Loading...
HomeMy WebLinkAboutAEA_COK_Attachment 2[1]TimelineAttachment 2 - Tactical Garbage to Energy Refinery (TGER) Project Months TGER Project Phase 1 2 3 4 5 6 7 8 9 10 11 12 Reconnaissance and Feasibility Project Scoping. Collect Wastestream Data. Collect Utility Data and Cost. Analyze Data to Determine Scale, Cost & Feasibility. Complete Phase. Design Run Data Through the Material and Energy Balance Model. Run Data Through the Life Cycle Cost Model. Run Data Through the Carbon Footprint Model. Design an Appropriately Scaled System. Update Models. Apply for and Obtain Permits. Resolution of System Location and Land Use. Update Economic and Financial Analysis. Negotiate Power Sales Agreements. Finalize System Design. Finalize Business and Operational Plan. Construction & Installation Confirm All Design & Feasibility Requirements Complete. Obtain Approvals to Proceed with Construction and Installation Phase. Develop Detailed Construction and Installation Schedule. System Installation. Integration and Testing. Commissioning and Start-Up. Operational Testing and Acceptance.