Loading...
HomeMy WebLinkAboutCostworksheet3_10-7-09 TLHD Transmission Renewable Energy Fund Round 3 Project Cost/Benefit Worksheet RFA AEA10-015 Application Cost Worksheet Page 1 10-7-09 Please note that some fields might not be applicable for all technologies or all project phases. The level of information detail varies according to phase requirements. 1. Renewable Energy Source The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Annual average resource availability. 8,000,000 Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel) 2. Existing Energy Generation and Usage a) Basic configuration (if system is part of the Railbelt1 grid, leave this section blank) i. Number of generators/boilers/other 1 435 kW CAT 3456 Genset ii. Rated capacity of generators/boilers/other 500 Kw iii. Generator/boilers/other type Diesel iv. Age of generators/boilers/other New at FY11 v. Efficiency of generators/boilers/other 13-14 kWh/gallon b) Annual O&M cost (if system is part of the Railbelt grid, leave this section blank) i. Annual O&M cost for labor 100,000 ii. Annual O&M cost for non-labor 150,000 c) Annual electricity production and fuel usage (fill in as applicable) (if system is part of the Railbelt grid, leave this section blank) i. Electricity [kWh] 2,000,000 ii. Fuel usage Diesel [gal] 152,000 gallons in 2008 Other 32,400 gallons burned by large lodge with similar Genset/efficiency iii. Peak Load 400 kW iv. Average Load 250 kW v. Minimum Load 200 kW vi. Efficiency 13 – 15 kWh/gallon vii. Future trends Home heating conversion to electric heat, economic growth d) Annual heating fuel usage (fill in as applicable) i. Diesel [gal or MMBtu] Unknown ii. Electricity [kWh] Fire Station using electric oven and plug in electric iii. Propane [gal or MMBtu] Unknown iv. Coal [tons or MMBtu] None v. Wood [cords, green tons, dry tons] 5% of home heat is supplemented with wood vi. Other 1 The Railbelt grid connects all customers of Chugach Electric Association, Homer Electric Association, Golden Valley Electric Association, the City of Seward Electric Department, Matanuska Electric Association and Anchorage Municipal Light and Power. Renewable Energy Fund Round 3 Project Cost/Benefit Worksheet RFA AEA10-015 Application Cost Worksheet Page 2 10-7-09 3. Proposed System Design Capacity and Fuel Usage (Include any projections for continued use of non-renewable fuels) a) Proposed renewable capacity (Wind, Hydro, Biomass, other) [kWh or MMBtu/hr] Hydro b) Proposed Annual electricity or heat production (fill in as applicable) i. Electricity [kWh] 2,000,000 ii. Heat [MMBtu] Convert diesel home heat and utilize balance of available power or 6,000,000 kWh beginning in year 5 17,455 MMbtu c) Proposed Annual fuel Usage (fill in as applicable) i. Propane [gal or MMBtu] 0 ii. Coal [tons or MMBtu] 0 iii. Wood [cords, green tons, dry tons] 0 iv. Other 0 4. Project Cost a) Total capital cost of new system $10,780,108 b) Development cost $2.200,000+ $ 2,221,000 =$4,421,000 c) Annual O&M cost of new system $85,000 per HDR d) Annual fuel cost 0 5. Project Benefits a) Amount of fuel displaced for i. Electricity 184,400 x 4.50 = $ 829,800 (PV = 3%, 47 years, 829,800 = $20.7 million) ii. Heat 130,266 x 4.50 = $ 586,197 (PV = 3%, 45 years, 586,197 = $14.4 million) iii. Transportation b) Price of displaced fuel $4.50 c) Other economic benefits Improved health, stable prices, economic growth d) Amount of Alaska public benefits 6. Power Purchase/Sales Price a) Price for power purchase/sale $.15 for 2,000,000 kWh year 3 for 47 years $.15 for 6,000,000 kWh year 5 for 45 years 7. Project Analysis a) Basic Economic Analysis Renewable Energy Fund Round 3 Project Cost/Benefit Worksheet RFA AEA10-015 Application Cost Worksheet Page 3 10-7-09 Project benefit/cost ratio $20.7 + $14.4 = $35.1 million/ $15.2 million = 2.31 Payback To be determined by later phases of the project