Loading...
HomeMy WebLinkAboutKodiak High School Renewable Energy Analysis App Renewable Energy Fund Round 3 Grant Application AEA 10-015 Application Page 1 of 17 10/7/2009 Application Forms and Instructions The following forms and instructions are provided to assist you in preparing your application for a Renewable Energy Fund Grant. An electronic version of the Request for Applications (RFA) and the forms are available online at: http://www.akenergyauthority.org/RE_Fund-III.html Grant Application Form GrantApp3.doc Application form in MS Word that includes an outline of information required to submit a complete application. Applicants should use the form to assure all information is provided and attach additional information as required. Application Cost Worksheet Costworksheet3 .doc Summary of Cost information that should be addressed by applicants in preparing their application. Grant Budget Form GrantBudget3.d oc A detailed grant budget that includes a breakdown of costs by milestone and a summary of funds available and requested to complete the work for which funds are being requested. Grant Budget Form Instructions GrantBudgetInst ructions3.pdf Instructions for completing the above grant budget form. • If you are applying for grants for more than one project, provide separate application forms for each project. • Multiple phases for the same project may be submitted as one application. • If you are applying for grant funding for more than one phase of a project, provide milestones and grant budget for completion of each phase. • If some work has already been completed on your project and you are requesting funding for an advanced phase, submit information sufficient to demonstrate that the preceding phases are satisfied and funding for an advanced phase is warranted. • If you have additional information or reports you would like the Authority to consider in reviewing your application, either provide an electronic version of the document with your submission or reference a web link where it can be downloaded or reviewed. REMINDER: • Alaska Energy Authority is subject to the Public Records Act AS 40.25, and materials submitted to the Authority may be subject to disclosure requirements under the act if no statutory exemptions apply. • All applications received will be posted on the Authority web site after final recommendations are made to the legislature. • In accordance with 3 AAC 107.630 (b) Applicants may request trade secrets or proprietary company data be kept confidential subject to review and approval by the Authority. If you want information is to be kept confidential the applicant must: o Request the information be kept confidential. o Clearly identify the information that is the trade secret or proprietary in their application. o Receive concurrence from the Authority that the information will be kept confidential. If the Authority determines it is not confidential it will be treated as a public record in accordance with AS 40.25 or returned to the applicant upon request. Renewable Energy Fund Grant Application Round 3 AEA10-015 Grant Application Page 2 of 17 10/7/2009 SECTION 1 – APPLICANT INFORMATION Name (Name of utility, IPP, or government entity submitting proposal) Kodiak Island Borough Type of Entity: Local government Mailing Address 710 Mill Bay Road, Kodiak, AK 99615 Physical Address 710 Mill Bay Road, Kodiak, AK 99615 Telephone 486-9301 Fax 486-9374 Email rgifford@kodiakak.us 1.1 APPLICANT POINT OF CONTACT Name Rick Gifford Title Borough Manager Mailing Address 710 Mill Bay Road, Kodiak, AK 99615 Telephone 486-9301 Fax 486-9374 Email rgifford@kodiakak.us 1.2 APPLICANT MINIMUM REQUIREMENTS Please check as appropriate. If you do not to meet the minimum applicant requirements, your application will be rejected. 1.2.1 As an Applicant, we are: (put an X in the appropriate box) An electric utility holding a certificate of public convenience and necessity under AS 42.05, or An independent power producer in accordance with 3 AAC 107.695 (a) (1), or X A local government, or A governmental entity (which includes tribal councils and housing authorities); Yes 1.2.2. Attached to this application is formal approval and endorsement for its project by its board of directors, executive management, or other governing authority. If the applicant is a collaborative grouping, a formal approval from each participant’s governing authority is necessary. (Indicate Yes or No in the box ) Yes 1.2.3. As an applicant, we have administrative and financial management systems and follow procurement standards that comply with the standards set forth in the grant agreement. Yes 1.2.4. If awarded the grant, we can comply with all terms and conditions of the attached grant form. (Any exceptions should be clearly noted and submitted with the application.) Yes 1.2.5 We intend to own and operate any project that may be constructed with grant funds for the benefit of the general public. Renewable Energy Fund Grant Application Round 3 AEA10-015 Grant Application Page 3 of 17 10/7/2009 SECTION 2 – PROJECT SUMMARY This is intended to be no more than a 1-2 page overview of your project. 2.1 Project Title – (Provide a 4 to 5 word title for your project) Kodiak High School Renewable Energy Analysis 2.2 Project Location – Include the physical location of your project and name(s) of the community or communities that will benefit from your project. The project site is Kodiak High School in the City of Kodiak; in addition to the greater Kodiak City area residents, the High School serves the Kodiak Island region. 2.3 PROJECT TYPE Put X in boxes as appropriate 2.3.1 Renewable Resource Type X Wind Biomass or Biofuels Hydro, including run of river Transmission of Renewable Energy X Geothermal, including Heat Pumps Small Natural Gas Heat Recovery from existing sources Hydrokinetic X Solar Storage of Renewable Other (Describe) 2.3.2 Proposed Grant Funded Phase(s) for this Request (Check all that apply) X Reconnaissance Design and Permitting X Feasibility Construction and Commissioning Conceptual Design 2.4 PROJECT DESCRIPTION Provide a brief one paragraph description of your proposed project. The Kodiak Island Borough is proposing to perform analysis or assessment to evaluate the potential for use of alternative energy sources to supplement the use of oil in the Kodiak High School facility. Specifically, we will investigate the potential for utilization of the following: • Ground source heat pumps utilizing latent ground heat tapped through a closed loop wellfield and distributed throughout the building via conventional heat pumps; • Site generated wind power; • Photovoltaic power generation; • Solar heat and power generation in conjunction with daylighting. Renewable Energy Fund Grant Application Round 3 AEA10-015 Grant Application Page 4 of 17 10/7/2009 2.5 PROJECT BENEFIT Briefly discuss the financial and public benefits that will result from this project, (such as reduced fuel costs, lower energy costs, etc.)  