Loading...
HomeMy WebLinkAboutFY11_Costworksheet3_10-7-09_GFH Renewable Energy Fund Round 3 Project Cost/Benefit Worksheet RFA AEA10-015 Application Cost Worksheet Page 1 10-7-09 Please note that some fields might not be applicable for all technologies or all project phases. The level of information detail varies according to phase requirements. 1. Renewable Energy Source: Glacier Fork Hydroelectric Project The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Estimated annual average resource availability. 330,000 MWh/year for average water year Unit depends on project type (e.g. windspeed, hydropower output, biomass fuel) 2. Existing Energy Generation and Usage a) Basic configuration (if system is part of the Railbelt1 grid, leave this section blank) i. Number of generators/boilers/other N/A – on railbelt ii. Rated capacity of generators/boilers/other N/A – on railbelt iii. Generator/boilers/other type N/A – on railbelt iv. Age of generators/boilers/other N/A – on railbelt v. Efficiency of generators/boilers/other N/A – on railbelt b) Annual O&M cost (if system is part of the Railbelt grid, leave this section blank) i. Annual O&M cost for labor N/A – on railbelt ii. Annual O&M cost for non- labor N/A – on railbelt c) Annual electricity production and fuel usage (fill in as applicable) (if system is part of the Railbelt grid, leave this section blank) i. Electricity [kWh] N/A – on railbelt ii. Fuel usage Diesel [gal] N/A – on railbelt NG/Hydro Other N/A – on railbelt 1 The Railbelt grid connects all customers of Chugach Electric Association, Homer Electric Association, Golden Valley Electric Association, the City of Seward Electric Department, Matanuska Electric Association and Anchorage Municipal Light and Power. Renewable Energy Fund Round 3 Project Cost/Benefit Worksheet RFA AEA10-015 Application Cost Worksheet Page 2 10-7-09 iii. Peak Load N/A – on railbelt iv. Average Load N/A – on railbelt v. Minimum Load N/A – on railbelt vi. Efficiency N/A – on railbelt vii. Future trends N/A – on railbelt d) Annual heating fuel usage (fill in as applicable) i. Diesel [gal or MMBtu] N/A – on railbelt ii. Electricity [kWh] N/A – on railbelt iii. Propane [gal or MMBtu] N/A – on railbelt iv. Coal [tons or MMBtu] N/A – on railbelt v. Wood [cords, green tons, dry tons] N/A – on railbelt vi. Other N/A – on railbelt 3. Proposed System Design Capacity and Fuel Usage (Include any projections for continued use of non-renewable fuels) a) Proposed renewable capacity (Wind, Hydro, Biomass, other) [kWh or MMBtu/hr] 75 MW of installed capacity est. 330,000,000 kWh of ann. energy (average water year) 52% est. capacity factor b) Proposed Annual electricity or heat production (fill in as applicable) i. Electricity [kWh] 330,000,000 kWh/year ii. Heat [MMBtu] - c) Proposed Annual fuel Usage (fill in as applicable) i. Propane [gal or MMBtu] N/A ii. Coal [tons or MMBtu] N/A iii. Wood [cords, green tons, dry tons] N/A iv. Other N/A 4. Project Cost a) Total capital cost of new system $260 – 400 million (400 million used) Renewable Energy Fund Round 3 Project Cost/Benefit Worksheet RFA AEA10-015 Application Cost Worksheet Page 3 10-7-09 b) Development cost $ 5 million c) Annual O&M cost of new system $ 5 million d) Annual fuel cost Zero 5. Project Benefits a) Amount of fuel displaced for i. Electricity 2.8 BCF of Natural Gas per year ii. Heat N/A iii. Transportation N/A b) Price of displaced fuel $25,400,000 per year (at $9.00 per MCF) c) Other economic benefits $ 14,800,000 per year d) Amount of Alaska public benefits $0 in quantifiable economic terms 6. Power Purchase/Sales Price a) Price for power purchase/sale $0.081/kWh 7. Project Analysis a) Basic Economic Analysis Project benefit/cost ratio 1,032,000,000 / 400,000,000 = 2.58 Payback 400,000,000 / 40,200,000 = 10.0 years