Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
08 Attachment I boiler sizing data
Hoonah City Schools Proposed Wood-Fired Hydronic Heating System Attachment I PRELIMINARY BOILER SIZING DATA Likely Peak System Output Load Peak MBH Factor MBH Elementary & Junior/Sr High School 4,100 0.6 2460.0 Combined Gymnasium/Pool Building 1,252 0.6 751.3 Total: 5,352 3211.3 Likely Biomass System Biomass Boiler Peak Boiler Size MBH Factor MBH System Total: 3211 0.6 1927 Heat Energy Produced Input Assumed Gals Btu/gal Btu Efficiency Fuel Oil 50,000 134,000 6,700,000,000 0.75 Maximum Potential Output - Existing Boilers Connected Max Output Weeks of Possible Capacity Btu/hr Operation Btu Factor 5,352,200 36 32,370,105,600 0.16 Maximum Potential Output - Biomass Boiler Connected Max Output Weeks of Possible Capacity Btu/hr Operation Btu Factor 1,926,792 36 11,653,238,016 0.43 Connected Boiler Load Summary Biomass Boiler Size School Heating System Capacity Factors 5,025,000,000 Heat Energy Prod. Btu Page 1 of 1