The Kodiak High School is truly a community use facility. The facility houses the high school education and sports programs, regional education programs, community recreation programs, is designated as a tsunami shelter, houses the community Arts Program, and hosts community functions that include meetings and gatherings of local, regional, and state organizations. A renovation and expansion project at the Kodiak High School provides an opportunity to investigate the potential for renewable energy resources that will provide alternatives or supplements to oil use and for incorporating those resources into the daily operation of the facility. The resulting public benefit will include: • The primary benefit of this energy assessment will be information o An assessment will definitively answer questions regarding the possibility of utilizing renewable energy resources to ensure sustainability in the renovation and expansion of the high school facility. o The assessment at the high school site, in the middle of Kodiak City, will provide information to residents regarding what renewable resources can be utilized and may provide cost benefit to them in their own homes and businesses in the surrounding community. • In the long run, if renewable energy resources are found to be feasible and viable, then savings can be achieved from reduced fuel and power costs in the Kodiak High School which will be passed along to the taxpayers who ultimately pay for the operation of the facility. • The investigation into the use of renewable energy will have an impact on students; they will know that the options for using renewable energy were investigated; they will know that effort was made to build a sustainable facility; they will know that the effort was made to provide a healthy learning environment that reduces the impact on the greater environment. The Borough will have modeled practices that address environmental and financial concerns for the future of the community. 2.6 PROJECT BUDGET OVERVIEW Briefly discuss the amount of funds needed, the anticipated sources of funds, and the nature and source of other contributions to the project. The funds required for our proposed alternative energy analysis are as shown in the attached spread sheet and total $317,190. We anticipate utilizing Kodiak Island Borough funds allocated for design of Kodiak High School Renovation and Expansion to pay for the BIM (Building Information Model) of the existing campus buildings as described in the Scope of Work document attached to this application, solicitation and travel expenses estimated at: $129,440. We have attached the Reconnaissance and Feasibility pages of the Grant Budget Form which describe how these costs were generated. These are the only pages of the Form that apply to this application. The KIB will determine how to fund construction of the preferred option once it is decided upon. An option that relates directly to the construction of their proposed renovated Renewable Energy Fund Grant Application Round 3 AEA10-015 Grant Application Page 5 of 17 10/7/2009 High School will be incorporated into their construction budget. Alternative funding sources will be investigated if an option is selected that adds considerably to the construction cost of the High School. 2.7 COST AND BENEFIT SUMARY Include a summary of grant request and your project’s total costs and benefits below. Grant Costs (Summary of funds requested) 2.7.1 Grant Funds Requested in this application. $187,750 2.7.2 Other Funds to be provided (Project match) $129,440 2.7.3 Total Grant Costs (sum of 2.7.1 and 2.7.2) $317,190 Project Costs & Benefits (Summary of total project costs including work to date and future cost estimates to get to a fully operational project) 2.7.4 Total Project Cost (Summary from Cost Worksheet including estimates through construction) $ see note below 2.7.5 Estimated Direct Financial Benefit (Savings) $ 2.7.6 Other Public Benefit (If you can calculate the benefit in terms of dollars please provide that number here and explain how you calculated that number in your application (Section 5.) $ We included the grant costs in this section, including both requested grant funds as well as the cash contributed by KIB. However, we cannot provide the Project Cost and Benefits because they are not known at this time and will not be known until the analysis is complete and the preferred alternative energy source determined. It is the intention of this project to evaluate GSHP, wind, solar heat and photovoltaic energy sources, each of which will have their own cost benefit scenario. A preferred alternative will be selected by the Borough that yields the most benefit and can be funded. Renewable Energy Fund Grant Application Round 3 AEA10-015 Grant Application Page 6 of 17 10/7/2009 SECTION 3 – PROJECT MANAGEMENT PLAN Describe who will be responsible for managing the project and provide a plan for successfully completing the project within the scope, schedule and budget proposed in the application. 3.1 Project Manager Tell us who will be managing the project for the Grantee and include a resume and references for the manager(s). If the applicant does not have a project manager indicate how you intend to solicit project management support. If the applicant expects project management assistance from AEA or another government entity, state that in this section. The project manager for this project will be Kodiak Island Borough Project Manager/Inspector Ken Smith, P.E. 3.2 Project Schedule Include a schedule for the proposed work that will be funded by this grant. (You may include a chart or table attachment with a summary of dates below.) The following is our proposed schedule. The tasks and work items shown are included in the Scope of Work document included in the appendix. Where the work is to be funded by the KIB it will be so indicated, otherwise work is proposed to be funded through this grant: February 2010: (KIB Funded) KIB will select design team to accomplish the renovation and addition of Kodiak High School. Selection will be qualifications based selection using standard EED approved selection criteria. The design team will include architectural, structural, civil, mechanical, electrical, cost and energy usage consultants. The design team will integrate the alternative energy design and analysis proposed in this application into the High School design process. This will ensure that the proposed options can be evaluated for integration into the new facility. March 2010 to July 2010: (KIB Funded) Baseline Information: The design phase of the new high school addition and renovation will include development of a BIM model of the existing school facilities, which will be used as a tool for energy usage modeling. This effort will also include determining heat loads in the buildings, existing and anticipated power demands and other baseline data that will be used to compare the efficacy of the proposed alternatives. July to August 2010: Grant Evaluation and Start up: This period of time is allocated for finalizing the grant agreement and obtaining the necessary authorizations. It is assumed that if this proposal is awarded a grant for funding that there will be some period of time needed for such start up activities. In addition, if this application is not funded, this time will be used by the KIB to determine if they will somehow proceed alone, find some other source of funding, or modify the scope of work to fit funds available. September to October, 2010: Preliminary energy options information gathering: The design team will research the latest available information on the various alternative energy systems included in the scope of this project. They will evaluate the likely energy either produced or saved by the system and compare it to the energy demand information collected previously. They will develop a life cycle cost model for each system to determine the likely optimum size and output of each option as well as first cost and operating costs. At this point preliminary evaluation of funding sources to implement the various energy options will begin. Renewable Energy Fund Grant Application Round 3 AEA10-015 Grant Application Page 7 of 17 10/7/2009 November to