HomeMy WebLinkAbout02 Attachment B Hoonah Costworksheet3_10-7-09  Renewable Energy Fund Round 3 Project Cost/Benefit Worksheet Attachment B  RFA AEA10-015 Application Cost Worksheet Page 1 10-7-09 Please note that some fields might not be applicable for all technologies or all project phases. The level of information detail varies according to phase requirements. 1. Renewable Energy Source The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Annual average resource availability. Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel) 2. Existing Energy Generation and Usage a) Basic configuration (if system is part of the Railbelt1 grid, leave this section blank) Elem/Jr/Sr HS Bldg Gymnasium/pool Bldg i. Number of generators/boilers/other 2 2 ii. Rated capacity of generators/boilers/other 2,050 mil BTU/hr ea 626.1 mil BTU/hr ea iii. Generator/boilers/other type Kewanee Weil McLain iv. Age of generators/boilers/other 18 28 v. Efficiency of generators/boilers/other 75% 75% b) Annual O&M cost (if system is part of the Railbelt grid, leave this section blank) i. Annual O&M cost for labor $2000 ii. Annual O&M cost for non-labor $1000 c) Annual electricity production and fuel usage (fill in as applicable) (if system is part of the Railbelt grid, leave this section blank) i. Electricity [kWh] ii. Fuel usage Diesel [gal] Other iii. Peak Load iv. Average Load v. Minimum Load vi. Efficiency vii. Future trends d) Annual heating fuel usage (fill in as applicable) i. Diesel [gal or MMBtu] 50,000 gal ii. Electricity [kWh] 522,920 kWh iii. Propane [gal or MMBtu] iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] vi. Other                                                                1 The Railbelt grid connects all customers of Chugach Electric Association, Homer Electric Association, Golden Valley Electric  Association, the City of Seward Electric Department, Matanuska Electric Association and Anchorage Municipal Light and Power.      Renewable Energy Fund Round 3 Project Cost/Benefit Worksheet Attachment B  RFA AEA10-015 Application Cost Worksheet Page 2 10-7-09 3. Proposed System Design Capacity and Fuel Usage (Include any projections for continued use of non-renewable fuels) a) Proposed renewable capacity (Wind, Hydro, Biomass, other) [kWh or MMBtu/hr] 1.927 MMBtu/hr b) Proposed Annual electricity or heat production (fill in as applicable) i. Electricity [kWh] ii. Heat [MMBtu] 5,025 MMBtu c) Proposed Annual fuel Usage (fill in as applicable) i. Propane [gal or MMBtu] ii. Coal [tons or MMBtu] iii. Wood [cords, green tons, dry tons] 1400 green tons iv. Other 4. Project Cost a) Total capital cost of new system $ 3,652,680 b) Development cost $ 101,500 c) Annual O&M cost of new system $ 3,000 (sunken cost) d) Annual fuel cost $ 75,600 5. Project Benefits a) Amount of fuel displaced for i. Electricity ii. Heat 45,000 gallons (90% of current consumption) iii. Transportation b) Price of displaced fuel $240,750 based on FY2009 fuel price of $5.35/gallon c) Other economic benefits Future economic benefit for carbon credits, should the US implement a plan. d) Amount of Alaska public benefits $12.58 million in savings over 30 years based on a conservative 5% annual fuel oil price escalation, using the FY2009 rate of $5.35/gallon. 6. Power Purchase/Sales Price a) Price for power purchase/sale No power will be purchased/sold under this project 7. Project Analysis a) Basic Economic Analysis Project benefit/cost ratio Assuming 5% fuel inflation: 0.26 in 5 yrs; 0.76 in 12 yrs; 1.65 in 20 yrs, using FY2009 fuel price of $5.35/gallon. Payback Simple payback = $3,652,680 / $167,225 annual savings = 22 years. Note that this calculation assumes fuel at the FY2009 rate of $5.35 per gallon, and does not allow for inflation.