HomeMy WebLinkAboutAEA_COK_Attachment 2[1]TimelineAttachment 2 - Tactical Garbage to Energy Refinery (TGER) Project
Months
TGER Project Phase 1 2 3 4 5 6 7 8 9 10 11 12
Reconnaissance and Feasibility
Project Scoping.
Collect Wastestream Data.
Collect Utility Data and Cost.
Analyze Data to Determine Scale, Cost &
Feasibility.
Complete Phase.
Design
Run Data Through the Material and
Energy Balance Model.
Run Data Through the Life Cycle Cost
Model.
Run Data Through the Carbon Footprint
Model.
Design an Appropriately Scaled System.
Update Models.
Apply for and Obtain Permits.
Resolution of System Location and Land
Use.
Update Economic and Financial Analysis.
Negotiate Power Sales Agreements.
Finalize System Design.
Finalize Business and Operational Plan.
Construction & Installation
Confirm All Design & Feasibility
Requirements Complete.
Obtain Approvals to Proceed with
Construction and Installation Phase.
Develop Detailed Construction and
Installation Schedule.
System Installation.
Integration and Testing.
Commissioning and Start-Up.
Operational Testing and Acceptance.