December, 2010: System Testing: A pair of test borings will be drilled in the High School campus to determine the heat exchange rate and likely recharge rate. This effort will include drilling a 6” test hole approximately 350 feet, inserting a 1” diameter HDPE loop into the boring and then backfilling it with thermal conductive grout. The loop will be charged with a heat conductive fluid (likely water or water/glycol mix) and then circulating it through a testing device that will record temperatures, discharge and recharge rates. This data will be evaluated to determine actual available ground source heat usable in a building conditioning system. If determined feasible, additional test apparatus will be installed to confirm potential energy source production. This would include installation of a meteorological test tower to begin actual wind profiling on the campus or the installation of prototype photovoltaic arrays. January, 2011: System evaluation and selection: The results of the previous analysis, including analysis of geothermal test wells, will be evaluated and a determination made of which alternative energy system is most appropriate for installation on the high school campus and integration into the design of the High School renovation and addition. February, 2011: (KIB Funded) Design of the ground loop bore field, if it is determined to be the preferred option, will begin if funding permits. Sources of funding for design and construction of the preferred option will be finalized. March 2011 to March 2012: (KIB Funded) Construction for the first phase of the new Kodiak High School addition and renovation is anticipated to occur between March 2011 and March 2012. During this period, the design of the preferred energy system can be finalized and incorporated into the construction. In particular, if the ground source loop field option is selected, it can be incorporated into the early site work owing to the early start on design anticipated in this schedule. 3.3 Project Milestones Define key tasks and decision points in your project and a schedule for achieving them. The Milestones must also be included on your budget worksheet to demonstrate how you propose to manage the project cash flow. (See Section 2 of the RFA or the Budget Form.) Reconnaissance Phase: February 2010: Project scoping and design team selection March to July 2010: Resource Identification and Analysis Land Use Permitting and Environmental Analysis Cost of Energy and Market Analysis August 2010: Grant determination and start up September 2010: Preliminary design analysis and cost Reconnaissance report and recommendations Feasibility Phase: September 2010: Solicitation and selection of test boring contractor Renewable Energy Fund Grant Application Round 3 AEA10-015 Grant Application Page 8 of 17 10/7/2009 October 2010: Identification of land and regulatory issues Permitting and environmental analysis November to Dec 2010: Detailed energy resource analysis and test bores January 2011: Detailed analysis, existing & future energy costs, markets Assessment of alternatives Conceptual design analysis and cost estimate Detailed economic and financial analysis Conceptual operations plans Final report and recommendation 3.4 Project Resources Describe the personnel, contractors, equipment, and services you will use to accomplish the project. Include any partnerships or commitments with other entities you have or anticipate will be needed to complete your project. Describe any existing contracts and the selection process you may use for major equipment purchases or contracts. Include brief resumes and references for known, key personnel, contractors, and suppliers as an attachment to your application. Kodiak Island Borough will provide project management and oversight of the project. Selection of a contractor to perform the assessment will be accomplished according to procurement provisions of the Borough Code. 3.5 Project Communications Discuss how you plan to monitor the project and keep the Authority informed of the status. The Kodiak Island Borough will monitor the project via an in-house project manager and will provide regular project reporting regarding progress and financial activities according to the requirements of the granting agency. 3.6 Project Risk Discuss potential problems and how you would address them. The following are some of the potential challenges and how they would be addressed: Land use issues: The entire project area is owned by the Kodiak Island Borough. The systems proposed are not prohibited on the site by local ordinance, as long as they stay within required setbacks. One possible exception would be height of wind turbines, which must be coordinated with FAA requirements and potentially illuminated as required for aircraft traffic. Funding: The KIB is committed to funding at least the baseline information gathering and potentially other analysis as the information is directly adaptable and of value to the ongoing High School renovation and addition. The KIB could potentially fund implementation directly, depending on how directly it is applicable to the conventional construction at the High School. For instance, a photovoltaic system incorporated into the roof and walls, daylighting schemes, even potentially wind turbines if they are incorporated into other work already expected. For instance, a vertical axis wind turbine could be incorporated into parking lot light poles. However, funding for a large front end loaded capital expenditure such as a ground source loop Renewable Energy Fund Grant Application Round 3 AEA10-015 Grant Application Page 9 of 17 10/7/2009 field has not been identified and would be addressed once the costs and benefits are understood. Weather: inclement weather could potentially affect collection of data on the site. We therefore plan on using as much existing data as possible, such as wind profile data recently collected by Kodiak Electrical Association for a nearby location. In addition, there are at least two contractors on Kodiak with equipment capable of drilling the bore holes necessary for the test wells who are well qualified to drill in virtually any weather. Schedule: This analysis effort is being conducted in conjunction with a long term, multi phase design and construction project that has not yet started. Adjustments of schedule should be simple to incorporate into the long range project with no penalty in efficiency. SECTION 4 – PROJECT DESCRIPTION AND TASKS • Tell us what the project is and how you will meet the requirements outlined in Section 2 of the RFA. • The level of information will vary according to phase(s) of the project you propose to undertake with grant funds. • If you are applying for grant funding for more than one phase of a project provide a plan and grant budget form for completion of each phase. • If some work has already been completed on your project and you are requesting funding for an advanced phase, submit information sufficient to demonstrate that the preceding phases are satisfied and funding for an advanced phase is warranted. 