Loading...
HomeMy WebLinkAboutProject Cost Benefit Worksheet  Renewable Energy Fund Round 3 Project Cost/Benefit Worksheet   RFA AEA10-015 Application Cost Worksheet 10-7-09 Please note that some fields might not be applicable for all technologies or all project phases. The level of information detail varies according to phase requirements. 1. Renewable Energy Source The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Annual average resource availability. Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel) 2. Existing Energy Generation and Usage a) Basic configuration (if system is part of the Railbelt1 grid, leave this section blank) i. Number of generators/boilers/other ii. Rated capacity of generators/boilers/other iii. Generator/boilers/other type iv. Age of generators/boilers/other v. Efficiency of generators/boilers/other b) Annual O&M cost (if system is part of the Railbelt grid, leave this section blank) i. Annual O&M cost for labor ii. Annual O&M cost for non-labor c) Annual electricity production and fuel usage (fill in as applicable) (if system is part of the Railbelt grid, leave this section blank) i. Electricity [kWh] ii. Fuel usage Diesel [gal] Other iii. Peak Load iv. Average Load v. Minimum Load vi. Efficiency vii. Future trends d) Annual heating fuel usage (fill in as applicable) i. Diesel [gal or MMBtu] 78,100 gallons ii. Electricity [kWh] 2kWh iii. Propane [gal or MMBtu] N/A iv. Coal [tons or MMBtu] N/A v. Wood [cords, green tons, dry tons] N/A vi. Other N/A                                                              1 The Railbelt grid connects all customers of Chugach Electric Association, Homer Electric Association, Golden Valley Electric  Association, the City of Seward Electric Department, Matanuska Electric Association and Anchorage Municipal Light and Power.      Renewable Energy Fund Round 3 Project Cost/Benefit Worksheet   RFA AEA10-015 Application Cost Worksheet 10-7-09 3. Proposed System Design Capacity and Fuel Usage (Include any projections for continued use of non-renewable fuels) a) Proposed renewable capacity (Wind, Hydro, Biomass, other) [kWh or MMBtu/hr] Biomass – 1,529 kW b) Proposed Annual electricity or heat production (fill in as applicable) i. Electricity [kWh] 11,384,934 kWh/yr ii. Heat [MMBtu] c) Proposed Annual fuel Usage (fill in as applicable) i. Propane [gal or MMBtu] ii. Coal [tons or MMBtu] iii. Wood [cords, green tons, dry tons] 22,337 green tons iv. Other 4. Project Cost a) Total capital cost of new system $ 7,092,620 b) Development cost $ 275,000 c) Annual O&M cost of new system $ 275,000 d) Annual fuel cost $ 1,116,900 5. Project Benefits a) Amount of fuel displaced for i. Electricity 2,000,000 kWh/yr ii. Heat 78,000 gallons diesel iii. Transportation b) Price of displaced fuel $805,000 c) Other economic benefits d) Amount of Alaska public benefits 6. Power Purchase/Sales Price a) Price for power purchase/sale $0.165/kWh 7. Project Analysis a) Basic Economic Analysis Project benefit/cost ratio Payback Return on Equity – 30.86%