Loading...
HomeMy WebLinkAbout06 Attachment G Engineers EstimateEngineer's Estimate Attachment G DATE PREPARED ESTIMATE OF PROBABLE COST OF DESIGN & CONSTRUCTION 11/9/2009 SHEET 1 OF 1 PROJECT Kenny Lake School Biomass Heating System CE2 Engineers, Inc. Option PO Box 232946 Fully Automated 1.5 Mmbtu/hr Wood Pellet Boiler with Stick Frame Building Anchorage, AK 99523 907-349-1010 School Only ESTIMATOR Costs obtained from Vendors and historical information.Weisner QUANTITY MATERIAL LABOR No. Unit Per Per TOTAL PROJECT COMPONENT Units Meas. Unit TOTAL Unit TOTAL COST COST Wood Fired Heating System (1.5 MMBtuh Output- Hot Water) 1 assy 170,000 $170,000 10,000 $10,000 $180,000 Stack 1 assy 25,000 $25,000 5,000 $5,000 $30,000 Boiler setup and startup by manufacturer's rep 1 ls 10,000 $10,000 $10,000 Subtotal $220,000 TOTAL- BIOMASS BOILER SYSTEMS $220,000 WOOD PELLET STORAGE SILO AND FEED SYSTEM Storage silo and foundation 1 assy 40,000 $40,000 20,000 $20,000 $60,000 Subtotal $60,000 TOTAL- STORAGE SILO AND FEED SYSTEM $60,000 BOILER BUILDING COSTS Boiler Plant Building - Stick construction, slab on grade 768 sf 100 $76,800 100 $76,800 $153,600 Subtotal $153,600 TOTAL- Boiler Building $153,600 BOILER BUILDING MECHANICAL COSTS Fire Sprinkler system 1 ls 15,000 $15,000 15,000 $15,000 $30,000 Building Heat Piping 1 ls 15,000 $15,000 15,000 $15,000 $30,000 Combustion Air and Misc. Sheet Metal 1 ls 5,000 $5,000 3,000 $3,000 $8,000 Site Utilities Insulated water service for sprinkler supply piping 120 lf 60 $7,200 40 $4,800 $12,000 Heat piping 250 lf 50 $12,500 40 $10,000 $22,500 Electrical supply to heat building 120 lf 20 $2,400 10 $1,200 $3,600 Trenching & Backfill 1 ls 4,500 $4,500 $4,500 Temperature Controls 1 ls 5,000 $5,000 5,000 $5,000 $10,000 Plant Electrical Work 1 ls 15,000 $15,000 25,000 $25,000 $40,000 Subtotal $160,600 TOTAL- BOILER BUILDING MECHANICAL COSTS $160,600 SUBTOTAL BUILDING & BOILER $594,200 MECHANICAL INTEGRATION COSTS School Heat Piping 1 ls 10,000 $10,000 10,000 $10,000 $20,000 Heat Exchanger 1 ls 20,000 $20,000 4,000 $4,000 $24,000 Electrical Work 1 ls 15,000 $15,000 10,000 $10,000 $25,000 Subtotal $69,000 TOTAL- MECHANICAL INTEGRATION COSTS $69,000 SUBTOTAL CONSTRUCTION $663,200 SOFT COSTS A/E Design Services (boiler, building & integration) 9%$59,688 Fire Marshal Plan Review 1 ls 2,500 $2,500 $2,500 Equipment Commissioning 1 ls 3,000 $3,000 $3,000 Construction Management 12% ls $79,584 SUBTOTAL SOFT COSTS $144,772 $144,772 PROJECT TOTAL $807,972 RECOMMENDED PROJECT BUDGET - DESIGN AND CONSTRUCTION COSTS $807,972 $807,972 BIOMASS BOILER AND STACK SYSTEM 091109 Kenny LakeCostEstimate 2009-1109.xls