4.1 Proposed Energy Resource Describe the potential extent/amount of the energy resource that is available. Discuss the pros and cons of your proposed energy resource vs. other alternatives that may be available for the market to be served by your project. An analysis will be performed to optimize the building energy systems (envelope, mechanical, electrical). This analysis, which is granted by the proposer, will reduce the building’s energy footprint and provide a computer energy model for evaluating alternative energy systems. The benefit of optimizing the building energy systems will be reduced energy requirements. It will also increase the percentage that alternative energy contributes to total energy consumption. The geothermal potential of the site will be assessed by drilling two 350’ deep boreholes, installing a 1” HDPE pipe loop in each bore, and backfilling grout. A thermal conductivity test will be performed to determine the conductance and diffusivity of the underlying rock. This information will be used to determine the size and geothermal heat production of a loopfield on the site. The wind generation potential of the site will be assessed by analyzing wind data from a weather station that is currently located a few blocks from the site. The Kodiak Electric Association has three wind turbines on the ridge above town. Data on the availability of wind power at that site will be used to correlate the wind speed with actual turbine output. The solar heat and power potential of the site will be assessed using data contained in the Solar Design Manual for Alaska, local weather station data, and other local data sources. Renewable Energy Fund Grant Application Round 3 AEA10-015 Grant Application Page 10 of 17 10/7/2009 Heat supplied by a ground source heat pump system will be derived from the ground (50%) and from electricity to power the heat pump compressors (50%). A ground source heat pump system will shift some of the building heating load from fuel oil to the electric grid. 4.2 Existing Energy System 4.2.1 Basic configuration of Existing Energy System Briefly discuss the basic configuration of the existing energy system. Include information about the number, size, age, efficiency, and type of generation. The high school is currently heated by an oil-fired boiler plant that distributes hydronic heating water to the campus buildings. The boiler plant at the Kodiak High School dates from the 1960’s and consists of three large fuel oil fired boilers that serve the entire campus, including the newly constructed swimming pool building. Total area of the campus buildings is anticipated to be approximately 145,000 sf at completion of the planned renovation and addition. The existing physical plant is obsolete and must be replaced. It is anticipated that the existing hydronic piping system as well as air handlers campus wide will be replaced. As exterior window and wall assemblies will be replaced, this is thus the ideal time to consider a broad range of alternative energy sources due to the flexibility to implement them. Electric power is supplied by Kodiak Electric Association. The power generation sources are currently 80% hydroelectric, 9% wind, and 11% diesel. 4.2.2 Existing Energy Resources Used Briefly discuss your understanding of the existing energy resources. Include a brief discussion of any impact the project may have on existing energy infrastructure and resources. Fuel oil will be an available heating energy for the life of the project. The price of fuel oil will be determined by world supply and demand dynamics. Wide price fluctuations that occurred over the past four years are likely to continue into the future. An upward trend in prices is expected likely at 6% per year, which was the inflation rate from 1992 to 2005. The project will have an insignificant effect on world oil prices and supply. The Kodiak Electric Association has a goal to increase the amount of renewable power generation to 95% in 2020. A higher percentage of renewable generation will stabilize rates from fuel oil inflation. Converting to ground source heat pumps will shift heating loads from fuel oil to 95% renewable power. Utilizing solar and wind energy will further decrease fuel oil and electricity use. 4.2.3 Existing Energy Market Discuss existing energy use and its market. Discuss impacts your project may have on energy customers. The project will reduce fuel oil use with no discernable effect on world oil markets. A ground source heat pump system will increase electricity consumption. The added load will be partly supplied by diesel generation, resulting in an incremental increase in electric rates. The solar and wind energy systems will reduce both fuel oil and electricity use. These reductions will have minimal impact on energy customers. Renewable Energy Fund Grant Application Round 3 AEA10-015 Grant Application Page 11 of 17 10/7/2009 A ground source heat pump system will extract heat from the ground with no discernable effect. 4.3 Proposed System Include information necessary to describe the system you are intending to develop and address potential system design, land ownership, permits, and environmental issues. 4.3.1 System Design Provide the following information for the proposed renewable energy system: • A description of renewable energy technology specific to project location • Optimum installed capacity • Anticipated capacity factor • Anticipated annual generation • Anticipated barriers • Basic integration concept • Delivery methods A feasibility analysis will be performed to assess the life cycle cost of alternative energy systems for the building. The recommendations will be used by the design team to integrate alternative energy systems into the building design. Task 1: Baseline Information Gathering 1. Develop Building Energy Analysis Model of the existing school buildings for use in describing what power is distributed through the building, where and how it is consumed. 2. Determine heating loads in the existing buildings, including the new pool building, the existing high school components and the proposed new additions. 3. Determine the electrical power demand on the campus overall, and required for the pool, existing high school components and the proposed new additions. Task 2: Geothermal Analysis 1. Thermal Conductivity Test: Drill two boreholes approx 350 feet deep and perform conductivity tests to determine the ground thermal conductivity for use in sizing a geothermal loopfield. The loopfield layout will optimize the available land area to determine the maximum connected capacity of a ground source heat pump system. 2. Evaluate the mechanical systems available to utilize the potential heat. Preliminary options include water-to-water heat pumps to heat the pool and domestic hot water and water-to-air heat pumps to heat the spaces. 3. Determine optimal loopfield size and other physical plant components. 4. Perform life cycle cost analysis to determine the optimum heating system for the buildings. 5. Prepare cost estimate of proposed system. Task 3: Wind Generation Analysis 1. Gather available wind data for the site including existing KEA data for Near Island Bridge site (Fred Zharoff Bridge). 2. Evaluate existing data. 3. Augment existing data by collecting additional data as required to evaluate system Renewable Energy Fund Grant Application Round 3 AEA10-015 Grant Application Page 12 of 17 10/7/2009 options, including installation of meteorological test tower on the existing school site. 4. Evaluate various wind power generation technologies and systems, compare likely power costs and yields and select a preferred system. Preliminary options include locating vertical axis turbines on the parking lot lighting poles or on the roof. 5. Perform a life cycle cost analysis to determine if the preferred system offers a life cycle savings. 6. Prepare a cost estimate to implement the preferred system. Task 4: Solar Heat 1. Collect existing data for potential solar heat gain. 2. Identify existing technologies and methods for capturing available solar heat to augment or reduce reliance on other heating methods. Preliminary options include solar hot water heating and taking advantage of solar heat gain through highly insulated windows (R-10+) to heat the building and provide daylighting. 