as applicable) (if system is part of the Railbelt grid, leave this section blank) i. Electricity [kWh] 7,800,000 kWh approx (noteā€”see Community Information Summary, Appendix 3) ii. Fuel usage Diesel [gal] 600,000 approx Other iii. Peak Load 1753 kW iv. Average Load 789 kW v. Minimum Load 500kW approx. vi. Efficiency 13.52 kWh/gallon vii. Future trends Increasing fuel cost and reduced load d) Annual heating fuel usage (fill in as applicable) i. Diesel [gal or MMBtu] 300,000 for GILA boarding school 1 The Railbelt grid connects all customers of Chugach Electric Association, Homer Electric Association, Golden Valley Electric Association, the City of Seward Electric Department, Matanuska Electric Association and Anchorage Municipal Light and Power. Renewable Energy Fund Round 4 Project Cost/Benefit Worksheet RFA AEA11-005 Application Cost Worksheet Page 2 7-21-10 ii. Electricity [kWh] iii. Propane [gal or MMBtu] iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] Home use vi. Other 3. Proposed System Design Capacity and Fuel Usage (Include any projections for continued use of non-renewable fuels) a) Proposed renewable capacity (Wind, Hydro, Biomass, other) [kW or MMBtu/hr] 1000 kW b) Proposed annual electricity or heat production (fill in as applicable) i. Electricity [kWh] ii. Heat [MMBtu] c) Proposed annual fuel usage (fill in as applicable) i. Propane [gal or MMBtu] ii. Coal [tons or MMBtu] iii. Wood [cords, green tons, dry tons] 17,000 to 23,000 green tons, estimated iv. Other 4. Project Cost a) Total capital cost of new system $11,000,000 b) Development cost Included (one year of fuel harvest prior to startup) c) Annual O&M cost of new system $900,000 d) Annual fuel cost $780,000 per year to harvest and store wood chips 5. Project Benefits a) Amount of fuel displaced for i. Electricity 700,000 ii. Heat 300,000 iii. Transportation b) Current price of displaced fuel $4.41/gallon, $4,410,000 per year c) Other economic benefits $1,000,000 per year local employment d) Alaska public benefits $3,730,000 6. Power Purchase/Sales Price a) Price for power purchase/sale Na Renewable Energy Fund Round 4 Project Cost/Benefit Worksheet RFA AEA11-005 Application Cost Worksheet Page 3 7-21-10 7. Project Analysis a) Basic Economic Analysis Project benefit/cost ratio $3,730,000/$11,000,000 = 0.339 Payback (years) 3