HomeMy WebLinkAboutAttach_E_Project ScheduleCook Inlet TidGen™ Project AEA10-015 REF Round III Attachment E: Project Schedule ATTACHMENT E Cook Inlet TidGen™ Project Schedule Cook Inlet TidGen™ Project AEA10-015 REF Round III Attachment E: Project Schedule Phase 3 - Final Design/Permitting 1.Project scoping complete and primary contractors solicited for project implementation 4/30/10 2. 2010 Environmental studies finalized and 2010 field season data collection underway 6/30/10 3. FERC Pilot Project License received, land use issues resolved 9/31/10 4. Final system design complete 11/21/10 5. Engineering cost estimate complete 12/1/10 6. Technical and economical analysis complete, PPA finalized, Final Design review by NREL complete 12/15/10 7. Reports on 2010 environmental studies completed and reviewed with agencies and stakeholders, post deployment studies finalized. 1/15/11 8. All additional permit applications completed and submitted 1/15/11 9. All permits received 3/31/11 10. Project monitoring For FERC license compliance implemented 6/30/11 11. Project monitoring for FERC license compliance complete 12/31/11 Phase 4 - Construction 1. Final design review/confirmation with NREL 12/15/10 2. Bids received for Initial TidGen™ device components, components released for manufacture. Deployment and operations bid documents complete 1/1/11 3. Deployment and operations contractors selected, contracts signed. 2/15/11 4. Initial TidGen™ device components procured, prepared for shipment. Three additional TidGen™ components released for manufacture. 3/31/11 5. Initial TidGen™ device components arrive at Port of Anchorage. 4/15/11 6. Initial bottom support frame fabrication completed at Port of Anchorage. 5/7/11 7. Bottom support frame and shore station deployed. TidGen™ device fabrication complete. 6/7/11 8. Initial TidGen™ device and power transmission system deployed. Three additional TidGen™ devices components procured and prepared for shipment. 6/30/11 9. Three additional TidGen™ systems arrive at Port of Anchorage 8/15. Three additional bottom support frames compete. Reporting on performance of Initial TidGen™ device 8/31/11 10. Three more TidGen™ device deployed 9/30/11 11. Report on device performance completed with NREL review 12/31/11