3. Perform life cycle cost analysis to determine if solar heating methods are cost effective 4. Prepare a cost estimate for the system if it offers a life cycle savings. Task 5: Solar Power Generation 1. Evaluate existing data on potential sunlight available for photovoltaic and other direct solar power generation systems. 2. Identify existing technologies and methods for capturing available solar power to augment or reduce reliance on other energy generation methods. 3. Perform a life cycle cost analysis to determine if solar heating methods are cost effective. 4. Prepare a cost estimate for system if it is determined to be cost effective. Task 6: Summarize and compare alternative power sources 1. Compare the life cycle cost savings of each system evaluated. 2. Compare levels of effort necessary to implement, manage and maintain the various alternative power generation systems, and determine a preferred option. 3. Evaluate the potential to expand the preferred option to other areas of the community. 4.3.2 Land Ownership Identify potential land ownership issues, including whether site owners have agreed to the project or how you intend to approach land ownership and access issues. The Kodiak Island Borough is the owner of the site. 4.3.3 Permits Provide the following information as it may relate to permitting and how you intend to address outstanding permit issues. • List of applicable permits • Anticipated permitting timeline • Identify and discussion of potential barriers No permits are required for installing a geothermal loopfield or any of the other alternative energy systems. Should there be a need for a tower for data collection that is greater than 25 feet high during the assessment process, a variance permit from the Kodiak Island Borough will be required. The permit process is approximately 2 months. Renewable Energy Fund Grant Application Round 3 AEA10-015 Grant Application Page 13 of 17 10/7/2009 4.3.4 Environmental Address whether the following environmental and land use issues apply, and if so how they will be addressed: • Threatened or Endangered species • Habitat issues • Wetlands and other protected areas • Archaeological and historical resources • Land development constraints • Telecommunications interference • Aviation considerations • Visual, aesthetics impacts • Identify and discuss other potential barriers There are no anticipated environmental or land use issues in relation to local code expected in the assessment process. Not addressed in local code are visual, aesthetic impacts; however no negative visual or aesthetic impacts are likely to occur as a result of this study. The work would be conducted in conjunction with the design of High School addition and renovation which will allow integration of solar based elements into the design of the building and can actually become a desirable feature. The ground loop system is completely buried and would not be apparent. Wind turbine configuration is anticipated to be limited to vertical axis turbines that can be integrated into parking lot light pole design or minimally obtrusive roof mounted units. 4.4 Proposed New System Costs and Projected Revenues (Total Estimated Costs and Projected Revenues) The level of cost information provided will vary according to the phase of funding requested and any previous work the applicant may have done on the project. Applicants must reference the source of their cost data. For example: Applicants Records or Analysis, Industry Standards, Consultant or Manufacturer’s estimates. 4.4.1 Project Development Cost Provide detailed project cost information based on your current knowledge and understanding of the project. Cost information should include the following: • Total anticipated project cost, and cost for this phase • Requested grant funding • Applicant matching funds – loans, capital contributions, in-kind • Identification of other funding sources • Projected capital cost of proposed renewable energy system • Projected development cost of proposed renewable energy system The project costs will not be known until the feasibility analysis is completed. 4.4.2 Project Operating and Maintenance Costs Include anticipated O&M costs for new facilities constructed and how these would be funded by the applicant. (Note: Operational costs are not eligible for grant funds however grantees are required to meet ongoing reporting requirements for the purpose of reporting impacts of projects on the communities they serve.) Not applicable for this phase. Renewable Energy Fund Grant Application Round 3 AEA10-015 Grant Application Page 14 of 17 10/7/2009 4.4.3 Power Purchase/Sale The power purchase/sale information should include the following: • Identification of potential power buyer(s)/customer(s) • Potential power purchase/sales price - at a minimum indicate a price range • Proposed rate of return from grant-funded project Not applicable 4.4.4 Project Cost Worksheet Complete the cost worksheet form which provides summary information that will be considered in evaluating the project. The Project Cost Worksheet is attached with the following note: This application is for an analysis of alternative energy sources useful for the Kodiak High School Addition and Renovation. While records of past fuel and electrical consumption are known, this information is not applicable to the alternative energy analysis. The past records apply to a building and use capacity that cannot be compared to the planned new facility. A new swimming pool came on line in the past two months and the existing campus will be increased by approximately 90, 000 sf. The existing heat plant and all existing hydronic and air handling equipment will be removed as part of the work. The analysis will thus generate estimated costs for traditional heating systems and compare them to costs for non traditional systems. The analysis will first give “order of magnitude” costs which can be verified with additional analysis, or where appropriate, installation of test apparatus to compare calculated values with actual values. SECTION 5– PROJECT BENEFIT Explain the economic and public benefits of your project. Include direct cost savings, and how the people of Alaska will benefit from the project. The benefits information should include the following: • Potential annual fuel displacement (gal and $) over the lifetime of the evaluated renewable energy project • Anticipated annual revenue (based on i.e. a Proposed Power Purchase Agreement price, RCA tariff, or cost based rate) • Potential additional annual incentives (i.e. tax credits) • Potential additional annual revenue streams (i.e. green tag sales or other renewable energy subsidies or programs that might be available) • Discuss the non-economic public benefits to Alaskans over the lifetime of the project It is not yet known what benefits may be provided by the use of alternative energy resources at this site. The proposed assessment will answer these questions for potential future benefit. Renewable Energy Fund Grant Application Round 3 AEA10-015 Grant Application Page 15 of 17 10/7/2009 SECTION 6– SUSTAINABILITY Discuss your plan for operating the completed project so that it will be sustainable. Include at a minimum: • Proposed business structure(s) and concepts that may be considered. • How you propose to finance the maintenance and operations for the life of the project • Identification of operational issues that could arise. • A description of operational costs including on-going support for any back-up or existing systems that may be require to continue operation • Commitment to reporting the savings and benefits Sustainability is not applicable in this phase of the project. Assessment will determine potential options for use of renewable resources which can then be examined for sustainability. SECTION 7 – READINESS & COMPLIANCE WITH OTHER GRANTS Discuss what you have done to prepare for this award and how quickly you intend to proceed with work once your grant is approved. Tell us what you may have already accomplished on the project to date and identify other grants that may have been previously awarded for this project and the degree you have been able to meet the requirements of previous grants. On October 6th, 2009 voters authorized the issuance of general obligation bonds to fund renovation and expansion of the Kodiak High School based on a preliminary concept derived from traditional design and construction of high school improvements. The purpose of this grant application is to supplement the high school design by funding a detailed evaluation of alternative energy systems that would ordinarily not be included in a traditional design services contract or constructed in a standard construction project. If approved, the efforts included in this grant application can be seamlessly integrated into the overall high school design and construction project. As shown in our schedule, our scope of work is intended to work with the anticipated schedule for these other efforts. Because the project was recently approved, there are no previous grant awards or accomplished work to report. SECTION 8– LOCAL SUPORT Discuss what local support or possible opposition there may be regarding your project. Include letters of support from the community that would benefit from this project. Support includes citizens concerned with taking advantage of the opportunity to incorporate energy efficiency, sustainability, and “green” building practices into the Kodiak High School expansion and renovation project. Possible opposition includes taxpayer concerns regarding the cost to the public. While renewable energy resources may create savings over time, there are many who are concerned about the immediate cost of initiating the use of the technology required for utilizing renewable energy and that the high school renovation and expansion project not overrun the budget for that purpose. Renewable Energy Fund Grant Application Round 3 AEA10-015 Grant Application Page 16 of 17 10/7/2009 SECTION 9 – GRANT BUDGET Tell us how much you want in grant funds Include any investments to date and funding sources, how much is being requested in grant funds, and additional investments you will make as an applicant. Include an estimate of budget costs by milestones using the form – GrantBudget3.doc The Kodiak Island Borough is requesting grant funds in the amount of $187,750 and providing matching funds in the amount of 129,440 for a total budget of $317,190 to perform an evaluation of geothermal, on-site wind, and solar/photovoltaic power generation potential at the Kodiak High School per the scope of work attached. The Kodiak Island Borough is providing matching funds from the design budget for the Kodiak High School Renovation and Expansion project, a project being financed with recent voter approval of approximately $76,000,000 in general obligation bonds. Kodiak Island Borough Kodiak High School Energy Analysis Scope of Work This scope is intended to describe all major tasks that would be funded by the granting agency, Alaska Energy Authority. Please review and comment as appropriate. Task 1: Baseline Information gathering 1. Develop Building Energy Analysis Model of the existing school buildings for use in describing what power is distributed through the building, where and how it is consumed. 2. Determine heating loads in the existing buildings, including the new pool building, the existing high school components and the proposed new additions. 3. Determine the electrical power demand on the campus overall, and required for the pool, existing high school components and the proposed new additions. Task 2: Geothermal Analysis 1. Drill two boreholes approx 350 feet deep and perform conductivity tests to determine the ground thermal conductivity for use in sizing a geothermal loopfield. 2. Evaluate the mechanical systems available to utilize the potential heat. 3. Determine optimal loopfield size and other physical plant components. 4. Perform life cycle cost analysis to determine the optimum heating system for the buildings. 5. Prepare cost estimate of proposed system. Task 3: Wind Generation Analysis 1. Gather available wind data for the site including existing KEA data for Near Island Bridge site (Fred Zharoff Bridge). 2. Evaluate existing data 3. Augment existing data by collecting additional data as required to evaluate system options, including installation of meteorological test tower on the existing school site. 4. Evaluate various wind power generation technologies and systems, compare likely power costs and yields and select a preferred system 5. Perform a life cycle cost analysis to determine if the preferred system offers a life cycle savings. 6. Prepare a cost estimate to implement the preferred system. Task 4: Solar Heat 1. Collect existing data for potential solar heat gain 2. Identify existing technologies and methods for capturing available solar heat to augment or reduce reliance on other heating methods 3. Perform life cycle cost analysis to determine if solar heating methods are cost effective 4. Prepare a cost estimate for the system if it offers a life cycle savings. Task 5: Solar Power Generation 1. Evaluate existing data on potential sunlight available for photovoltaic and other direct solar power generation systems. 2. Identify existing technologies and methods for capturing available solar power to augment or reduce reliance on other energy generation methods 3. Perform a life cycle cost analysis to determine if solar heating methods are cost effective. 4. Prepare a cost estimate for system if it is determined to be cost effective. Task 6: Summarize and compare alternative power sources 1. Compare the life cycle cost savings of each system evaluated 2. Compare levels of effort necessary to implement, manage and maintain the various alternative power generation systems, and determine a preferred option 3. Evaluate the potential to expand the preferred option to other areas of the community   Renewable Energy Fund Round 3 Project Cost/Benefit Worksheet   RFA AEA10-015 Application Cost Worksheet Page 1 10-7-09 Please note that some fields might not be applicable for all technologies or all project phases. The level of information detail varies according to phase requirements. 1. Renewable Energy Source The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Annual average resource availability. Not known Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel) 2. Existing Energy Generation and Usage a) Basic configuration (if system is part of the Railbelt 1 grid, leave this section blank) i. Number of generators/boilers/other Not Yet Known ii. Rated capacity of generators/boilers/other iii. Generator/boilers/other type iv. Age of generators/boilers/other v. Efficiency of generators/boilers/other b) Annual O&M cost (if system is part of the Railbelt grid, leave this section blank) i. Annual O&M cost for labor Not Yet Known ii. Annual O&M cost for non-labor c) Annual electricity production and fuel usage (fill in as applicable) (if system is part of the Railbelt grid, leave this section blank) i. Electricity [kWh] Not Yet Known ii. Fuel usage Diesel [gal] Other iii. Peak Load iv. Average Load v. Minimum Load vi. Efficiency vii. Future trends d) Annual heating fuel usage (fill in as applicable) i. Diesel [gal or MMBtu] Not Yet Known ii. Electricity [kWh] iii. Propane [gal or MMBtu] iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] vi. Other                                                              1 The Railbelt grid connects all customers of Chugach Electric Association, Homer Electric Association, Golden Valley Electric  Association, the City of Seward Electric Department, Matanuska Electric Association and Anchorage Municipal Light and Power.      Renewable Energy Fund Round 3 Project Cost/Benefit Worksheet   RFA AEA10-015 Application Cost Worksheet Page 2 10-7-09 3. Proposed System Design Capacity and Fuel Usage (Include any projections for continued use of non-renewable fuels) a) Proposed renewable capacity (Wind, Hydro, Biomass, other) [kWh or MMBtu/hr] Not yet known b) Proposed Annual electricity or heat production (fill in as applicable) i. Electricity [kWh] ii. Heat [MMBtu] c) Proposed Annual fuel Usage (fill in as applicable) i. Propane [gal or MMBtu] ii. Coal [tons or MMBtu] iii. Wood [cords, green tons, dry tons] iv. Other 4. Project Cost a) Total capital cost of new system Not yet known b) Development cost c) Annual O&M cost of new system d) Annual fuel cost 5. Project Benefits a) Amount of fuel displaced for i. Electricity Not yet known ii. Heat iii. Transportation b) Price of displaced fuel c) Other economic benefits d) Amount of Alaska public benefits 6. Power Purchase/Sales Price a) Price for power purchase/sale N/A 7. Project Analysis a) Basic Economic Analysis Project benefit/cost ratio Not yet known Payback Renewable Energy Fund Grant Round III Reconnaissance Phase 10-7-09 Reconnaissance Milestone or Task Anticipated Completion Date RE- Fund Grant Funds Grantee Matching Funds Source of Matching Funds: Cash/In-kind/Federal Grants/Other State Grants/Other TOTALS Project scoping and contractor solicitation March 1, 2010 $ $10,000 Cash $10,000 BIM modeling July 1, 2010 $ $108,440 Cash $108,440 Cost of energy and market analysis July 15, 2010 $6350 $ $6,350 Resource identification and analysis July 30, 2010 $6350 $ $6,350 Land use permitting and environmental analysis July 30, 2010 $6350 $ $6,350 Preliminary design analysis and cost Sept 1, 2010 $6350 $ $6,350 Simple economic analysis Sept 15, 2010 $6350 $ $6,350 Final Reconnaissance report and recommendations Sept 30, 2010 $6350 $ $6,350 $ $ $ $ TOTALS $38,100 118,440 $156,540 Budget Categories: Direct Labor & Benefits $ $10,000 Cash $10,000 Travel & Per Diem $ $10,000 Cash $10,000 Equipment $ $ $ Materials & Supplies $ $ $ Contractual Services $38,100 $98,440 Cash $136,540 Construction Services $ $ $ Other $ $ $ TOTALS $38,100 $118,440 $156,540 Renewable Energy Fund Grant Round III Feasibility Phase 10-7-09 Feasibility Milestone or Task Anticipated Completion Date RE- Fund Grant Funds Grantee Matching Funds Source of Matching Funds: Cash/In-kind/Federal Grants/Other State Grants/Other TOTALS Project Scoping and Solicitation Sept 30, 2010 $8,675 $5,000 Cash $13,675 Identification of land and regulatory issues Oct 15, 2010 $8,675 $ $8,675 Permitting and environmental analysis Oct 30, 2010 $8,675 $ $8,675 Detailed energy resource analysis December 21, 2010 $71,560 $ $71,560 Detailed analysis of energy costs and markets Jan 5, 2011 $8,675 $2,000 Cash $10,675 Assessment of alternatives Jan 5, 2011 $8,675 $ $8,675 Conceptual design analysis and cost estimate Jan 15, 2011 $8,675 $2,000 Cash $10,675 Detailed economic and financial analysis Jan 15, 2011 $8,675 $ $8,675 Conceptual operating plans Jan 15, 2011 $8,675 $ $8,675 Final Report and Recommendations Jan 30, 2011 $8,675 $2,000 Cash $10,675 TOTALS $149,650 11,000 $160,650 Budget Categories: Direct Labor & Benefits $ $5,000 Cash $5,000 Travel & Per Diem $ $6,000 Cash $6,000 Equipment $ $ $ Materials & Supplies $ $ $ Contractual Services $78,090 $ $78,090 Construction Services $71,560 $ $71,560 Other $ $ $ TOTALS $149,650 $11,000 $160,650 Applications should include a separate worksheet for each project phase (Reconnaissance, Feasibility, Design and Permitting, and Construction)- Add additional pages as needed 1 Introducedby Manager Gifford Requested by KIBAssembly 2 Draftedby GrantWriter 3 Christiansen 4 Introducedon 11052009 5 Amendedon 11052009 Adoptedon 11052009 6 7 KODIAKISLANDBOROUGH 8 RESOLUTION NO FY201017 9 10 A RESOLUTIONOFTHE ASSEMBLYOFTHE KODIAK ISLANDBOROUGHAUTHORIZING 11 THESUBMISSION OFA GRANTAPPLICATION TOTHE ALASKAENERGY AUTHORITY 12 RENEWABLE ENERGYFUNDGRANTRECOMMENDATION PROGRAMROUNDIII FOR A 13 RESOURCE ASSESSMENT ANDFEASIBILITYSTUDY FORTHEUSE OFRENEWABLE 14 ENERGYRESOURCESIN THEKODIAK HIGH SCHOOL 15 16 WHEREAS On October 6 2009votersauthorized the Kodiak Island Borough to issuegeneral 17 obligationbondstofinance the renovation andexpansionof the KodiakHighSchooland 18 19 WHEREAS staffis movingforward withtheplanningphase oftherenovation andexpansion 20 projectand 21 22 WHEREAS it isinthebestinterestof thecommunityto explorethefeasibility ofemploying 23 alternativeenergyuse inthehighschoolaspartof therenovation andexpansionprojectinorder 24 toreducethecostofenergy whichwillprovideTongtermsavingsto taxpayers andreducethe 25 harmfuleffectsof energy useontheenvironment and 26 27 WHEREAS theAlaskaEnergyAuthorityhasannounced theRenewable EnergyFundGrant 28 RecommendationProgramRound III whichincludesfundingforreconnaissanceandfeasibility 29 studiesforuseofrenewableresources and 30 31 WHEREAS theKodiakIslandBorough will providematching fundstowardthis projectinthe 32 formof inkind contributionwithinthe project budget 33 34 NOWTHEREFOREBEITRESOLVED BY THEASSEMBLYOFTHE KODIAKISLAND 35 BOROUGHthat anapplicationbe submittedtothe Alaska EnergyAuthorityRenewableEnergy 36 FundGrant Recommendation ProgramRoundIII forresource assessment andfeasibility 37 analysesof thepotential useof therenewableenergy resourcesinthe KodiakHigh School 38 BE ITFURTHERRESOLVED thattheBoroughManageris authorizedtonegotiate andexecute 39 anyandall documentsrequiredforgrantingand managingfundsonbehalfof the KodiakIsland 40 Borough 41 42 43 44 KodiakIslandBorough ResolutionNo FY201017 Page 1of 2 45 46 47 48 49 50 51 52 53 54 ATTEST 55 56 57 58 ADOPTED BY THEASSEMBLYOFTHEKODIAKISLANDBOROUGH THISFIFTHDAYOFNOVEMBER 2009 NovaMJavierMMCB i roughClerk KODIAKISLAND BOROUGH Jero eMSelbyBor KodiakIslandBorough ResolutionNoFY2010 17 Page2of 2 JENSEN YORBA LOTT, Inc. DESIGN SERVICES PROPOSAL SUMMARY Project: KHS ENERGY ANALYSIS GRANT SERVICES FEE TYPE EXPENSES TAX TOTAL Task 1 BIM Modelling $97,440 Lump sum $0 $97,440 Task 1 $38,104 Lump sum $0 $38,104 Task 2 $18,720 Lump sum $0 $18,720 Task 2 Test Boring $58,320 Lump sum $58,320 Task 3 $9,490 Lump sum $0 $9,490 Task 3 Test Tower $13,240 Lump sum $0 $13,240 Task 4 $17,540 Lump sum $0 $17,540 Task 5 $15,620 Lump sum $0 $15,620 Task 6 $16,720 Lump Sum $0 $16,720 TOTAL $285,194 energy analysis fee.xls-SUM 3 11/9/2009 JENSEN YORBA LOTT, Inc. DESIGN SERVICES PROPOSAL TASK 1 BIM MODELING Project:KHS ENERGY ANALYSIS GRANT Arch/LArch/IDes STAFF: PMgr III II I Intern Drft AA TOTAL $140 $120 $105 $95 $90 $80 $70 ARCHITECTURE: Project Management 8 Disc Coor/Doc Review 8 24 BIM model of exist bldg 20 240 Consultant Coordination 24 24 Subtotal (hours) 60 00002880 348 Subtotal (dollars) $8,400 $0 $0 $0 $0 $23,040 $0 $31,440 CONSULTANTS: Structural Engineering BIM $20,000 Mechanical Engineering BIM $20,000 Electrical Engineering BIM $20,000 Subtotal $60,000 Overhead/Profit 10%$6,000 Total $66,000 TOTAL PRE-DESIGN SERVICES FEE $97,440 energy analysis fee.xls-Task 1 BIM 5 11/9/2009 JENSEN YORBA LOTT, Inc. DESIGN SERVICES PROPOSAL TASK 1 BASELINE INFORMATION GATHERING Project:KHS ENERGY ANALYSIS GRANT Arch/LArch/IDes STAFF: PMgr III II I Intern Drft AA TOTAL $140 $120 $105 $95 $90 $80 $70 ARCHITECTURE: Project Management 10 Agency coordination 16 Report and recommendations 24 Subtotal (hours) 50 000000 50 Subtotal (dollars) $7,000 $0 $0 $0 $0 $0 $0 $7,000 CONSULTANTS: Energy consultant $24,276 Mechanical Engineering $2,000 Electrical Engineering $2,000 Subtotal $28,276 Overhead/Profit 10%$2,828 Total $31,104 TOTAL TASK 1 SERVICES FEE $38,104 energy analysis fee.xls-task 1 6 11/9/2009 JENSEN YORBA LOTT, Inc. DESIGN SERVICES PROPOSAL TASK 2 GEOTHERMAL ANALYSIS Project:KHS ENERGY ANALYSIS GRANT Arch/LArch/IDes STAFF: PMgr III II I Intern Drft AA TOTAL $140 $120 $105 $95 $90 $80 $70 ARCHITECTURE: Project Management 4 Consultant coordination 4 Subtotal (hours)8000000 8 Subtotal (dollars) $1,120 $0 $0 $0 $0 $0 $0 $1,120 CONSULTANTS: energy engineering $12,000 Electrical Engineering $1,000 Mechanical Engineer $1,000 civil engineer $2,000 Subtotal $16,000 Overhead/Profit 10%$1,600 Total $17,600 TOTAL TASK 2 SERVICES FEE $18,720 energy analysis fee.xls-task 2 analysis 7 11/9/2009 JENSEN YORBA LOTT, Inc. DESIGN SERVICES PROPOSAL TASK 2 GEOTHERMAL ANALYSIS Project:KHS ENERGY ANALYSIS GRANT Arch/LArch/IDes STAFF: PMgr III II I Intern Drft AA TOTAL $140 $120 $105 $95 $90 $80 $70 ARCHITECTURE: Project Management 4 Consultant coordination 4 Subtotal (hours)8000000 8 Subtotal (dollars) $1,120 $0 $0 $0 $0 $0 $0 $1,120 CONSULTANTS: two boreholes 350 ft ea $24,500 partial borehole casing $2,000 1" loop and grout backfill $10,500 Thermal conductivity tests $5,000 Misc well test expensen $10,000 Subtotal $52,000 Overhead/Profit 10%$5,200 Total $57,200 TOTAL TASK 2 SERVICES FEE $58,320 energy analysis fee.xls-task 2 test boring 8 11/9/2009 JENSEN YORBA LOTT, Inc. DESIGN SERVICES PROPOSAL TASK 3 WIND GENERATION ANALYSIS Project:KHS ENERGY ANALYSIS GRANT Arch/LArch/IDes STAFF: PMgr III II I Intern Drft AA TOTAL $140 $120 $105 $95 $90 $80 $70 ARCHITECTURE: Project Management 4 Consultant coordination 4 agnecy coordination 4 Subtotal (hours) 12 000000 12 Subtotal (dollars) $1,680 $0 $0 $0 $0 $0 $0 $1,680 CONSULTANTS: Structural Engineering $1,000 Energy Engineering $5,100 Electrical Engineering $1,000 Subtotal $7,100 Overhead/Profit 10%$710 Total $7,810 TOTAL TASK 3 SERVICES FEE $9,490 energy analysis fee.xls-task 3 9 11/9/2009 JENSEN YORBA LOTT, Inc. DESIGN SERVICES PROPOSAL TASK 3 WIND GENERATION ANALYSIS Project:KHS ENERGY ANALYSIS GRANT Arch/LArch/IDes STAFF: PMgr III II I Intern Drft AA TOTAL $140 $120 $105 $95 $90 $80 $70 ARCHITECTURE: Project Management 4 Consultant coordination 4 agnecy coordination 8 Subtotal (hours) 16 000000 16 Subtotal (dollars) $2,240 $0 $0 $0 $0 $0 $0 $2,240 CONSULTANTS: Meterological Test Tower $10,000 Subtotal $10,000 Overhead/Profit 10%$1,000 Total $11,000 TOTAL TASK 3 SERVICES FEE $13,240 energy analysis fee.xls-task 3 test tower 10 11/9/2009 JENSEN YORBA LOTT, Inc. DESIGN SERVICES PROPOSAL TASK 4 SOLAR HEAT ANALYSIS Project:KHS ENERGY ANALYSIS GRANT Arch/LArch/IDes STAFF: PMgr III II I Intern Drft AA TOTAL $140 $120 $105 $95 $90 $80 $70 ARCHITECTURE: Project Management 4 Consultant coordination 8 conceptual design 16 40 Product Research 8 Subtotal (hours) 36 40 00000 76 Subtotal (dollars) $5,040 $4,800 $0 $0 $0 $0 $0 $9,840 CONSULTANTS: Mechanical Engineering $1,000 Electrical Engineering $1,000 Energy Engineering $5,000 Subtotal $7,000 Overhead/Profit 10%$700 Total $7,700 TOTAL CONSTRUCTION DOCUMENT SERVICES FEE $17,540 energy analysis fee.xls-task 4 11 11/9/2009 JENSEN YORBA LOTT, Inc. DESIGN SERVICES PROPOSAL TASK 5 SOLAR POWER GENERATION ANALYSIS Project:KHS ENERGY ANALYSIS GRANT Arch/LArch/IDes STAFF: PMgr III II I Intern Drft AA TOTAL $140 $120 $105 $95 $90 $80 $70 ARCHITECTURE: Project Management 4 Consultant Coordination 8 Conceptual Design 16 24 Product Research 8 Subtotal (hours) 36 24 00000 60 Subtotal (dollars) $5,040 $2,880 $0 $0 $0 $0 $0 $7,920 CONSULTANTS: Mechanical Engineering $1,000 Electrical Engineering $1,000 Energy Engineering $5,000 Subtotal $7,000 Overhead/Profit 10%$700 Total $7,700 TOTAL BIDDING AND NEGOTIATION SERVICES FEE $15,620 energy analysis fee.xls-task 5 12 11/9/2009 JENSEN YORBA LOTT, Inc. DESIGN SERVICES PROPOSAL TASK 6 COMPARATIVE SUMMARY AND ANALYSIS Project:KHS ENERGY ANALYSIS GRANT Arch/LArch/IDes STAFF: PMgr III II I Intern Drft AA TOTAL $140 $120 $105 $95 $90 $80 $70 ARCHITECTURE: Project Management 4 Cunsultant Coordination 8 Draft Analysis Report 888 Review meetings 8 Final Analysis Report 84 Subtotal (hours) 36 0008012 56 Subtotal (dollars) $5,040 $0 $0 $0 $720 $0 $840 $6,600 CONSULTANTS: Civil Engineering 500 Structural Engineering 500 Mechanical Engineering 1000 Electrical Engineering 1000 Energy engineering 6200 Subtotal $9,200 Overhead/Profit 10%$920 Total $10,120 TOTAL CONSTRUCTION ADMINISTRATION SERVICES FEE $16,720 energy analysis fee.xls-task 6 13 11/9/2009 Alaska Energy Engineering LLC Fee Proposal 25200 Amalga Harbor Road Tel/Fax: 907.789.1226 Juneau, Alaska 99801 alaskaenergy@earthlink.net Kodiak Island Borough Kodiak High School Alternative Energy Feasibility Analysis Engineering Services Qty Unit Unit Cost Total Task1: Baseline Information Gathering Develop baseline energy anaysis model 240 hr $102 $24,480 Building optimization; envelope, HVAC, lighting, etc. 150 hr $102 $15,300 Determine heating loads 4 hr $102 $408 Determine electric power use and demand 4 hr $102 $408 $40,596 Task 2: Geothermal Analysis Test boreholes Drill two boreholes 700 lnft $35 $24,500 Casing 60 lnft $25 $1,500 Install 1" HDPE loop and backfill with groute 700 lnft $10 $7,000 Thermal conductivity test equipment 1 ea $2,000 $2,000 Borehole and thermal conductivity engineering support 40 hr $102 $4,080 GSHP System Conceptual Design and Evaluation 80 hr $102 $8,160 Loopfield optimization 8 hr $102 $816 Energy and life cycle cost analysis 40 hr $102 $4,080 Cost estimate 2 hr $102 $204 $52,340 November 5, 2009 Task 3: Wind Generation Analysis Gather data 8 hr $102 $816 Evaluate data 8 hr $102 $816 Additional data, test tower Tony?? Evaluate wind power technologies; conceptual design 24 hr $102 $2,448 Energy and life cycle cost analysis 24 hr $102 $2,448 Cost estimate 2 hr $102 $204 $6,732 Task 4: Solar Heat Gather and evaluate existing data 8 hr $102 $816 Evaluate solar heating technologies; conceptual design 24 hr $102 $2,448 Energy and life cycle cost analysis 60 hr $102 $6,120 Cost estimate 4 hr $102 $408 $9,792 Task 5: Solar Power Generation Gather and evaluate existing data 8 hr $102 $816 Evaluate solar power technologies; conceptual design 24 hr $102 $2,448 Energy and life cycle cost analysis 24 hr $102 $2,448 Cost estimate 4 hr $102 $408 $6,120 1 Task 6: Comparative Summary Comparitive analysis including sensitivity analysis 24 hr $102 $2,448 Comparative analysis of effort to own each option 16 hr $102 $1,632 Evaluate expansion of technology to community 16 hr $102 $1,632 Draft and final report 32 hr $102 $3,264 $8,976 Summary Grant Request Totals Task1: Baseline Information Gathering $40,596 Task 2: Geothermal Analysis $52,340 $52,340 Task 3: Wind Generation Analysis $6,732 $6,732 Task 4: Solar Heat $9,792 $9,792 Task 5: Solar Power Generation $6,120 $6,120 Task 6: Comparative Summary $8,976 $8,976 Totals $83,960 $124,556 33% 67% 40,596$ Grant In-kind 40,596$ 2